SlideShare ist ein Scribd-Unternehmen logo
1 von 63
Downloaden Sie, um offline zu lesen
1NuggetHub 2019. All rights reserved |
Best Practices
C L O U D E R P S T R A T E G Y &
T R A N S F O R M A T I O N
2NuggetHub 2019. All rights reserved |
ERP Platform Transformation3
ERP Platform Strategy & Evaluation2
Cloud ERP Strategy Definition and Introduction1
Agenda
3NuggetHub 2019. All rights reserved |
A best practice end-to-end process model defines the initial scope
of the cloud ERP functional evaluation
End-to-end processes in scope
Central Q-data
& process mgmt.
GR / GI Q-
inspection
In-production
Q-control
Non-confor-
mance mgmt.
Q-reporting
& KPI‘s
Quality Management
Quotation
negotiation
Quotation
adaptation
Order entry
Quote-to-Order
Goods receipt Stock transfer Goods issue
Physical
inventory
Inventory & WH Mgmt.
Receive
requirements
Inquiry / Bid
processing
Vendor
qualification
Purchase order
execution
Purchase order
tracking
Goods receipt
&
Q-inspection
Invoice
processing
Exception
handling
Purchase-to-Pay
Purchase order
release
SerialisedPartsManagement
ProductLifecycle
Mgmt.
UnitConfigurationManagement
(to-bestructure)
Requirement to
Quotation
Project
Execution to
Billing
Portfolio
Management
Engineering Scheduling & Capacity Planning
Authorisation
to executable
Project
Template
Management
Simulative
planning
Production
scheduling
Production
executing and
monitoring
Product
delivery to
warehouse
Reporting
and KPIs
Demand-to-Supply
Strategic
product planning
Product Design
Sales
preparation
Design
implementation
Product
Validation
Requirement-to-Product
Maintenance
strategy
Maintenance
planning
Material
and service
procurement
Maintenance
execution
Registration
and
documentation
Cost
accounting
and reporting
Master data
governance / MD
mgmt..
Customer &
vendor master
maintenance
Bill of Material
maintenance
Access control
& data security
(IPP)
Data Management
GL & asset
accounting
Accounts
payable &
receivable
Period end
closing
Finance-to-Manage
Material master
maintenance
Product
structure
Mgmt.
Document
management
Engineering
change
management
Product Data Management
Time Collection Plan Budget Reporting
Engineering Value Flow Controlling
Demand
Planning
Supply
Network
Planning
Forecast
Execution
Order
completion
Outbound
logistics
Invoice
processing &
closure act.
Order creation
Inquiry
Product/project
calculation
Technical &
commercial
clarification
Quotation
processing
Inquiry-to-Quote
Order-to-Cash
Planning
Project system
and reporting
Product costing
and reporting
Profitability
analysis and
reporting
Profit centre
accounting &
reporting
Record-to-Report
Supply chain
performance
management
Analytical
finance &
controlling
Analytical
human
resources
Business
performance
management
Business Intelligence
Overhead
management
and reporting
Forecast-to-Plan
Material
Requirements
Planning
Support processes
Maintain-to-Settle
4NuggetHub 2019. All rights reserved |
ERP standards and best practices for critical E2E processes
Inquiry-to-Quote
Level-0 Level-1 Best practices
Inquiry-to-
Quote
Inquiry
 Editing all relevant sales-related information with synchronized central master
data
 Selection list of inquiries based on pre-defined criteria
 Inquiry evaluation incl. monitoring and controlling
 Integrated opportunity management
 Seamless process integration from Inquiry to Quote
Product /
project
calculation
 Integrated configure-price-quote process for standard, variant and custom
configuration (also BOM integration)
 Product template reuse
 Usage of synchronized prices and discounts
 Management of special discounts
Technical /
commercial
clarification
 Configure delivery times and commitment dates for sales orders
 Support in planning resources, materials and expenses
Quotation
processing
 Editing and monitoring of quotations
 Calculation of order probability
 All relevant business partners can be specified as sold-to parties
5NuggetHub 2019. All rights reserved |
ERP standards and best practices for critical E2E processes
Quote-to-Order
Level-0 Level-1 Best practices
Quote-to-
Order
Quotation
negotiation
 Present and negotiate products and conditions with customized quotes
 Contact and account management
 Opportunity and lead management
 Seamless process integration from Quote to Order
Quotation
adaptation
 Adaptation of quotation to changes (e.g. changed requirements)
 Integrated configure-price-quote process for standard, variant and custom
configuration (also BOM integration)
 Monitor quote status driven by dashboards and alerts
 Approve pricing
 Confirm order options
Order entry
 Support initial and recurring order entries
 Support intercompany functionalities
6NuggetHub 2019. All rights reserved |
ERP standards and best practices for critical E2E processes
Order-to-Cash
Level-0 Level-1 Best practices
Order-to-Cash
Order creation
 Utilization of the CRM system and fully integrated CPQ process (also BOM
integration)
 Order based on templates and catalogues for clear material requirements
 Support of standard, variant and custom orders
 Support of intercompany functionalities
Order
completion
 Thorough and strict limit check
Material
requirements
planning
(MRP)
 Automated run after order creation
 Automated material orders
 Support of intercompany functionalities
Outbound
logistics
 Integration with system for transportation procurement, invoice processing and
goods tracking
Invoice
processing &
closure act.
 Sales order dashboards
 Milestone billing
 Strict order closing routines and regular check runs
 Support of intercompany functionalities
7NuggetHub 2019. All rights reserved |
ERP standards and best practices for critical E2E processes
Purchase-to-Pay
Level-0 Level-1 Best practices
Purchase-to-Pay
Receive
requirements
 Material Requirements Planning as only source for direct material demands
Inquiry / Bid
processing
 Central procurement department to ensure "one face to the supplier"
Vendor qualification
 System-integrated vendor qualification to block sourcing from non-complying vendors or with outdated Q-
certificates
Purchase order
release
 Multi-level electronic release strategy with workflow and clearly defined thresholds
 Consistent & documented internal purchasing guidelines
 Order status is in real time; track & trace available
Purchase order
execution
 EDI transfer to vendor with shipping notification, PO transmission via EDI; mandatory request for PO approval
 Single purchase order execution system & global purchase order layout standard
Purchase order
tracking
 Order delivery tracking capabilities
 Usage of advanced shipping notifications via EDI; continuous KPI measurement
 Automatic delivery notification capabilities
Goods receipt & Q-
inspection
 Integration of quality management with material management to create inspection lot automatically at goods
receipts
 Centralized goods receipt & electronic goods receipts for services and indirect materials
 Utilization of scanner technologies
 Delivery scheduling
Invoice processing
 Usage of logistics invoice verification and evaluated receipt settlement (vendor self-billing)
 Increased use of EDI; electronic invoices; supplier invoice entry via web
 Invoices are sent to AP automatically
 Scanning of invoices
Exception handling
 Thorough design of "R" processes (reject, return, repair) and related value flow (invoice rejection, debit note
processing, …)
8NuggetHub 2019. All rights reserved |
ERP standards and best practices for critical E2E processes
Demand-to-Supply
Level-0 Level-1 Best practices
Demand-to-Supply
Simulative
planning
 Integrated planning with network planning and finite capacity planning for standard, variant and
custom products
 Integrated consideration of maintenance down-times in production planning
 Support for intercompany functionalities
Production
scheduling
 Use advanced planning and scheduling to support complex planning situation on bottleneck resources
(including dynamic scheduling, change of priority and sequencing)
 Integration with CPQ / PLM (BOM)
 Support for intercompany functionalities
Production
executing and
monitoring
 Integrated manufacturing execution system to have actual situation of confirmation, consumption and
good receipt in the system
Product delivery
to warehouse
 Timely posting of material movements
 Support of scanner technologies
Reporting and
KPIs
 Aligned data base and reports to have full transparency on KPIs (e.g. DOT)
 Production and material analysis (e.g. material costs, product profitability)
 Support for intercompany functionalities
9NuggetHub 2019. All rights reserved |
ERP Platform Transformation3
ERP Platform Strategy & Evaluation2
Cloud ERP Strategy Definition and Introduction1
Agenda
10NuggetHub 2019. All rights reserved |
The detailed ERP evaluation methodology includes validation and
alignment phases with main stakeholders
Detailed ERP evaluation approach
Next
steps
Evaluation
alignment
Requirements
validation
Platform
recommendation
ERP
pre-evaluation
 ERP evaluation
finalized and
documented
 ERP platform
recommendation
aligned with Client
experts
 Next steps (incl.
transformation
scenarios)
recommended
 Critical Client
requirements
validated by core
team (focus
interviews; document
analysis)
 Best practices
complemented by
Consultant experts
1 3 42
 Short-listed ERP
platforms pre-
evaluated based on
criteria catalogue by
core team (focus
interviews) and
Consultant experts
 Criteria catalogue
aligned and
prioritized on
alignment workshop
with key stakeholders
and senior experts
 ERP pre-evaluation
validated and
feedback considered
on alignment
workshop
 ERP transformation
scenarios identified
and evaluated
Alignment
workshop
Project start Final
presentation
Focus
interviews
Key deliverables
 ERP evaluation and
recommendation
 Initial
criteria catalogue
 ERP pre-evaluation  Aligned
criteria catalogue
11NuggetHub 2019. All rights reserved |
All relevant stakeholders set cornerstones and guidelines
to narrow the requirements on the future ERP platform
Cornerstones & Guidelines – overview
Cornerstones & Guidelines
Description
 Cornerstones & Guidelines
– represent design principles for the
development of a common objective
– define priorities for provisioning of
functionalities and technical features
– set clear limitations for feasible solutions
and the path to achieve the objective
– define conditions for the implementation
of an ERP Roadmap
 Strategic guidelines for the Client ERP
platform are valid for the entire Client group
Strategic guidelines
Cornerstones &
Guidelines
ERP
platform
Defined by
executive board
To be defined
in project
12NuggetHub 2019. All rights reserved |
Leveraging of synergies, standardization and integration are
guidelines for a future ERP platform
Cornerstones & Guidelines – guidelines
Remarks
Increase automation of
processes and data flows
Focus on manufacturing-
relevant operations
 Ensure high degree of process automation possibilities
 Ensure high degree of data interface automation
 Focus on ERP platforms with industry solutions for manufacturing
 Focus on manufacturing industry proven ERP solutions
Maximize usage of ERP
platform standard processes
 Choose one global ERP standard
 Use standard processes as much as possible
 Adapt system only if necessary (e.g. localizations, Client specifics)
Leverage group wide
synergies
 Implement process best practices in the group
 Ensure reuse of ERP platform functionality
 Ensure leverage of synergies for system operations
Ensure easy integration  Ensure simple integration to and interoperation with other systems
 Ensure easy integration and separation of plants and partners (“plug
and play”)
Prefer one system  Ensure support of a wide range of processes with one system
 Focus on most relevant processes
13NuggetHub 2019. All rights reserved |
All long list vendors are assessed using two dimensions: fitness of
product and ability to deliver
Long list assessment dimensions
How well does the vendor’s product fit
Client’s requirements?
Is the vendor able to deliver on the
scale required by Client?
Ability to
deliver
Fitness of
product
To qualify for the short list, vendors need to show sufficient strengths in both dimensions.
Assessment dimensions
Fitness of
product
strongpoor
Abilityto
deliverstrongpoor
Vendor
A
Vendor
B
Vendor
C
Vendor
D
Vendor
E
Assessment matrix
14NuggetHub 2019. All rights reserved |
Depending on the placement along these dimensions, vendors
qualify for the short list or are eliminated
Long list assessment outcome
Matrix placement Outcome
Maybe
Short list
Knock-out
Abilitytodeliver
stron
g
poor
Fitness of product strongpoor
Short list
Vendor qualifies for short list
Knock-out
Vendor can be eliminated,
remaining information gaps do
not need to be closed
Maybe
Vendor can only be considered
further if gaps are outside of core
functionality or if it pairs with a
strong integration partner
15NuggetHub 2019. All rights reserved |
Both dimensions are assessed using multiple criteria, each criterion
bundles multiple related requirements
Assessment criteria by dimension
Long list
assessment
Vendor characteristics
 Release strategy
 Support
 Resources
 Global footprint
Track record
 References
 Industry
 Number of customers
Functional requirements
 Standard software product
 Intercompany business
 Multi-client
 Multi-currency
 Multi-language
Non-functional
requirements
 Multi-modes of operation
(cloud, etc.)
 Availability
 Technology
Fitness of
product
Ability to
deliver
CriteriaDimensions
Assessment
criteria
Fitnessof product strongpoor
Abilitytodeliverstrongpoor
16NuggetHub 2019. All rights reserved |
Functional requirements include all functionality necessary for use
in the manufacturing industry
Criteria for fitness of product (1/2)
Long list
assessment
Fitness of
product
Ability to
deliver
Functional
requirements
Non-functional
requirements
Vendor
characteristics
Track
record
 Standard software product
 Multi-client companies and countries /
jurisdictions
 Multi-currency contracts, invoices and
payments
 Multi-language independent system, interface
and output language
 Intercompany business companies and
countries / jurisdictions
Assessment
criteria
17NuggetHub 2019. All rights reserved |
Non-functional requirements include technical and organizational
demands on software quality
Criteria for fitness of product (2/2)
Long list
assessment
Fitness of
product
Ability to
deliver
Functional
requirements
Non-functional
requirements
Vendor
characteristics
Track
record
 Availability & scalability 24x7 operations with
up to 20.000 active customers
 Technology
– Built on modern technologies that fit into Client’s IT
landscape
– Web services that enable “high-level” data access,
custom portals and steering
 Multi-modes of operation
– e.g. on-premises, IaaS, SaaS
Assessment
criteria
18NuggetHub 2019. All rights reserved |
Vendor characteristics include major vendor -related risks of
procuring a software product
Criteria for ability to deliver (1/2)
Long list
assessment
Fitness of
product
Ability to
deliver
Functional
requirements
Non-functional
requirements
Vendor
characteristics
Track
record
 Release strategy clearly defined and reliable release
strategy and roadmap
 Resources sufficient resources (both human and financial)
for development, support and implementation
 Support coverage of CET business hours; “premium
support” option is available off-the-shelf
 Global footprint vendor operates on a global basis and has
customers in multiple countries
Assessment
criteria
19NuggetHub 2019. All rights reserved |
Track record assesses a vendor’s market position and the trust and
confidence of our customers
Criteria for ability to deliver (2/2)
Long list
assessment
Fitness of
product
Ability to
deliver
Functional
requirements
Non-functional
requirements
Vendor
characteristics
Track
record
 Relevance of references strong track record of projects with
similar size
 Number of customers proven track record of collaboration with
market leader in relevant industries
 Industry proven track record of customers within manufacturing
industry
20NuggetHub 2019. All rights reserved |
The qualitative assessment divide the long list into three clusters
with three clear leaders
Vendor assessment overview
Abilitytodeliverstrongpoor
Fitness of product strongpoor
 Infor LN is a clear short list
candidates that offer both strong
products and the ability to deliver
 SAP S/4 Hana and Microsoft
Dynamics AX also offers both product
and ability to deliver, but they have a
smaller customer base compared to
Infor LN
Maybe
Knockou
t
Short
list
21NuggetHub 2019. All rights reserved |
Infor LN and SAP S/4HANA are the two most suitable candidates for
the future global Client ERP platform
Pre-evaluation overview – functional
SAP S/4HANAInfor LN Remarks
Functional Performance Score
 Infor integrated CPQ functionality ready
to use, relevant for inquiry-to-quote, quote-
to-order and order-to-cash
 SAP S/4HANA integrates CPQ with limited
functionality in v1709 (full in 1809)
 Infor LN provides manufacturing
execution functionality with its core
system whereas SAP provides a
manufacturing execution system as a an
additional application
 Regarding data availability, analytics and
reporting within the ERP platform Infor
LN provides better functionality and
usability (e.g. Widgets for business users)
 Infor implemented extensive and solid
intercompany functionalities with
release 10.5 (intercompany trading,
manufacturing, accounting and controlling),
SAP has best in class-functionality related
to financial and intercompany business
 SAP has a more intuitive and flexible
basic business intelligence functionality,
both vendors provide additionally licensed
application
Order-to-Cash 55
Purchase-to-Pay 55
Demand-to-Supply 45
Requirement-to-Product 45
Product Data Management 44
Forecast-to-Plan 44
Inquiry-to-Quote 45
Quote-to-Order 45
Quality Management 54
Engineering Sched. & Capacity
Planning
54
Inventory & WH Mgmt. 54
Maintain-to-Settle 44
Finance-to-Manage 54
Master Data Management 44
Engineering Value Flow Controlling 44
Record-to-Report 54
Product lifecycle Management 43
Business Intelligence 54
4,434,28
22NuggetHub 2019. All rights reserved |
Strategic, non-functional and technical criteria of the two leading
vendors have been pre-evaluated
Pre-evaluation overview – strategic, non-functional and technical
Synergy potential
Vendor characteristics
Cost implication
Implementation
feasibility
Usability
Reliability
Performance
Automation
Supportability
Architectural
Security
Release Management
Infrastructure
4,424,42Overall Performance Score
StrategicNon-FunctionalTechnical
1 - low 2 – below average 3 –
average
4 – above
average
5 –
strong
SAP S/4HANAInfor LN Remarks
 Infor LN and SAP S/4HANA can leverage
similar synergies and have similar
characteristics from a vendor perspective
 Infor LN has lower cost implications than
SAP S/4HANA from a total cost of
ownership perspective
 There is a higher availability of internal
know-how for Infor LN but there is a
higher availability of external experts for
SAP S/4HANA
 The standard Infor LN comes with an
attractive graphical user interface –
SAP S/4HANA requires Fiori Apps
 The current Client ERP architecture causes
a possibly better integration of Infor LN
and a better implementation feasibility
of Infor LN
5
5
3
3
3
5
5
5
5
4
5
4
5
5
5
4
4
5
5
4
5
4
5
5
5
4
Other criteria score 4,384,62
23NuggetHub 2019. All rights reserved |
The evaluation results include Client-specific criteria weights and
show […] as the recommended ERP platform
Evaluation results with weighted criteria
Category Weights Sub-category
Count
P
Count
V
Count
T
Weights Score
weighted
Score
Score
weighted
Score
Synergy potential 5 5
Vendor characteristics 5 5
Cost implications 4 3
Implementation feasibility 4 3
Inquiry-to-Quote 5 4
Quote-to-Order 5 4
Order-to-Cash 5 5
Purchase-to-Pay 5 5
Demand-to-Supply 5 4
Inventory & WH Mgmt. 4 5
Quality Management 4 5
Requirement-to-Product 5 4
Engineering Scheduling & Capacity 4 5
Engineering Value Flow Controlling 4 4
Forecast-to-Plan 4 4
Maintain-to-Settle 4 4
Finance-to-Manage 4 5
Record-to-Report 4 5
Product Data Management 4 4
Product Lifecycle Management 3 4
Master Data Management 4 4
Business Intelligence 4 5
Usability 5 3
Reliability 5 5
Performance 4 5
Automation 5 5
Supportability 4 5
Architectural 5 4
Security 5 5
Release Management 4 4
Infrastructure 5 5
Total Score 0% 4.42 0.00 4.42 0.00
Strategic
Functional
Non-
Functional
Technical
P: Physically present participants
V: Virtually present participants
T: Total present participants
24NuggetHub 2019. All rights reserved |
All three candidates have manufacturing references, a solid
installation base and global support organizations
Company & Product Overview
Infor SAP
Customers
Company
facts
Microsoft
Founded: 2002
$2.7B total revenue FY16
15.500 employees
Founded: 1972
€22.1B total revenue FY16
85.000 employees
Founded: 1975
€85.3B total revenue FY16
124.000 employees
Evaluated
solution
Financing
Support and
Service
Availability
Installations
Lease, Owner Financing,
Lease to own
Lease, Owner Financing,
Lease to own
Lease, Owner Financing,
Lease to own
Offices in 41 countries Offices in 81 countries Only partner-based offices
Infor LN 10.5 SAP S/4HANA Microsoft Dynamics AX 12
Essential support, Premium
support, Elite support
Preferred Success, Preferred
Care, Enterprise Support
Enhanced Support, Professional Direct
Support, Premier Support
Bae systems, Ferrari, Wausau,
Sparaylat, Propper,
Mingledorff’s, DAB
Vectus Industries,
Veolia, Carl Stahl, CEITEC
Trelleborg, Würth Group, ROOS Dental
9.300 +1.000 +5.000 +
25NuggetHub 2019. All rights reserved |
Client’s E2E processes have a profound global ERP standardization
potential and a few relations to other systems
Client-specific functional requirements (1/2)
Demand-to-
Supply
Requirement-
to-Product
Purchase-to-
Pay
Order-to-Cash
Product Data
Management
E2E process
ERP standard.
degree
Quality
Management
Forecast-to-
Plan
high
high
high
high
high
high
high
Global
Global
Global
Global
Global
Global
Global
Requirements on
other systems Critical requirements (Excerpt)
Inquiry-to-
Quote
high Global
Quote-to-
Order
high Global
high medium low Global Regional Local
Process stand.
requirements
26NuggetHub 2019. All rights reserved |
Client’s E2E processes have a profound global ERP standardization
potential and a few relations to other systems
Client-specific functional requirements (2/2)
Finance-to-
Manage
Maintain-to-
Settle
Inventory & WH
Mgmt.
Eng. Scheduling
& Capacity Plan.
Data
management
E2E process
ERP standard.
degree
Record-to-
Report
Product Lifecycle
Mgmt.
Eng. Value Flow
Controlling
Business
Intelligence
Process stand.
requirements
Requirements on
other systems Critical requirements (Excerpt)
high medium low Global Regional Local
high
high
high
high
high
high
high
Global
Global
Global
Global
Global
Global
Global
high Global
high Global
27NuggetHub 2019. All rights reserved |
The current validation shows a high potential to standardize and
harmonize the ERP platform
Key findings
Critical
requirements
Pain points
Strategic and
non-functional
requirements
 A high degree of critical requirements can be supported with ERP standard
functionality and do not need customization
 Many critical functional requirements are not supported by the current ERPs
 A significant amount of critical requirements address global process standardization
and master data harmonization
 Some critical requirements address other systems (e.g. PDM, PLM, CRM and CPQ)
 Many processes are lacking global standards and are inconsistent (can be
harmonized by central ERP platform)
 Consistent adherence to existing processes is missing (can be supported by
central ERP platform but organization and management is key)
 Missing system integration and inconsistent master data require a huge amount
of manual effort and hinder effectiveness and process improvements
 Strategic focus is put on cost efficiency, system standardization, process harmonization,
local adjustments, one global standard solution and automation
 There is less strategic focus on flexibility and digitization
 There is strong non-functional focus on usability, reliability, performance, automation
and supportability, but there is no focus on costs of the ERP platform
implementation (a failed ERP implementation creates much higher costs, compared to
an expensive ERP implementation)
Showstoppers for standard ERP platforms (Infor/SAP) could not be identified
28NuggetHub 2019. All rights reserved |
The focus interviews followed a structured procedure including
functional discussions and evaluation scales
Interview topics and content
Gather
critical
Client
requirement
s and pain
points
 Identification of Client-specific ERP
requirements based on functional best
practice E2E process model to derive
standardization potential
• Perspectives: Global, regional, local
 Identification of Client-specific ERP
pain points to derive optimization
potential
• Perspectives: System-, process-
related
Gather
criteria
weights
 Assessment of relevance for strategic,
non-functional and technical
requirements to derive criteria weights
Further
opinions
 Expectations on “ERP Platform Evaluation” project
 Risks for ERP platform selection and implementation
 Strategic: Synergy potential, vendor
characteristics, cost implications,
implementation feasibility
 Non-functional: Usability, reliability,
performance, automation, supportability
 Technical: Architectural, security, release
management, infrastructure
 Order-to-Cash
 Purchase-to-Pay
 Demand-to-Supply
 Requirement-to-
Product
 Product Data
Management
 Forecast-to-Plan
 Inquiry-to-Quote
 Quote-to-Order
 Quality
Management
 Eng. Scheduling &
Capacity Planning
 Inventory & WH
Mgmt.
 Finance-to-Manage
 Maintain-to-Settle
 Data management
 Business
Intelligence
 Engineering Value
Flow Controlling
 Record-to-Report
 Product Lifecycle
Management
Functional E2E process model
15 interviews with a duration of 60-90 minutes
29NuggetHub 2019. All rights reserved |
A pre-evaluation of the shortlist candidates excludes Microsoft
Dynamics - Infor LN and SAP S/4HANA remain
Reasons against Microsoft Dynamics
Considering the project objective to provide one global ERP platform with as much
standard processes as possible MS Dynamics AX is not a suitable candidate
E2E process
functionality
weakness
 Compared to Infor LN and SAP S/4HANA, MS Dynamics AX has a much
weaker support of E2E processes overall
Data analysis
weakness
 Provisioning of reporting and Business Intelligence functionality is very
complex and needs much higher effort than Infor and SAP
Standard process
availability
weakness
 Compared to Infor LN and SAP S/4HANA, MS Dynamics AX does not
provide many standard processes, but relies on partners to provide a
industry specific process implementation
 Implementation of business processes have a high customization need
Know-how
availability
weakness
 Availability of Microsoft Dynamics AX expertise is very limited outside Italy
 Performance of implementation partners for larger Dynamics AX
implementations is poor outside of Italy
30NuggetHub 2019. All rights reserved |
The requirements’ ratings are rather uniformly distributed showing
relevant importance of each requirement
Strategic, non-functional and technical requirements
Strategic
 Synergy potential
 Vendor characteristics
 Cost implications
 Implementation
feasibility
Non-
functional
 Usability
 Reliability
 Performance
 Automation
 Supportability
Technical
 Architectural
 Security
 Release Management
 Infrastructure
Least
important
Most
important
In addition to the functional
requirements all further
requirements for the ERP
platform evaluation have
been assessed by the Client
experts and show high
relevance
31NuggetHub 2019. All rights reserved |
Long-list of potential 8 ERP vendors identified
ERP vendor long-list (1/2)
Company Price
INFOR LN
Materials
Mgmt.
SalesOrderMgmt.
FinancialMgmt.
ProductionMgmt.
SupplyChain
Mgmt.
CustomerRel.Mgmt.
SAP S/4 HANA
EPICOR
sage
MS Dynamics
$25K-500K
$4K -500K
$2600/ user
$20K-750K
$25K -250K
References
Ferrari, Wausau,
Sparaylat
Indus Motor,
Veolia
LD Industries,
Unilever, Chrysler
Renault F1 Team,
Accu Weather
INTERTEC-Hess
GmbH, ROOS
Dental
Industry focus Customers
Industrial
Manufacturin
g
90.000
Industrial
Manufacturin
g
1.000
Industrial
Manufacturin
g
20.000
Financial
Services,
Accounting
250.000
Industrial
Manufacturin
g
20.000
32NuggetHub 2019. All rights reserved |
Long-list of potential 8 ERP vendors identified
ERP vendor long-list (2/2)
Company Price
Oracle
Materials
Mgmt.
SalesOrderMgmt.
FinancialMgmt.
ProductionMgmt.
SupplyChain
Mgmt.
CustomerRel.Mgmt.
QAD Cloud ERP
IFS
proALPHA
$15K-400K
$300K-2M
TBD
$250/User
References
Starplast, Sako
Limited
Kendrion, Völkl,
Maxon Motor
Evco, DS Smith,
Renolit,
Anca CNC
Gaudlitz,
Aichelin, apra
Gruppe, H2O
Industry focus Customers
Manufacturin
g,Packed
Goods
11.000
Manufacturing
, Financial 4.000
Production,
Retail,
Manufacturin
g
2.700
Industrial
Manufacturin
g
1.800
33NuggetHub 2019. All rights reserved |
The operation model evaluation shows Cloud IaaS and Cloud SaaS as
preferred options for the ERP
ERP operation model – evaluation
Client data center Hosted Cloud (IaaS) Cloud (SaaS)
Total cost of
ownership
- -
 High initial infrastructure
investment
 Ongoing infra./app.
maintenance costs
o
 Infrastructure and
application costs included
in hosting fees
 Partly ongoing infra./app.
maintenance costs
++/
+
 Usage-driven
infrastructure costs
 Remaining application
maintenance costs
++/
+
 Infrastructure and
application costs included
in subscription costs
Implementati
on feasibility
-
 High transformational
efforts and low resource
availability o
 Implementation done by
hosting service provider
 High integration efforts +
 Fast, simple set-up (on-
demand) but high reqs. on
network and integration ++
 Fast, simple set-up (on-
demand) but high reqs. on
network
Operational
feasibility
-
 Low operational Infor/SAP
experience
 Data center know-how
needed
o
 Operations partially done
by hosting service
provider
 Own network
infrastructure necessary
 High alignment effort
o
 Less internal know-
how/resources about
maintaining IaaS and
Infor/SAP maintenance
++
 Ready-to-use
 Infrastructure and
Infor/SAP maintenance
done by service provider
System
performance
o/-
 Probably limited system
performance
 Depending on investment
and know-how
o
 Good availability
(depending on SLA and
connectivity)
 Probably lower system
performance compared to
IaaS and SaaS
++
 Best-in-class availability,
highly reliable and
automated scaling
+
 High availability
 Probably lower system
performance compared to
IaaS
Security o/-
 Probably low data security
 Limited security
capabilities
 Depending on investment
and know-how
+/o
 High security and
policy/compliance
fulfillment
 Own network security
necessary
+
 Highest security and
policy/compliance
fulfillment on
infrastructure
 Application security
managed by client
++
 Highest security and
policy/compliance
fulfillment on
infrastructure and
application
Overall - o + ++
- - very poor - poor o neutral + good ++ very good
Client
Cloud
Cloud
ERP
Service
Provider
34NuggetHub 2019. All rights reserved |
Cloud IaaS and Cloud SaaS are the best options for Infor LN
- for SAP S/4HANA Cloud IaaS is the best option
ERP operation model – comparison
Infor SAP
Cloud
(IaaS)
+
 Full support for deployment on IaaS
 Support for leading IaaS provider (e.g.
AWS)
 License purchase + yearly maintenance fee
+
 Full support for deployment on IaaS
 Support for leading IaaS provider (e.g.
AWS)
 License purchase + yearly maintenance fee
Cloud
(SaaS)
++
 Proven SaaS solution with full functionality
 Global high performance infrastructure
(AWS)
 Subscription instead of license purchase
o
 Introduced just recently in 2017 (FI);
incomplete functional coverage
 Subscription instead of license purchase
Hosted o
 Hosting services available in market
 Infrastructure partly managed by service
provider
 Application could be managed partly by
service provider
o
 Proven hosting services available in market
 Infrastructure partly managed by service
provider
 Application could be managed partly by
service provider
- - very poor - poor o neutral + good ++ very good
1 version 10.5.X 2 version 17XX
CloudCloud
ERP
Service
Provider
1
2
35NuggetHub 2019. All rights reserved |
A first cost estimate indicates cost advantages for Infor - details
to be validated after vendor negotiations
ERP cost indication (direct internal and external costs without benefits
realization)
Operating Models
Client
data
center
Hosted
Cloud
(IaaS)
Cloud
(SaaS)
Client
data
center
Hosted
Cloud
(IaaS)
Cloud
(SaaS)
Net present value3 23M € - 58M € 16M € - 47M € 11M € - 38M € 9M € - 20M € 27M € - 71M € 24M € - 62M € 13M € - 48M € 11M € - 25M €
initial
Investment costs 17M € - 52M € 12M € - 41M € 7M € - 33M € 1M € - 6M € 20M € - 62M € 14M € - 50M € 9M € - 41M € 2M € - 6M €
Implementation costs4 15M € - 48M € 10M € - 40M € 6M € - 32M € 1M € - 6M € 17M € - 56M € 12M € - 46M € 7M € - 36M € 2M € - 6M €
Infrastructure
investment
1M € - 2M € 1M € - 2M €
Licensing5 ~1M € ~1M € ~1M € 2M € - 4M € 2M € - 4M € 2M € - 4M €
peryear
Operating costs 1M € - 2M € ~1M € 722k € - 1M € 1M € - 2M € 1M € - 2M € 2M € - 3M € 1M € - 2M € 2M € - 3M €
Subscription costs5 1M € - 2M € 1M € - 3M €
Vendor maintenance
fees
~270k € ~270k € ~270k € 431k € - 863k €431k € - 863k €431k € - 863k €
Application operations 200k € - 300k €100k € - 200k €100k € - 200k € 50k € - 100k € 200k € - 300k € ~800k € 100k € - 200k € 50k € - 100k €
Infrastructure
operations
646k € - 1M € 460k € - 1M € 352k € - 1M € 646k € - 1M € 483k € - 1M € 302k € - 1M €
10years
Net present value
for a 10 years horizon
in Mio. €
3: based on WACC 8%
Min-Max range
indication
1: version
10.5.X
2: version
17XX
4: templates and 14
rollouts
5: Infor pricing aligned with Infor for Client;
SAP pricing based on historical values (only indicative),
current licensing is different
1113
2427
911
16
23 25
48
62
71
20
38
47
58 MaxMin
36NuggetHub 2019. All rights reserved |
A transition to Infor shows the lowest transition effort for locations
currently using BaaN and Infor
ERP transition evaluation – effort
Transition effort for future ERP
+
 Proven best practices for
migration from BaaN to
Infor
 Moderately more
advanced IT skills needed
 Moderate process and
system changes (training,
change mgmt)
-
 Complex technical
migration (data, reports,
interfaces, forms)
 Different IT skills
needed
 Extensive process and
system change (training
and change management
needs)
+
 Simple migration
 Sufficient current IT
skills
 No/moderate process
changes (training,
change)
o
 Moderate migration
 Similar current IT skills
 Many process changes
(training, change mgmt)
-
 Complex technical
migration (data, reports,
interfaces, forms)
 Different IT skills
needed
 Extensive process and
system change (training
and change management
needs)
-
 Complex technical
migration (data, reports,
interfaces, forms)
 Different IT skills
needed
 Extensive process and
system change (training
and change management
needs)
 Leverage BaaN/Infor know-
how and experience
 Maintain a manufacturing-
oriented ERP for mid-size
enterprises
 Similar change impact for all
companies and locations
 Easy setup of Center of
Excellence (CoE)
* DD=Dresden, AR=Argentina, BR=Brazil
Company Location
ERPs
today
Users
* DD=Dresden, AR=Argentina, BR=Brazil
37NuggetHub 2019. All rights reserved |
Our SAP S/4HANA Strategy Assessment is based on the two main
phases including the assigned actions and work packages
SAP S/4HANA & Cloud Strategy Assessment
38NuggetHub 2019. All rights reserved |
The structured and proofed impact analysis will set the stable
foundation for the further S/4HANA transformation
Impact Analysis
1
DESCRIPTIONRESULTSCOLLABORATION
WORKSHOPS & FOCUS
INTERVIEWS
 Assessment of criteria
based on structured focus
interviews with process
and IT departments
 Criteria are security,
flexibility, scalability or
readiness for new
business scenarios
BUSINESS AND IMPROVEMENT
POTENTIAL
Interviews
 (Bus. Stakeholder HC/CS)
 Process Area Owner
 Global Process Owner
 Enterprise Architect
 IT Domain Manager
 ERP Strategy Manager
ARCHITECTURE
ANALYSIS
 Analysis of the current
Client SAP architecture
landscape, functional
coverage and impact of
the S/4HANA application
architecture
 Analysis of critical and
relevant interfaces
IMPACT ON THE SYSTEM
LANDSCAPE
TRANSFORMATION
4
IT-Experts
 Enterprise Architect
CODE ANALYSIS
 Analysis of the code
repository to separate
between used and non-
used lines of code (LOC)
of additional code lines by
using smartShift
 Output of the analysis
gives an overview of the
recommended action
fields
BASELINE FOR DIFFERENT
SCENARIOS INCLUDING
COST ESTIMATIONS
3
IT Experts
 IT-Basis Consultant
 IT Security Officer
 IT Application Consultant
S/4 PROCESS COVERAGE
 Assessment of the
current business process
scope against the
upcoming SAP S/4HANA
core and cloud
capabilities
 Determination of the key
action points for the
transformation towards
S/4HANA
IMPACT ANALYSIS AGAINST
EXISTING SYSTEM
LANDSCAPE
2
Process Experts
 Process Experts to
guarantee access to
required data and the
alignment of the results
DEPENDENCY
ANALYSIS
 Based on started,
planned and defined
project initiatives
identification of impact
towards the S/4HANA
transformation
 Especially the big global
and important local
project initiatives have
to be considered
IMPACT ANALYSIS OF
DEPENDENT IT PROJECT
INITIATIVES
5
Project Stakeholder
 IT Project Leads
 Business Project Leads -
optional
39NuggetHub 2019. All rights reserved |
The conception phase will define and structure the identified
measures for the step-by-step transformation
Conception
S/4HANA BENEFITS PER
SCENARIO
DIGITAL BUSINESS
MODEL
 Determination of benefits
for the S/4HANA
Transformation per target
scenario
 Concretion of the
business impact of each
of the selected scenarios
6
Business / IT Experts
 Process Area Owner
 Global Process Owner
TARGET ARCHITECTURE
TARGET ARCHITECTURE
 Analysis and conception
of the target application
architecture per domain
for each of the scenarios
 Definition of the long
term target scenario with
SAP Enterprise and
Technology Architects
8
IT Experts
 Enterprise Architect
 IT Domain Manager
SCENARIO
ROADMAPS
 Definition of multiple
scenario roadmaps to
compare the possible
scenarios
 The effects for the
organisation will be
transparent
COMPARABLE SCENARIO
ROADMAPS
7
IT Experts
 Enterprise Architect
 ERP Strategy Manager
 IT Domain Manager
DESCRIPTIONRESULTSCOLLABORATION
GOVERNANCE RISK
ASSESSMENT
PROJECT GOVERNANCE
 Analysis of the current
project governance in
terms of risks considering
the S/4HANA project
 Evaluation and
prioritization of measure
to mitigate the risks and
to improve the success
probability
IT Experts
 Enterprise Architect
10
RAMP-UP OF ACTIVITIES TO
GET BACK TO THE
STANDARD
RETROFIT ACTIVITIES
 Definition and alignment
of retrofit activities to get
back to SAP standard
 Combination of the code
analysis and facilitation of
SAP best practices lead
the way towards the SAP
standard
9
IT Experts
 Enterprise Architect
 IT-Basis Consultant
40NuggetHub 2019. All rights reserved |
ERP Platform Transformation3
ERP Platform Strategy & Evaluation2
Cloud ERP Strategy Definition and Introduction1
Agenda
41NuggetHub 2019. All rights reserved |
Proposed Timeline 2019: Assessment, Template & Pilot
S/4HANA
Template Design
01/19 02/19 03/19 04/19 05/19 06/19 07/19 08/19 09/19 10/19 11/19 12/19 01/20
Scoping
Phase
Project
Initiation
& Prep.
Rollout Pilot
Template Design &
Build
S/4HANA
Assessment
Further
Rollouts
01.01.2019 – 31.03.2019
S/4HANA
Assessment
Rollout Pilot
Main Phases
Rollout
country 2
01/21
31.12.2019*31.08.2019*31.05.2019*
*All proposed dates to be evaluated jointly during assessment phase
42NuggetHub 2019. All rights reserved |
Transformation to a harmonized ERP landscape could be conducted in
several possible scenarios
ERP harmonization scenarios
Scenario 1 Scenario 2 Scenario 3
Name Function-specific rollout Full-scope rollout Global big bang rollout
Key facts 1 ERP – 4 Templates 1 ERP – 1 Template 1 ERP – 1 Template
Templates
 4 central templates with local
adjustments for every plant
 Contract-based manufacturing
 Project-based manufacturing
 Trading
 Holding
 Amendment of local adjustments
to central template during rollout
 One central template with local
adjustments for every plant
 Amendment of local adjustments
to central template during rollout
 One central template with local
adjustments for every plant
 Amendment of local adjustments
to central template before and
after rollout
Roll-out  Phased rollout (sequential)  Phased rollout (sequential)  Big bang rollout (parallel)
Duration
 ~ 1 year pilot and central config.
 ~ 3 years rollout (8-12 per year)
 ~ 0,5-1 year pilot and central
config.
 ~ 5 years rollout (5-8 per year)
 ~ 1 year pilot and central config.
 ~ 1 year rollout
Resource
needs
 Medium resource needs (central
teams for templates and rollout)
 Low resource needs (smaller
team for larger time span)
 High resource needs (many
external consultants/experts and
internal experts)
Change
needs
 High change need (business
process change)
 High change need (business
process change)
 Highest change need (business
process change and fast
implementation)
Wave 1 – Region A
Wave 2 – Region B
Wave 1 – Region A
Wave 2 – Region B
Big Bang
43NuggetHub 2019. All rights reserved |
Out of the three different scenarios the full scope rollout (phased )
has the least disadvantages
ERP harmonization scenarios
Scenario 1 Scenario 2 Scenario 3
Name Function-specific rollout Full-scope rollout Global big bang rollout
Pro
 Centrally defined business
processes with standards for
different entities
 Consideration of local
amendments during rollout
 2nd fastest implementation time
 Central resources for template
configuration
 Centrally defined business
processes with standards for all
entities
 Consideration of local
amendments during rollout
 Lowest implementation risk
 Lowest resource needs
 Low maintenance effort (1
template)
 Centrally defined business
processes with standards for all
entities
 Parallel availability of new ERP
platform for all plants
 Fastest implementation
 Fast realization of process
efficiencies
 Low maintenance effort (1
template)
Con
 Medium implementation risk
 Medium-fast realization of process
efficiencies
 Higher maintenance effort
(4 different templates)
 Longest implementation time
 Slow realization of process
efficiencies
 High one-time effort and costs
 Possible excessive demand of
employees (change of business
processes)
 High implementation risk
 Consideration of local
amendments during blueprint
Points 8 2 1
Wave 1 – Region A
Wave 2 – Region B
Wave 1 – Region A
Wave 2 – Region B
Big Bang
44NuggetHub 2019. All rights reserved |
The future ERP harmonization should be separated in a pilot phase
and a rollout phase
Pilot and rollout phase for the future ERP harmonization
 Business processes and system implementation
 Data migration
 End user training
 User acceptance testing
 System cutover
 Change management
 Post implementation training
 Continuous improvement
 As-Is analysis and gap analysis
 Business case calculation
 Project setup and planning
 Pilot plant selection
 Business process analysis
 Central template development
 Implementation for pilot plant
 Implementation of central template
 Implementation of local specifics
 Further development of central template
with relevant amendments after rollout
at pilot plant
 Preparation and planning of ERP rollout
for plants and other entities
Phase 1 – ERP Pilot
Q1 2018 Q1 2019 2020 / 2022 / 2024
Phase 2 – ERP Rollout
The ERP harmonization is a major business project. ICT is just an enabler and provides the system
functionality – the implementation of the business processes has to be done by the business.
~0,5-1 year ~2-5 years
 Business processes standardized
 System rollout conducted
 Business processes analyzed
 System rollout planned and prepared
45NuggetHub 2019. All rights reserved |
Concurrent transformation approach for harmonization projects with strong
business and IT alignment
Cloud ERP Program Approach
Process & Data
Technology
Current system setup analysis
Technical architecture and
system usage analysis
Future IT landscape design
Pre-configured system setup
Agile demonstration and realization
Data migration and test
concept creation
System set-up and
data migration
System configuration
Technical specification
and development
Cut-over planning
Final ITC and UAT
conduction
Migration planning
Unit testing and issue
fixing
Cut-over tracking and
execution
Local development
finalization
Go-Live
JOURNEY
Kick-Off
Initiation
Team
Stakeholder
Walkthrough
Change
Management Key users and stakeholder
identification
Training concept definition
Change Impact
Analysis execution
Train-the-trainer
execution Lessons Learned
compilation
Project roadshow execution
Communication and people mobilization
Figures
Business case structure
development
KPI measurementKPI definition
Business case calculation Test status reporting
Go-live readiness reporting
Go/No-Go
Decision
Kick-Off
Project Team
Project
Management
Governance structure
definition
Project planning
Resource and working mode management
Risk, issue, and quality management
Scope and change request management
S/4HANA Assessment
Agile Approach
EeE process design
and alignment on
business scenarios
Align Business
requirements
with SAP
Standard
Capabilities &
feature detailing
/ definition of
user story
Backlog
management,
sprints, scrum
coordination
Plan & conduct
testing (e.g. IT,
DataMig, UAT,
Regression)
Training people
Build support
organization
Establish
operational
routines
Define, Build & Test Pilot Roll OutInitiation
46NuggetHub 2019. All rights reserved |
Example timeline: We see the timeline until DEC 2019 as a valid
starting point and like to detail and adjust activities and dates jointly
REGIONAL BUSINESS
CASE ALIGNMENTS
CONDUCT ORANIZATIONAL CHANGE
IMPACT ANALYSIS
IDENTIFACTION OF PROCESS EXTENSIONS / SATELLITES
ALIGN ON SAP CLOUD
PRODUCTS
RAPID
START
DEFINE TECHNICAL
GOVERNANCE MODEL
MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
SETUP INITIAL
BUSINESS CASE
DEFINE AND ALIGN
IMPLEMENTATION ROADMAP
DEFINE & ALIGN MIGRATION APPROACH
DESIGN
TARGET ARCHITECTURE
SETUP S/4 AND
SOLUTION (CG)
ASE1
ESTABLISH TRANSFORMATION
GOVERNANCE MODEL
A
IMPLEMENT VALUE
SCENARIOS
Q-GATE 1 Q-GATE 2 Q-GATE 3
CHANGE &
PROJECT
MANAGEMENT
BUSINESS CASE
BUSINESS
PROCESSES
ARCHITECTURE &
DEVELOPMENT
DATA MODEL FOR
PROTOTYPE
DEFINE
VALUE
SCENARIOS
A Prepare phase Foundation phaseB C BuildPrint phase Test phaseDLegend:
DEFINE DATA GOVERNANCE
ELABORATE TECHNICAL TRANSITION
FOR SEQUENTIAL ROLLOUT
DETAILE & ALIGN REMAINING
FUNDAMENTAL DESIGN QUESTIONS
COMPLETE
BUSINESS CASE 1.0
COMPLETE
BUSINESS CASE 2.0
ASE2
ASE3
A
A S/4 AGILE PROTOYPING => MVP for Client SALES COMPANYB C
C
A B
A B B C
DATA
Kick-Off SteerCo SteerCoSteerCo
MAIN RI(C)EFW list initialization & arbitration
A CHANGE STRATEGY,
COMMUNICATION PLAN
STAKEHOLDER
ANALYSIS
A
SETUP AGILE FRAMEWORKA
C
B
C
C
C
C
B C
C
C
PROCESS ALIGNMENT E2E WS (INCL. SYSTEM
DEMO) – DIGITAL CORE
B
C
PREPARE
PROCESS WS
A
B
47NuggetHub 2019. All rights reserved |
Key success factor 1: A stringent top-down governance, successful
transformation programs mirror line organizations
ERP Transformation: Key success factors: 1) Governance
End-to-End Process Model
(End-to-end process flows, operating procedures)
IT applications & infrastructure
(Technology landscape (systems, applications,
interfaces), ERP transactions)
Line organization
Program management
& governance
Process & data programs
S4/HANA
transformation
program
Business governance
Process &
data governance
IT governance
Program organization
Vision
& Strategy
(Strategic
Directives &
cornerstones)
RTR
Record to
Report
PTP
Purchase
to Pay
OTC
Order to
Cash
FTD
Forecast
to Deploy
MTS/
MTO
Production
Business Model
(Interaction model with external
business partners, business
scenarios)
Operating Model
(Organizational set-up, interaction model
with internal business partners,
responsibility definition)
Governance
Governance
Frank internal culture of improvement and disclosure of project-relevant information
Approved business case to enable target-oriented design decisions and prioritizations
48NuggetHub 2019. All rights reserved |
Detailed governance principles, structures, bodies and mechanisms
should be elaborated as a key success factor
ERP Transformation: Key success factors: 1) Governance
 Outlines the overall
governance principles (e.g.
maintain regional
independence)
Governance
Principles
 Outlines the overall decision
rights structure in line with
org structure, the defined
roles and the KPI
responsibilities (incl.
authorization competencies)
Governance
structure &
roles
 Outlines the overall
governance bodies structure
 Specifically designs each
governance body (Objectives,
frequency, members, etc.)
Governance
bodies
 Outlines the decision process
flow incl. RACI
 Outlines the mechanisms that
are applied to actually come
to a decision (e.g. majority
rule vs. consensus rule)
Governance
mechanisms
49NuggetHub 2019. All rights reserved |
A remained focus should be put on the highest value-added business
opportunities and challenges
ERP Transformation: Key success factors: 2) Business focus
Interconnectedlayers
Strategy &
Operating Model
Organization &
Capabilities
Business
Processes
Technology
& Data
Your transformation is an
opportunity to intensify
collaboration across divisions
and markets for a holistic
business conversion:
Optimize entrenched processes
across division and markets
Rethink the business model &
open space for new business
models
Improve insights & business
steering & collaboration
Digital disruption of chemical and
pharmaceutical industry with new
business models
Necessity for new business capabilities
Standardization and harmonization
as strategic priorities
SAP S/4 HANA technology as enabler for
business benefits
50NuggetHub 2019. All rights reserved |
Our proposed governance model enables Client to calculate a
collaborative transformation business case
ERP Transformation: Key success factors: 2) Business focus
Division perspective Market perspective
…
G
r
o
u
p
Fi & Co
Prod.
Procure-
ment
D
i
v
i
s
i
o
n
Fi & Co
…
Market 1 Market 2 … … Market n…
Log.
Group / Division
 Division Councils, Area Product Owner,
Business Process Manager p. Domain
 Limited support for market initiatives, yet
best suited for alignment on division level
 Shortest duration to achieve top-down
alignment across divisions
 Low w.r.t. manageability of scope
 Higher w.r.t. market involvement
 Best fit to division strategies and steering
 Better tailoring of processes
 Requires Area Product Owner to govern
Key market
 Area Product Owner aligned with country
Business Process Manager and Councils
 Improve collaboration between key
markets and x-division cost optimization
 Scope enlarged to key countries to achieve
bottom-up alignment
 Standardize and harmonize processes
 Higher w.r.t. organizational and technical
complexity
 Integration of business benefits
 Finance-related division activities are
aligned cross-market / cross-division
Group / Division, key markets (final
consolidation)
 Area Product Owner, Business Process
Manager and Experts, Councils
 Further improved collaboration and joined
alignment
 Standardization and process harmonization
across the program and aligned divisional
and market initiative
 Higher due to strong dependency on
governance and collaboration model
 Aligned finance- and logistics / Supply
Chain-related activities
 Highest potential for collaboration
…
G
r
o
u
p
Fi & Co
Prod.
Procure-
ment
D
i
v
i
s
i
o
n
Fi & Co
…
Market 1 Market 2 … … Market n…
Log.
…
G
r
o
u
p
Fi & Co
Prod.
Procure-
ment
D
i
v
i
s
i
o
n
Fi & Co
…
Market 1 Market 2 … … Market n…
Log.
Level
Governance
Support for x-division and market
initiatives
Benefits
Risks
Other
Domains in project scope
Harmonized processes / standards
Market specific harmonization approach
Legend:
SETUP INITIAL
BUSINESS CASE
COMPLETE
BUSINESS CASE 1.0
A REGIONAL BUSINESS
CASE ALIGNMENTS
ASE2
COMPLETE
BUSINESS CASE 2.0
Bridge to project phase
Final Business Case
51NuggetHub 2019. All rights reserved |
We will make use of our use case library to propose cases for
digitization and identify change levers
ERP Transformation: Key success factors: 2) Business focus
 For each domain
determination of benefit / cost
levers / use case for
supporting overall business
case targets
 For each use case verification
of usage and benefits for the
markets
 Showcase not only in the E2E
process domain but also in
the reference S/4 HANA CORE
system by Demo
Rethink business
 Each use case with clear
aligned description of usage
and benefits for having a
standardized discussion within
the workshops with the
domain experts
 Clear verification of feasibility
within this market
 Leverage of S/4 HANA
transformation by the use
case library of Consultant
Improve insights
 Drill down of benefit / cost
efficiency tree
 Alignment of current benefits
with controlling, process
expertise in IT and business
process in functional domains
 Overall consolidation and
alignment of the KPI /
Business Case framework
according to Client standards
and regulation up front
Optimize operations
52NuggetHub 2019. All rights reserved |
Change management is embedded from the start - developing the
culture, workforce and skills needed for the digital age
ERP Transformation: Key success factors: 3) Change Management
Effective Change Management is
embedded in all our transformation
projects (‘DNA’)
Our New Deal
Change Management Framework is
Consultant Invent’s globally
implemented change approach
Our innovative target-group specific
change architectures deals with the
dynamic environments and projects of
our client
By balancing the rational, political, and
emotional side of change, we ensure
sustainable transformations
Clear and transparent KPIs build the
‘backbone‘ of our sustainable change
work
All projects benefit from our strong
Thought Leadership
(e.g. change 2.0, our regular Change
Management Study)
53NuggetHub 2019. All rights reserved |
To ensure you master your business transformation and prepare for
the future way of working we work collaboratively
ERP Transformation: Key success factors: 3) Change Management
Key
considera-
tions
Key
Outcomes
ORGANIZATIONAL CHANGE MANAGEMENT (OCM)
CHANGE MANAGEMENT COMMUNICATIONS ROLES & TRAINING
Need to align the leadership
team around a clear
transformation vision and
case-for-change
 Established change monitoring
 Analyzed key stakeholder groups
 Analyzed change impact for people,
process, organization and technology
 Continuous and iterative usage of a
change roadmap
Need to develop a robust
change plan, to achieve deep
and lasting organizational
change
Need to develop a
comprehensive, multi-phased
transformation roadmap
Need to establish an accurate
capability baseline, on which
to base the transformation plan
 Aligned communication plan with
identified measures and channels
 Established information strategy to
keep all stakeholders integrated in the
project progress
 Defined change story to enhance
commitment on a emotional level
 Identified training needs, objectives
and target groups
 Roles aligned to specific user groups
 Established training strategy in align-
ment with overall change strategy
 Developed training approach including
different channels for knowledge
transfer (online, offline)
Agile Agile
54NuggetHub 2019. All rights reserved |
The “Change Deal”, is an iterative, and truly
agile approach that delivers lasting organizational change
ERP Transformation: Key success factors: 3) Change Management
1 3 4 5 62
Adopt &
Share
Backlog
(Change Tools)
Sprint
Planning
Adopt &
Share
Change Sprint
Plan for
Scaling
Change Sprint
Review
Embedded
Change Team
Change Experts
Transformation Project
Member
Key Stakeholder/
User
Comms
Plan
Stake-
holder
Analysis
Work
Hacks
Agile
Boot
Camp
Lean
Coffee
Vision
Digithon
Digital Am-
bassador
Network
…
Change
Impact
Assess-
ment
Training
needs
Leader-
ship
develop-
ment
Change
Story
 Refine and further detail - add new activities depending on the learning experience during sprint
Fill the Backlog with change
activities and order activities
according to priority. Then
define milestones beginning with
high priority activities
Select activities with high priority
for the sprint plan and define
sprint outcome (definition of
done“) for each activity
Develop change and
communication formats in
interdisciplinary teams and plan
the roll-out
Present formats to product
owner, proof maturity of the
formats and roll-out mature
formats. Collect required changes
to the backlog
…
55NuggetHub 2019. All rights reserved |
Standard procedures and hierarchies are used to define the various levels of
process flows
ERP Level numbering and process classification
End To End
Process
Major Process
Business
Process
Process Step
Activity
(Transaction)
The critical 5 to 10 business processes that:
 Traverses the entire value chain,
 Crosses functional, geographic, company boundaries
 Have measurable outcomes
The process categories within an End To End Process that:
 Represents logical groupings of processes
 Typically demonstrates logical business “hand-offs” or integration
points across the E2E process stream
Typically 5-7 logical groupings within each major process that:
 Can be subdivided into process steps assignable to process roles
 Maintain discrete metrics unique to its specific activities
Logical groupings of business transactions:
 E.g. Create, Change, Release order…
 Must be uniquely assignable to a Role without
separation of duties conflicts
Lowest level of work activity in
Blueprinting
L0
L3
L4
L1
L2
End to
End
Process
Major Process
Business Process
L0
L1
L2
L3
Levelofdetailincreasing
-
1
1.1
1.1.
1
56NuggetHub 2019. All rights reserved |
Consultant will help Client to follow SAP standard processes and
solutions and establishing a clear escalation pyramid
57NuggetHub 2019. All rights reserved |
The right migration approach should be identified after check of
data and data quality in Client legacy systems
Lift-and-shift Cloud-enabled virtual
automation
A DevOps transformation
Workloads are migrated to cloud IaaS
in as unchanged a manner as possible,
and change is done only when
absolutely necessary
IT processes are modified in this
approach to take advantage of
automation and some cloud-native
capabilities
IT and some business processes are
transformed, and a cloud-native agile
approach is used as much as possible
during the migration
Legacy systems SAP Data
Services (ETL)
Source 1
Source 2
Source 3
Source 4
To-Be landscape
Extract
Transform
&
Load
(ETL) data to
primary systems
S/4HANA
Working Assumption => ETL for Client Data Migration because of data quality and redundancy in PSG, PSI and PS3
+
• Profiling
• Cleansing
• Harmonization
Usual Cloud Migration Approaches
58NuggetHub 2019. All rights reserved |
End-to-End Process to migrate of one application instances
2.
Data
cleansing
3.
Data
harmonisation
1.
Data
profiling
 Inspection of data source for
validity and completeness
 Collection of statistical
information at the data source
and identification of anomalies
 Decide on migration objects in
scope (master & transactional
data)
 Repair data in a staging area
(SAP DS) or in legacy
applications
 Deals with incorrect, incomplete
or obsolete data
 Only the data in scope will be
cleansed, according to the
scope definition & extraction
rules
 Removal of duplicate records
 Golden record selection
 Validation and repair of target applications specific fields
 Add information needed for S/4HANA, MDG etc.
1. Profiling 2. Cleansing
3.
Harmonization
& Completion
59NuggetHub 2019. All rights reserved |
Example Extract, Transform & Load (ETL), the classical data
migration approach
SAP DS (ETL)
Custom program
(Scripts, file transfer)
Manual conversion
(Excel, flat files)
Legacy
System
Secondary
System
Primary
System
Other
System
Target file
Staging &
TransformationSource File
Secondary
System
Further distribution to other consuming applications: Standard Interfaces
Initial load to primary systems: ETL (AUTO), Custom program (AUTO) and manual conversion (MANUAL)
60NuggetHub 2019. All rights reserved |
Example Cloud Migration: End-to-End Process for migration of one application
instance
60
Customer Activities
Consultant
Migration Activities
Legend
Customer Activities
supported by
Consultant
Governance, Security, Planning, Tracking
Migration Phases for a single migration
TransitionPreparation
Design &
Implementation
Migration & Testing
Go /
No Go
Go /
No Go
Analysis
Go /
No Go
Customer Service
Management
Plan
Consultant
Remediation
Activities
Consultant
Process Phases
Consultant
Decommissioning
Activities
Consultant
Optional Activities
Project
Kick-off
Input & Environment
Access
Program Kick-off
Project Governance
Setup
Migration Program
Planning
Functional (UAT) Test
Execution
Migration Execution
Validation of
Migration
Prerequisites
Migration Tests
Execution
Remediation
Migration Design
Definition
Migration Execution
Planning
Application
packaging
Application Pack
definition
Migration & Affinity
Pack Implementation
Warranty
Decommissioning
Handover of to RUN
team
Last data
synchronization &
Service switch
Sign-off
Rollback
Live Test Execution
Application Pack &
Package Analysis
Migration
Project Planning
Quality
gate
61NuggetHub 2019. All rights reserved |
Clear definition of project roles and responsibilities for each rollout should be
part of the overall project and team planning
Project roles per team
Template Team
Process Owner R O R R O O R R O O R O O O O R R O
Application Owner R O O R R O O R O O O O R R O
Offshore Build Team
(Factories)
R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R
Business (already live) R R R R
Rollout Team
Application Manager O O O O O O O O O O O O O O O O O O O
Deploy. Team Member R O R R O O R R R R O O R R O O R R R R R O O O R R R O O O R R O
Local Team
Local key user O O O O O O O O O O O O O O O O O O O O O O O O
Pre-Assessment
Pre-Configuration
Fit / gap workshop
Localization & Gap Implementation
Integration Test
User Acceptance Test
Regression Test
Final Preparation
Post Go-Live Support
Other project
activities (e.g. data
cleansing)
O Onsite R Remote
Further description
 Process- & applications owners are the bridge to discuss the template with the rollout team, e.g. fit-/gap analysis
 The rollout team is working primarily on local training, data migration and testing
 Business (key) users in countries already live perform regression test and benefit from updates, supported by test automation
62NuggetHub 2019. All rights reserved |
Embedded Change Management integrates specific Change
Management activities in the regular project / roll -off work
Methodology: Embedded Change
Methodology: Embedded Change
Change
Management
Business and IT
Architecture and
validation workshops
 “Align” results early
 Create buy-in and
understanding on
harmonization needs
 Early consider change
impact – start re-thinking
Communication of
results
 Workshop
documentation
 Alignment weeks before
Steering Committees
 Results presentation,
e.g. via Live Meeting
Interviews and
LoB/ board area
workshops
 Involve and create
understanding
 Consider positions
and actively plan
involvement
Leadership commitment
& buy-in
 Unify leaders around the
change vision with initial
workshop
 Ensure commitment and
respective communication
 “Walk-the-talk”
Initial
stakeholder
analysis
 Collect stakeholder
as input for
interview/ workshop
planning
 Understand setup
and position
 Communication
needs
Scoping and
roadmap workshop
 Actively involve
stakeholders in the
initial design to
create buy-in (Think
Tank)
63NuggetHub 2019. All rights reserved |
Our training approach ensures learning success and a smooth
Go-Live by providing training on a global and local level
Define Training
Approach and Plan
Design Training
Curriculum
Deliver Training
Prepare for Training
Delivery
Develop Training and
Support Materials
 Identify system roles
and training
requirements
 Identify people who
need to be trained
 Assess corporate
learning aspirations
and logistical resources
 Define/confirm guiding
principles and plan
training development
 Outline plan for
training delivery
 Analyze “to-be” job
roles and respective
training needs
 Define training
modules and methods
(e.g. web-based
training, train-the-
trainer, micro learning,
classroom)
 Confirm outlined plan
for training delivery
and key user learning
journey
 Agree standards and
templates
 Create and validate
training materials & set
up training content
 Create global and local
training plans
 Dry run of key user
trainings
 Support for dry run of
end user trainings
steered by key users
 Tailor data and content
for web-based
trainings, train the
trainer and classroom
trainings
 Conduct train-the-
trainer
 Set up training rooms
and equipment
 Send joining
instructions (especially
for eLearnings)
 Prepare training
assessment and
evaluations
 Monitor training
interventions regularly
 Conduct training
 Track attendance
 Make online support
materials available
 Ongoing training
evaluation and user
satisfaction with
resulting corrective
measures
 Modify training
materials & re-train
trainers as required
Training need
analysis
Global training
concept
Key User learning
journey
E-Learning &
Teach-Try-Learn
Tailored Training
Packages
Learning
Management
system
Training
evaluation
Interactive
Learning

Weitere ähnliche Inhalte

Was ist angesagt?

Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesAurelien Domont, MBA
 
IT4IT and DevOps Tools Landscape (2020).
IT4IT and DevOps Tools Landscape (2020).IT4IT and DevOps Tools Landscape (2020).
IT4IT and DevOps Tools Landscape (2020).Rob Akershoek
 
8 Key Elements to Modern IT Operations Management with a Digital Operations C...
8 Key Elements to Modern IT Operations Management with a Digital Operations C...8 Key Elements to Modern IT Operations Management with a Digital Operations C...
8 Key Elements to Modern IT Operations Management with a Digital Operations C...OpsRamp
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Jean Gehring
 
IT4IT / DevOps Tooling Landscape 2022
IT4IT / DevOps Tooling Landscape 2022 IT4IT / DevOps Tooling Landscape 2022
IT4IT / DevOps Tooling Landscape 2022 Rob Akershoek
 
Enterprise Architecture - TOGAF Overview
Enterprise Architecture - TOGAF OverviewEnterprise Architecture - TOGAF Overview
Enterprise Architecture - TOGAF OverviewMohamed Sami El-Tahawy
 
Business capability mapping and business architecture
Business capability mapping and business architectureBusiness capability mapping and business architecture
Business capability mapping and business architectureSatyaIluri
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureCraig Martin
 
Kickoff meeting template
Kickoff meeting templateKickoff meeting template
Kickoff meeting templateVan Chau
 
IT4IT - Manage the Digital Enterprise.pdf
IT4IT - Manage the Digital Enterprise.pdfIT4IT - Manage the Digital Enterprise.pdf
IT4IT - Manage the Digital Enterprise.pdfitSMF Belgium
 
Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxAdilPatel34
 
Application rationalization- Invest today to save tomorrow!
Application rationalization- Invest today to save tomorrow!Application rationalization- Invest today to save tomorrow!
Application rationalization- Invest today to save tomorrow!Vivek Mishra
 
Sap Implementation Presentation
Sap Implementation PresentationSap Implementation Presentation
Sap Implementation Presentationlarrymcc
 
Togaf introduction and core concepts
Togaf introduction and core conceptsTogaf introduction and core concepts
Togaf introduction and core conceptsPaul Sullivan
 

Was ist angesagt? (20)

Change and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and TemplatesChange and Project Management Toolkit - Framework, Best Practices and Templates
Change and Project Management Toolkit - Framework, Best Practices and Templates
 
IT4IT and DevOps Tools Landscape (2020).
IT4IT and DevOps Tools Landscape (2020).IT4IT and DevOps Tools Landscape (2020).
IT4IT and DevOps Tools Landscape (2020).
 
8 Key Elements to Modern IT Operations Management with a Digital Operations C...
8 Key Elements to Modern IT Operations Management with a Digital Operations C...8 Key Elements to Modern IT Operations Management with a Digital Operations C...
8 Key Elements to Modern IT Operations Management with a Digital Operations C...
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2
 
IT4IT / DevOps Tooling Landscape 2022
IT4IT / DevOps Tooling Landscape 2022 IT4IT / DevOps Tooling Landscape 2022
IT4IT / DevOps Tooling Landscape 2022
 
Enterprise Architecture - TOGAF Overview
Enterprise Architecture - TOGAF OverviewEnterprise Architecture - TOGAF Overview
Enterprise Architecture - TOGAF Overview
 
Business capability mapping and business architecture
Business capability mapping and business architectureBusiness capability mapping and business architecture
Business capability mapping and business architecture
 
SAP OpenText
SAP OpenTextSAP OpenText
SAP OpenText
 
An Introduction into the design of business using business architecture
An Introduction into the design of business using business architectureAn Introduction into the design of business using business architecture
An Introduction into the design of business using business architecture
 
Kickoff meeting template
Kickoff meeting templateKickoff meeting template
Kickoff meeting template
 
IT4IT - Manage the Digital Enterprise.pdf
IT4IT - Manage the Digital Enterprise.pdfIT4IT - Manage the Digital Enterprise.pdf
IT4IT - Manage the Digital Enterprise.pdf
 
Change, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptxChange, Release, Management In-Depth vTom.pptx
Change, Release, Management In-Depth vTom.pptx
 
S4HANA Migration Overview
S4HANA Migration OverviewS4HANA Migration Overview
S4HANA Migration Overview
 
SAP Project Systems with Success Factors
SAP Project Systems with Success FactorsSAP Project Systems with Success Factors
SAP Project Systems with Success Factors
 
Strategic Operating Model
Strategic Operating Model Strategic Operating Model
Strategic Operating Model
 
Moving to SAP S/4HANA
Moving to SAP S/4HANAMoving to SAP S/4HANA
Moving to SAP S/4HANA
 
TOGAF 9.2 - the update
TOGAF 9.2 - the updateTOGAF 9.2 - the update
TOGAF 9.2 - the update
 
Application rationalization- Invest today to save tomorrow!
Application rationalization- Invest today to save tomorrow!Application rationalization- Invest today to save tomorrow!
Application rationalization- Invest today to save tomorrow!
 
Sap Implementation Presentation
Sap Implementation PresentationSap Implementation Presentation
Sap Implementation Presentation
 
Togaf introduction and core concepts
Togaf introduction and core conceptsTogaf introduction and core concepts
Togaf introduction and core concepts
 

Ähnlich wie Cloud ERP Strategy & Transformation I Best Practices I NuggetHub

Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementAnand Subramaniam
 
ERP for Manufacturing Industry
ERP for Manufacturing IndustryERP for Manufacturing Industry
ERP for Manufacturing Industryvelcomerp
 
Eprocurement sourcing mro environment
Eprocurement  sourcing   mro environmentEprocurement  sourcing   mro environment
Eprocurement sourcing mro environmentUtomo Prawiro
 
Achieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologyAchieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologySSFIndia1
 
CEM Construct - ERP Solution for Construction Industry
CEM Construct - ERP Solution for Construction IndustryCEM Construct - ERP Solution for Construction Industry
CEM Construct - ERP Solution for Construction IndustryCEM Business Solutions
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality DemoZero Wait-State
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryiasaglobal
 
Erp introduction
Erp introductionErp introduction
Erp introductionGoa App
 
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...SAP Ariba
 
Pharm tech core traceability presentation
Pharm tech core traceability presentationPharm tech core traceability presentation
Pharm tech core traceability presentationMichael Stewart
 
A Roadmap for a Successful P2P Automation Journey
A Roadmap for a Successful P2P Automation JourneyA Roadmap for a Successful P2P Automation Journey
A Roadmap for a Successful P2P Automation JourneyKissflow
 
XIT_ERPbyNet_Brochure
XIT_ERPbyNet_BrochureXIT_ERPbyNet_Brochure
XIT_ERPbyNet_BrochureGanesh Limaye
 
Oracle ERP Overview for Pharma Industry..pptx
Oracle ERP Overview for Pharma Industry..pptxOracle ERP Overview for Pharma Industry..pptx
Oracle ERP Overview for Pharma Industry..pptxDadan546110
 
eprocbayoverviewdemopresentation-130201034007-phpapp02
eprocbayoverviewdemopresentation-130201034007-phpapp02eprocbayoverviewdemopresentation-130201034007-phpapp02
eprocbayoverviewdemopresentation-130201034007-phpapp02Satwinder Singh
 
What is Every Angle? SAP Operational Analytics Made Easy!
What is Every Angle? SAP Operational Analytics Made Easy!What is Every Angle? SAP Operational Analytics Made Easy!
What is Every Angle? SAP Operational Analytics Made Easy!Every Angle US
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturingPrasad Bidwai
 

Ähnlich wie Cloud ERP Strategy & Transformation I Best Practices I NuggetHub (20)

Strategic Sourcing & E Procurement
Strategic Sourcing & E ProcurementStrategic Sourcing & E Procurement
Strategic Sourcing & E Procurement
 
ERP for Manufacturing Industry
ERP for Manufacturing IndustryERP for Manufacturing Industry
ERP for Manufacturing Industry
 
E-Goverment Procurement Presentation - MoFPS
E-Goverment Procurement Presentation - MoFPSE-Goverment Procurement Presentation - MoFPS
E-Goverment Procurement Presentation - MoFPS
 
Eprocurement sourcing mro environment
Eprocurement  sourcing   mro environmentEprocurement  sourcing   mro environment
Eprocurement sourcing mro environment
 
Achieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart TechnologyAchieving non-linear operational growth through Smart Technology
Achieving non-linear operational growth through Smart Technology
 
CEM Construct - ERP Solution for Construction Industry
CEM Construct - ERP Solution for Construction IndustryCEM Construct - ERP Solution for Construction Industry
CEM Construct - ERP Solution for Construction Industry
 
WFX Cloud ERP
WFX Cloud ERPWFX Cloud ERP
WFX Cloud ERP
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality Demo
 
Case study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industryCase study value of it strategy in hi tech industry
Case study value of it strategy in hi tech industry
 
Erp introduction
Erp introductionErp introduction
Erp introduction
 
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...
The Hartford's Michael Knipper on Blueprint for Rapid and Sustainable Spend M...
 
Pharm tech core traceability presentation
Pharm tech core traceability presentationPharm tech core traceability presentation
Pharm tech core traceability presentation
 
A Roadmap for a Successful P2P Automation Journey
A Roadmap for a Successful P2P Automation JourneyA Roadmap for a Successful P2P Automation Journey
A Roadmap for a Successful P2P Automation Journey
 
Maninder Singh
Maninder SinghManinder Singh
Maninder Singh
 
BIS11 ERP
BIS11 ERPBIS11 ERP
BIS11 ERP
 
XIT_ERPbyNet_Brochure
XIT_ERPbyNet_BrochureXIT_ERPbyNet_Brochure
XIT_ERPbyNet_Brochure
 
Oracle ERP Overview for Pharma Industry..pptx
Oracle ERP Overview for Pharma Industry..pptxOracle ERP Overview for Pharma Industry..pptx
Oracle ERP Overview for Pharma Industry..pptx
 
eprocbayoverviewdemopresentation-130201034007-phpapp02
eprocbayoverviewdemopresentation-130201034007-phpapp02eprocbayoverviewdemopresentation-130201034007-phpapp02
eprocbayoverviewdemopresentation-130201034007-phpapp02
 
What is Every Angle? SAP Operational Analytics Made Easy!
What is Every Angle? SAP Operational Analytics Made Easy!What is Every Angle? SAP Operational Analytics Made Easy!
What is Every Angle? SAP Operational Analytics Made Easy!
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturing
 

Mehr von RichardNowack

Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubRichardNowack
 
IT Strategy I Best Practices I NuggetHub
IT Strategy I Best Practices I NuggetHubIT Strategy I Best Practices I NuggetHub
IT Strategy I Best Practices I NuggetHubRichardNowack
 
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubEnterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubRichardNowack
 
Software Asset Management I Best Practices I NuggetHub
Software Asset Management I Best Practices I NuggetHubSoftware Asset Management I Best Practices I NuggetHub
Software Asset Management I Best Practices I NuggetHubRichardNowack
 
IT Sourcing I Best Practices I NuggetHub
IT Sourcing I Best Practices I NuggetHubIT Sourcing I Best Practices I NuggetHub
IT Sourcing I Best Practices I NuggetHubRichardNowack
 
Cloud Strategy & Transformation I Best Practices I NuggetHub
Cloud Strategy & Transformation I Best Practices I NuggetHubCloud Strategy & Transformation I Best Practices I NuggetHub
Cloud Strategy & Transformation I Best Practices I NuggetHubRichardNowack
 
IT Assessments I Best Practices I NuggetHub
IT Assessments I Best Practices I NuggetHubIT Assessments I Best Practices I NuggetHub
IT Assessments I Best Practices I NuggetHubRichardNowack
 
Digital Business Models I Best Practices I NuggetHub
Digital Business Models I Best Practices I NuggetHubDigital Business Models I Best Practices I NuggetHub
Digital Business Models I Best Practices I NuggetHubRichardNowack
 
IT M&A I Best Practices I NuggetHub
IT M&A I Best Practices I NuggetHubIT M&A I Best Practices I NuggetHub
IT M&A I Best Practices I NuggetHubRichardNowack
 
Digital HR I Best Practices I NuggetHub
Digital HR I Best Practices I NuggetHubDigital HR I Best Practices I NuggetHub
Digital HR I Best Practices I NuggetHubRichardNowack
 

Mehr von RichardNowack (10)

Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
 
IT Strategy I Best Practices I NuggetHub
IT Strategy I Best Practices I NuggetHubIT Strategy I Best Practices I NuggetHub
IT Strategy I Best Practices I NuggetHub
 
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubEnterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
 
Software Asset Management I Best Practices I NuggetHub
Software Asset Management I Best Practices I NuggetHubSoftware Asset Management I Best Practices I NuggetHub
Software Asset Management I Best Practices I NuggetHub
 
IT Sourcing I Best Practices I NuggetHub
IT Sourcing I Best Practices I NuggetHubIT Sourcing I Best Practices I NuggetHub
IT Sourcing I Best Practices I NuggetHub
 
Cloud Strategy & Transformation I Best Practices I NuggetHub
Cloud Strategy & Transformation I Best Practices I NuggetHubCloud Strategy & Transformation I Best Practices I NuggetHub
Cloud Strategy & Transformation I Best Practices I NuggetHub
 
IT Assessments I Best Practices I NuggetHub
IT Assessments I Best Practices I NuggetHubIT Assessments I Best Practices I NuggetHub
IT Assessments I Best Practices I NuggetHub
 
Digital Business Models I Best Practices I NuggetHub
Digital Business Models I Best Practices I NuggetHubDigital Business Models I Best Practices I NuggetHub
Digital Business Models I Best Practices I NuggetHub
 
IT M&A I Best Practices I NuggetHub
IT M&A I Best Practices I NuggetHubIT M&A I Best Practices I NuggetHub
IT M&A I Best Practices I NuggetHub
 
Digital HR I Best Practices I NuggetHub
Digital HR I Best Practices I NuggetHubDigital HR I Best Practices I NuggetHub
Digital HR I Best Practices I NuggetHub
 

Kürzlich hochgeladen

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Kürzlich hochgeladen (20)

Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Cloud ERP Strategy & Transformation I Best Practices I NuggetHub

  • 1. 1NuggetHub 2019. All rights reserved | Best Practices C L O U D E R P S T R A T E G Y & T R A N S F O R M A T I O N
  • 2. 2NuggetHub 2019. All rights reserved | ERP Platform Transformation3 ERP Platform Strategy & Evaluation2 Cloud ERP Strategy Definition and Introduction1 Agenda
  • 3. 3NuggetHub 2019. All rights reserved | A best practice end-to-end process model defines the initial scope of the cloud ERP functional evaluation End-to-end processes in scope Central Q-data & process mgmt. GR / GI Q- inspection In-production Q-control Non-confor- mance mgmt. Q-reporting & KPI‘s Quality Management Quotation negotiation Quotation adaptation Order entry Quote-to-Order Goods receipt Stock transfer Goods issue Physical inventory Inventory & WH Mgmt. Receive requirements Inquiry / Bid processing Vendor qualification Purchase order execution Purchase order tracking Goods receipt & Q-inspection Invoice processing Exception handling Purchase-to-Pay Purchase order release SerialisedPartsManagement ProductLifecycle Mgmt. UnitConfigurationManagement (to-bestructure) Requirement to Quotation Project Execution to Billing Portfolio Management Engineering Scheduling & Capacity Planning Authorisation to executable Project Template Management Simulative planning Production scheduling Production executing and monitoring Product delivery to warehouse Reporting and KPIs Demand-to-Supply Strategic product planning Product Design Sales preparation Design implementation Product Validation Requirement-to-Product Maintenance strategy Maintenance planning Material and service procurement Maintenance execution Registration and documentation Cost accounting and reporting Master data governance / MD mgmt.. Customer & vendor master maintenance Bill of Material maintenance Access control & data security (IPP) Data Management GL & asset accounting Accounts payable & receivable Period end closing Finance-to-Manage Material master maintenance Product structure Mgmt. Document management Engineering change management Product Data Management Time Collection Plan Budget Reporting Engineering Value Flow Controlling Demand Planning Supply Network Planning Forecast Execution Order completion Outbound logistics Invoice processing & closure act. Order creation Inquiry Product/project calculation Technical & commercial clarification Quotation processing Inquiry-to-Quote Order-to-Cash Planning Project system and reporting Product costing and reporting Profitability analysis and reporting Profit centre accounting & reporting Record-to-Report Supply chain performance management Analytical finance & controlling Analytical human resources Business performance management Business Intelligence Overhead management and reporting Forecast-to-Plan Material Requirements Planning Support processes Maintain-to-Settle
  • 4. 4NuggetHub 2019. All rights reserved | ERP standards and best practices for critical E2E processes Inquiry-to-Quote Level-0 Level-1 Best practices Inquiry-to- Quote Inquiry  Editing all relevant sales-related information with synchronized central master data  Selection list of inquiries based on pre-defined criteria  Inquiry evaluation incl. monitoring and controlling  Integrated opportunity management  Seamless process integration from Inquiry to Quote Product / project calculation  Integrated configure-price-quote process for standard, variant and custom configuration (also BOM integration)  Product template reuse  Usage of synchronized prices and discounts  Management of special discounts Technical / commercial clarification  Configure delivery times and commitment dates for sales orders  Support in planning resources, materials and expenses Quotation processing  Editing and monitoring of quotations  Calculation of order probability  All relevant business partners can be specified as sold-to parties
  • 5. 5NuggetHub 2019. All rights reserved | ERP standards and best practices for critical E2E processes Quote-to-Order Level-0 Level-1 Best practices Quote-to- Order Quotation negotiation  Present and negotiate products and conditions with customized quotes  Contact and account management  Opportunity and lead management  Seamless process integration from Quote to Order Quotation adaptation  Adaptation of quotation to changes (e.g. changed requirements)  Integrated configure-price-quote process for standard, variant and custom configuration (also BOM integration)  Monitor quote status driven by dashboards and alerts  Approve pricing  Confirm order options Order entry  Support initial and recurring order entries  Support intercompany functionalities
  • 6. 6NuggetHub 2019. All rights reserved | ERP standards and best practices for critical E2E processes Order-to-Cash Level-0 Level-1 Best practices Order-to-Cash Order creation  Utilization of the CRM system and fully integrated CPQ process (also BOM integration)  Order based on templates and catalogues for clear material requirements  Support of standard, variant and custom orders  Support of intercompany functionalities Order completion  Thorough and strict limit check Material requirements planning (MRP)  Automated run after order creation  Automated material orders  Support of intercompany functionalities Outbound logistics  Integration with system for transportation procurement, invoice processing and goods tracking Invoice processing & closure act.  Sales order dashboards  Milestone billing  Strict order closing routines and regular check runs  Support of intercompany functionalities
  • 7. 7NuggetHub 2019. All rights reserved | ERP standards and best practices for critical E2E processes Purchase-to-Pay Level-0 Level-1 Best practices Purchase-to-Pay Receive requirements  Material Requirements Planning as only source for direct material demands Inquiry / Bid processing  Central procurement department to ensure "one face to the supplier" Vendor qualification  System-integrated vendor qualification to block sourcing from non-complying vendors or with outdated Q- certificates Purchase order release  Multi-level electronic release strategy with workflow and clearly defined thresholds  Consistent & documented internal purchasing guidelines  Order status is in real time; track & trace available Purchase order execution  EDI transfer to vendor with shipping notification, PO transmission via EDI; mandatory request for PO approval  Single purchase order execution system & global purchase order layout standard Purchase order tracking  Order delivery tracking capabilities  Usage of advanced shipping notifications via EDI; continuous KPI measurement  Automatic delivery notification capabilities Goods receipt & Q- inspection  Integration of quality management with material management to create inspection lot automatically at goods receipts  Centralized goods receipt & electronic goods receipts for services and indirect materials  Utilization of scanner technologies  Delivery scheduling Invoice processing  Usage of logistics invoice verification and evaluated receipt settlement (vendor self-billing)  Increased use of EDI; electronic invoices; supplier invoice entry via web  Invoices are sent to AP automatically  Scanning of invoices Exception handling  Thorough design of "R" processes (reject, return, repair) and related value flow (invoice rejection, debit note processing, …)
  • 8. 8NuggetHub 2019. All rights reserved | ERP standards and best practices for critical E2E processes Demand-to-Supply Level-0 Level-1 Best practices Demand-to-Supply Simulative planning  Integrated planning with network planning and finite capacity planning for standard, variant and custom products  Integrated consideration of maintenance down-times in production planning  Support for intercompany functionalities Production scheduling  Use advanced planning and scheduling to support complex planning situation on bottleneck resources (including dynamic scheduling, change of priority and sequencing)  Integration with CPQ / PLM (BOM)  Support for intercompany functionalities Production executing and monitoring  Integrated manufacturing execution system to have actual situation of confirmation, consumption and good receipt in the system Product delivery to warehouse  Timely posting of material movements  Support of scanner technologies Reporting and KPIs  Aligned data base and reports to have full transparency on KPIs (e.g. DOT)  Production and material analysis (e.g. material costs, product profitability)  Support for intercompany functionalities
  • 9. 9NuggetHub 2019. All rights reserved | ERP Platform Transformation3 ERP Platform Strategy & Evaluation2 Cloud ERP Strategy Definition and Introduction1 Agenda
  • 10. 10NuggetHub 2019. All rights reserved | The detailed ERP evaluation methodology includes validation and alignment phases with main stakeholders Detailed ERP evaluation approach Next steps Evaluation alignment Requirements validation Platform recommendation ERP pre-evaluation  ERP evaluation finalized and documented  ERP platform recommendation aligned with Client experts  Next steps (incl. transformation scenarios) recommended  Critical Client requirements validated by core team (focus interviews; document analysis)  Best practices complemented by Consultant experts 1 3 42  Short-listed ERP platforms pre- evaluated based on criteria catalogue by core team (focus interviews) and Consultant experts  Criteria catalogue aligned and prioritized on alignment workshop with key stakeholders and senior experts  ERP pre-evaluation validated and feedback considered on alignment workshop  ERP transformation scenarios identified and evaluated Alignment workshop Project start Final presentation Focus interviews Key deliverables  ERP evaluation and recommendation  Initial criteria catalogue  ERP pre-evaluation  Aligned criteria catalogue
  • 11. 11NuggetHub 2019. All rights reserved | All relevant stakeholders set cornerstones and guidelines to narrow the requirements on the future ERP platform Cornerstones & Guidelines – overview Cornerstones & Guidelines Description  Cornerstones & Guidelines – represent design principles for the development of a common objective – define priorities for provisioning of functionalities and technical features – set clear limitations for feasible solutions and the path to achieve the objective – define conditions for the implementation of an ERP Roadmap  Strategic guidelines for the Client ERP platform are valid for the entire Client group Strategic guidelines Cornerstones & Guidelines ERP platform Defined by executive board To be defined in project
  • 12. 12NuggetHub 2019. All rights reserved | Leveraging of synergies, standardization and integration are guidelines for a future ERP platform Cornerstones & Guidelines – guidelines Remarks Increase automation of processes and data flows Focus on manufacturing- relevant operations  Ensure high degree of process automation possibilities  Ensure high degree of data interface automation  Focus on ERP platforms with industry solutions for manufacturing  Focus on manufacturing industry proven ERP solutions Maximize usage of ERP platform standard processes  Choose one global ERP standard  Use standard processes as much as possible  Adapt system only if necessary (e.g. localizations, Client specifics) Leverage group wide synergies  Implement process best practices in the group  Ensure reuse of ERP platform functionality  Ensure leverage of synergies for system operations Ensure easy integration  Ensure simple integration to and interoperation with other systems  Ensure easy integration and separation of plants and partners (“plug and play”) Prefer one system  Ensure support of a wide range of processes with one system  Focus on most relevant processes
  • 13. 13NuggetHub 2019. All rights reserved | All long list vendors are assessed using two dimensions: fitness of product and ability to deliver Long list assessment dimensions How well does the vendor’s product fit Client’s requirements? Is the vendor able to deliver on the scale required by Client? Ability to deliver Fitness of product To qualify for the short list, vendors need to show sufficient strengths in both dimensions. Assessment dimensions Fitness of product strongpoor Abilityto deliverstrongpoor Vendor A Vendor B Vendor C Vendor D Vendor E Assessment matrix
  • 14. 14NuggetHub 2019. All rights reserved | Depending on the placement along these dimensions, vendors qualify for the short list or are eliminated Long list assessment outcome Matrix placement Outcome Maybe Short list Knock-out Abilitytodeliver stron g poor Fitness of product strongpoor Short list Vendor qualifies for short list Knock-out Vendor can be eliminated, remaining information gaps do not need to be closed Maybe Vendor can only be considered further if gaps are outside of core functionality or if it pairs with a strong integration partner
  • 15. 15NuggetHub 2019. All rights reserved | Both dimensions are assessed using multiple criteria, each criterion bundles multiple related requirements Assessment criteria by dimension Long list assessment Vendor characteristics  Release strategy  Support  Resources  Global footprint Track record  References  Industry  Number of customers Functional requirements  Standard software product  Intercompany business  Multi-client  Multi-currency  Multi-language Non-functional requirements  Multi-modes of operation (cloud, etc.)  Availability  Technology Fitness of product Ability to deliver CriteriaDimensions Assessment criteria Fitnessof product strongpoor Abilitytodeliverstrongpoor
  • 16. 16NuggetHub 2019. All rights reserved | Functional requirements include all functionality necessary for use in the manufacturing industry Criteria for fitness of product (1/2) Long list assessment Fitness of product Ability to deliver Functional requirements Non-functional requirements Vendor characteristics Track record  Standard software product  Multi-client companies and countries / jurisdictions  Multi-currency contracts, invoices and payments  Multi-language independent system, interface and output language  Intercompany business companies and countries / jurisdictions Assessment criteria
  • 17. 17NuggetHub 2019. All rights reserved | Non-functional requirements include technical and organizational demands on software quality Criteria for fitness of product (2/2) Long list assessment Fitness of product Ability to deliver Functional requirements Non-functional requirements Vendor characteristics Track record  Availability & scalability 24x7 operations with up to 20.000 active customers  Technology – Built on modern technologies that fit into Client’s IT landscape – Web services that enable “high-level” data access, custom portals and steering  Multi-modes of operation – e.g. on-premises, IaaS, SaaS Assessment criteria
  • 18. 18NuggetHub 2019. All rights reserved | Vendor characteristics include major vendor -related risks of procuring a software product Criteria for ability to deliver (1/2) Long list assessment Fitness of product Ability to deliver Functional requirements Non-functional requirements Vendor characteristics Track record  Release strategy clearly defined and reliable release strategy and roadmap  Resources sufficient resources (both human and financial) for development, support and implementation  Support coverage of CET business hours; “premium support” option is available off-the-shelf  Global footprint vendor operates on a global basis and has customers in multiple countries Assessment criteria
  • 19. 19NuggetHub 2019. All rights reserved | Track record assesses a vendor’s market position and the trust and confidence of our customers Criteria for ability to deliver (2/2) Long list assessment Fitness of product Ability to deliver Functional requirements Non-functional requirements Vendor characteristics Track record  Relevance of references strong track record of projects with similar size  Number of customers proven track record of collaboration with market leader in relevant industries  Industry proven track record of customers within manufacturing industry
  • 20. 20NuggetHub 2019. All rights reserved | The qualitative assessment divide the long list into three clusters with three clear leaders Vendor assessment overview Abilitytodeliverstrongpoor Fitness of product strongpoor  Infor LN is a clear short list candidates that offer both strong products and the ability to deliver  SAP S/4 Hana and Microsoft Dynamics AX also offers both product and ability to deliver, but they have a smaller customer base compared to Infor LN Maybe Knockou t Short list
  • 21. 21NuggetHub 2019. All rights reserved | Infor LN and SAP S/4HANA are the two most suitable candidates for the future global Client ERP platform Pre-evaluation overview – functional SAP S/4HANAInfor LN Remarks Functional Performance Score  Infor integrated CPQ functionality ready to use, relevant for inquiry-to-quote, quote- to-order and order-to-cash  SAP S/4HANA integrates CPQ with limited functionality in v1709 (full in 1809)  Infor LN provides manufacturing execution functionality with its core system whereas SAP provides a manufacturing execution system as a an additional application  Regarding data availability, analytics and reporting within the ERP platform Infor LN provides better functionality and usability (e.g. Widgets for business users)  Infor implemented extensive and solid intercompany functionalities with release 10.5 (intercompany trading, manufacturing, accounting and controlling), SAP has best in class-functionality related to financial and intercompany business  SAP has a more intuitive and flexible basic business intelligence functionality, both vendors provide additionally licensed application Order-to-Cash 55 Purchase-to-Pay 55 Demand-to-Supply 45 Requirement-to-Product 45 Product Data Management 44 Forecast-to-Plan 44 Inquiry-to-Quote 45 Quote-to-Order 45 Quality Management 54 Engineering Sched. & Capacity Planning 54 Inventory & WH Mgmt. 54 Maintain-to-Settle 44 Finance-to-Manage 54 Master Data Management 44 Engineering Value Flow Controlling 44 Record-to-Report 54 Product lifecycle Management 43 Business Intelligence 54 4,434,28
  • 22. 22NuggetHub 2019. All rights reserved | Strategic, non-functional and technical criteria of the two leading vendors have been pre-evaluated Pre-evaluation overview – strategic, non-functional and technical Synergy potential Vendor characteristics Cost implication Implementation feasibility Usability Reliability Performance Automation Supportability Architectural Security Release Management Infrastructure 4,424,42Overall Performance Score StrategicNon-FunctionalTechnical 1 - low 2 – below average 3 – average 4 – above average 5 – strong SAP S/4HANAInfor LN Remarks  Infor LN and SAP S/4HANA can leverage similar synergies and have similar characteristics from a vendor perspective  Infor LN has lower cost implications than SAP S/4HANA from a total cost of ownership perspective  There is a higher availability of internal know-how for Infor LN but there is a higher availability of external experts for SAP S/4HANA  The standard Infor LN comes with an attractive graphical user interface – SAP S/4HANA requires Fiori Apps  The current Client ERP architecture causes a possibly better integration of Infor LN and a better implementation feasibility of Infor LN 5 5 3 3 3 5 5 5 5 4 5 4 5 5 5 4 4 5 5 4 5 4 5 5 5 4 Other criteria score 4,384,62
  • 23. 23NuggetHub 2019. All rights reserved | The evaluation results include Client-specific criteria weights and show […] as the recommended ERP platform Evaluation results with weighted criteria Category Weights Sub-category Count P Count V Count T Weights Score weighted Score Score weighted Score Synergy potential 5 5 Vendor characteristics 5 5 Cost implications 4 3 Implementation feasibility 4 3 Inquiry-to-Quote 5 4 Quote-to-Order 5 4 Order-to-Cash 5 5 Purchase-to-Pay 5 5 Demand-to-Supply 5 4 Inventory & WH Mgmt. 4 5 Quality Management 4 5 Requirement-to-Product 5 4 Engineering Scheduling & Capacity 4 5 Engineering Value Flow Controlling 4 4 Forecast-to-Plan 4 4 Maintain-to-Settle 4 4 Finance-to-Manage 4 5 Record-to-Report 4 5 Product Data Management 4 4 Product Lifecycle Management 3 4 Master Data Management 4 4 Business Intelligence 4 5 Usability 5 3 Reliability 5 5 Performance 4 5 Automation 5 5 Supportability 4 5 Architectural 5 4 Security 5 5 Release Management 4 4 Infrastructure 5 5 Total Score 0% 4.42 0.00 4.42 0.00 Strategic Functional Non- Functional Technical P: Physically present participants V: Virtually present participants T: Total present participants
  • 24. 24NuggetHub 2019. All rights reserved | All three candidates have manufacturing references, a solid installation base and global support organizations Company & Product Overview Infor SAP Customers Company facts Microsoft Founded: 2002 $2.7B total revenue FY16 15.500 employees Founded: 1972 €22.1B total revenue FY16 85.000 employees Founded: 1975 €85.3B total revenue FY16 124.000 employees Evaluated solution Financing Support and Service Availability Installations Lease, Owner Financing, Lease to own Lease, Owner Financing, Lease to own Lease, Owner Financing, Lease to own Offices in 41 countries Offices in 81 countries Only partner-based offices Infor LN 10.5 SAP S/4HANA Microsoft Dynamics AX 12 Essential support, Premium support, Elite support Preferred Success, Preferred Care, Enterprise Support Enhanced Support, Professional Direct Support, Premier Support Bae systems, Ferrari, Wausau, Sparaylat, Propper, Mingledorff’s, DAB Vectus Industries, Veolia, Carl Stahl, CEITEC Trelleborg, Würth Group, ROOS Dental 9.300 +1.000 +5.000 +
  • 25. 25NuggetHub 2019. All rights reserved | Client’s E2E processes have a profound global ERP standardization potential and a few relations to other systems Client-specific functional requirements (1/2) Demand-to- Supply Requirement- to-Product Purchase-to- Pay Order-to-Cash Product Data Management E2E process ERP standard. degree Quality Management Forecast-to- Plan high high high high high high high Global Global Global Global Global Global Global Requirements on other systems Critical requirements (Excerpt) Inquiry-to- Quote high Global Quote-to- Order high Global high medium low Global Regional Local Process stand. requirements
  • 26. 26NuggetHub 2019. All rights reserved | Client’s E2E processes have a profound global ERP standardization potential and a few relations to other systems Client-specific functional requirements (2/2) Finance-to- Manage Maintain-to- Settle Inventory & WH Mgmt. Eng. Scheduling & Capacity Plan. Data management E2E process ERP standard. degree Record-to- Report Product Lifecycle Mgmt. Eng. Value Flow Controlling Business Intelligence Process stand. requirements Requirements on other systems Critical requirements (Excerpt) high medium low Global Regional Local high high high high high high high Global Global Global Global Global Global Global high Global high Global
  • 27. 27NuggetHub 2019. All rights reserved | The current validation shows a high potential to standardize and harmonize the ERP platform Key findings Critical requirements Pain points Strategic and non-functional requirements  A high degree of critical requirements can be supported with ERP standard functionality and do not need customization  Many critical functional requirements are not supported by the current ERPs  A significant amount of critical requirements address global process standardization and master data harmonization  Some critical requirements address other systems (e.g. PDM, PLM, CRM and CPQ)  Many processes are lacking global standards and are inconsistent (can be harmonized by central ERP platform)  Consistent adherence to existing processes is missing (can be supported by central ERP platform but organization and management is key)  Missing system integration and inconsistent master data require a huge amount of manual effort and hinder effectiveness and process improvements  Strategic focus is put on cost efficiency, system standardization, process harmonization, local adjustments, one global standard solution and automation  There is less strategic focus on flexibility and digitization  There is strong non-functional focus on usability, reliability, performance, automation and supportability, but there is no focus on costs of the ERP platform implementation (a failed ERP implementation creates much higher costs, compared to an expensive ERP implementation) Showstoppers for standard ERP platforms (Infor/SAP) could not be identified
  • 28. 28NuggetHub 2019. All rights reserved | The focus interviews followed a structured procedure including functional discussions and evaluation scales Interview topics and content Gather critical Client requirement s and pain points  Identification of Client-specific ERP requirements based on functional best practice E2E process model to derive standardization potential • Perspectives: Global, regional, local  Identification of Client-specific ERP pain points to derive optimization potential • Perspectives: System-, process- related Gather criteria weights  Assessment of relevance for strategic, non-functional and technical requirements to derive criteria weights Further opinions  Expectations on “ERP Platform Evaluation” project  Risks for ERP platform selection and implementation  Strategic: Synergy potential, vendor characteristics, cost implications, implementation feasibility  Non-functional: Usability, reliability, performance, automation, supportability  Technical: Architectural, security, release management, infrastructure  Order-to-Cash  Purchase-to-Pay  Demand-to-Supply  Requirement-to- Product  Product Data Management  Forecast-to-Plan  Inquiry-to-Quote  Quote-to-Order  Quality Management  Eng. Scheduling & Capacity Planning  Inventory & WH Mgmt.  Finance-to-Manage  Maintain-to-Settle  Data management  Business Intelligence  Engineering Value Flow Controlling  Record-to-Report  Product Lifecycle Management Functional E2E process model 15 interviews with a duration of 60-90 minutes
  • 29. 29NuggetHub 2019. All rights reserved | A pre-evaluation of the shortlist candidates excludes Microsoft Dynamics - Infor LN and SAP S/4HANA remain Reasons against Microsoft Dynamics Considering the project objective to provide one global ERP platform with as much standard processes as possible MS Dynamics AX is not a suitable candidate E2E process functionality weakness  Compared to Infor LN and SAP S/4HANA, MS Dynamics AX has a much weaker support of E2E processes overall Data analysis weakness  Provisioning of reporting and Business Intelligence functionality is very complex and needs much higher effort than Infor and SAP Standard process availability weakness  Compared to Infor LN and SAP S/4HANA, MS Dynamics AX does not provide many standard processes, but relies on partners to provide a industry specific process implementation  Implementation of business processes have a high customization need Know-how availability weakness  Availability of Microsoft Dynamics AX expertise is very limited outside Italy  Performance of implementation partners for larger Dynamics AX implementations is poor outside of Italy
  • 30. 30NuggetHub 2019. All rights reserved | The requirements’ ratings are rather uniformly distributed showing relevant importance of each requirement Strategic, non-functional and technical requirements Strategic  Synergy potential  Vendor characteristics  Cost implications  Implementation feasibility Non- functional  Usability  Reliability  Performance  Automation  Supportability Technical  Architectural  Security  Release Management  Infrastructure Least important Most important In addition to the functional requirements all further requirements for the ERP platform evaluation have been assessed by the Client experts and show high relevance
  • 31. 31NuggetHub 2019. All rights reserved | Long-list of potential 8 ERP vendors identified ERP vendor long-list (1/2) Company Price INFOR LN Materials Mgmt. SalesOrderMgmt. FinancialMgmt. ProductionMgmt. SupplyChain Mgmt. CustomerRel.Mgmt. SAP S/4 HANA EPICOR sage MS Dynamics $25K-500K $4K -500K $2600/ user $20K-750K $25K -250K References Ferrari, Wausau, Sparaylat Indus Motor, Veolia LD Industries, Unilever, Chrysler Renault F1 Team, Accu Weather INTERTEC-Hess GmbH, ROOS Dental Industry focus Customers Industrial Manufacturin g 90.000 Industrial Manufacturin g 1.000 Industrial Manufacturin g 20.000 Financial Services, Accounting 250.000 Industrial Manufacturin g 20.000
  • 32. 32NuggetHub 2019. All rights reserved | Long-list of potential 8 ERP vendors identified ERP vendor long-list (2/2) Company Price Oracle Materials Mgmt. SalesOrderMgmt. FinancialMgmt. ProductionMgmt. SupplyChain Mgmt. CustomerRel.Mgmt. QAD Cloud ERP IFS proALPHA $15K-400K $300K-2M TBD $250/User References Starplast, Sako Limited Kendrion, Völkl, Maxon Motor Evco, DS Smith, Renolit, Anca CNC Gaudlitz, Aichelin, apra Gruppe, H2O Industry focus Customers Manufacturin g,Packed Goods 11.000 Manufacturing , Financial 4.000 Production, Retail, Manufacturin g 2.700 Industrial Manufacturin g 1.800
  • 33. 33NuggetHub 2019. All rights reserved | The operation model evaluation shows Cloud IaaS and Cloud SaaS as preferred options for the ERP ERP operation model – evaluation Client data center Hosted Cloud (IaaS) Cloud (SaaS) Total cost of ownership - -  High initial infrastructure investment  Ongoing infra./app. maintenance costs o  Infrastructure and application costs included in hosting fees  Partly ongoing infra./app. maintenance costs ++/ +  Usage-driven infrastructure costs  Remaining application maintenance costs ++/ +  Infrastructure and application costs included in subscription costs Implementati on feasibility -  High transformational efforts and low resource availability o  Implementation done by hosting service provider  High integration efforts +  Fast, simple set-up (on- demand) but high reqs. on network and integration ++  Fast, simple set-up (on- demand) but high reqs. on network Operational feasibility -  Low operational Infor/SAP experience  Data center know-how needed o  Operations partially done by hosting service provider  Own network infrastructure necessary  High alignment effort o  Less internal know- how/resources about maintaining IaaS and Infor/SAP maintenance ++  Ready-to-use  Infrastructure and Infor/SAP maintenance done by service provider System performance o/-  Probably limited system performance  Depending on investment and know-how o  Good availability (depending on SLA and connectivity)  Probably lower system performance compared to IaaS and SaaS ++  Best-in-class availability, highly reliable and automated scaling +  High availability  Probably lower system performance compared to IaaS Security o/-  Probably low data security  Limited security capabilities  Depending on investment and know-how +/o  High security and policy/compliance fulfillment  Own network security necessary +  Highest security and policy/compliance fulfillment on infrastructure  Application security managed by client ++  Highest security and policy/compliance fulfillment on infrastructure and application Overall - o + ++ - - very poor - poor o neutral + good ++ very good Client Cloud Cloud ERP Service Provider
  • 34. 34NuggetHub 2019. All rights reserved | Cloud IaaS and Cloud SaaS are the best options for Infor LN - for SAP S/4HANA Cloud IaaS is the best option ERP operation model – comparison Infor SAP Cloud (IaaS) +  Full support for deployment on IaaS  Support for leading IaaS provider (e.g. AWS)  License purchase + yearly maintenance fee +  Full support for deployment on IaaS  Support for leading IaaS provider (e.g. AWS)  License purchase + yearly maintenance fee Cloud (SaaS) ++  Proven SaaS solution with full functionality  Global high performance infrastructure (AWS)  Subscription instead of license purchase o  Introduced just recently in 2017 (FI); incomplete functional coverage  Subscription instead of license purchase Hosted o  Hosting services available in market  Infrastructure partly managed by service provider  Application could be managed partly by service provider o  Proven hosting services available in market  Infrastructure partly managed by service provider  Application could be managed partly by service provider - - very poor - poor o neutral + good ++ very good 1 version 10.5.X 2 version 17XX CloudCloud ERP Service Provider 1 2
  • 35. 35NuggetHub 2019. All rights reserved | A first cost estimate indicates cost advantages for Infor - details to be validated after vendor negotiations ERP cost indication (direct internal and external costs without benefits realization) Operating Models Client data center Hosted Cloud (IaaS) Cloud (SaaS) Client data center Hosted Cloud (IaaS) Cloud (SaaS) Net present value3 23M € - 58M € 16M € - 47M € 11M € - 38M € 9M € - 20M € 27M € - 71M € 24M € - 62M € 13M € - 48M € 11M € - 25M € initial Investment costs 17M € - 52M € 12M € - 41M € 7M € - 33M € 1M € - 6M € 20M € - 62M € 14M € - 50M € 9M € - 41M € 2M € - 6M € Implementation costs4 15M € - 48M € 10M € - 40M € 6M € - 32M € 1M € - 6M € 17M € - 56M € 12M € - 46M € 7M € - 36M € 2M € - 6M € Infrastructure investment 1M € - 2M € 1M € - 2M € Licensing5 ~1M € ~1M € ~1M € 2M € - 4M € 2M € - 4M € 2M € - 4M € peryear Operating costs 1M € - 2M € ~1M € 722k € - 1M € 1M € - 2M € 1M € - 2M € 2M € - 3M € 1M € - 2M € 2M € - 3M € Subscription costs5 1M € - 2M € 1M € - 3M € Vendor maintenance fees ~270k € ~270k € ~270k € 431k € - 863k €431k € - 863k €431k € - 863k € Application operations 200k € - 300k €100k € - 200k €100k € - 200k € 50k € - 100k € 200k € - 300k € ~800k € 100k € - 200k € 50k € - 100k € Infrastructure operations 646k € - 1M € 460k € - 1M € 352k € - 1M € 646k € - 1M € 483k € - 1M € 302k € - 1M € 10years Net present value for a 10 years horizon in Mio. € 3: based on WACC 8% Min-Max range indication 1: version 10.5.X 2: version 17XX 4: templates and 14 rollouts 5: Infor pricing aligned with Infor for Client; SAP pricing based on historical values (only indicative), current licensing is different 1113 2427 911 16 23 25 48 62 71 20 38 47 58 MaxMin
  • 36. 36NuggetHub 2019. All rights reserved | A transition to Infor shows the lowest transition effort for locations currently using BaaN and Infor ERP transition evaluation – effort Transition effort for future ERP +  Proven best practices for migration from BaaN to Infor  Moderately more advanced IT skills needed  Moderate process and system changes (training, change mgmt) -  Complex technical migration (data, reports, interfaces, forms)  Different IT skills needed  Extensive process and system change (training and change management needs) +  Simple migration  Sufficient current IT skills  No/moderate process changes (training, change) o  Moderate migration  Similar current IT skills  Many process changes (training, change mgmt) -  Complex technical migration (data, reports, interfaces, forms)  Different IT skills needed  Extensive process and system change (training and change management needs) -  Complex technical migration (data, reports, interfaces, forms)  Different IT skills needed  Extensive process and system change (training and change management needs)  Leverage BaaN/Infor know- how and experience  Maintain a manufacturing- oriented ERP for mid-size enterprises  Similar change impact for all companies and locations  Easy setup of Center of Excellence (CoE) * DD=Dresden, AR=Argentina, BR=Brazil Company Location ERPs today Users * DD=Dresden, AR=Argentina, BR=Brazil
  • 37. 37NuggetHub 2019. All rights reserved | Our SAP S/4HANA Strategy Assessment is based on the two main phases including the assigned actions and work packages SAP S/4HANA & Cloud Strategy Assessment
  • 38. 38NuggetHub 2019. All rights reserved | The structured and proofed impact analysis will set the stable foundation for the further S/4HANA transformation Impact Analysis 1 DESCRIPTIONRESULTSCOLLABORATION WORKSHOPS & FOCUS INTERVIEWS  Assessment of criteria based on structured focus interviews with process and IT departments  Criteria are security, flexibility, scalability or readiness for new business scenarios BUSINESS AND IMPROVEMENT POTENTIAL Interviews  (Bus. Stakeholder HC/CS)  Process Area Owner  Global Process Owner  Enterprise Architect  IT Domain Manager  ERP Strategy Manager ARCHITECTURE ANALYSIS  Analysis of the current Client SAP architecture landscape, functional coverage and impact of the S/4HANA application architecture  Analysis of critical and relevant interfaces IMPACT ON THE SYSTEM LANDSCAPE TRANSFORMATION 4 IT-Experts  Enterprise Architect CODE ANALYSIS  Analysis of the code repository to separate between used and non- used lines of code (LOC) of additional code lines by using smartShift  Output of the analysis gives an overview of the recommended action fields BASELINE FOR DIFFERENT SCENARIOS INCLUDING COST ESTIMATIONS 3 IT Experts  IT-Basis Consultant  IT Security Officer  IT Application Consultant S/4 PROCESS COVERAGE  Assessment of the current business process scope against the upcoming SAP S/4HANA core and cloud capabilities  Determination of the key action points for the transformation towards S/4HANA IMPACT ANALYSIS AGAINST EXISTING SYSTEM LANDSCAPE 2 Process Experts  Process Experts to guarantee access to required data and the alignment of the results DEPENDENCY ANALYSIS  Based on started, planned and defined project initiatives identification of impact towards the S/4HANA transformation  Especially the big global and important local project initiatives have to be considered IMPACT ANALYSIS OF DEPENDENT IT PROJECT INITIATIVES 5 Project Stakeholder  IT Project Leads  Business Project Leads - optional
  • 39. 39NuggetHub 2019. All rights reserved | The conception phase will define and structure the identified measures for the step-by-step transformation Conception S/4HANA BENEFITS PER SCENARIO DIGITAL BUSINESS MODEL  Determination of benefits for the S/4HANA Transformation per target scenario  Concretion of the business impact of each of the selected scenarios 6 Business / IT Experts  Process Area Owner  Global Process Owner TARGET ARCHITECTURE TARGET ARCHITECTURE  Analysis and conception of the target application architecture per domain for each of the scenarios  Definition of the long term target scenario with SAP Enterprise and Technology Architects 8 IT Experts  Enterprise Architect  IT Domain Manager SCENARIO ROADMAPS  Definition of multiple scenario roadmaps to compare the possible scenarios  The effects for the organisation will be transparent COMPARABLE SCENARIO ROADMAPS 7 IT Experts  Enterprise Architect  ERP Strategy Manager  IT Domain Manager DESCRIPTIONRESULTSCOLLABORATION GOVERNANCE RISK ASSESSMENT PROJECT GOVERNANCE  Analysis of the current project governance in terms of risks considering the S/4HANA project  Evaluation and prioritization of measure to mitigate the risks and to improve the success probability IT Experts  Enterprise Architect 10 RAMP-UP OF ACTIVITIES TO GET BACK TO THE STANDARD RETROFIT ACTIVITIES  Definition and alignment of retrofit activities to get back to SAP standard  Combination of the code analysis and facilitation of SAP best practices lead the way towards the SAP standard 9 IT Experts  Enterprise Architect  IT-Basis Consultant
  • 40. 40NuggetHub 2019. All rights reserved | ERP Platform Transformation3 ERP Platform Strategy & Evaluation2 Cloud ERP Strategy Definition and Introduction1 Agenda
  • 41. 41NuggetHub 2019. All rights reserved | Proposed Timeline 2019: Assessment, Template & Pilot S/4HANA Template Design 01/19 02/19 03/19 04/19 05/19 06/19 07/19 08/19 09/19 10/19 11/19 12/19 01/20 Scoping Phase Project Initiation & Prep. Rollout Pilot Template Design & Build S/4HANA Assessment Further Rollouts 01.01.2019 – 31.03.2019 S/4HANA Assessment Rollout Pilot Main Phases Rollout country 2 01/21 31.12.2019*31.08.2019*31.05.2019* *All proposed dates to be evaluated jointly during assessment phase
  • 42. 42NuggetHub 2019. All rights reserved | Transformation to a harmonized ERP landscape could be conducted in several possible scenarios ERP harmonization scenarios Scenario 1 Scenario 2 Scenario 3 Name Function-specific rollout Full-scope rollout Global big bang rollout Key facts 1 ERP – 4 Templates 1 ERP – 1 Template 1 ERP – 1 Template Templates  4 central templates with local adjustments for every plant  Contract-based manufacturing  Project-based manufacturing  Trading  Holding  Amendment of local adjustments to central template during rollout  One central template with local adjustments for every plant  Amendment of local adjustments to central template during rollout  One central template with local adjustments for every plant  Amendment of local adjustments to central template before and after rollout Roll-out  Phased rollout (sequential)  Phased rollout (sequential)  Big bang rollout (parallel) Duration  ~ 1 year pilot and central config.  ~ 3 years rollout (8-12 per year)  ~ 0,5-1 year pilot and central config.  ~ 5 years rollout (5-8 per year)  ~ 1 year pilot and central config.  ~ 1 year rollout Resource needs  Medium resource needs (central teams for templates and rollout)  Low resource needs (smaller team for larger time span)  High resource needs (many external consultants/experts and internal experts) Change needs  High change need (business process change)  High change need (business process change)  Highest change need (business process change and fast implementation) Wave 1 – Region A Wave 2 – Region B Wave 1 – Region A Wave 2 – Region B Big Bang
  • 43. 43NuggetHub 2019. All rights reserved | Out of the three different scenarios the full scope rollout (phased ) has the least disadvantages ERP harmonization scenarios Scenario 1 Scenario 2 Scenario 3 Name Function-specific rollout Full-scope rollout Global big bang rollout Pro  Centrally defined business processes with standards for different entities  Consideration of local amendments during rollout  2nd fastest implementation time  Central resources for template configuration  Centrally defined business processes with standards for all entities  Consideration of local amendments during rollout  Lowest implementation risk  Lowest resource needs  Low maintenance effort (1 template)  Centrally defined business processes with standards for all entities  Parallel availability of new ERP platform for all plants  Fastest implementation  Fast realization of process efficiencies  Low maintenance effort (1 template) Con  Medium implementation risk  Medium-fast realization of process efficiencies  Higher maintenance effort (4 different templates)  Longest implementation time  Slow realization of process efficiencies  High one-time effort and costs  Possible excessive demand of employees (change of business processes)  High implementation risk  Consideration of local amendments during blueprint Points 8 2 1 Wave 1 – Region A Wave 2 – Region B Wave 1 – Region A Wave 2 – Region B Big Bang
  • 44. 44NuggetHub 2019. All rights reserved | The future ERP harmonization should be separated in a pilot phase and a rollout phase Pilot and rollout phase for the future ERP harmonization  Business processes and system implementation  Data migration  End user training  User acceptance testing  System cutover  Change management  Post implementation training  Continuous improvement  As-Is analysis and gap analysis  Business case calculation  Project setup and planning  Pilot plant selection  Business process analysis  Central template development  Implementation for pilot plant  Implementation of central template  Implementation of local specifics  Further development of central template with relevant amendments after rollout at pilot plant  Preparation and planning of ERP rollout for plants and other entities Phase 1 – ERP Pilot Q1 2018 Q1 2019 2020 / 2022 / 2024 Phase 2 – ERP Rollout The ERP harmonization is a major business project. ICT is just an enabler and provides the system functionality – the implementation of the business processes has to be done by the business. ~0,5-1 year ~2-5 years  Business processes standardized  System rollout conducted  Business processes analyzed  System rollout planned and prepared
  • 45. 45NuggetHub 2019. All rights reserved | Concurrent transformation approach for harmonization projects with strong business and IT alignment Cloud ERP Program Approach Process & Data Technology Current system setup analysis Technical architecture and system usage analysis Future IT landscape design Pre-configured system setup Agile demonstration and realization Data migration and test concept creation System set-up and data migration System configuration Technical specification and development Cut-over planning Final ITC and UAT conduction Migration planning Unit testing and issue fixing Cut-over tracking and execution Local development finalization Go-Live JOURNEY Kick-Off Initiation Team Stakeholder Walkthrough Change Management Key users and stakeholder identification Training concept definition Change Impact Analysis execution Train-the-trainer execution Lessons Learned compilation Project roadshow execution Communication and people mobilization Figures Business case structure development KPI measurementKPI definition Business case calculation Test status reporting Go-live readiness reporting Go/No-Go Decision Kick-Off Project Team Project Management Governance structure definition Project planning Resource and working mode management Risk, issue, and quality management Scope and change request management S/4HANA Assessment Agile Approach EeE process design and alignment on business scenarios Align Business requirements with SAP Standard Capabilities & feature detailing / definition of user story Backlog management, sprints, scrum coordination Plan & conduct testing (e.g. IT, DataMig, UAT, Regression) Training people Build support organization Establish operational routines Define, Build & Test Pilot Roll OutInitiation
  • 46. 46NuggetHub 2019. All rights reserved | Example timeline: We see the timeline until DEC 2019 as a valid starting point and like to detail and adjust activities and dates jointly REGIONAL BUSINESS CASE ALIGNMENTS CONDUCT ORANIZATIONAL CHANGE IMPACT ANALYSIS IDENTIFACTION OF PROCESS EXTENSIONS / SATELLITES ALIGN ON SAP CLOUD PRODUCTS RAPID START DEFINE TECHNICAL GOVERNANCE MODEL MAR APR MAY JUN JUL AUG SEP OCT NOV DEC SETUP INITIAL BUSINESS CASE DEFINE AND ALIGN IMPLEMENTATION ROADMAP DEFINE & ALIGN MIGRATION APPROACH DESIGN TARGET ARCHITECTURE SETUP S/4 AND SOLUTION (CG) ASE1 ESTABLISH TRANSFORMATION GOVERNANCE MODEL A IMPLEMENT VALUE SCENARIOS Q-GATE 1 Q-GATE 2 Q-GATE 3 CHANGE & PROJECT MANAGEMENT BUSINESS CASE BUSINESS PROCESSES ARCHITECTURE & DEVELOPMENT DATA MODEL FOR PROTOTYPE DEFINE VALUE SCENARIOS A Prepare phase Foundation phaseB C BuildPrint phase Test phaseDLegend: DEFINE DATA GOVERNANCE ELABORATE TECHNICAL TRANSITION FOR SEQUENTIAL ROLLOUT DETAILE & ALIGN REMAINING FUNDAMENTAL DESIGN QUESTIONS COMPLETE BUSINESS CASE 1.0 COMPLETE BUSINESS CASE 2.0 ASE2 ASE3 A A S/4 AGILE PROTOYPING => MVP for Client SALES COMPANYB C C A B A B B C DATA Kick-Off SteerCo SteerCoSteerCo MAIN RI(C)EFW list initialization & arbitration A CHANGE STRATEGY, COMMUNICATION PLAN STAKEHOLDER ANALYSIS A SETUP AGILE FRAMEWORKA C B C C C C B C C C PROCESS ALIGNMENT E2E WS (INCL. SYSTEM DEMO) – DIGITAL CORE B C PREPARE PROCESS WS A B
  • 47. 47NuggetHub 2019. All rights reserved | Key success factor 1: A stringent top-down governance, successful transformation programs mirror line organizations ERP Transformation: Key success factors: 1) Governance End-to-End Process Model (End-to-end process flows, operating procedures) IT applications & infrastructure (Technology landscape (systems, applications, interfaces), ERP transactions) Line organization Program management & governance Process & data programs S4/HANA transformation program Business governance Process & data governance IT governance Program organization Vision & Strategy (Strategic Directives & cornerstones) RTR Record to Report PTP Purchase to Pay OTC Order to Cash FTD Forecast to Deploy MTS/ MTO Production Business Model (Interaction model with external business partners, business scenarios) Operating Model (Organizational set-up, interaction model with internal business partners, responsibility definition) Governance Governance Frank internal culture of improvement and disclosure of project-relevant information Approved business case to enable target-oriented design decisions and prioritizations
  • 48. 48NuggetHub 2019. All rights reserved | Detailed governance principles, structures, bodies and mechanisms should be elaborated as a key success factor ERP Transformation: Key success factors: 1) Governance  Outlines the overall governance principles (e.g. maintain regional independence) Governance Principles  Outlines the overall decision rights structure in line with org structure, the defined roles and the KPI responsibilities (incl. authorization competencies) Governance structure & roles  Outlines the overall governance bodies structure  Specifically designs each governance body (Objectives, frequency, members, etc.) Governance bodies  Outlines the decision process flow incl. RACI  Outlines the mechanisms that are applied to actually come to a decision (e.g. majority rule vs. consensus rule) Governance mechanisms
  • 49. 49NuggetHub 2019. All rights reserved | A remained focus should be put on the highest value-added business opportunities and challenges ERP Transformation: Key success factors: 2) Business focus Interconnectedlayers Strategy & Operating Model Organization & Capabilities Business Processes Technology & Data Your transformation is an opportunity to intensify collaboration across divisions and markets for a holistic business conversion: Optimize entrenched processes across division and markets Rethink the business model & open space for new business models Improve insights & business steering & collaboration Digital disruption of chemical and pharmaceutical industry with new business models Necessity for new business capabilities Standardization and harmonization as strategic priorities SAP S/4 HANA technology as enabler for business benefits
  • 50. 50NuggetHub 2019. All rights reserved | Our proposed governance model enables Client to calculate a collaborative transformation business case ERP Transformation: Key success factors: 2) Business focus Division perspective Market perspective … G r o u p Fi & Co Prod. Procure- ment D i v i s i o n Fi & Co … Market 1 Market 2 … … Market n… Log. Group / Division  Division Councils, Area Product Owner, Business Process Manager p. Domain  Limited support for market initiatives, yet best suited for alignment on division level  Shortest duration to achieve top-down alignment across divisions  Low w.r.t. manageability of scope  Higher w.r.t. market involvement  Best fit to division strategies and steering  Better tailoring of processes  Requires Area Product Owner to govern Key market  Area Product Owner aligned with country Business Process Manager and Councils  Improve collaboration between key markets and x-division cost optimization  Scope enlarged to key countries to achieve bottom-up alignment  Standardize and harmonize processes  Higher w.r.t. organizational and technical complexity  Integration of business benefits  Finance-related division activities are aligned cross-market / cross-division Group / Division, key markets (final consolidation)  Area Product Owner, Business Process Manager and Experts, Councils  Further improved collaboration and joined alignment  Standardization and process harmonization across the program and aligned divisional and market initiative  Higher due to strong dependency on governance and collaboration model  Aligned finance- and logistics / Supply Chain-related activities  Highest potential for collaboration … G r o u p Fi & Co Prod. Procure- ment D i v i s i o n Fi & Co … Market 1 Market 2 … … Market n… Log. … G r o u p Fi & Co Prod. Procure- ment D i v i s i o n Fi & Co … Market 1 Market 2 … … Market n… Log. Level Governance Support for x-division and market initiatives Benefits Risks Other Domains in project scope Harmonized processes / standards Market specific harmonization approach Legend: SETUP INITIAL BUSINESS CASE COMPLETE BUSINESS CASE 1.0 A REGIONAL BUSINESS CASE ALIGNMENTS ASE2 COMPLETE BUSINESS CASE 2.0 Bridge to project phase Final Business Case
  • 51. 51NuggetHub 2019. All rights reserved | We will make use of our use case library to propose cases for digitization and identify change levers ERP Transformation: Key success factors: 2) Business focus  For each domain determination of benefit / cost levers / use case for supporting overall business case targets  For each use case verification of usage and benefits for the markets  Showcase not only in the E2E process domain but also in the reference S/4 HANA CORE system by Demo Rethink business  Each use case with clear aligned description of usage and benefits for having a standardized discussion within the workshops with the domain experts  Clear verification of feasibility within this market  Leverage of S/4 HANA transformation by the use case library of Consultant Improve insights  Drill down of benefit / cost efficiency tree  Alignment of current benefits with controlling, process expertise in IT and business process in functional domains  Overall consolidation and alignment of the KPI / Business Case framework according to Client standards and regulation up front Optimize operations
  • 52. 52NuggetHub 2019. All rights reserved | Change management is embedded from the start - developing the culture, workforce and skills needed for the digital age ERP Transformation: Key success factors: 3) Change Management Effective Change Management is embedded in all our transformation projects (‘DNA’) Our New Deal Change Management Framework is Consultant Invent’s globally implemented change approach Our innovative target-group specific change architectures deals with the dynamic environments and projects of our client By balancing the rational, political, and emotional side of change, we ensure sustainable transformations Clear and transparent KPIs build the ‘backbone‘ of our sustainable change work All projects benefit from our strong Thought Leadership (e.g. change 2.0, our regular Change Management Study)
  • 53. 53NuggetHub 2019. All rights reserved | To ensure you master your business transformation and prepare for the future way of working we work collaboratively ERP Transformation: Key success factors: 3) Change Management Key considera- tions Key Outcomes ORGANIZATIONAL CHANGE MANAGEMENT (OCM) CHANGE MANAGEMENT COMMUNICATIONS ROLES & TRAINING Need to align the leadership team around a clear transformation vision and case-for-change  Established change monitoring  Analyzed key stakeholder groups  Analyzed change impact for people, process, organization and technology  Continuous and iterative usage of a change roadmap Need to develop a robust change plan, to achieve deep and lasting organizational change Need to develop a comprehensive, multi-phased transformation roadmap Need to establish an accurate capability baseline, on which to base the transformation plan  Aligned communication plan with identified measures and channels  Established information strategy to keep all stakeholders integrated in the project progress  Defined change story to enhance commitment on a emotional level  Identified training needs, objectives and target groups  Roles aligned to specific user groups  Established training strategy in align- ment with overall change strategy  Developed training approach including different channels for knowledge transfer (online, offline) Agile Agile
  • 54. 54NuggetHub 2019. All rights reserved | The “Change Deal”, is an iterative, and truly agile approach that delivers lasting organizational change ERP Transformation: Key success factors: 3) Change Management 1 3 4 5 62 Adopt & Share Backlog (Change Tools) Sprint Planning Adopt & Share Change Sprint Plan for Scaling Change Sprint Review Embedded Change Team Change Experts Transformation Project Member Key Stakeholder/ User Comms Plan Stake- holder Analysis Work Hacks Agile Boot Camp Lean Coffee Vision Digithon Digital Am- bassador Network … Change Impact Assess- ment Training needs Leader- ship develop- ment Change Story  Refine and further detail - add new activities depending on the learning experience during sprint Fill the Backlog with change activities and order activities according to priority. Then define milestones beginning with high priority activities Select activities with high priority for the sprint plan and define sprint outcome (definition of done“) for each activity Develop change and communication formats in interdisciplinary teams and plan the roll-out Present formats to product owner, proof maturity of the formats and roll-out mature formats. Collect required changes to the backlog …
  • 55. 55NuggetHub 2019. All rights reserved | Standard procedures and hierarchies are used to define the various levels of process flows ERP Level numbering and process classification End To End Process Major Process Business Process Process Step Activity (Transaction) The critical 5 to 10 business processes that:  Traverses the entire value chain,  Crosses functional, geographic, company boundaries  Have measurable outcomes The process categories within an End To End Process that:  Represents logical groupings of processes  Typically demonstrates logical business “hand-offs” or integration points across the E2E process stream Typically 5-7 logical groupings within each major process that:  Can be subdivided into process steps assignable to process roles  Maintain discrete metrics unique to its specific activities Logical groupings of business transactions:  E.g. Create, Change, Release order…  Must be uniquely assignable to a Role without separation of duties conflicts Lowest level of work activity in Blueprinting L0 L3 L4 L1 L2 End to End Process Major Process Business Process L0 L1 L2 L3 Levelofdetailincreasing - 1 1.1 1.1. 1
  • 56. 56NuggetHub 2019. All rights reserved | Consultant will help Client to follow SAP standard processes and solutions and establishing a clear escalation pyramid
  • 57. 57NuggetHub 2019. All rights reserved | The right migration approach should be identified after check of data and data quality in Client legacy systems Lift-and-shift Cloud-enabled virtual automation A DevOps transformation Workloads are migrated to cloud IaaS in as unchanged a manner as possible, and change is done only when absolutely necessary IT processes are modified in this approach to take advantage of automation and some cloud-native capabilities IT and some business processes are transformed, and a cloud-native agile approach is used as much as possible during the migration Legacy systems SAP Data Services (ETL) Source 1 Source 2 Source 3 Source 4 To-Be landscape Extract Transform & Load (ETL) data to primary systems S/4HANA Working Assumption => ETL for Client Data Migration because of data quality and redundancy in PSG, PSI and PS3 + • Profiling • Cleansing • Harmonization Usual Cloud Migration Approaches
  • 58. 58NuggetHub 2019. All rights reserved | End-to-End Process to migrate of one application instances 2. Data cleansing 3. Data harmonisation 1. Data profiling  Inspection of data source for validity and completeness  Collection of statistical information at the data source and identification of anomalies  Decide on migration objects in scope (master & transactional data)  Repair data in a staging area (SAP DS) or in legacy applications  Deals with incorrect, incomplete or obsolete data  Only the data in scope will be cleansed, according to the scope definition & extraction rules  Removal of duplicate records  Golden record selection  Validation and repair of target applications specific fields  Add information needed for S/4HANA, MDG etc. 1. Profiling 2. Cleansing 3. Harmonization & Completion
  • 59. 59NuggetHub 2019. All rights reserved | Example Extract, Transform & Load (ETL), the classical data migration approach SAP DS (ETL) Custom program (Scripts, file transfer) Manual conversion (Excel, flat files) Legacy System Secondary System Primary System Other System Target file Staging & TransformationSource File Secondary System Further distribution to other consuming applications: Standard Interfaces Initial load to primary systems: ETL (AUTO), Custom program (AUTO) and manual conversion (MANUAL)
  • 60. 60NuggetHub 2019. All rights reserved | Example Cloud Migration: End-to-End Process for migration of one application instance 60 Customer Activities Consultant Migration Activities Legend Customer Activities supported by Consultant Governance, Security, Planning, Tracking Migration Phases for a single migration TransitionPreparation Design & Implementation Migration & Testing Go / No Go Go / No Go Analysis Go / No Go Customer Service Management Plan Consultant Remediation Activities Consultant Process Phases Consultant Decommissioning Activities Consultant Optional Activities Project Kick-off Input & Environment Access Program Kick-off Project Governance Setup Migration Program Planning Functional (UAT) Test Execution Migration Execution Validation of Migration Prerequisites Migration Tests Execution Remediation Migration Design Definition Migration Execution Planning Application packaging Application Pack definition Migration & Affinity Pack Implementation Warranty Decommissioning Handover of to RUN team Last data synchronization & Service switch Sign-off Rollback Live Test Execution Application Pack & Package Analysis Migration Project Planning Quality gate
  • 61. 61NuggetHub 2019. All rights reserved | Clear definition of project roles and responsibilities for each rollout should be part of the overall project and team planning Project roles per team Template Team Process Owner R O R R O O R R O O R O O O O R R O Application Owner R O O R R O O R O O O O R R O Offshore Build Team (Factories) R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R Business (already live) R R R R Rollout Team Application Manager O O O O O O O O O O O O O O O O O O O Deploy. Team Member R O R R O O R R R R O O R R O O R R R R R O O O R R R O O O R R O Local Team Local key user O O O O O O O O O O O O O O O O O O O O O O O O Pre-Assessment Pre-Configuration Fit / gap workshop Localization & Gap Implementation Integration Test User Acceptance Test Regression Test Final Preparation Post Go-Live Support Other project activities (e.g. data cleansing) O Onsite R Remote Further description  Process- & applications owners are the bridge to discuss the template with the rollout team, e.g. fit-/gap analysis  The rollout team is working primarily on local training, data migration and testing  Business (key) users in countries already live perform regression test and benefit from updates, supported by test automation
  • 62. 62NuggetHub 2019. All rights reserved | Embedded Change Management integrates specific Change Management activities in the regular project / roll -off work Methodology: Embedded Change Methodology: Embedded Change Change Management Business and IT Architecture and validation workshops  “Align” results early  Create buy-in and understanding on harmonization needs  Early consider change impact – start re-thinking Communication of results  Workshop documentation  Alignment weeks before Steering Committees  Results presentation, e.g. via Live Meeting Interviews and LoB/ board area workshops  Involve and create understanding  Consider positions and actively plan involvement Leadership commitment & buy-in  Unify leaders around the change vision with initial workshop  Ensure commitment and respective communication  “Walk-the-talk” Initial stakeholder analysis  Collect stakeholder as input for interview/ workshop planning  Understand setup and position  Communication needs Scoping and roadmap workshop  Actively involve stakeholders in the initial design to create buy-in (Think Tank)
  • 63. 63NuggetHub 2019. All rights reserved | Our training approach ensures learning success and a smooth Go-Live by providing training on a global and local level Define Training Approach and Plan Design Training Curriculum Deliver Training Prepare for Training Delivery Develop Training and Support Materials  Identify system roles and training requirements  Identify people who need to be trained  Assess corporate learning aspirations and logistical resources  Define/confirm guiding principles and plan training development  Outline plan for training delivery  Analyze “to-be” job roles and respective training needs  Define training modules and methods (e.g. web-based training, train-the- trainer, micro learning, classroom)  Confirm outlined plan for training delivery and key user learning journey  Agree standards and templates  Create and validate training materials & set up training content  Create global and local training plans  Dry run of key user trainings  Support for dry run of end user trainings steered by key users  Tailor data and content for web-based trainings, train the trainer and classroom trainings  Conduct train-the- trainer  Set up training rooms and equipment  Send joining instructions (especially for eLearnings)  Prepare training assessment and evaluations  Monitor training interventions regularly  Conduct training  Track attendance  Make online support materials available  Ongoing training evaluation and user satisfaction with resulting corrective measures  Modify training materials & re-train trainers as required Training need analysis Global training concept Key User learning journey E-Learning & Teach-Try-Learn Tailored Training Packages Learning Management system Training evaluation Interactive Learning