RENCANA PEMBUATAN AONING
RENCANA PEMBUATAN AONING
HASIL PEMBUATAN AONING
PADA HARI JUM’AT YANG BERTEPATAN
DENGAN HARI LIBUR
KAPASITAS MASJID TERMASUK WING
KIRI, KANAN DAN SELASAR DEPAN
MASIH BELUM MENCUKUPI UNTUK
MENAMPUNG PARA JAMAAH WARGA
BSI
KEPADATAN JAMAAH TERUTAMA PADA
HARI LIBUR YANG TERJADI SAAT INI,
AKAN TERUS BERTAMBAH PADAT
SEIRING DENGAN PERTUMBUHAN
ANAK-ANAK KITA YANG MENGINJAK
USIA REMAJA SEKITAR 5 – 10 TAHUN
YANG AKAN DATANG
HAL INILAH YANG MENJADI
ALASAN UTAMA KENAPA RENOVASI
  MASJID PERLU DILAKSANAKAN
KONDISI EKSISTING BANGUNAN MASJID
RENCANA LANTAI I , RUANG SERBAGUNA
RENCANA LANTAI II , RUANG MASJID
TAMPAK DEPAN RENCANA MASJID
TAMPAK SAMPING RENCANA MASJID
PERINCIAN BIAYA
PEKERJAAN RENOVASI MASJID JAMI AKMALIA
PERUM.BSI II-KEL.PENGASINAN-KEC,SAWANGAN-KOTA DEPOK

No.               Uraian              Volume Harga Satuan       Jumlah         Total

 I    PEKERJAAN PENDAHULUAN
      Pek.Bongkaran dinding, beton,      1    ls   5,000,000     5,000,000
          Atap, dll
      Pek.pas.Galian pondasi            130   m3    150,000     19,500,000
      Pek.pas.Pond.batukali            78.7   m3    450,000     35,415,000
                                                                              59,915,000
 II PEKERJAAN BETON
    Pek.Pondasi setempat               19.8   m3   2,650,000    52,470,000
    Pek.Sloop                            15   m3   2,650,000    39,750,000
    Pek.Kolom Struktur 50x50             20   m3   3,400,000    68,000,000
    Pek.Kolom Struktur 40x40           28.2   m3   3,300,000    93,060,000
    Pek.Kolom Struktur 30x30           7.56   m3   3,250,000    24,570,000
    Pek.Balok Struktur 25x50          28.75   m3   3,250,000    93,437,500
    Pek.Balok Struktur 20x30           14.9   m3   3,250,000    48,425,000
    Pek.Plat beton                     83.7   m3   3,250,000   272,025,000
    Pek.Kolom Praktis                  1.57   m3   2,650,000     4,160,500
    Pek.Ringbalok                       2.9   m3   3,250,000     9,425,000
    Pek.Tangga beton                    9.5   m3   2,650,000    25,175,000
                                                                             730,498,000
III PEKERJAAN PASANGAN
     Pek.Bata bata merah               1075   m2   115,000   123,625,000
     Pek.Plesteran                     2150   m2    65,000   139,750,000
     Pek.acian                         2150   m2    22,500    48,375,000
                                                                           311,750,000
 IV PEKERJAAN PLAFOND
    Pek.pas.Rangka+penutup             953    m2   80,000     76,240,000
    Pek.pas.Listplafond t.8 cm         510    m2   25,000     12,750,000
                                                                            88,990,000
 V PEKERJAAN LANTAI
   Pek.ploor Lantai                     465   m2    60,000    27,900,000
   Pek.pas.Lantai utama 60x60 excina   595    m2   265,000   157,675,000
   Pek.pas.Lantai teras                 65    m2   205,000    13,325,000
   Kamar mandi
   .-Pek.pas.lantai                     50    m2   175,000     8,750,000
   .-Pek.pas.dinding                   140    m2   210,000    29,400,000
   Pek.pas.Plint                       245    m'    65,000    15,925,000
                                                                           252,975,000
VI   PEKERJAAN ATAP
     Pek.pas.Rangka atap baja          320    m2   325,000   104,000,000
     Pek.pas.Genteng badan             320    m2   220,000    70,400,000
     Pek.pas.Nok                        40    m'   105,000     4,200,000
     Pek.pas.Listplang                  85    m'    90,000     7,650,000
                                                                           186,250,000
VII   PEKERJAAN INSTALASI AIR
      Pek.pas.air bersih                190     m'       15,000    2,850,000
      Pek.pas.air kotor/hujan/kotoran   143     m'       40,000    5,720,000
      Pek.pas.Closet Jongkok              8     bh      350,000    2,800,000
      Pek.Ploor drain                    16     bh      100,000    1,600,000
      Pek.pas.Kran biasa                 24     bh       55,000    1,320,000
      Pek.pas.Watertorn 1000 lt           2     bh    2,000,000    4,000,000
      Pek.pas.Septictank                  1     bh    4,500,000    4,500,000
                                                                               22,790,000
VIII PEKERJAAN INSTALASI LISTRIK
     Pek.pas.Inst.Lampu / Stp kontak    155     ttk     185,000   28,675,000
     Pek.pas.Inst.stop kontak TV          2     ttk     220,000     440,000
     Pek.pas.Inst.stop kontak Telpon      2     ttk     220,000     440,000
     Pek.pas.Inst.stop kontak AC                ttk                       -
     Pek.pas.Inst.group MCB             24      ttk     205,000    4,920,000
     ARMATURE
     Pek.pas.lampu Tl 2x36              92 bh          325,000    29,900,000
     Pek.pas.Downlight                  33 bh           65,000     2,145,000
     Pek.pas.saklar engkel               8 bh           25,000      200,000
     Pek.pas.saklar serie               40 bh           40,000     1,600,000
     Pek.pas.Stopkontak                 30 bh           40,000     1,200,000
     Pek.pas.Stopkontak TV               2 bh           75,000      150,000
     Pek.pas.Stopkontak Telpon           2 bh           75,000      150,000
                                                                               69,820,000
IX PEKERJAAN KUSEN
   Pek.pas.Kusen kayu 6/15 kamper       2.88 m3        15,000,000      43,200,000
   Pek.pas.Daun pintu panel                9 bh         1,550,000      13,950,000
   Pek.pas.Daun pintu kaca                22 bh         1,350,000      29,700,000
   Pek.pas.Daun jendela                   44 bh           750,000      33,000,000
   Pek.pas.Engsel pintu                   47 pcs           75,000       3,525,000
   Pek.pas.Hendle pintu                   22 unt          450,000       9,900,000
   Pek.pas.Engsel jendela                 44 pcs           55,000       2,420,000
   Pek.pas.Rambuncis jendela              44 bh            30,000       1,320,000
   Pek.pas.Hak angin                      44 bh            20,000        880,000
   Pek.pas.Pintu PVC                       8 bh           500,000       4,000,000
                                                                                     141,895,000
X PEKERJAAN CAT-CATAN
  Pek.Cat dinding                      2150 m2            25,000       53,750,000
  Pek.Cat plafond                       953 m2            20,000       19,060,000
  Pek.Cat melamik kusen                 320 m'            70,000       22,400,000
  Pek.Cat melamik daun pintu              9 bh            475,000       4,275,000
  Pek.Cat melamik daun pintu kaca        22 bh            375,000       8,250,000
  Pek.Cat.mlk.Daun jendela               44 bh            270,000      11,880,000
  Pek.Cat melamik listplang              85 m'            75,000        6,375,000
  Pek.Cat Aquaproof                     140 m2            50,000        7,000,000
                                                                                     132,990,000
                                                   Total Keseluruhan                1,997,873,000
                                                   Dibulatkan                       1,997,000,000

   (Terbilang : Satu milyard sembilan ratus sembilan puluh tujuh juta rupiah )
JENDELA EXISTING
RENCANA PEMASANGAN TERLIS JENDELA
RENOVASI MASJID

Weitere ähnliche Inhalte

Ähnlich wie RENOVASI MASJID

Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikikurniawan yusril
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonEdd Leo G
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfAJI DARMAWAN
 
harga jasa pemasangan tower triangle
harga jasa pemasangan tower triangleharga jasa pemasangan tower triangle
harga jasa pemasangan tower triangleKang Asep
 
Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentationBrasilEcodiesel
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdownarmada7000
 
Gopi architect portfolio
Gopi architect portfolioGopi architect portfolio
Gopi architect portfolioGopi Krishna
 
Presentacion grafi ca de intervalo
Presentacion grafi ca de intervaloPresentacion grafi ca de intervalo
Presentacion grafi ca de intervaloIvis Garcis Mor
 
Bisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandBisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandRobby Ariebullah
 
Queen burger pres 2 p+f
Queen burger pres 2 p+fQueen burger pres 2 p+f
Queen burger pres 2 p+fRofoMG
 
Container dimensions
Container dimensionsContainer dimensions
Container dimensionsxngoc83
 

Ähnlich wie RENOVASI MASJID (20)

Adendum blh 2009 diperbaiki
Adendum blh 2009 diperbaikiAdendum blh 2009 diperbaiki
Adendum blh 2009 diperbaiki
 
Valorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddsonValorización adicionales 28 01-2015 eddson
Valorización adicionales 28 01-2015 eddson
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
Rab
RabRab
Rab
 
Lamp m 32
Lamp m 32Lamp m 32
Lamp m 32
 
Facade man hour
Facade man hourFacade man hour
Facade man hour
 
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdfMaster Schedule vs Actual Progress Bp Andi Week 13.pdf
Master Schedule vs Actual Progress Bp Andi Week 13.pdf
 
harga jasa pemasangan tower triangle
harga jasa pemasangan tower triangleharga jasa pemasangan tower triangle
harga jasa pemasangan tower triangle
 
Earnings release 3 q09 presentation
Earnings release 3 q09 presentationEarnings release 3 q09 presentation
Earnings release 3 q09 presentation
 
Grafica de intervalos
Grafica de intervalosGrafica de intervalos
Grafica de intervalos
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdown
 
Gopi architect portfolio
Gopi architect portfolioGopi architect portfolio
Gopi architect portfolio
 
Presentacion grafi ca de intervalo
Presentacion grafi ca de intervaloPresentacion grafi ca de intervalo
Presentacion grafi ca de intervalo
 
Bisnis plan-warnet-broadband
Bisnis plan-warnet-broadbandBisnis plan-warnet-broadband
Bisnis plan-warnet-broadband
 
Queen burger pres 2 p+f
Queen burger pres 2 p+fQueen burger pres 2 p+f
Queen burger pres 2 p+f
 
Revit Samples
Revit SamplesRevit Samples
Revit Samples
 
Revit Samples
Revit SamplesRevit Samples
Revit Samples
 
Container dimensions
Container dimensionsContainer dimensions
Container dimensions
 
Lista de precios iccu 2016
Lista de precios iccu 2016 Lista de precios iccu 2016
Lista de precios iccu 2016
 
Drawing1
Drawing1Drawing1
Drawing1
 

RENOVASI MASJID

  • 1.
  • 2.
  • 3.
  • 4.
  • 8.
  • 9.
  • 10.
  • 11. PADA HARI JUM’AT YANG BERTEPATAN DENGAN HARI LIBUR KAPASITAS MASJID TERMASUK WING KIRI, KANAN DAN SELASAR DEPAN MASIH BELUM MENCUKUPI UNTUK MENAMPUNG PARA JAMAAH WARGA BSI
  • 12.
  • 13.
  • 14. KEPADATAN JAMAAH TERUTAMA PADA HARI LIBUR YANG TERJADI SAAT INI, AKAN TERUS BERTAMBAH PADAT SEIRING DENGAN PERTUMBUHAN ANAK-ANAK KITA YANG MENGINJAK USIA REMAJA SEKITAR 5 – 10 TAHUN YANG AKAN DATANG
  • 15. HAL INILAH YANG MENJADI ALASAN UTAMA KENAPA RENOVASI MASJID PERLU DILAKSANAKAN
  • 16.
  • 18. RENCANA LANTAI I , RUANG SERBAGUNA
  • 19. RENCANA LANTAI II , RUANG MASJID
  • 22. PERINCIAN BIAYA PEKERJAAN RENOVASI MASJID JAMI AKMALIA PERUM.BSI II-KEL.PENGASINAN-KEC,SAWANGAN-KOTA DEPOK No. Uraian Volume Harga Satuan Jumlah Total I PEKERJAAN PENDAHULUAN Pek.Bongkaran dinding, beton, 1 ls 5,000,000 5,000,000 Atap, dll Pek.pas.Galian pondasi 130 m3 150,000 19,500,000 Pek.pas.Pond.batukali 78.7 m3 450,000 35,415,000 59,915,000 II PEKERJAAN BETON Pek.Pondasi setempat 19.8 m3 2,650,000 52,470,000 Pek.Sloop 15 m3 2,650,000 39,750,000 Pek.Kolom Struktur 50x50 20 m3 3,400,000 68,000,000 Pek.Kolom Struktur 40x40 28.2 m3 3,300,000 93,060,000 Pek.Kolom Struktur 30x30 7.56 m3 3,250,000 24,570,000 Pek.Balok Struktur 25x50 28.75 m3 3,250,000 93,437,500 Pek.Balok Struktur 20x30 14.9 m3 3,250,000 48,425,000 Pek.Plat beton 83.7 m3 3,250,000 272,025,000 Pek.Kolom Praktis 1.57 m3 2,650,000 4,160,500 Pek.Ringbalok 2.9 m3 3,250,000 9,425,000 Pek.Tangga beton 9.5 m3 2,650,000 25,175,000 730,498,000
  • 23. III PEKERJAAN PASANGAN Pek.Bata bata merah 1075 m2 115,000 123,625,000 Pek.Plesteran 2150 m2 65,000 139,750,000 Pek.acian 2150 m2 22,500 48,375,000 311,750,000 IV PEKERJAAN PLAFOND Pek.pas.Rangka+penutup 953 m2 80,000 76,240,000 Pek.pas.Listplafond t.8 cm 510 m2 25,000 12,750,000 88,990,000 V PEKERJAAN LANTAI Pek.ploor Lantai 465 m2 60,000 27,900,000 Pek.pas.Lantai utama 60x60 excina 595 m2 265,000 157,675,000 Pek.pas.Lantai teras 65 m2 205,000 13,325,000 Kamar mandi .-Pek.pas.lantai 50 m2 175,000 8,750,000 .-Pek.pas.dinding 140 m2 210,000 29,400,000 Pek.pas.Plint 245 m' 65,000 15,925,000 252,975,000 VI PEKERJAAN ATAP Pek.pas.Rangka atap baja 320 m2 325,000 104,000,000 Pek.pas.Genteng badan 320 m2 220,000 70,400,000 Pek.pas.Nok 40 m' 105,000 4,200,000 Pek.pas.Listplang 85 m' 90,000 7,650,000 186,250,000
  • 24. VII PEKERJAAN INSTALASI AIR Pek.pas.air bersih 190 m' 15,000 2,850,000 Pek.pas.air kotor/hujan/kotoran 143 m' 40,000 5,720,000 Pek.pas.Closet Jongkok 8 bh 350,000 2,800,000 Pek.Ploor drain 16 bh 100,000 1,600,000 Pek.pas.Kran biasa 24 bh 55,000 1,320,000 Pek.pas.Watertorn 1000 lt 2 bh 2,000,000 4,000,000 Pek.pas.Septictank 1 bh 4,500,000 4,500,000 22,790,000 VIII PEKERJAAN INSTALASI LISTRIK Pek.pas.Inst.Lampu / Stp kontak 155 ttk 185,000 28,675,000 Pek.pas.Inst.stop kontak TV 2 ttk 220,000 440,000 Pek.pas.Inst.stop kontak Telpon 2 ttk 220,000 440,000 Pek.pas.Inst.stop kontak AC ttk - Pek.pas.Inst.group MCB 24 ttk 205,000 4,920,000 ARMATURE Pek.pas.lampu Tl 2x36 92 bh 325,000 29,900,000 Pek.pas.Downlight 33 bh 65,000 2,145,000 Pek.pas.saklar engkel 8 bh 25,000 200,000 Pek.pas.saklar serie 40 bh 40,000 1,600,000 Pek.pas.Stopkontak 30 bh 40,000 1,200,000 Pek.pas.Stopkontak TV 2 bh 75,000 150,000 Pek.pas.Stopkontak Telpon 2 bh 75,000 150,000 69,820,000
  • 25. IX PEKERJAAN KUSEN Pek.pas.Kusen kayu 6/15 kamper 2.88 m3 15,000,000 43,200,000 Pek.pas.Daun pintu panel 9 bh 1,550,000 13,950,000 Pek.pas.Daun pintu kaca 22 bh 1,350,000 29,700,000 Pek.pas.Daun jendela 44 bh 750,000 33,000,000 Pek.pas.Engsel pintu 47 pcs 75,000 3,525,000 Pek.pas.Hendle pintu 22 unt 450,000 9,900,000 Pek.pas.Engsel jendela 44 pcs 55,000 2,420,000 Pek.pas.Rambuncis jendela 44 bh 30,000 1,320,000 Pek.pas.Hak angin 44 bh 20,000 880,000 Pek.pas.Pintu PVC 8 bh 500,000 4,000,000 141,895,000 X PEKERJAAN CAT-CATAN Pek.Cat dinding 2150 m2 25,000 53,750,000 Pek.Cat plafond 953 m2 20,000 19,060,000 Pek.Cat melamik kusen 320 m' 70,000 22,400,000 Pek.Cat melamik daun pintu 9 bh 475,000 4,275,000 Pek.Cat melamik daun pintu kaca 22 bh 375,000 8,250,000 Pek.Cat.mlk.Daun jendela 44 bh 270,000 11,880,000 Pek.Cat melamik listplang 85 m' 75,000 6,375,000 Pek.Cat Aquaproof 140 m2 50,000 7,000,000 132,990,000 Total Keseluruhan 1,997,873,000 Dibulatkan 1,997,000,000 (Terbilang : Satu milyard sembilan ratus sembilan puluh tujuh juta rupiah )
  • 26.