PROJECT REVIEW Industrial
Automation
CAPSA (CHANGAN AUTOMOBILES and PSA) SHENZHEN CHINA – PAINT SHOP
Sales Value € 3,750,000
Control Media Allen Bradley 1756-L61
Control Gear Rockwell
Variable Speed Drives Powerflex
Networks Ethernet IP, DeviceNet
Project Duration Feb’12 – Mar’13
CUSTOMER
Changan PSA Automobiles Co Ltd (CAPSA) is a joint venture initiated by China Changan Automobile
Group and PSA Peugeot Citroën established in November 2011. It is the PSA Group's second joint
venture company in China. Production trials started in early 2013. With the initial annual
production capacity of 200,000 vehicles and engines, CAPSA will gradually expand the production
capacity according to the market demand. The joint venture will initially produce the Citroen DS.
REQUIREMENTS
To supply the electrical control panels and software (project manage, design, supply, program and
commission) for the following elements of the new Paint Shop at the new CAPSA facility in
Shenzhen, China:
• Complete Conveyor System
• Pretreatment
• E Coat
• E Coat, Sealer and Topcoat Ovens
• Topcoat Booth
• Paint Distribution
• Paint Shop Supervision
PROJECT REVIEW Industrial
Automation
OVERVIEW
Phoenix won the electrical controls for a PSA & Mitsubishi joint venture new 35uph Paint Shop
project for Taikisha Europe in Kaluga Russia. Design for this project started in Feb 2010 and an 18
month schedule concluded in late summer/early Autumn 2011.
For this project in Shenzhen China, Phoenix was approached again to provide the electrical controls
of the new CAPSA 60uph Paint Shop involving the Conveyor System, Process Plant, Paint Distribution
and Plant Supervision Systems. The project size was 50% greater than the Kaluga project. Phoenix
won the project but this time a more aggressive 12 month schedule had to be achieved.
The project commenced with design meetings with the CAPSA pilot and Phoenix at their
headquarters in China. From these initial design meetings a Functional Design Specification was
generated for each of the systems (14 in total) and agreed by all parties.
Following the finalisation of the Design specs with CAPSA the Electrical Design and Control Panel
Manufacture was undertaken. All the panels were manufactured in our premises at Speke and from
there shipped to China.
The complete conveyor from Paintshop entry to the exit comprises six systems each of which has
it’s own PLC and suite of panels. In addition Phoenix provided the electrical panels for the Pre-
Treatment and E Coat Systems, The Ovens for E Coat, Sealer and Topcoat. The Topcoat Booths, The
Paint Distribution and Central Supervision System.
Once installed all these systems were commissioned commencing by Phoenix engineers,
commencing in December 2012
All Control Panels were manufactured in our Liverpool premises.
PROJECT REVIEW Industrial
Automation
The contract for the Control Panels was won as a separate contract from the Project Management
& Design and we won the entire scope inclusive of shipment to Shenzhen China. Our competition
was Chinese and Japanese suppliers.
The scope covered the following:
• Rockwell CLX PLC (14x PLCs).
• 15x Ethernet Switch Enclosures for Paint Shop Ethernet Network
• 21x Conveyor Control Panel suites (51x 800mm Sections).
• 277x Conveyor Remote Motor Control Boxes
• 13x Remote HMI Stations
• 3x Pre-treatment Plant Control Panel suites (11x 800mm Sections
• 1x Electrocoat Plant Control Panel suites (6x 800mm Sections)
• 23x Oven Control Panel suites (50x 800mm Sections)
• 14x Spray Booth Control Panel suites (66x 800mm Sections)
• 1x Paint Mix Control Panel suite (10x 800mm Sections)
• 18,750 Panel Shop Hours of Build and Testing in a duration of 4.5 months
• All Panels Manufactured in the UK and shipped to Shenzhen China
• Complete Project Management
• Complete Electrical Design.
• Complete PLC Software Code & HMI Design
• Creation of Interfaces to PSA Hierarchical Computer Systems for Body Tracking, Process
Parameter Reporting and Fault Diagnostic Reporting
• Complete Documentation for the Project
• Commission and Production Support.
PROJECT REVIEW Industrial
Automation
KEYDATES
Start Feb 2012
Design Start Mar 2012
Panel Manufacture May 2012 – Sep 2012
Panel Shipment Jul 2012 – Oct 2012
Commissioning Nov 2012 – Mar 2013
© PHOENIX CONTROL SYSTEMS LIMITED 2013
Registered Office: Mobs Miller House, Ardington Road, Northampton, NN1 5LP
Registered in England No. 05650790
HEAD OFFICE
7D Park Square,
Milton Park
Abingdon,
Oxfordshire, OX14 4RR
Tel: 01235 823120
Fax: 01235 861502
LIVERPOOL OFFICE
Unit 4
Spectrum Court
Edwards Lane
Liverpool L24 9HW
Tel: 0151 4864998
Fax: 0151 4864998
INTERNET
www.phoenixcontrol.co.uk
EMAIL
sales@phoenixcontrol.co.uk

Weitere ähnliche Inhalte

Was ist angesagt?

Company Profile: Ladder Automation Solution Pvt Ltd
Company Profile: Ladder Automation Solution Pvt LtdCompany Profile: Ladder Automation Solution Pvt Ltd
Company Profile: Ladder Automation Solution Pvt LtdSudhir Dhawan
 
Osmose EPC Pilot_Automotive
Osmose EPC Pilot_AutomotiveOsmose EPC Pilot_Automotive
Osmose EPC Pilot_AutomotiveOsmose Project
 
10_years_Experience_in_Automation
10_years_Experience_in_Automation10_years_Experience_in_Automation
10_years_Experience_in_AutomationArpita Gohel
 
Company profile january 2015
Company profile   january 2015Company profile   january 2015
Company profile january 2015Tinca Secuianu
 
Studio 5000® Application Code Manager: Introduction and Demonstration
Studio 5000® Application Code Manager: Introduction and DemonstrationStudio 5000® Application Code Manager: Introduction and Demonstration
Studio 5000® Application Code Manager: Introduction and DemonstrationRockwell Automation
 
Dragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launchDragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launchDragon Sourcing
 
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...Exploring the Functionality of the Rockwell Automation® Library of Process Ob...
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...Rockwell Automation
 
2013 dep teaser
2013 dep teaser 2013 dep teaser
2013 dep teaser nzv526
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationWorksoft
 
Automated Reporting Director
Automated Reporting DirectorAutomated Reporting Director
Automated Reporting DirectorAltair
 
Batch Management: Overview and What’s New and
Batch Management: Overview and What’s New andBatch Management: Overview and What’s New and
Batch Management: Overview and What’s New andRockwell Automation
 
Webinar June 2017 l Apica LoadTest to compliment HP Loadrunner
Webinar June 2017 l Apica LoadTest to compliment HP LoadrunnerWebinar June 2017 l Apica LoadTest to compliment HP Loadrunner
Webinar June 2017 l Apica LoadTest to compliment HP LoadrunnerWhitney Donaldson
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Energy Construction Forum
 
Remote Access and Monitoring of Connected IoT Assets
Remote Access and Monitoring of Connected IoT AssetsRemote Access and Monitoring of Connected IoT Assets
Remote Access and Monitoring of Connected IoT AssetsRockwell Automation
 
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLELead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLEAltair
 
Newport News Shipbuilding Takes the Pain out of Compliance & Testing
Newport News Shipbuilding Takes the Pain out of Compliance & TestingNewport News Shipbuilding Takes the Pain out of Compliance & Testing
Newport News Shipbuilding Takes the Pain out of Compliance & TestingWorksoft
 

Was ist angesagt? (20)

Company Profile: Ladder Automation Solution Pvt Ltd
Company Profile: Ladder Automation Solution Pvt LtdCompany Profile: Ladder Automation Solution Pvt Ltd
Company Profile: Ladder Automation Solution Pvt Ltd
 
Osmose EPC Pilot_Automotive
Osmose EPC Pilot_AutomotiveOsmose EPC Pilot_Automotive
Osmose EPC Pilot_Automotive
 
10_years_Experience_in_Automation
10_years_Experience_in_Automation10_years_Experience_in_Automation
10_years_Experience_in_Automation
 
Company profile january 2015
Company profile   january 2015Company profile   january 2015
Company profile january 2015
 
Studio 5000® Application Code Manager: Introduction and Demonstration
Studio 5000® Application Code Manager: Introduction and DemonstrationStudio 5000® Application Code Manager: Introduction and Demonstration
Studio 5000® Application Code Manager: Introduction and Demonstration
 
Dragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launchDragon Sourcing case study Supporting New Factory launch
Dragon Sourcing case study Supporting New Factory launch
 
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...Exploring the Functionality of the Rockwell Automation® Library of Process Ob...
Exploring the Functionality of the Rockwell Automation® Library of Process Ob...
 
2013 dep teaser
2013 dep teaser 2013 dep teaser
2013 dep teaser
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
 
PlantPAx system - what's new and what's next
PlantPAx system - what's new and what's nextPlantPAx system - what's new and what's next
PlantPAx system - what's new and what's next
 
Automated Reporting Director
Automated Reporting DirectorAutomated Reporting Director
Automated Reporting Director
 
Batch Management: Overview and What’s New and
Batch Management: Overview and What’s New andBatch Management: Overview and What’s New and
Batch Management: Overview and What’s New and
 
Webinar June 2017 l Apica LoadTest to compliment HP Loadrunner
Webinar June 2017 l Apica LoadTest to compliment HP LoadrunnerWebinar June 2017 l Apica LoadTest to compliment HP Loadrunner
Webinar June 2017 l Apica LoadTest to compliment HP Loadrunner
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
Remote Access and Monitoring of Connected IoT Assets
Remote Access and Monitoring of Connected IoT AssetsRemote Access and Monitoring of Connected IoT Assets
Remote Access and Monitoring of Connected IoT Assets
 
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLELead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
Lead Time Reduction using Automatic Reporting Director (ARD) for MAHLE
 
Newport News Shipbuilding Takes the Pain out of Compliance & Testing
Newport News Shipbuilding Takes the Pain out of Compliance & TestingNewport News Shipbuilding Takes the Pain out of Compliance & Testing
Newport News Shipbuilding Takes the Pain out of Compliance & Testing
 
Matimba Power Station
Matimba Power StationMatimba Power Station
Matimba Power Station
 
Industrial Automation Capability Overview
Industrial Automation Capability OverviewIndustrial Automation Capability Overview
Industrial Automation Capability Overview
 
Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 

Ähnlich wie Phoenix Control Systems

I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experiencehugo_mx
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experiencehugo_mx
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experiencehugo_mx
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016PANKAJ PAL
 
Customer presentation
Customer presentationCustomer presentation
Customer presentationDaniel Webb
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015Moreau Mulume
 
RA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxRA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxAjay Gangakhedkar
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015j phillips
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsNick Darrall
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsGuy Black
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyIntelligentManufacturingInstitute
 
RA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx SystemsRA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx SystemsRockwell Automation
 

Ähnlich wie Phoenix Control Systems (20)

Vinay Resume
Vinay ResumeVinay Resume
Vinay Resume
 
Mohamed Elwardany's resume
Mohamed Elwardany's resumeMohamed Elwardany's resume
Mohamed Elwardany's resume
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
 
I tron automation's experience
I tron automation's experienceI tron automation's experience
I tron automation's experience
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
Yogesh K
Yogesh KYogesh K
Yogesh K
 
Customer presentation
Customer presentationCustomer presentation
Customer presentation
 
MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015MoreauMulumeCV_Profile07012015
MoreauMulumeCV_Profile07012015
 
RA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptxRA Implementation of PlantPAx Systems.pptx
RA Implementation of PlantPAx Systems.pptx
 
Anindam_Resume
Anindam_ResumeAnindam_Resume
Anindam_Resume
 
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
resume
resumeresume
resume
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and Controls
 
CS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and ControlsCS0022 - Automotive PBS Conveyor and Controls
CS0022 - Automotive PBS Conveyor and Controls
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves money
 
RA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx SystemsRA TechED 2019 - PR03 - Implementation of PlantPAx Systems
RA TechED 2019 - PR03 - Implementation of PlantPAx Systems
 

Phoenix Control Systems

  • 1. PROJECT REVIEW Industrial Automation CAPSA (CHANGAN AUTOMOBILES and PSA) SHENZHEN CHINA – PAINT SHOP Sales Value € 3,750,000 Control Media Allen Bradley 1756-L61 Control Gear Rockwell Variable Speed Drives Powerflex Networks Ethernet IP, DeviceNet Project Duration Feb’12 – Mar’13 CUSTOMER Changan PSA Automobiles Co Ltd (CAPSA) is a joint venture initiated by China Changan Automobile Group and PSA Peugeot Citroën established in November 2011. It is the PSA Group's second joint venture company in China. Production trials started in early 2013. With the initial annual production capacity of 200,000 vehicles and engines, CAPSA will gradually expand the production capacity according to the market demand. The joint venture will initially produce the Citroen DS. REQUIREMENTS To supply the electrical control panels and software (project manage, design, supply, program and commission) for the following elements of the new Paint Shop at the new CAPSA facility in Shenzhen, China: • Complete Conveyor System • Pretreatment • E Coat • E Coat, Sealer and Topcoat Ovens • Topcoat Booth • Paint Distribution • Paint Shop Supervision
  • 2. PROJECT REVIEW Industrial Automation OVERVIEW Phoenix won the electrical controls for a PSA & Mitsubishi joint venture new 35uph Paint Shop project for Taikisha Europe in Kaluga Russia. Design for this project started in Feb 2010 and an 18 month schedule concluded in late summer/early Autumn 2011. For this project in Shenzhen China, Phoenix was approached again to provide the electrical controls of the new CAPSA 60uph Paint Shop involving the Conveyor System, Process Plant, Paint Distribution and Plant Supervision Systems. The project size was 50% greater than the Kaluga project. Phoenix won the project but this time a more aggressive 12 month schedule had to be achieved. The project commenced with design meetings with the CAPSA pilot and Phoenix at their headquarters in China. From these initial design meetings a Functional Design Specification was generated for each of the systems (14 in total) and agreed by all parties. Following the finalisation of the Design specs with CAPSA the Electrical Design and Control Panel Manufacture was undertaken. All the panels were manufactured in our premises at Speke and from there shipped to China. The complete conveyor from Paintshop entry to the exit comprises six systems each of which has it’s own PLC and suite of panels. In addition Phoenix provided the electrical panels for the Pre- Treatment and E Coat Systems, The Ovens for E Coat, Sealer and Topcoat. The Topcoat Booths, The Paint Distribution and Central Supervision System. Once installed all these systems were commissioned commencing by Phoenix engineers, commencing in December 2012 All Control Panels were manufactured in our Liverpool premises.
  • 3. PROJECT REVIEW Industrial Automation The contract for the Control Panels was won as a separate contract from the Project Management & Design and we won the entire scope inclusive of shipment to Shenzhen China. Our competition was Chinese and Japanese suppliers. The scope covered the following: • Rockwell CLX PLC (14x PLCs). • 15x Ethernet Switch Enclosures for Paint Shop Ethernet Network • 21x Conveyor Control Panel suites (51x 800mm Sections). • 277x Conveyor Remote Motor Control Boxes • 13x Remote HMI Stations • 3x Pre-treatment Plant Control Panel suites (11x 800mm Sections • 1x Electrocoat Plant Control Panel suites (6x 800mm Sections) • 23x Oven Control Panel suites (50x 800mm Sections) • 14x Spray Booth Control Panel suites (66x 800mm Sections) • 1x Paint Mix Control Panel suite (10x 800mm Sections) • 18,750 Panel Shop Hours of Build and Testing in a duration of 4.5 months • All Panels Manufactured in the UK and shipped to Shenzhen China • Complete Project Management • Complete Electrical Design. • Complete PLC Software Code & HMI Design • Creation of Interfaces to PSA Hierarchical Computer Systems for Body Tracking, Process Parameter Reporting and Fault Diagnostic Reporting • Complete Documentation for the Project • Commission and Production Support.
  • 4. PROJECT REVIEW Industrial Automation KEYDATES Start Feb 2012 Design Start Mar 2012 Panel Manufacture May 2012 – Sep 2012 Panel Shipment Jul 2012 – Oct 2012 Commissioning Nov 2012 – Mar 2013 © PHOENIX CONTROL SYSTEMS LIMITED 2013 Registered Office: Mobs Miller House, Ardington Road, Northampton, NN1 5LP Registered in England No. 05650790 HEAD OFFICE 7D Park Square, Milton Park Abingdon, Oxfordshire, OX14 4RR Tel: 01235 823120 Fax: 01235 861502 LIVERPOOL OFFICE Unit 4 Spectrum Court Edwards Lane Liverpool L24 9HW Tel: 0151 4864998 Fax: 0151 4864998 INTERNET www.phoenixcontrol.co.uk EMAIL sales@phoenixcontrol.co.uk