ROCKWOOL plant for wool insulation production (Elabuga, Russia)
The 4th Russian plant of ROCKWOOL, located in the Republic of Tatarstan in the
territory of the special economic zone "Alabuga" (Elabuga region), was
inaugurated on April 4, 2012. The Rockwool Group has invested $ 150 million in
this production line.
The volume of production is 110 thousand tons per year with the possibility of
installing a second production line, which will double the existing capacity. The
plant produces an innovative product of ROCKWOOL - Light Butts SCANDIC, the
first stone wool insulation to be compressed.
Gross Building area – 48,500 m2
Role in the project – Project Engineer from Client (2010-2012)
ROCKWOOL Technical Insulation Centre (Bohumin, Czech Republic)
Rockwool, a leading world producer of mineral wool insulation, has invested one billion
crowns in Bohumin. The Bohumin plant thus became a new production and logistics centre
for the technical insulation of the entire Rockwool Group for Central and Eastern Europe.
Much of the investment was used to build 3 production lines for technical insulation. The
new lines are linked to the primary line, with an annual capacity of 65,000 tones, producing
stone mineral wool as a semi-finished product. The project also included the construction
of buildings for storage, handling and shipping of products. In Bohumin they also revitalized
the inner area of ​​the plant and strengthened the areas for outdoor warehouses.
The investment has further helped to improve the waste management area. Stone wool is a
fully recyclable material and the installation of new equipment has significantly increased
the proportion of production waste that is recycled back to the production in the form of
briquettes.
Gross Building area – 30,000 m2
Role in the project – Project Manager from Client (2013-2014)
Aviation Industrial Plants Sukhoi (Moscow region, Russia)
The reconstruction of the mechanical workshop for the assembly production of the
components of the medium-range aircraft was carried out. As a result, it was possible
to create a modern production site with highly efficient jobs.
The commissioning of the reconstructed workshop almost completes the
implementation of the action plan to expand the production of civil aircraft and bring
production volumes to the planned level.
A deep reconstruction and technical modernization were carried out here, which
allowed introducing the latest technologies into production. High-capacity machines
and machining centres are installed in the workshops, and lean manufacturing
technologies are used as part of the production system. As part of the modernization
of production, the construction of an automated workshop for galvanic coatings and a
central factory laboratory is executed. The company switched to 3D-modeling and no
paper technology.
Gross building area – 74,500 m2
Role in the project – Design Manager from Designer (2005-2007)
Shopping Centre "MEGA Dybenko" redevelopment 1st phase (Saint-Petersburg, Russia)
The 1st phase of Redevelopment program aimed to remove existing physical barriers
between shopping mall and IKEA store, upgrade the internal design, improve customer
convenience in terms of access, offer and services.
IKEA store integration used all Integration principles and a specially developed concept
solution to make new internal IKEA trade dress an integral part of the mall gallery,
driving visitation to IKEA store and ensuring complete and seamless customer
experience.
The project aimed to address the following components: remove physical barriers
between IKEA, community and MEGA, open the new entrance to IKEA/ MEGA with
direct pedestrian bridge connection to residential area, provide fast access, drive
visitation to IKEA and ensure full range of shopping categories and services for
families, provide IKEA with opportunities for inspiring range presentation, upgrade
IKEA food offer with new concept of the restaurant, upgrade all customer touchpoints
for seamless customer experience, introduce new increased and upscaled family
fashion offer with flagship stores (H&M, Reserved, etc), introduce new generation F&B
offer for leisure dining, arrange physical community space with necessary elements for
emotional engagement with “home feeling” for people.
Gross Building area – 38,580 m2
Role in the project – Construction Project Manager from Client (2017-2019)
Standalone IKEA Store on Kashirskoje highway (Moscow, Russia)
The expected development of the land plot will consist of a Large size IKEA standard
store of 38,500 m2 including a glass-house together with 1,530 parking spaces of
which 800 spaces shall be located under the raised building.
This shall be the first stand alone IKEA store in Russia.
The permit documentation is developed and approved by authorities.
The project is on hold due to company expansion priority.
Gross Building area – 38,500 m2
Role in the project – Construction Project Manager from Client (2016-2017)
A-class Business Centre "Renaissance Plaza" (Saint-Petersburg, Russia)
Renaissance Plaza, one of the largest “A” class business centre in St. Petersburg,
Russia, is located in the historical part of the city, at the very center of business life, at
69 – 71, Marata street. The business centre was designed by one of the best
architectural and construction companies in the world of Gensler-London, with vast
experience in creating an effective business environment. An impressive 8-story
building was created using high architectural and state-of-the-art technological
solutions. Elegant and sophisticated interiors, a luxurious hall decorated with natural
marble give the complex an exquisite style, emphasizing the atmosphere of success.
Renaissance Plaza consists of three buildings, united by a landscaped courtyard. A
fitness center with panoramic city views, a sauna with a cozy relaxation area and a
spacious cafe will delight our tenants. Extensive underground parking will easily solve
the parking issue relevant to the city center.
Gross Building area – 36,300 m2
Number of floors – 8
Role in the project – Design Manager from Designer, Author Supervisor (2006-2007)
Hotel Ibis Kazan Centre 3* (Kazan, Russia)
Ibis Kazan Centre is the first European-class 3-star chain hotel in Kazan. It is distinguished by its
advantageous location - in the central part of the city, next to the famous Bauman Street, a five-
minute walk from the Kazan Kremlin, a UNESCO World Heritage Site, and the historic city
center. The hotel meets all the international standards and offers all the services required for a
modern hotel.
The highlight of the hotel, distinguishing it from other Ibis hotels, is the expanded concept of
the restaurant Sud et Cie.
The hotel offers 155 comfortable rooms of an updated standard: LCD TV, satellite TV, wireless
and high-speed Internet access, air conditioning, direct dial telephone. The hotel provides
deluxe rooms, standard for disabled people. Ibis Kazan Centre also offers pet-friendly
accommodation. The hotel also has a Rendez Vouz bar, 3 meeting rooms and secured
underground parking.
Gross Building area – 6,600 m2
Number of floors – 5
Role in the project – Design Manager from Designer (2006-2007)
The Kazan State University reconstruction (Kazan, Russia)
The project is provided for the reconstruction of the Kazan State University, which
celebrated its 200th anniversary in 2004.
The project scope consisted of restoration works, electrical and engineering systems
upgrade, infrastructure, access roads, landscaping for the faculty of astronomy,
physical laboratories, the mechanical engineering faculty and the department of
geometry. In addition, the reconstruction of the musical and philological faculties of
the Kazan State Pedagogical University was carried out.
Reconstruction of facades, windows, doors, floors and all existing architectural
elements of the university and faculty premises was carried out with the maximum
preservation of the historical appearance of the building and in accordance with the
requirements of the cultural heritage protection authorities.
Gross Building area – 39,700 m2
Role in the project – Civil Works Lead, Cost Manager from GC (2003-2004)
World Kazan Universiade Games (Kazan, Russia)
The 2013 Summer Universiade, officially known as the XXVII Summer Universiade, was
held in the city of Kazan, Russia, the most northerly city ever to host a Summer
Universiade. Over 10,400 university athletes from 162 countries participated in 13
mandatory and 14 optional sports, making the 2013 Universiade the biggest ever in the
history of the event. For the first time in history a Cultural Universiade was also included,
with many festivals and shows held simultaneously with the sporting events. The
Universiade was organized by the International University Sports Federation (FISU) and by
the authorities of the Republic of Tatarstan.
Universiade Village – 274,000 m2
Rowing Centre – 14,000 m2
Tennis Academy – 19,400 m2
Kazan Volleyball Centre – 13,000 m2
Role in the project – Project Manager from Client (2009-2010)
XXVII World Summer Universiade (Kazan, Russia)
A total of 27 new stadiums were built as venues for the event. The Games
used 64 venues in all, 36 of which were constructed specifically for the 2013
Summer Universiade. The 64 venues were concentrated in 4 zones across the
city of Kazan. These included the area of Pobeda Avenue with the Kazan Arena,
the Aquatics Palace of Water Sports, the Combat Sports (Boxing) Palace, and
the arena of Orenburgsky Trakt where the Universiade Village was located, as
well as the Tennis Academy and Gymnastics Palace. In addition, many sports
venues for training functions were located elsewhere in Zarechye (Novo-
Savinovsky and Airbuilders districts), and some of them in downtown Kazan.
Combat sports palace «Ak Bars» – 17,000 m2
Swimming pool «Burevestnik» - 12,300 m2
Sport complex «Bustan» - 3,800 m2
Sport complex «Zilant» – 6,400 m2
Role in the project – Project Manager from Client (2009-2010)
XXVII World Summer Universiade (Kazan, Russia)
The 2013 Summer Universiade opening and closing ceremonies were held on
6th and 17th July 2013, with country leaders in attendance accordingly. The
ceremonies took place in the new Kazan Arena stadium with a seating capacity
of 45,000 people. In the handover, the Korean branch of the boy group EXO
performed their hit song "Wolf", the title track from their first full-length album
XOXO, at the closing ceremony while Russian artists and popstars made a huge
shows with many decorations and special effects at both ceremonies.
Swimming pool «Olimp» - 11,000 m2
Stadium «Olimp» - 8,200 m2
Sport complex «Olimpijetz» – 3,800 m2
Boxing Centre – 15,200 m2
Role in the project – Project Manager from Client (2009-2010)
XXVII World Summer Universiade (Kazan, Russia)
For the first time in the history of the Universiades, twenty-seven sports were
included in Kazan 2013.
The optional sports chosen were badminton, beach volleyball, belt wrestling,
boxing, canoeing, chess, field hockey, rugby sevens, sambo, shooting, synchronized
swimming, rowing, weightlifting, and wrestling. Of the optional sports chosen, belt
wrestling, boxing, sambo, rugby sevens, and synchronized swimming made their
debut at the 2013 Summer Universiade.
Swimming pool «Aktcharlak» - 9,400 m2
Shooting Centre «Svijaga» - 5,500 m2
Sport complex «Vatan» - 5,600 m2
Sport complex «Moskva» - 5,150 m2
Role in the project – Project Manager from Client (2009-2010)
XXVII World Summer Universiade (Kazan, Russia)
Some 1,200 journalists from 170 countries were assisted by the Main Press
Center (MPC), the International Broadcasting Center (IBC) at Kazan Arena, and
the International Info Center at Universiade Village.
The games were televised by Eurosport as well as by 12 other international and
3 Russian TV networks.
After the Universiade, the venues and stadiums were to be consigned over to
high schools and universities of Kazan, to children and youth sport schools, and
to Olympic reserve schools. The Universiade Village was to be integrated into the
main campus of the Federal University system.
Sport complex «Tezjutsche» - 6,200 m2
Sport complex «Triumph» - 5,150 m2
Sport complex «Forward» - 3,100 m2
Sport complex «Miras» - 6,200 m2
Role in the project – Project Manager from Client (2009-2010)
Children‘s Railway (Kazan, Russia)
A children's railway or pioneer railway is an extracurricular educational institution,
where teenagers learn railway professions. This phenomenon originated in the USSR
and was greatly developed in Soviet times. The world's first children's railway was
opened in Gorky Park, Moscow, in 1932. At the breakup of the USSR, 52 children's
railways existed in the country.
Many children's railways are still functioning in post-Soviet states and Eastern
European countries. Many exhibit railway technology not seen anymore on the main
lines and can be seen as heritage railways.
Kazan Children’s Railway in the city of Kazan with a length of 4,3 km, located in the
Lebyazhje forest park between the village of Zalesnij and the Izumrudnoje lake in the
village of Judino. The railway has 2 stations (Molodezhnaja, Emerald) and 2 landing
platforms (Sportivnaja, Birch Grove). Track is 750 mm. It is equipped by 2 diesel
locomotives (TU7A-3344 and TU10-022) and 4 wagons manufactured by
Metrovagonmash of models 20.0017 and 20.0018. Not far in Zalesnoje there is a
railway technical college, which is basis for the Railways.
Railway length – 4.3 km
Role in the project – Design Manager from Designer, Author Supervision (2006-2007)
Truck Service Stations (Kazan, Elabuga, Nizhnij Novgorod, Samara, Tyumen, Krasnodar, Russia)
The new truck service stations are located along the federal highways, close to the big
cities Kazan, Elabuga, Nizhnij Novgorod, Samara, Tyumen, Krasnodar. The stations are
equipped with all necessary equipment for maintenance and repair of commercial
vehicles. The sales department presents a wide selection of new and used motor
vehicles - from small tonnage trucks and truck tractors to buses. Buyers are able to get
expert advice and choose a vehicle that meets all the requirements.
For the convenience of customers, there is a cozy lounge where they can have a meal
and spend time waiting for the work to be completed in a relaxed atmosphere.
The service area of ​​the new stations include 18 posts each. Service station capacity -
up to 50 trucks per day each.
Gross building area – 2,500 m2 each
Role in the project – Project Director from Client (2008-2009)
Residential complex "Kazan XXI Century" - 1st phase (Kazan, Russia)
The comfortable complex "Kazan XXI Century" fully lives up to its name. Several buildings
were erected using advanced technologies forming a separate micro district with
developed urban infrastructure.
For the construction of the residential complex, the territory of the former airfield was
chosen. The place is excellent, spacious and free from contaminations. This is a quiet and
peaceful place.
City center could be reached in just ten minutes, both by personal and public transport.
The nearest metro station "Gorki" is four kilometers away from the complex.
The complex is provided with necessary infrastructure. On the territory there are kinder-
gardens and a comprehensive school, playing and sports grounds, necessary for organizing
leisure activities. In addition, well-developed recreation areas, walking and bicycle paths,
green areas for picnics and outdoor recreation, as well as parking lots for residents of the
complex and its guests, are developed.
Gross Building area – 250,000 m2
Scope – 9 residential blocks, school, kinder-garden
Role in the project – Design Manager from Designer, Author Supervision (2004-2006)
Mixed-use “M-2 Aviastroitelnij district" (Kazan, Russia)
"M-2 Aviastroitelnij district" is a residential mixed-use economy-class complex with its
business and administrative centre with a population of 20 thousand people. 3 kinder-
gardens, school with swimming pool, several multi-level parking decks are built in this
district. The residential complex is built on the site of old emergency buildings which
were demolished for new modern blocks.
Gross Building area – 450,000 m2
Scope – 14 mixed-use residential blocks, school with swimming pool, kinder-garden
Role in the project – Design Manager from Designer, Author Supervision (2004-2006)
Medical building for Balkish sanatorium (Kazan, Russia)
The medical building is designed between the dining area and the pool
connected with galleries in a single complex. The modern medical base that
meets international standards is designed to treat diseases of:
cardio-vascular system;
musculoskeletal system;
nervous system;
genitourinary system;
respiratory organs;
digestive organs.
Gross Building area – 900 m2
Role in the project – Design Manager from Designer, Author Supervisor (2005)

Weitere Àhnliche Inhalte

Ähnlich wie Project portfolio Rinat Sakhipov

B-Club | Investment Opportunities 1Q 2016 | Section II
B-Club | Investment Opportunities 1Q 2016 | Section IIB-Club | Investment Opportunities 1Q 2016 | Section II
B-Club | Investment Opportunities 1Q 2016 | Section IIBillion Estate
 
Energy efficient apartment hotel in sochi(en)
Energy efficient apartment hotel in sochi(en)Energy efficient apartment hotel in sochi(en)
Energy efficient apartment hotel in sochi(en)Ecoestate
 
Innopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaInnopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaDerrick Staten
 
CV+PORTFOLIO_Pelayo HernĂĄndez Torres
CV+PORTFOLIO_Pelayo HernĂĄndez Torres CV+PORTFOLIO_Pelayo HernĂĄndez Torres
CV+PORTFOLIO_Pelayo HernĂĄndez Torres Pelayo HernĂĄndez Torres
 
Design of the presentation for the architecture bureau DPM
Design of the presentation for the architecture bureau DPMDesign of the presentation for the architecture bureau DPM
Design of the presentation for the architecture bureau DPMLidia Dranik
 
Georgi_Bibin_Portfolio
Georgi_Bibin_PortfolioGeorgi_Bibin_Portfolio
Georgi_Bibin_PortfolioGeorge Bibin
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproYaroslav Yaroshenko
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamEhab Abdelmoneam
 
2015 Ahmed Kamal -Experience
2015 Ahmed Kamal -Experience2015 Ahmed Kamal -Experience
2015 Ahmed Kamal -ExperienceAhmed Kamal
 
WorkSamples
WorkSamplesWorkSamples
WorkSamplesAndreia Gao
 
Russian engineering company to invest in - our company looking for investors
Russian engineering company to invest in - our company looking for investorsRussian engineering company to invest in - our company looking for investors
Russian engineering company to invest in - our company looking for investorsMaxim Gavrik
 
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČ
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČĐ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČ
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČVeeRoute
 
B-Club | Investment Opportunities 1Q 2016 | Section I
B-Club | Investment Opportunities 1Q 2016 | Section IB-Club | Investment Opportunities 1Q 2016 | Section I
B-Club | Investment Opportunities 1Q 2016 | Section IBillion Estate
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural PortfolioHammad Haroon
 
AMEY CV & PORTFOLIO_2015-0909_web Q
AMEY CV & PORTFOLIO_2015-0909_web QAMEY CV & PORTFOLIO_2015-0909_web Q
AMEY CV & PORTFOLIO_2015-0909_web QAmey Kandalgaonkar
 
Zvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic
 

Ähnlich wie Project portfolio Rinat Sakhipov (20)

%100
%100%100
%100
 
B-Club | Investment Opportunities 1Q 2016 | Section II
B-Club | Investment Opportunities 1Q 2016 | Section IIB-Club | Investment Opportunities 1Q 2016 | Section II
B-Club | Investment Opportunities 1Q 2016 | Section II
 
Energy efficient apartment hotel in sochi(en)
Energy efficient apartment hotel in sochi(en)Energy efficient apartment hotel in sochi(en)
Energy efficient apartment hotel in sochi(en)
 
Innopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of RussiaInnopolis: The Future IT Capital of Russia
Innopolis: The Future IT Capital of Russia
 
CV+PORTFOLIO_Pelayo HernĂĄndez Torres
CV+PORTFOLIO_Pelayo HernĂĄndez Torres CV+PORTFOLIO_Pelayo HernĂĄndez Torres
CV+PORTFOLIO_Pelayo HernĂĄndez Torres
 
Design of the presentation for the architecture bureau DPM
Design of the presentation for the architecture bureau DPMDesign of the presentation for the architecture bureau DPM
Design of the presentation for the architecture bureau DPM
 
Georgi_Bibin_Portfolio
Georgi_Bibin_PortfolioGeorgi_Bibin_Portfolio
Georgi_Bibin_Portfolio
 
Industrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" DniproIndustrial park "Innovation forpost" Dnipro
Industrial park "Innovation forpost" Dnipro
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
 
2015 Ahmed Kamal -Experience
2015 Ahmed Kamal -Experience2015 Ahmed Kamal -Experience
2015 Ahmed Kamal -Experience
 
Next generation manaseer
Next generation manaseerNext generation manaseer
Next generation manaseer
 
WorkSamples
WorkSamplesWorkSamples
WorkSamples
 
Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
The concept of industrial park centralniy
The concept of industrial park centralniyThe concept of industrial park centralniy
The concept of industrial park centralniy
 
Russian engineering company to invest in - our company looking for investors
Russian engineering company to invest in - our company looking for investorsRussian engineering company to invest in - our company looking for investors
Russian engineering company to invest in - our company looking for investors
 
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČ
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČĐ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČ
Đ»ĐžĐżĐ°Ń‚ĐŸĐČĐ° Юарья. ĐœĐ°ĐœĐŸŃ†Đ”ĐœŃ‚Ń€Đ° ĐșĐŸĐœŃŃ‚Ń€ŃƒĐșŃ†ĐžĐŸĐœĐœŃ‹Ń… ĐŒĐ°Ń‚Đ”Ń€ĐžĐ°Đ»ĐŸĐČ
 
B-Club | Investment Opportunities 1Q 2016 | Section I
B-Club | Investment Opportunities 1Q 2016 | Section IB-Club | Investment Opportunities 1Q 2016 | Section I
B-Club | Investment Opportunities 1Q 2016 | Section I
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
AMEY CV & PORTFOLIO_2015-0909_web Q
AMEY CV & PORTFOLIO_2015-0909_web QAMEY CV & PORTFOLIO_2015-0909_web Q
AMEY CV & PORTFOLIO_2015-0909_web Q
 
Zvezdan Kostic Portfolio
Zvezdan Kostic PortfolioZvezdan Kostic Portfolio
Zvezdan Kostic Portfolio
 

KĂŒrzlich hochgeladen

Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)delhi24hrs1
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyListing Turkey
 
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)delhi24hrs1
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfabbu831446
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ - Mainstreet Equity Corp.
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realtypunitranainchbrick02
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700Truhomes
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)knoxdigital1
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirementsmarketingkingdomofku
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...ApartmentWala1
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfkishor21012022
 
Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfsabhyara24
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024VickyAulakh1
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdfManishSaxena95
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyListing Turkey
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfVickyAulakh1
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfPrachiRudram
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdfManishSaxena95
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in Indiarohanindosup
 
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
Kalpataru Exquisite Wakad Pune  E-Brochure.pdfKalpataru Exquisite Wakad Pune  E-Brochure.pdf
Kalpataru Exquisite Wakad Pune E-Brochure.pdfManishSaxena95
 

KĂŒrzlich hochgeladen (20)

Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✚➄9711108085▻✚Call Girls In East Of Kailash (E.K) (Delhi)
 
Acibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin TurkeyAcibadem Konaklari Uskudar - Listin Turkey
Acibadem Konaklari Uskudar - Listin Turkey
 
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✚➄9582086666▻✚Call Girls In Gurgaon Sector 1 (Gurgaon)
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realty
 
ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700ACE Terra Yamuna Expressway | 8929888700
ACE Terra Yamuna Expressway | 8929888700
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdf
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in India
 
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
Kalpataru Exquisite Wakad Pune  E-Brochure.pdfKalpataru Exquisite Wakad Pune  E-Brochure.pdf
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
 

Project portfolio Rinat Sakhipov

  • 1. ROCKWOOL plant for wool insulation production (Elabuga, Russia) The 4th Russian plant of ROCKWOOL, located in the Republic of Tatarstan in the territory of the special economic zone "Alabuga" (Elabuga region), was inaugurated on April 4, 2012. The Rockwool Group has invested $ 150 million in this production line. The volume of production is 110 thousand tons per year with the possibility of installing a second production line, which will double the existing capacity. The plant produces an innovative product of ROCKWOOL - Light Butts SCANDIC, the first stone wool insulation to be compressed. Gross Building area – 48,500 m2 Role in the project – Project Engineer from Client (2010-2012)
  • 2. ROCKWOOL Technical Insulation Centre (Bohumin, Czech Republic) Rockwool, a leading world producer of mineral wool insulation, has invested one billion crowns in Bohumin. The Bohumin plant thus became a new production and logistics centre for the technical insulation of the entire Rockwool Group for Central and Eastern Europe. Much of the investment was used to build 3 production lines for technical insulation. The new lines are linked to the primary line, with an annual capacity of 65,000 tones, producing stone mineral wool as a semi-finished product. The project also included the construction of buildings for storage, handling and shipping of products. In Bohumin they also revitalized the inner area of ​​the plant and strengthened the areas for outdoor warehouses. The investment has further helped to improve the waste management area. Stone wool is a fully recyclable material and the installation of new equipment has significantly increased the proportion of production waste that is recycled back to the production in the form of briquettes. Gross Building area – 30,000 m2 Role in the project – Project Manager from Client (2013-2014)
  • 3. Aviation Industrial Plants Sukhoi (Moscow region, Russia) The reconstruction of the mechanical workshop for the assembly production of the components of the medium-range aircraft was carried out. As a result, it was possible to create a modern production site with highly efficient jobs. The commissioning of the reconstructed workshop almost completes the implementation of the action plan to expand the production of civil aircraft and bring production volumes to the planned level. A deep reconstruction and technical modernization were carried out here, which allowed introducing the latest technologies into production. High-capacity machines and machining centres are installed in the workshops, and lean manufacturing technologies are used as part of the production system. As part of the modernization of production, the construction of an automated workshop for galvanic coatings and a central factory laboratory is executed. The company switched to 3D-modeling and no paper technology. Gross building area – 74,500 m2 Role in the project – Design Manager from Designer (2005-2007)
  • 4. Shopping Centre "MEGA Dybenko" redevelopment 1st phase (Saint-Petersburg, Russia) The 1st phase of Redevelopment program aimed to remove existing physical barriers between shopping mall and IKEA store, upgrade the internal design, improve customer convenience in terms of access, offer and services. IKEA store integration used all Integration principles and a specially developed concept solution to make new internal IKEA trade dress an integral part of the mall gallery, driving visitation to IKEA store and ensuring complete and seamless customer experience. The project aimed to address the following components: remove physical barriers between IKEA, community and MEGA, open the new entrance to IKEA/ MEGA with direct pedestrian bridge connection to residential area, provide fast access, drive visitation to IKEA and ensure full range of shopping categories and services for families, provide IKEA with opportunities for inspiring range presentation, upgrade IKEA food offer with new concept of the restaurant, upgrade all customer touchpoints for seamless customer experience, introduce new increased and upscaled family fashion offer with flagship stores (H&M, Reserved, etc), introduce new generation F&B offer for leisure dining, arrange physical community space with necessary elements for emotional engagement with “home feeling” for people. Gross Building area – 38,580 m2 Role in the project – Construction Project Manager from Client (2017-2019)
  • 5. Standalone IKEA Store on Kashirskoje highway (Moscow, Russia) The expected development of the land plot will consist of a Large size IKEA standard store of 38,500 m2 including a glass-house together with 1,530 parking spaces of which 800 spaces shall be located under the raised building. This shall be the first stand alone IKEA store in Russia. The permit documentation is developed and approved by authorities. The project is on hold due to company expansion priority. Gross Building area – 38,500 m2 Role in the project – Construction Project Manager from Client (2016-2017)
  • 6. A-class Business Centre "Renaissance Plaza" (Saint-Petersburg, Russia) Renaissance Plaza, one of the largest “A” class business centre in St. Petersburg, Russia, is located in the historical part of the city, at the very center of business life, at 69 – 71, Marata street. The business centre was designed by one of the best architectural and construction companies in the world of Gensler-London, with vast experience in creating an effective business environment. An impressive 8-story building was created using high architectural and state-of-the-art technological solutions. Elegant and sophisticated interiors, a luxurious hall decorated with natural marble give the complex an exquisite style, emphasizing the atmosphere of success. Renaissance Plaza consists of three buildings, united by a landscaped courtyard. A fitness center with panoramic city views, a sauna with a cozy relaxation area and a spacious cafe will delight our tenants. Extensive underground parking will easily solve the parking issue relevant to the city center. Gross Building area – 36,300 m2 Number of floors – 8 Role in the project – Design Manager from Designer, Author Supervisor (2006-2007)
  • 7. Hotel Ibis Kazan Centre 3* (Kazan, Russia) Ibis Kazan Centre is the first European-class 3-star chain hotel in Kazan. It is distinguished by its advantageous location - in the central part of the city, next to the famous Bauman Street, a five- minute walk from the Kazan Kremlin, a UNESCO World Heritage Site, and the historic city center. The hotel meets all the international standards and offers all the services required for a modern hotel. The highlight of the hotel, distinguishing it from other Ibis hotels, is the expanded concept of the restaurant Sud et Cie. The hotel offers 155 comfortable rooms of an updated standard: LCD TV, satellite TV, wireless and high-speed Internet access, air conditioning, direct dial telephone. The hotel provides deluxe rooms, standard for disabled people. Ibis Kazan Centre also offers pet-friendly accommodation. The hotel also has a Rendez Vouz bar, 3 meeting rooms and secured underground parking. Gross Building area – 6,600 m2 Number of floors – 5 Role in the project – Design Manager from Designer (2006-2007)
  • 8. The Kazan State University reconstruction (Kazan, Russia) The project is provided for the reconstruction of the Kazan State University, which celebrated its 200th anniversary in 2004. The project scope consisted of restoration works, electrical and engineering systems upgrade, infrastructure, access roads, landscaping for the faculty of astronomy, physical laboratories, the mechanical engineering faculty and the department of geometry. In addition, the reconstruction of the musical and philological faculties of the Kazan State Pedagogical University was carried out. Reconstruction of facades, windows, doors, floors and all existing architectural elements of the university and faculty premises was carried out with the maximum preservation of the historical appearance of the building and in accordance with the requirements of the cultural heritage protection authorities. Gross Building area – 39,700 m2 Role in the project – Civil Works Lead, Cost Manager from GC (2003-2004)
  • 9. World Kazan Universiade Games (Kazan, Russia) The 2013 Summer Universiade, officially known as the XXVII Summer Universiade, was held in the city of Kazan, Russia, the most northerly city ever to host a Summer Universiade. Over 10,400 university athletes from 162 countries participated in 13 mandatory and 14 optional sports, making the 2013 Universiade the biggest ever in the history of the event. For the first time in history a Cultural Universiade was also included, with many festivals and shows held simultaneously with the sporting events. The Universiade was organized by the International University Sports Federation (FISU) and by the authorities of the Republic of Tatarstan. Universiade Village – 274,000 m2 Rowing Centre – 14,000 m2 Tennis Academy – 19,400 m2 Kazan Volleyball Centre – 13,000 m2 Role in the project – Project Manager from Client (2009-2010)
  • 10. XXVII World Summer Universiade (Kazan, Russia) A total of 27 new stadiums were built as venues for the event. The Games used 64 venues in all, 36 of which were constructed specifically for the 2013 Summer Universiade. The 64 venues were concentrated in 4 zones across the city of Kazan. These included the area of Pobeda Avenue with the Kazan Arena, the Aquatics Palace of Water Sports, the Combat Sports (Boxing) Palace, and the arena of Orenburgsky Trakt where the Universiade Village was located, as well as the Tennis Academy and Gymnastics Palace. In addition, many sports venues for training functions were located elsewhere in Zarechye (Novo- Savinovsky and Airbuilders districts), and some of them in downtown Kazan. Combat sports palace «Ak Bars» – 17,000 m2 Swimming pool «Burevestnik» - 12,300 m2 Sport complex «Bustan» - 3,800 m2 Sport complex «Zilant» – 6,400 m2 Role in the project – Project Manager from Client (2009-2010)
  • 11. XXVII World Summer Universiade (Kazan, Russia) The 2013 Summer Universiade opening and closing ceremonies were held on 6th and 17th July 2013, with country leaders in attendance accordingly. The ceremonies took place in the new Kazan Arena stadium with a seating capacity of 45,000 people. In the handover, the Korean branch of the boy group EXO performed their hit song "Wolf", the title track from their first full-length album XOXO, at the closing ceremony while Russian artists and popstars made a huge shows with many decorations and special effects at both ceremonies. Swimming pool «Olimp» - 11,000 m2 Stadium «Olimp» - 8,200 m2 Sport complex «Olimpijetz» – 3,800 m2 Boxing Centre – 15,200 m2 Role in the project – Project Manager from Client (2009-2010)
  • 12. XXVII World Summer Universiade (Kazan, Russia) For the first time in the history of the Universiades, twenty-seven sports were included in Kazan 2013. The optional sports chosen were badminton, beach volleyball, belt wrestling, boxing, canoeing, chess, field hockey, rugby sevens, sambo, shooting, synchronized swimming, rowing, weightlifting, and wrestling. Of the optional sports chosen, belt wrestling, boxing, sambo, rugby sevens, and synchronized swimming made their debut at the 2013 Summer Universiade. Swimming pool «Aktcharlak» - 9,400 m2 Shooting Centre «Svijaga» - 5,500 m2 Sport complex «Vatan» - 5,600 m2 Sport complex «Moskva» - 5,150 m2 Role in the project – Project Manager from Client (2009-2010)
  • 13. XXVII World Summer Universiade (Kazan, Russia) Some 1,200 journalists from 170 countries were assisted by the Main Press Center (MPC), the International Broadcasting Center (IBC) at Kazan Arena, and the International Info Center at Universiade Village. The games were televised by Eurosport as well as by 12 other international and 3 Russian TV networks. After the Universiade, the venues and stadiums were to be consigned over to high schools and universities of Kazan, to children and youth sport schools, and to Olympic reserve schools. The Universiade Village was to be integrated into the main campus of the Federal University system. Sport complex «Tezjutsche» - 6,200 m2 Sport complex «Triumph» - 5,150 m2 Sport complex «Forward» - 3,100 m2 Sport complex «Miras» - 6,200 m2 Role in the project – Project Manager from Client (2009-2010)
  • 14. Children‘s Railway (Kazan, Russia) A children's railway or pioneer railway is an extracurricular educational institution, where teenagers learn railway professions. This phenomenon originated in the USSR and was greatly developed in Soviet times. The world's first children's railway was opened in Gorky Park, Moscow, in 1932. At the breakup of the USSR, 52 children's railways existed in the country. Many children's railways are still functioning in post-Soviet states and Eastern European countries. Many exhibit railway technology not seen anymore on the main lines and can be seen as heritage railways. Kazan Children’s Railway in the city of Kazan with a length of 4,3 km, located in the Lebyazhje forest park between the village of Zalesnij and the Izumrudnoje lake in the village of Judino. The railway has 2 stations (Molodezhnaja, Emerald) and 2 landing platforms (Sportivnaja, Birch Grove). Track is 750 mm. It is equipped by 2 diesel locomotives (TU7A-3344 and TU10-022) and 4 wagons manufactured by Metrovagonmash of models 20.0017 and 20.0018. Not far in Zalesnoje there is a railway technical college, which is basis for the Railways. Railway length – 4.3 km Role in the project – Design Manager from Designer, Author Supervision (2006-2007)
  • 15. Truck Service Stations (Kazan, Elabuga, Nizhnij Novgorod, Samara, Tyumen, Krasnodar, Russia) The new truck service stations are located along the federal highways, close to the big cities Kazan, Elabuga, Nizhnij Novgorod, Samara, Tyumen, Krasnodar. The stations are equipped with all necessary equipment for maintenance and repair of commercial vehicles. The sales department presents a wide selection of new and used motor vehicles - from small tonnage trucks and truck tractors to buses. Buyers are able to get expert advice and choose a vehicle that meets all the requirements. For the convenience of customers, there is a cozy lounge where they can have a meal and spend time waiting for the work to be completed in a relaxed atmosphere. The service area of ​​the new stations include 18 posts each. Service station capacity - up to 50 trucks per day each. Gross building area – 2,500 m2 each Role in the project – Project Director from Client (2008-2009)
  • 16. Residential complex "Kazan XXI Century" - 1st phase (Kazan, Russia) The comfortable complex "Kazan XXI Century" fully lives up to its name. Several buildings were erected using advanced technologies forming a separate micro district with developed urban infrastructure. For the construction of the residential complex, the territory of the former airfield was chosen. The place is excellent, spacious and free from contaminations. This is a quiet and peaceful place. City center could be reached in just ten minutes, both by personal and public transport. The nearest metro station "Gorki" is four kilometers away from the complex. The complex is provided with necessary infrastructure. On the territory there are kinder- gardens and a comprehensive school, playing and sports grounds, necessary for organizing leisure activities. In addition, well-developed recreation areas, walking and bicycle paths, green areas for picnics and outdoor recreation, as well as parking lots for residents of the complex and its guests, are developed. Gross Building area – 250,000 m2 Scope – 9 residential blocks, school, kinder-garden Role in the project – Design Manager from Designer, Author Supervision (2004-2006)
  • 17. Mixed-use “M-2 Aviastroitelnij district" (Kazan, Russia) "M-2 Aviastroitelnij district" is a residential mixed-use economy-class complex with its business and administrative centre with a population of 20 thousand people. 3 kinder- gardens, school with swimming pool, several multi-level parking decks are built in this district. The residential complex is built on the site of old emergency buildings which were demolished for new modern blocks. Gross Building area – 450,000 m2 Scope – 14 mixed-use residential blocks, school with swimming pool, kinder-garden Role in the project – Design Manager from Designer, Author Supervision (2004-2006)
  • 18. Medical building for Balkish sanatorium (Kazan, Russia) The medical building is designed between the dining area and the pool connected with galleries in a single complex. The modern medical base that meets international standards is designed to treat diseases of: cardio-vascular system; musculoskeletal system; nervous system; genitourinary system; respiratory organs; digestive organs. Gross Building area – 900 m2 Role in the project – Design Manager from Designer, Author Supervisor (2005)