SlideShare ist ein Scribd-Unternehmen logo
1 von 10
OPS 571 Final Exam
ANSWERS ARE HERE 
1. Which of the following is true about make-to-stock processes?
A. Make-to-stock processes can be controlled based on the actual or anticipated amount of finished
goods
B. Make-to-stock process is used when demand is seasonal and the firm does not have enough
C. Services by their very nature often use make-to-stock processes.
D. A and B
2. According to your text, the most common process metric is:
A. Productivity
B. Utilization
C. Throughput time
D. Efficiency
3. ________ is when the activities in the stage must stop because there is no place to deposit the item
just completed.
A. Buffering
B. Starving
C. None of these answers
D. Blocking
4. According to Hayes and Wheelwright, which of the following is not a major process flow structure?
A. Job Shop
B. Assembly Line
C. Project
D. Batch
5. The most important performance dimension for product development projects is
A. Quality
B. Product flexibility
C. Time-to-market
D. Productivity
6. The major decision variables in equipment selection are:
A. Flexibility
B. Labor requirements
C. Manufacturer
D. Both A and B
7. Quality Function Deployment:
A. is a tool for translating customer requirements into concrete operating and engineering goals.
B. facilitates inter-functional cooperation between marketing, engineering, and manufacturing.
C. provides a better understanding and focus on process characteristics that require improvements.
D both a and B.
8. Which of the following statements is true about value analysis/value engineering?
A. the purpose of VA/VE is to simplify products and processes.
B the objective of VA/VE is to achieve equivalent or better performance at a lower cost.
C. VA is performed before the production stage, while VE deals with products already in production.
D both A and B.
9. In which phase of new-product design process are considerations to target market, desired level of
performance, investment requirements and financial impact made:
A. detailed engineering.
B. Preliminary process design.
C. pilot manufacturing phase.
D. concept development and product planning.
10. Which of the following is not a dimension of design quality?
A. Durability.
B. Serviceability.
C. Customization.
D. Features.
11. Testing is an example of:
A. Prevention costs.
B. Internal Failure costs.
C. External Failure Cost.
D. Appraisal costs.
12. Which Quality Guru advocated that senior management is responsible for 94% of quality problems?
A. Deming.
B. Ishikawa.
C. Juran.
D. Crosby.
13. Independent Demand is:
A. demand that is related to the demand for another item.
B. demand determined by the marketplace that requires forecasting.
C. Inventory whose demand comes from independent suppliers.
D. Inventory that is independent of any known rules of demand and supply.
14. Which of the following statements is true about the Q-system?
A. It does not have an EOQ, since the quality varies according to the demand.
B. The order interval is fixed not the order quanity.
C. It does not have a reorder point but rather a target inventory.
D. The system is completely determined by the two parameters, Q and R.
15. Which of the following is not an assumption of the basic economic-order quantity model?
A. ordering or setup costs are constant.
B. Quantity discounts are available.
C. annual demand is constant and known.
D. lead time is constant.
16. Which of the following is not a principle of work-center scheduling?
A. Schedule jobs as strings, with process steps back to back.
B. Obtain feedback each day on the jobs that are completed at each work center.
C. Once started, a job should not be interrupted.
D. Reschedule every day.
17. The assignment method is appropriate in solving problems that have the following characteristics?
A. There are ‘n’ things to be distributed to ‘n’ destinations.
B. Though each destination may handle all the things, the final assignment has each thing assigned to
one and only one destination.
C. Only one criterion should be used (minimum cost, maximum profit, for example).
D. A and C.
18. The objective of work-center scheduling include(s):
A. To meet due dates.
B. To minimize lead times.
C. To minimize finish goods inventory.
D. Both A and B.
19. The measure of the firm’s ability to make money according to Goldratt include:
A. Net profit.
B. Return on assets.
C. Cash flow.
D. Both A and C.
20. Goldratt’s rule of production scheduling include all but:
A. An hour saved at a non-bottleneck is a marriage.
B. A process batch should be fixed both along its route and in time.
C. Do not balance the capacity-balance the flow.
D. Utilization and activation of a resource is not the same thing.
21. According to Goldratt and Fox, a useful performance measure to treat inventory is:
A. Quick ratio.
B. Dollar days.
C. Inventory turnover.
D. Current ratio.
22. The advantages of pure project include all but:
A. Decisions are made quickly.
B. A team member can work on several projects.
C. The project manager has full authority over the project.
D. Team pride, motivation, and commitments are high.
23. Which of the following is not a typical milestone?
A. Training of project members.
B. Completed testing of the prototype.
C. Completion of design.
D. Production of a prototype.
24. “Slack” refers to the difference between:
A. Observed and predicted times.
B. optimistic and pessimistic times.
C. Latest and earliest times.
D. finish and start times.
25. Which of the following statements are true about time-series forcasting?
A. Time series analysis is based on the idea that the history of occurrences over time can be used to
predict the future.
B. Agent liability. Time series analysis tries to understand the system underlying and surrounding the
item being forecast.
C. Under time-series methods, demand is divided into the time-based components such as daily, weekly,
etc.
D. Time series methods are useful for long-range forecasts when the demand pattern is erratic.
26. Which of the following product promotional activities would probably help make the supply chain
more efficient?
A. Special packaging for a specific event that occurs one time each year.
B. A 2 for 1 price promotion.
C. Price promotions that expire on a specific date.
D. An “everyday” low price strategy where prices are not dependent on quantity delivered with a
specific order.
27. According to Hau Lee, which of the following types of products need to be delivered with efficient
supply-chains?
A. Grocery Products.
B. High technology products.
C Customer products.
D. Innovative products.
28. Supply-chain response relates to the following?
A. How quickly a customer order can be filled.
B. How quickly a company can react to a new competing product.
C. How inexpensive the product is.
D. Both A and B.
29. Which of the following statements is not true about capacity management in operations?
A. Capacity planning itself has different meaning to individual at different levels within the operations
management hierarchy.
B. the definition of capacity, in an operations management context, makes a clear distinction between
efficient and inefficient use of capacity.
C. When looking at capacity, operations managers need to look at both resource input and product
outputs.
D. An operations management view also emphasizes the dimension of capacity.
30. Capacity utilization rate can be computed as:
A. Capacity used-best.
B. Capacity used x best.
C. Capacity used/best.
D. Capacity used + best.
31. Lean systems typically require?
A. delivery of large lots at frequent intervals.
B Buyer inspection of goods and materials.
C. multiple sources from which to purchase.
D. long-term relationships and commitments.
32. Which of the following is not true about JIT systems?
A. The JIT system is based on the philosophy of eliminating waste and utilizing the full capacity of the
worker.
B. Under JIT the ideal lot size is one.
C. JIT is typically applied to repetitive manufacturing.
D. The goal of JIT is to drive all inventory queues to a moderate level thus minimizing inventory
investment and shortening lead times.
33. Which of the following is not an element of JIT?
A. small-lot production.
B. quickly changing schedule.
C. Multifunction worker.
D. Kanan pull system.
34. Which of the following would not be classified as a time-series technique?
A. Simple moving average.
B. Exponential smoothing.
C. Box Jenkins technique.
D. Regression model.
35. Which phase most closely describes the Delphi forecasting technique?
A. consumer survey.
B. random individual opinions.
C. group of expert’s opinions.
D. test markets.
36. Aggregate planners balance?
A. demand and costs.
B. demand and inventories.
C. demand and capacity.
D. supply and inventories.
37. Which of the following accurately descrives a chase strategy?
A. The firms produces the same amount each day over the planning period and deals with the variations
in demand through the use of inventory or overtime.
B. The firm produces at the same level for several months, and then adjusts production to another level
and produces at that level for several more months.
C. The firm produces exactly what is needed each month.
D. All of the above could describe the strategy depending on the organization.
38. Which of the following is not a cost relevant to aggregate production planning?
A. Basic production costs.
B. Quantity discounts.
C. Cost associated with changes in the production rate.
D. Inventory holding costs.
39. Which MRP system input element specifies how many and when the firm plans to build each end
item?
A. Master Production schedule.
B. Bill of Material.
C. Inventory records file.
D. Capacity Planning.
40. Which of the following most closely describes net material requirements?
A. gross requirements-on hand-planned order receipts.
B. gross requirements-on-hand+ planned order receipts.
C. gross requirements-planned order receipts.
D. gross requirements-planned order releases.
41. Which of the following is not an advantage of MRP?
A. Reduced idle time.
B. Reduced inventory.
C. Reduced sales price.
D. MRP is flexible-easy to veer away from the schedule is need arises.
42. The steps to determining capacity requirements include:
A. Using decision trees to evaluate capacity alternatives
B. Calculating equipment and labor requirements to meet product line forecasts
C. Projecting labor and equipment availabilities over the planning horizon
D. B and C
43. Service capacity
A. is highly time and location dependent
B. is subject to less volatile demand fluctuations
C. utilization directly impacts service quality
D. A and C

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (16)

Blogging As The Backbone of Social Marketing
Blogging As The Backbone of Social MarketingBlogging As The Backbone of Social Marketing
Blogging As The Backbone of Social Marketing
 
Lect24 hmm
Lect24 hmmLect24 hmm
Lect24 hmm
 
Entrepreneurial Collaboration: multiple perspectives and one replicable resea...
Entrepreneurial Collaboration: multiple perspectives and one replicable resea...Entrepreneurial Collaboration: multiple perspectives and one replicable resea...
Entrepreneurial Collaboration: multiple perspectives and one replicable resea...
 
Senior movie
Senior movieSenior movie
Senior movie
 
When a Veteran is a Novice: A New Constituency and a New Opportunity
When a Veteran is a Novice: A New Constituency and a New OpportunityWhen a Veteran is a Novice: A New Constituency and a New Opportunity
When a Veteran is a Novice: A New Constituency and a New Opportunity
 
Loomideck for Enterprises
Loomideck for EnterprisesLoomideck for Enterprises
Loomideck for Enterprises
 
Gestión de riesgo
Gestión de riesgoGestión de riesgo
Gestión de riesgo
 
Primary ed
Primary edPrimary ed
Primary ed
 
Partying on a Budget: The Cost of Digital Commemoration
Partying on a Budget: The Cost of Digital CommemorationPartying on a Budget: The Cost of Digital Commemoration
Partying on a Budget: The Cost of Digital Commemoration
 
Quality ed
Quality edQuality ed
Quality ed
 
Lineamientos drogas (1)
Lineamientos drogas (1)Lineamientos drogas (1)
Lineamientos drogas (1)
 
8 building blocks for a high performance school IT network
8 building blocks for a high performance school IT network8 building blocks for a high performance school IT network
8 building blocks for a high performance school IT network
 
Dovbysh byulleten
Dovbysh byulletenDovbysh byulleten
Dovbysh byulleten
 
Podstawy prawne sprawowania dozoru
Podstawy prawne sprawowania dozoruPodstawy prawne sprawowania dozoru
Podstawy prawne sprawowania dozoru
 
001 design idea
001 design idea001 design idea
001 design idea
 
Recycled Reads
Recycled ReadsRecycled Reads
Recycled Reads
 

Ähnlich wie OPS 571 OPS/571 Final Exam 100% Correct

Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%choices11
 
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%johnMilit
 
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%johnMilit
 
QNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectQNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectRieTian99
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exambubyslyke
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final examgiquickly
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final examginistays
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final examginistays
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exambubyslyke
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#siliverseyr
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final examgiquickly
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final examgiquickly
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final examginistays
 
Qnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersQnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersGliven
 
Qnt 561 final exam view 369
Qnt 561 final exam view 369Qnt 561 final exam view 369
Qnt 561 final exam view 369forrest44
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%sharing3444
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%singup22
 
1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%Euroday
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%flyperhan
 
(New) ops 571 ops571 final exam entire answers with questions correct 100%
(New) ops 571 ops571 final exam entire answers with questions correct  100%(New) ops 571 ops571 final exam entire answers with questions correct  100%
(New) ops 571 ops571 final exam entire answers with questions correct 100%twiter343r
 

Ähnlich wie OPS 571 OPS/571 Final Exam 100% Correct (20)

Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%Ops 571 final exam 43#questions with answers correct 100%
Ops 571 final exam 43#questions with answers correct 100%
 
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
QNT 561 QNT561 Final EXAM MCQ`s Correct Answers 100%
 
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
QNT 561 QNT/561 Final EXAM MCQ\s Correct Answers 100%
 
QNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% CorrectQNT 561 QNT/561 Final Exam 100% Correct
QNT 561 QNT/561 Final Exam 100% Correct
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Mkt 571 final exam
Mkt 571 final examMkt 571 final exam
Mkt 571 final exam
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#
 
Ops 571 final exam
Ops 571 final examOps 571 final exam
Ops 571 final exam
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final exam
 
Qnt 561 final exam
Qnt 561 final examQnt 561 final exam
Qnt 561 final exam
 
Qnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answersQnt 561 qnt/561 final exam 100% correct answers
Qnt 561 qnt/561 final exam 100% correct answers
 
Qnt 561 final exam view 369
Qnt 561 final exam view 369Qnt 561 final exam view 369
Qnt 561 final exam view 369
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%1..ops 571 ops571 final exam correct 100%
1..ops 571 ops571 final exam correct 100%
 
Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%Ops 571 ops571 final exam correct 100%
Ops 571 ops571 final exam correct 100%
 
(New) ops 571 ops571 final exam entire answers with questions correct 100%
(New) ops 571 ops571 final exam entire answers with questions correct  100%(New) ops 571 ops571 final exam entire answers with questions correct  100%
(New) ops 571 ops571 final exam entire answers with questions correct 100%
 

Mehr von RieTian99

MKT 571 MKT/571 Final Exam 100% Correct
MKT 571 MKT/571 Final Exam 100% CorrectMKT 571 MKT/571 Final Exam 100% Correct
MKT 571 MKT/571 Final Exam 100% CorrectRieTian99
 
MGT 521 MGT/521 Final Exam 100% Correct
MGT 521 MGT/521 Final Exam 100% CorrectMGT 521 MGT/521 Final Exam 100% Correct
MGT 521 MGT/521 Final Exam 100% CorrectRieTian99
 
MGT 498 MGT/498 Final Exam 100% Correct
MGT 498 MGT/498 Final Exam 100% CorrectMGT 498 MGT/498 Final Exam 100% Correct
MGT 498 MGT/498 Final Exam 100% CorrectRieTian99
 
FIN 370 FIN/370 Final Exam 100% Correct
FIN 370 FIN/370 Final Exam 100% CorrectFIN 370 FIN/370 Final Exam 100% Correct
FIN 370 FIN/370 Final Exam 100% CorrectRieTian99
 
ACC 561 ACC/561 Final Exam 100% Correct
ACC 561 ACC/561 Final Exam 100% CorrectACC 561 ACC/561 Final Exam 100% Correct
ACC 561 ACC/561 Final Exam 100% CorrectRieTian99
 
ACC 460 ACC/460 Final Exam 100% Correct
ACC 460 ACC/460 Final Exam 100% CorrectACC 460 ACC/460 Final Exam 100% Correct
ACC 460 ACC/460 Final Exam 100% CorrectRieTian99
 
ACC 423 ACC/423 Final Exam 100% Correct
ACC 423 ACC/423 Final Exam 100% CorrectACC 423 ACC/423 Final Exam 100% Correct
ACC 423 ACC/423 Final Exam 100% CorrectRieTian99
 
ACC 422 ACC/422 Final Exam 100% Correct
ACC 422 ACC/422 Final Exam 100% CorrectACC 422 ACC/422 Final Exam 100% Correct
ACC 422 ACC/422 Final Exam 100% CorrectRieTian99
 

Mehr von RieTian99 (8)

MKT 571 MKT/571 Final Exam 100% Correct
MKT 571 MKT/571 Final Exam 100% CorrectMKT 571 MKT/571 Final Exam 100% Correct
MKT 571 MKT/571 Final Exam 100% Correct
 
MGT 521 MGT/521 Final Exam 100% Correct
MGT 521 MGT/521 Final Exam 100% CorrectMGT 521 MGT/521 Final Exam 100% Correct
MGT 521 MGT/521 Final Exam 100% Correct
 
MGT 498 MGT/498 Final Exam 100% Correct
MGT 498 MGT/498 Final Exam 100% CorrectMGT 498 MGT/498 Final Exam 100% Correct
MGT 498 MGT/498 Final Exam 100% Correct
 
FIN 370 FIN/370 Final Exam 100% Correct
FIN 370 FIN/370 Final Exam 100% CorrectFIN 370 FIN/370 Final Exam 100% Correct
FIN 370 FIN/370 Final Exam 100% Correct
 
ACC 561 ACC/561 Final Exam 100% Correct
ACC 561 ACC/561 Final Exam 100% CorrectACC 561 ACC/561 Final Exam 100% Correct
ACC 561 ACC/561 Final Exam 100% Correct
 
ACC 460 ACC/460 Final Exam 100% Correct
ACC 460 ACC/460 Final Exam 100% CorrectACC 460 ACC/460 Final Exam 100% Correct
ACC 460 ACC/460 Final Exam 100% Correct
 
ACC 423 ACC/423 Final Exam 100% Correct
ACC 423 ACC/423 Final Exam 100% CorrectACC 423 ACC/423 Final Exam 100% Correct
ACC 423 ACC/423 Final Exam 100% Correct
 
ACC 422 ACC/422 Final Exam 100% Correct
ACC 422 ACC/422 Final Exam 100% CorrectACC 422 ACC/422 Final Exam 100% Correct
ACC 422 ACC/422 Final Exam 100% Correct
 

Kürzlich hochgeladen

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Kürzlich hochgeladen (20)

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 

OPS 571 OPS/571 Final Exam 100% Correct

  • 1. OPS 571 Final Exam ANSWERS ARE HERE  1. Which of the following is true about make-to-stock processes? A. Make-to-stock processes can be controlled based on the actual or anticipated amount of finished goods B. Make-to-stock process is used when demand is seasonal and the firm does not have enough C. Services by their very nature often use make-to-stock processes. D. A and B 2. According to your text, the most common process metric is: A. Productivity B. Utilization C. Throughput time D. Efficiency 3. ________ is when the activities in the stage must stop because there is no place to deposit the item just completed. A. Buffering B. Starving C. None of these answers D. Blocking 4. According to Hayes and Wheelwright, which of the following is not a major process flow structure? A. Job Shop B. Assembly Line C. Project D. Batch 5. The most important performance dimension for product development projects is A. Quality B. Product flexibility C. Time-to-market
  • 2. D. Productivity 6. The major decision variables in equipment selection are: A. Flexibility B. Labor requirements C. Manufacturer D. Both A and B 7. Quality Function Deployment: A. is a tool for translating customer requirements into concrete operating and engineering goals. B. facilitates inter-functional cooperation between marketing, engineering, and manufacturing. C. provides a better understanding and focus on process characteristics that require improvements. D both a and B. 8. Which of the following statements is true about value analysis/value engineering? A. the purpose of VA/VE is to simplify products and processes. B the objective of VA/VE is to achieve equivalent or better performance at a lower cost. C. VA is performed before the production stage, while VE deals with products already in production. D both A and B. 9. In which phase of new-product design process are considerations to target market, desired level of performance, investment requirements and financial impact made: A. detailed engineering. B. Preliminary process design. C. pilot manufacturing phase. D. concept development and product planning. 10. Which of the following is not a dimension of design quality? A. Durability.
  • 3. B. Serviceability. C. Customization. D. Features. 11. Testing is an example of: A. Prevention costs. B. Internal Failure costs. C. External Failure Cost. D. Appraisal costs. 12. Which Quality Guru advocated that senior management is responsible for 94% of quality problems? A. Deming. B. Ishikawa. C. Juran. D. Crosby. 13. Independent Demand is: A. demand that is related to the demand for another item. B. demand determined by the marketplace that requires forecasting. C. Inventory whose demand comes from independent suppliers. D. Inventory that is independent of any known rules of demand and supply. 14. Which of the following statements is true about the Q-system? A. It does not have an EOQ, since the quality varies according to the demand. B. The order interval is fixed not the order quanity. C. It does not have a reorder point but rather a target inventory. D. The system is completely determined by the two parameters, Q and R. 15. Which of the following is not an assumption of the basic economic-order quantity model?
  • 4. A. ordering or setup costs are constant. B. Quantity discounts are available. C. annual demand is constant and known. D. lead time is constant. 16. Which of the following is not a principle of work-center scheduling? A. Schedule jobs as strings, with process steps back to back. B. Obtain feedback each day on the jobs that are completed at each work center. C. Once started, a job should not be interrupted. D. Reschedule every day. 17. The assignment method is appropriate in solving problems that have the following characteristics? A. There are ‘n’ things to be distributed to ‘n’ destinations. B. Though each destination may handle all the things, the final assignment has each thing assigned to one and only one destination. C. Only one criterion should be used (minimum cost, maximum profit, for example). D. A and C. 18. The objective of work-center scheduling include(s): A. To meet due dates. B. To minimize lead times. C. To minimize finish goods inventory. D. Both A and B. 19. The measure of the firm’s ability to make money according to Goldratt include: A. Net profit. B. Return on assets. C. Cash flow. D. Both A and C.
  • 5. 20. Goldratt’s rule of production scheduling include all but: A. An hour saved at a non-bottleneck is a marriage. B. A process batch should be fixed both along its route and in time. C. Do not balance the capacity-balance the flow. D. Utilization and activation of a resource is not the same thing. 21. According to Goldratt and Fox, a useful performance measure to treat inventory is: A. Quick ratio. B. Dollar days. C. Inventory turnover. D. Current ratio. 22. The advantages of pure project include all but: A. Decisions are made quickly. B. A team member can work on several projects. C. The project manager has full authority over the project. D. Team pride, motivation, and commitments are high. 23. Which of the following is not a typical milestone? A. Training of project members. B. Completed testing of the prototype. C. Completion of design. D. Production of a prototype. 24. “Slack” refers to the difference between: A. Observed and predicted times. B. optimistic and pessimistic times. C. Latest and earliest times.
  • 6. D. finish and start times. 25. Which of the following statements are true about time-series forcasting? A. Time series analysis is based on the idea that the history of occurrences over time can be used to predict the future. B. Agent liability. Time series analysis tries to understand the system underlying and surrounding the item being forecast. C. Under time-series methods, demand is divided into the time-based components such as daily, weekly, etc. D. Time series methods are useful for long-range forecasts when the demand pattern is erratic. 26. Which of the following product promotional activities would probably help make the supply chain more efficient? A. Special packaging for a specific event that occurs one time each year. B. A 2 for 1 price promotion. C. Price promotions that expire on a specific date. D. An “everyday” low price strategy where prices are not dependent on quantity delivered with a specific order. 27. According to Hau Lee, which of the following types of products need to be delivered with efficient supply-chains? A. Grocery Products. B. High technology products. C Customer products. D. Innovative products. 28. Supply-chain response relates to the following? A. How quickly a customer order can be filled. B. How quickly a company can react to a new competing product. C. How inexpensive the product is. D. Both A and B.
  • 7. 29. Which of the following statements is not true about capacity management in operations? A. Capacity planning itself has different meaning to individual at different levels within the operations management hierarchy. B. the definition of capacity, in an operations management context, makes a clear distinction between efficient and inefficient use of capacity. C. When looking at capacity, operations managers need to look at both resource input and product outputs. D. An operations management view also emphasizes the dimension of capacity. 30. Capacity utilization rate can be computed as: A. Capacity used-best. B. Capacity used x best. C. Capacity used/best. D. Capacity used + best. 31. Lean systems typically require? A. delivery of large lots at frequent intervals. B Buyer inspection of goods and materials. C. multiple sources from which to purchase. D. long-term relationships and commitments. 32. Which of the following is not true about JIT systems? A. The JIT system is based on the philosophy of eliminating waste and utilizing the full capacity of the worker. B. Under JIT the ideal lot size is one. C. JIT is typically applied to repetitive manufacturing. D. The goal of JIT is to drive all inventory queues to a moderate level thus minimizing inventory investment and shortening lead times. 33. Which of the following is not an element of JIT?
  • 8. A. small-lot production. B. quickly changing schedule. C. Multifunction worker. D. Kanan pull system. 34. Which of the following would not be classified as a time-series technique? A. Simple moving average. B. Exponential smoothing. C. Box Jenkins technique. D. Regression model. 35. Which phase most closely describes the Delphi forecasting technique? A. consumer survey. B. random individual opinions. C. group of expert’s opinions. D. test markets. 36. Aggregate planners balance? A. demand and costs. B. demand and inventories. C. demand and capacity. D. supply and inventories. 37. Which of the following accurately descrives a chase strategy? A. The firms produces the same amount each day over the planning period and deals with the variations in demand through the use of inventory or overtime. B. The firm produces at the same level for several months, and then adjusts production to another level and produces at that level for several more months. C. The firm produces exactly what is needed each month.
  • 9. D. All of the above could describe the strategy depending on the organization. 38. Which of the following is not a cost relevant to aggregate production planning? A. Basic production costs. B. Quantity discounts. C. Cost associated with changes in the production rate. D. Inventory holding costs. 39. Which MRP system input element specifies how many and when the firm plans to build each end item? A. Master Production schedule. B. Bill of Material. C. Inventory records file. D. Capacity Planning. 40. Which of the following most closely describes net material requirements? A. gross requirements-on hand-planned order receipts. B. gross requirements-on-hand+ planned order receipts. C. gross requirements-planned order receipts. D. gross requirements-planned order releases. 41. Which of the following is not an advantage of MRP? A. Reduced idle time. B. Reduced inventory. C. Reduced sales price. D. MRP is flexible-easy to veer away from the schedule is need arises. 42. The steps to determining capacity requirements include: A. Using decision trees to evaluate capacity alternatives
  • 10. B. Calculating equipment and labor requirements to meet product line forecasts C. Projecting labor and equipment availabilities over the planning horizon D. B and C 43. Service capacity A. is highly time and location dependent B. is subject to less volatile demand fluctuations C. utilization directly impacts service quality D. A and C