School District of Beloit
REFERENDUM PRESENTATION




      IMAGINE BELOIT
1.   History/Challenge and Opportunity
2.   The cost
3.   The physical plants
4.   Educational Advantages
5.   Fiscal Responsibility and Savings
6.   Economic Development
7.   April 3, 2012
Board of Education:

• Facility study 1998
• Architectural drawings 2008
Board of Education challenge:

  •   8 buildings built before 1928
  •   Newest building built: 1965
  •   Last major improvements: 1994
  •   Non-functional pool: 1968
  •   Deteriorating facilities
2012-2013 Tax Impact
             On a $70 Million Dollar Referendum
             Under Current Funding Aid Formula
                 Estimated Interest at 3.5%
Home Value            Annual Cost       Monthly Cost

$75,000*              $ 67.50               $5.63

• State reimburses District $45 million or 64% of the bond issue
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Success Breeds Success

•   National AP Honor Roll, 1 of 367
•   National Blue Ribbon, Gaston, 1 of 305
•   National GPA award, Girls Swim, 20th
•   National GPA award, Boys Swim, 6th
•   National Jazz Competition, top 15
•   RTI program receiving state and national
    attention
Referendum Plan: Physical Plants
Renovate six elementary schools to PK-3
1. More and larger classrooms for consolidation/team
   teaching
2. Create intervention rooms
3. More gym space
4. Needed repairs
    •Roofing               •Security Upgrade
    •Boiler Systems/HVAC   •Parking/Drop off
    •Building Envelope     •Playgrounds
    •Needed Furnishings    •Technology


5. Food prep and serving areas
Primary Schools
  Cost Approximately $31 million
Approximately 440 Students/Building

East              West
  Todd    $6.0M    Converse $5.6M
  Merrill 4.4M     Hackett   5.1M
  Robinson 5.6M    Gaston    4.2M
Todd
Merrill
Robinson
Converse
Hackett
Gaston
Aldrich and McNeel

$1.2M for new roof & lighting by June 2012
through Federal Energy Efficiency program

 $10M to be allocated from maintenance
     savings over the next 5 years

   Fewer students after reconfiguration
McNeel
Aldrich
New Cunningham 4-8
 Cost Approximately $16 million

• Cunningham 60% increase in square
  footage
• Land area sufficient for expansion
• Large amount of green space remaining
  after expansion
New Cunningham
New SE Intermediate School 4-8
 Cost Approximately $16 million
• Site Acquisition completed by mid March
• In the Morgan neighborhood
New SE Intermediate
Intermediate School Design
1. Separate wings for 4,5,6 and 7,8
2. Separate entrances/pickup and drop off areas
3. Shared spaces for:
  –   Music
  –   Art
  –   Phy Ed
  –   ELL
  –   Special Education
  –   Library Media
Beloit Memorial High School

•   New Swimming Pool – 8 lane
•   Conference and Sectional meets
•   Locker rooms male and female
•   Community Changing Room
•   Bleachers for 500 + people at pool level
•   All mechanical-Electrical-Plumbing
•   Pool Room Heating and Ventilation
Tennis Courts

•   Tear up existing Tennis Courts
•   Relocate west of student parking
•   8 tennis courts complex
•   Tournaments
Life Center
• New equipment relocated from class rooms
• Level playing field for Big 8 athletics
• Relocate to existing pool area
• Current weight room transformed to
  wrestling and/or dance or yoga studio
• Fight childhood obesity
• Lower health care costs of district
  employees
High School
High School
Future Use of District-Owned Buildings
• Buildings Available for    • Possible Uses
  Retirement or Repurposing:    – District Office
   –   Royce                       – Charter School (RCAA)
   –   McLenegan                   – Learning Academy
   –   Kolak                       – Sale to outside party
   –   Morgan
   –   Wright
   –   Burdge
Educational Advantages
PK-3 Grade Alignment
       Educational Advantages

• Six PK-3 Schools
• Alignment of resources for learning to read
• Collaborative opportunities
• Intense focus on developmental needs of the
  young child
• Dedicated Art and Music areas
PK-3 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
4-8 Grade Alignment
         Educational Advantages
• “Elemiddle” approach
  – Makes smaller grades 6-8, approx 150 per grade
• Alignment of resources for reading to learn
• Use of other resources and shared classrooms
 (e.g. Gym, Tech Ed, Music, Art)
4-8 Grade Alignment
         Educational Advantages
• Collaborative opportunities for
• 4-6 and 7-8 wings
• Culture change in a building with younger and
  older students
• More opportunities to be involved in sports and
  extracurricular activities with smaller classes.
4-8 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
The Cost
Primary schools =        $31 million
Intermediate schools =   $32 million
Secondary School =       $ 7 million
                Total=   $70 million

$45 million reimbursed by the State
These are estimated permanent reductions that would assist
   us with our budget challenges in each year going forward.
Cost Savings Area                                          Estimated Annual Cost Savings If
                                                                 Referendum Passes

Rent                                                   $             128,007.00
Utilities (Gas, Electric, Water, Sewer, Storm Water)   $              66,232.00
Reduction of Personnel                                 $           1,019,582.00
Facility and Building Maintenance                      $             978,780.00
Property Services                                      $              28,334.00
Technology Savings-Fiber Lease /Phone
Lines                                                  $              10,446.00
Transportation                                         $              35,730.00
Staff Travel                                           $              30,000.00
   Grand Total                                         $           2,297,111.00
Referendum versus Operating Cost
 • Referendum is a stand-alone loan fund
   – Must be for capital improvements only
   – Not used for operating budget or salaries

 • Yearly Operating budget is effected only by
   the savings incurred by improvements
   – Helps offset the budget challenges we will
     continue to face due to decreasing funding
Fiscal Responsibility
25


20


15
                                           Actual Levy collected
10                                         1995 Levy adjusted for inflation


 5


 0
 1990   1995   2000   2005   2010   2015
2012-2013 Tax Impact
             On a $70 Million Dollar Referendum
             Under Current Funding Aid Formula
                 Estimated Interest at 3.5%
Home Value            Annual Cost       Monthly Cost

$75,000*              $ 67.50               $5.63

• State reimburses District $45 million or 64% of the bond issue
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Economic Development
• Schools are one of the most
  important reasons for business
  start-ups and expansion
• More new employees stay in Beloit
• Increased community pride
• Local construction jobs
• Higher property values
• $45 million in outside investment
• Chamber of Commerce full support
• Outside tourism revenue produced
  by visiting spectators of large swim
  meets and tennis tournaments
• Improved image to non-Beloiters
• Continue trend of Beloit
  improvements
• $45 million in outside investment
Discussion
VOTE

April 3, 2012

Weitere ähnliche Inhalte

Was ist angesagt?

Five lamps presentation 2 7 13
Five lamps presentation 2 7 13Five lamps presentation 2 7 13
Five lamps presentation 2 7 13
HACThousing
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513
maitlandyoursay
 

Was ist angesagt? (15)

Public Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful StrategiesPublic Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful Strategies
 
Using TIF to Promote Healthy Communities
Using TIF to Promote Healthy CommunitiesUsing TIF to Promote Healthy Communities
Using TIF to Promote Healthy Communities
 
LTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATIONLTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATION
 
What planners need to know
What planners need to knowWhat planners need to know
What planners need to know
 
Affordable and Senior Housing
Affordable and Senior HousingAffordable and Senior Housing
Affordable and Senior Housing
 
FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)
 
Five lamps presentation 2 7 13
Five lamps presentation 2 7 13Five lamps presentation 2 7 13
Five lamps presentation 2 7 13
 
Community Energy Planning: Policies and Tools
Community Energy Planning: Policies and ToolsCommunity Energy Planning: Policies and Tools
Community Energy Planning: Policies and Tools
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513
 
levy2
levy2levy2
levy2
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding Strategies
 
Doing Nothing is Not an Option - 10-Year Plan submission to Regional Governme...
Doing Nothing is Not an Option - 10-Year Plan submission to Regional Governme...Doing Nothing is Not an Option - 10-Year Plan submission to Regional Governme...
Doing Nothing is Not an Option - 10-Year Plan submission to Regional Governme...
 
Neri seminar assessing funding models for water services provision
Neri seminar assessing funding models for water services provisionNeri seminar assessing funding models for water services provision
Neri seminar assessing funding models for water services provision
 
Chapel Hill-Carrboro Region
Chapel Hill-Carrboro RegionChapel Hill-Carrboro Region
Chapel Hill-Carrboro Region
 
The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)
 

Andere mochten auch (6)

Imagine ppt.3.spanish
Imagine ppt.3.spanishImagine ppt.3.spanish
Imagine ppt.3.spanish
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Final Presentation in 2015
Final Presentation in 2015Final Presentation in 2015
Final Presentation in 2015
 
Greater Beloit Chamber of Commerce - Internet Marketing Series, 2010
Greater Beloit Chamber of Commerce - Internet Marketing Series, 2010Greater Beloit Chamber of Commerce - Internet Marketing Series, 2010
Greater Beloit Chamber of Commerce - Internet Marketing Series, 2010
 
GBCC - Internet Marketing > SEO
GBCC - Internet Marketing > SEOGBCC - Internet Marketing > SEO
GBCC - Internet Marketing > SEO
 
20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage Content20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage Content
 

Ähnlich wie Imagine Beloit Powerpoint

Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
rcox726
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSD
aaronjacoby
 

Ähnlich wie Imagine Beloit Powerpoint (20)

Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Levy presentation2
Levy presentation2Levy presentation2
Levy presentation2
 
2012 usd263 bond
2012 usd263 bond2012 usd263 bond
2012 usd263 bond
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
NYASBO Webinar
NYASBO Webinar NYASBO Webinar
NYASBO Webinar
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues Presentations
 
Proposed bond referendum community
Proposed bond referendum communityProposed bond referendum community
Proposed bond referendum community
 
Olene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy ResultsOlene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy Results
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSD
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012
 
High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding Request
 
Referendum Presentation
Referendum PresentationReferendum Presentation
Referendum Presentation
 
31013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-1131013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-11
 

Kürzlich hochgeladen

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Kürzlich hochgeladen (20)

Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 

Imagine Beloit Powerpoint

  • 1. School District of Beloit REFERENDUM PRESENTATION IMAGINE BELOIT
  • 2. 1. History/Challenge and Opportunity 2. The cost 3. The physical plants 4. Educational Advantages 5. Fiscal Responsibility and Savings 6. Economic Development 7. April 3, 2012
  • 3. Board of Education: • Facility study 1998 • Architectural drawings 2008
  • 4. Board of Education challenge: • 8 buildings built before 1928 • Newest building built: 1965 • Last major improvements: 1994 • Non-functional pool: 1968 • Deteriorating facilities
  • 5. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 6. Success Breeds Success • National AP Honor Roll, 1 of 367 • National Blue Ribbon, Gaston, 1 of 305 • National GPA award, Girls Swim, 20th • National GPA award, Boys Swim, 6th • National Jazz Competition, top 15 • RTI program receiving state and national attention
  • 8. Renovate six elementary schools to PK-3 1. More and larger classrooms for consolidation/team teaching 2. Create intervention rooms 3. More gym space 4. Needed repairs •Roofing •Security Upgrade •Boiler Systems/HVAC •Parking/Drop off •Building Envelope •Playgrounds •Needed Furnishings •Technology 5. Food prep and serving areas
  • 9. Primary Schools Cost Approximately $31 million Approximately 440 Students/Building East West Todd $6.0M Converse $5.6M Merrill 4.4M Hackett 5.1M Robinson 5.6M Gaston 4.2M
  • 10. Todd
  • 16. Aldrich and McNeel $1.2M for new roof & lighting by June 2012 through Federal Energy Efficiency program $10M to be allocated from maintenance savings over the next 5 years Fewer students after reconfiguration
  • 19. New Cunningham 4-8 Cost Approximately $16 million • Cunningham 60% increase in square footage • Land area sufficient for expansion • Large amount of green space remaining after expansion
  • 21. New SE Intermediate School 4-8 Cost Approximately $16 million • Site Acquisition completed by mid March • In the Morgan neighborhood
  • 23. Intermediate School Design 1. Separate wings for 4,5,6 and 7,8 2. Separate entrances/pickup and drop off areas 3. Shared spaces for: – Music – Art – Phy Ed – ELL – Special Education – Library Media
  • 24. Beloit Memorial High School • New Swimming Pool – 8 lane • Conference and Sectional meets • Locker rooms male and female • Community Changing Room • Bleachers for 500 + people at pool level • All mechanical-Electrical-Plumbing • Pool Room Heating and Ventilation
  • 25. Tennis Courts • Tear up existing Tennis Courts • Relocate west of student parking • 8 tennis courts complex • Tournaments
  • 26. Life Center • New equipment relocated from class rooms • Level playing field for Big 8 athletics • Relocate to existing pool area • Current weight room transformed to wrestling and/or dance or yoga studio • Fight childhood obesity • Lower health care costs of district employees
  • 29. Future Use of District-Owned Buildings • Buildings Available for • Possible Uses Retirement or Repurposing: – District Office – Royce – Charter School (RCAA) – McLenegan – Learning Academy – Kolak – Sale to outside party – Morgan – Wright – Burdge
  • 31. PK-3 Grade Alignment Educational Advantages • Six PK-3 Schools • Alignment of resources for learning to read • Collaborative opportunities • Intense focus on developmental needs of the young child • Dedicated Art and Music areas
  • 32. PK-3 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 33. 4-8 Grade Alignment Educational Advantages • “Elemiddle” approach – Makes smaller grades 6-8, approx 150 per grade • Alignment of resources for reading to learn • Use of other resources and shared classrooms (e.g. Gym, Tech Ed, Music, Art)
  • 34. 4-8 Grade Alignment Educational Advantages • Collaborative opportunities for • 4-6 and 7-8 wings • Culture change in a building with younger and older students • More opportunities to be involved in sports and extracurricular activities with smaller classes.
  • 35. 4-8 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 36. The Cost Primary schools = $31 million Intermediate schools = $32 million Secondary School = $ 7 million Total= $70 million $45 million reimbursed by the State
  • 37. These are estimated permanent reductions that would assist us with our budget challenges in each year going forward. Cost Savings Area Estimated Annual Cost Savings If Referendum Passes Rent $ 128,007.00 Utilities (Gas, Electric, Water, Sewer, Storm Water) $ 66,232.00 Reduction of Personnel $ 1,019,582.00 Facility and Building Maintenance $ 978,780.00 Property Services $ 28,334.00 Technology Savings-Fiber Lease /Phone Lines $ 10,446.00 Transportation $ 35,730.00 Staff Travel $ 30,000.00 Grand Total $ 2,297,111.00
  • 38. Referendum versus Operating Cost • Referendum is a stand-alone loan fund – Must be for capital improvements only – Not used for operating budget or salaries • Yearly Operating budget is effected only by the savings incurred by improvements – Helps offset the budget challenges we will continue to face due to decreasing funding
  • 39. Fiscal Responsibility 25 20 15 Actual Levy collected 10 1995 Levy adjusted for inflation 5 0 1990 1995 2000 2005 2010 2015
  • 40. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 42. • Schools are one of the most important reasons for business start-ups and expansion • More new employees stay in Beloit • Increased community pride • Local construction jobs • Higher property values • $45 million in outside investment
  • 43. • Chamber of Commerce full support • Outside tourism revenue produced by visiting spectators of large swim meets and tennis tournaments • Improved image to non-Beloiters • Continue trend of Beloit improvements • $45 million in outside investment

Hinweis der Redaktion

  1. Welcome. Thank the community for their support of our programs.