This document provides details of the cable tray, trunking, and containment layout for Floor 19 (Level 16) of the mechanical floor in Tower 3. It includes labels and descriptions for various cable trays of different sizes (e.g. 150mm, 450mm) for essential, non-essential low voltage cables and other systems. It also provides information on electrical rooms, tapoff boxes, distribution boards, and details of circuits feeding various equipment like fire pumps, jockey pumps, air handling units, etc. Electrical containment routes and equipment locations are shown on the floor plan.
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
T3 Floor 19 Mechanical Layout
1. T3.1
T3.A
T3.B
T3.C
T3.D
T3.E
T3.F
T3.2T3.3T3.4T3.5T3.6T3.7T3.8
2/3
T3-116
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
450 mm ESSENTIAL LV CABLE TRAY450 mm ESSENTIAL LV CABLE TRAY
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
EMCC-TX5-T3-LL-L16-01
MCC-TX5-T3-LL-L16-01
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
450 mm NON ESSENTIAL LV CABLE TRAY450 mm NON ESSENTIAL LV CABLE TRAY
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
225 mm ESSENTIAL LV CABLE TRAY225 mm ESSENTIAL LV CABLE TRAY
WP
WP
WP
FOR FAHU-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01/C1
FOR CHWP - T3-L16-01,02 & 03
FED FROM MCC - TX5-T3-LL-L16-01
FOR FAHU -T3-L16-02
FED FROM MCC-TX5-T3-LL-L16-01
FOR FWCP T3- L16-01
FED FROM SMDB - TX5-T3-LL-L16-01
FOR CWTP-T3-L16-01 & 02
FED FROM ESMDB-TX5-T3-LL-L16-01
63A TPN
80A TPN
20A
TP
N
63A TPN
WP
WP
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
100A
TPN
100A TPN 100A TPN
WP WP
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
300 mm NON ESSENTIAL LV CABLE TRAY300 mm NON ESSENTIAL LV CABLE TRAY
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
450 mm NON ESSENTIAL LV CABLE TRAY450 mm NON ESSENTIAL LV CABLE TRAY
ELEC. RM.
IT/GSM
F.F.
GARBAGE
STAIR-02 FIREMAN'S LOBBY
SE-02
PE-02
SE-01 SER. LOBBY STAIR-01
PE-05
PE-01PE-03
PE-04 PE-06
F.H.R FHR.
WATER METER.
LIFT MACHINE ROOM
200 mm SECURITY TRUNKING200 mm SECURITY TRUNKING
200 mm ICT NETWORK TELEPHONE/DATA CABLE TRAY200 mm ICT NETWORK TELEPHONE/DATA CABLE TRAY
300 mm GSM CABLE TRAY300 mm GSM CABLE TRAY
300 mm ISP ETISALAT CABLE TRAY300 mm ISP ETISALAT CABLE TRAY
300 mm ISP DU CABLE TRAY300 mm ISP DU CABLE TRAY
750mm(H)x600mm(W)x600mm(D)
15U ICT CABINET (HCC)
FOR FP-T3-L16-01
FIRE PUMP CONTROL PANEL
FOR FWCP -T3- L16-02
FED FROM SMDB - TX5-T3-LL-L16-01
FOR JP-T3-L16-01
JOCKEY PUMP CONTROL PANEL
20A
TPN
WP
50mm ESSENTIAL POWER TRUNKING
50mm LIGHTING TRUNKING
50mm EMERGENCY LIGHTING TRUNKING
50mm POWER TRUNKING
50mm FIRE ALARM CABLE TRAY
20A TPN
WP
HL
FOR SEF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-L16-01 20A TPN
HL
WP
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
FOR SPF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-L16-01 20A TPN
HL
WP
100mm ICT NETWORK TELEPHONE/DATA CABLE TRAY
150mm GSM CABLE TRAY
50mm SECURITY TRUNKING
50mm ELV CABLE BASKET
FOR MAF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-L16-01
2x150mm NON ESSENTIAL LV CABLE TRAY
150mm ESSENTIAL LV CABLE TRAY
450mm ESSENTIAL LV CABLE TRAY
50mm FIRE ALARM CABLE TRAY
50mm POWER TRUNKING
50mm EMERGENCY LIGHTING TRUNKING
50mm LIGHTING TRUNKING
50mm ESSENTIAL POWER TRUNKING
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
20A TPN
FOR FA-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01
WP
HL
20A TPN
FOR EAF-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01
WP
HL
FOR SPF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01
20A TPN
HL
WP
50mm FIRE ALARM CABLE TRAY
50mm POWER TRUNKING
50mm EMERGENCY LIGHTING TRUNKING
50mm LIGHTING TRUNKING
50mm ESSENTIAL POWER TRUNKING
225 mm NON ESSENTIAL LV CABLE TRAY225 mm NON ESSENTIAL LV CABLE TRAY
150 mm NON ESSENTIAL LV CABLE TRAY150 mm NON ESSENTIAL LV CABLE TRAY
FOR MAF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01/C4
20A TPN
WP
HL
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
FOR SEF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01
20A TPN
WP
HL
150 mm ESSENTIAL LV CABLE TRAY150 mm ESSENTIAL LV CABLE TRAY
T3.D
T3.E
150 mm FIRE ALARM CABLE TRAY150 mm FIRE ALARM CABLE TRAY
150 mm EMERGENCY LIGHTING CABLE TRAY150 mm EMERGENCY LIGHTING CABLE TRAY
300 mm NON ESSENTIAL LV CABLE TRAY300 mm NON ESSENTIAL LV CABLE TRAY
600 mm ESSENTIAL LV CABLE TRAY600 mm ESSENTIAL LV CABLE TRAY
SMDB-TX5-T3-LL-L16 LCP-T3-LL-L16
DB-T3-LL-L16
600
800
FOR CBSP-T3-LL-L18
FED FROM EDB-T3-LL-L17
ELEC. RM.
EDB-T3-LL-L16
ESMDB-TX5-T3-LL-L16
CBSP-T3-LL-L18 @ LEVEL 18
SERVING FROM LEVEL 16 -20
500 600
FOR FACP-T3-LL-L16
FED FROM EDB-T3-LL-L16/Y6
400(W) X400(D)mmX600(H) TAPOFF
BOX
TAP OFF BOX
BB-T3-06
BB-T3-05
BB-T3-04
BB-T3-03
BB-T3-02
2900
500
350350350350350300
150800100450100450150
400
400
FACP-T3-LL-L16
ESMDB-TX5-T3-LL-L16
DB-T3-LL-L16
EDB-T3-LL-L16
FACP-T3-LL-L16
CBSP AT LEVEL 18
400(W) X400(D)mmX600(H)
TAPOFF BOX
BB-T3-05
BB-T3-04
BB-T3-03
BB-T3-02
600 mm ESSENTIAL LV CABLE TRAY600 mm ESSENTIAL LV CABLE TRAY
300 mm NON ESSENTIAL LV CABLE TRAY300 mm NON ESSENTIAL LV CABLE TRAY
150 mm FIRE ALARM CABLE TRAY150 mm FIRE ALARM CABLE TRAY
150 mm EMERGENCY LIGHTING CABLE TRAY150 mm EMERGENCY LIGHTING CABLE TRAY
SMDB-TX5-T3-LL-L16
LCP-T3-LL-L16
BB-T3-06
FH C
FH C
FHC
FHC
FHC
FHC
4.200 M FFL
UP
DNDN
DN
UP
UP
DN
DN
DN
DN
QIBLA
N
11.43° FROM
W TOWARDS S
P250201DATE
DRG NO.
SCALE
DRAWING
JOB NO.
LEAD CONSULTANT
DRN. BY CHKD BY REVISION
DATE
PROJECT
DESCRIPTIONREV. NO.
CLIENT
PROJECT
NORTH
SUB CONSULTANT
WORK IN PROGRESS
As indicated
TOWER 3
FLOOR 19 (LVL 16) MECH FLOOR
CONTAINMENT LAYOUT
WM-EC-T3-116
50% DETAIL DESIGN
BW KH B
29.06.17100% SCHEMATIC DESIGNA
31.08.1750% DETAIL DESIGNB
31.08.17
1 : 100
FLOOR 19 (LVL 16) MECH FLOOR CONTAINMENT LAYOUT
1
1 : 25
ELECTRICAL ROOM DETAIL - 3
2
ELECTRICAL ROOM DETAIL - 4
3
2. EXIT
E
E
E
EXIT
E
EXIT
T
IFU
H
RI
MS
OS
OS
OS
CS
CS
Symbol Description
Symbol Description
Symbol Description
FIRE ALARM:
VOICE EVACUATION SYSTEM:
EMERGENCY LIGHTING:
SMOKE DETECTOR
HEAT DETECTOR
SMOKE DETECTOR INSIDE VOID
MANUAL CALL POINT
REMOTE INDICATOR
SAFE MULTI SENSOR DETECTOR
MANUAL CALL POINT - WP
FIRE TELEPHONE INPUT JACK
SMOKE DETECTOR WITH BUILT-IN SOUNDER
FIRE ALARM CONTROL PANEL.
CENTRAL BATTERY SUB PANEL
INTERFACE UNIT
WALL MOUNTED VOICE EVAC. SPEAKER
WALL MOUNTED VA SPEAKER WITH STROBE
HORN SPEAKER
CEILING MOUNTED VA SPEAKER
CEILING MOUNTED SPEAKER WITH STROBE
1x4W,SURFACE MOUNTED EMERGENCY LIGHT NON
MAINTAINED CONNECTED TO CENTRAL BATTERY
SYSTEM WEATHER PROOF.
8W,EXIT LIGHT MAINTAINED CONNECTED TO
CENTRAL BATTERY SYSTEM.
DOUBLE SIDE 1.8W,DIRECTIONAL EXIT LIGHT WITH
HORIZONTAL ARROWS.MAINTAINED CONNECTED TO
CENTRAL BATTERY SYSTEM.
1x4W,RECESSED/SURFACE MOUNTED EMERGENCY
LIGHT NON MAINTAINED CONNECTED TO CENTRAL
BATTERY SYSTEM.
4x1W,SURFACE MOUNTED EMERGENCY LIGHT NON
MAINTAINED CONNECTED TO CENTRAL BATTERY
SYSTEM.EM1
EM2
EM4
EX3
EX5
SINGLE SIDE 1.8W,DIRECTIONAL EXIT LIGHT WITH
HORIZONTAL ARROWS.MAINTAINED CONNECTED TO
CENTRAL BATTERY SYSTEM.EX2
1x8W,DOUBLE HEIGHT AREA RECESSED MOUNTED
EMERGENCY LIGHT NON MAINTAINED CONNECTED
TO CENTRAL BATTERY SYSTEM.EM3
T3.1
T3.A
T3.B
T3.C
T3.D
T3.E
T3.F
T3.2T3.3T3.4T3.5T3.6T3.7T3.8
WP
WP
WP
WP
WP
WP
WP WP WP WP WP
T
T
T
T
EM4
EM4 EM4
EM4
EM4
EM4
EM4 EM4 EM4 EM4 EM4 EM4
EM4
EM4
EM4
EM4 EM4
EM4
EM4EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM4
EM2 EM2 EM2 EM2 EM2 EM2 EM2
EX3 EX3
EX5 EX5
EX5
EX5
EM2EM2 EM2
EM2
EX3
EX5EX5
EX3
EX5 EX5
EX3 EX3
EM2 EM2
EX2
EX2
EM2 EM2 EM2 EM2
IT/GSM
ELEC. RM. F.F.
GARBAGE
STAIR-02
FIREMAN'S LOBBY
SE-02
PE-02
SE-01
SER. LOBBY
STAIR-01
PE-05
PE-01PE-03
PE-04 PE-06
F.H.R FHR.
WATER METER.
LIFT MACHINE ROOM
EM4
EM4
EM4
WP
WATER TANK WATER TANK
FAHU
FAHU
EM2
EM2
FOR MOTORISED DAMPER FOR FAHU EQUIPMENT FOR SMOKE EXTRACT
FOR MOTORISED DAMPER
FOR FAHU EQUIPMENT
FOR FIRE PUMPS
FOR STAIRCASE
PRESSURISATION FAN
FOR STAIRCASE
PRESSURISATION FAN
EM4 EM4
EM4
EM4
EM4
EM4
EM4
EM4 EM4
EM4EM4
EM2
EM2
EM4
EM4
EM4
CBSP-T3-LL-L18 @ LEVEL 18
SERVING FROM LEVEL 16 -20
FACP-T3-LL-L16
FH C
FH C
FHC
FHC
FHC
FHC
4.200 M FFL
UP
DNDN
DN
UP
UP
DN
DN
DN
DN
QIBLA
N
11.43° FROM
W TOWARDS S
P250201DATE
DRG NO.
SCALE
DRAWING
JOB NO.
LEAD CONSULTANT
DRN. BY CHKD BY REVISION
DATE
PROJECT
DESCRIPTIONREV. NO.
CLIENT
PROJECT
NORTH
SUB CONSULTANT
WORK IN PROGRESS
@ A01 : 100
TOWER 3
FLOOR 19 (LVL 16) MECH FLOOR
FIRE ALARM & EM. LIGHTING LAYOUT
WM-EF-T3-116
50% DETAIL DESIGN
BW KH B
29.06.17100% SCHEMATIC DESIGNA
31.08.1750% DETAIL DESIGNB
31.08.17
1 : 100
FLOOR 19 (LVL 16) MECH FLOOR FIRE ALARM & EM. LIGHTING LAYOUT
1
3. 2
F1
F2
LIGHTING:
SYMBOL DESCRIPTION
36W LED WEATHER PROOF SURFACE/SUSPENDED
MOUNTED LUMINAIRE IP66.
30W LED SURFACE/SUSPENDED MOUNTED
LUMINAIRE
34W LED SURFACE/SUSPENDED MOUNTED
LUMINAIRE
13W, LED LAMP, SURFACE MOUNTED DOWN LIGHT
IP-20
10A ONE WAY SWITCH, 'Ng' INDICATE NUMBER
OF GANGS
10A TWO WAY SWITCH 'Ng' INDICATE NUMBER
OF GANGS
PRESENCE DETECTOR
15W LED ROUND VANDAL RESISTANT BULKHEAD
LUMINAIRE-FIXED OUTPUT BALLAST
SENSOR MODULE
W1
QSM
Ng
Ng
PR
PR PR
PR PR PR
PR PRPRPR
PR PR
T3.1
T3.A
T3.B
T3.C
T3.D
T3.E
T3.F
T3.2T3.3T3.4T3.5T3.6T3.7T3.8
F1
F1 F1
F1
F1
F1
F1
F1
F1
F1 F1
F1
F1
F1
F1
F1 F1
F1
F1 F1
F1
F1
F1
F2
LIFT SHAFT LIGHTS
@ ALTERNATE LEVELS (TYPICAL)
F1
S1 S1 S1
IT/GSM
ELEC. RM.
F.F.
GARBAGE
STAIR-02
FIREMAN'S LOBBY
SE-02 PE-02
SE-01
SER. LOBBY
STAIR-01
PE-05
PE-01PE-03
PE-04 PE-06
F.H.R FHR.
WATER METER.
LIFT MACHINE ROOM
DB-T3-LL-L16/R3
DB-T3-LL-L16/B2
DB-T3-LL-L16/Y2
DB-T3-LL-L16/Y1
DB-T3-LL-L16/B1
DB-T3-LL-L16/R1
DB-T3-LL-L16/R2
EDB-T3-LL-L16/R7
EDB-T3-LL-L16/B9
EDB-T3-LL-L16/Y11
EDB-T3-LL-L16/B11
EDB-T3-LL-L16/B10
EDB-T3-LL-L16/R11
EDB-T3-LL-L16/B8 EDB-T3-LL-L16/Y8 EDB-T3-LL-L16/Y10
EDB-T3-LL-L16/Y9
EDB-T3-LL-L16/R9
EDB-T3-LL-L16/R8 EDB-T3-LL-L16/R10
EDB-T3-LL-L16/B7
F1
F1
F1
F1
F1
F1
S1
F2 F2
W1
W1 W1 W1
F1
W1
F2
F2
F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F2 F1
F1
F1
F2
F2
S2
S2
S2
F1
F1
F1
W1 W1 W1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1F1F1
F1
F1
F1 F1
F1F1F1F1F1F1F1
F1 F1
WP
WP
WP WP
WP
WP2
3
2
2
2
2 2
2
2
2
3
32
33
2
DB-T3-LL-L16/R1
F2
S2S2
2
WATER TANK WATER TANK
FAHU
FAHU
F2F2
2
2
WP2 2
WP2 2
2
2
2
2
FH C
FH C
FHC
FHC
FHC
FHC
4.200 M FFL
UP
DNDN
DN
UP
UP
DN
DN
DN
DN
QIBLA
N
11.43° FROM
W TOWARDS S
P250201DATE
DRG NO.
SCALE
DRAWING
JOB NO.
LEAD CONSULTANT
DRN. BY CHKD BY REVISION
DATE
PROJECT
DESCRIPTIONREV. NO.
CLIENT
PROJECT
NORTH
SUB CONSULTANT
WORK IN PROGRESS
@ A01 : 100
TOWER 3
FLOOR 19 (LVL 16) MECH FLOOR
LIGHTING LAYOUT
WM-EL-T3-116
50% DETAIL DESIGN
BW KH A
31.08.1750% DETAIL DESIGNA
31.08.17
1 : 100
FLOOR 19 (LVL 16) MECH FLOOR LIGHTING LAYOUT
1
4. T3.1
T3.A
T3.B
T3.C
T3.D
T3.E
T3.F
T3.2T3.3T3.4T3.5T3.6T3.7T3.8
WP
WP
WPWP
2
WP
WP
WP
FOR IT RACK (PROVISION)
FOR ACCESS
CONTROL PANEL
(PROVISION)
3
EC-T3-116
FCU
WP
WP
STAIR SOCKET @ ALTERNATE
LEVELS (EVEN FLOOR LEVELS)
STAIR SOCKET @ ALTERNATE
LEVELS (EVEN FLOOR LEVELS)
DB-T3-LL-L16/Y11 DB-T3-LL-L16/B11
EDB-T3-LL-L16/R1
EDB-T3-LL-L16/R2
EDB-T3-LL-L16/R5
FOR FAHU-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01/C1
FOR CHWP - T3-L16-01,02 & 03
FED FROM MCC - TX5-T3-LL-L16-01/C3,C4 &C5
FOR FAHU - T3-L16-02
FED FROM MCC-TX5-T3-LL-L16-01/C2
FOR FP-T3-L16-01
FIRE PUMP CONTROL PANEL
FED FROM ESMDB-TX5-T3-LL-L16-01/C4
FOR FWCP -T3- L16-02
FED FROM SMDB - TX5-T3-LL-
L16-01/C2
FOR FWCP T3- L16-01
FED FROM SMDB - TX5-T3-LL-
L16-01/C1
FOR JP-T3-L16-01
JOCKEY PUMP CONTROL PANEL
FED FROM SMDB-TX5-T3-LL-L16-01/C3
FOR CWTP-T3-L16-01 & 02
FED FROM ESMDB-TX5-T3-LL-L16-01/C1 &C2
63A TPN
80A TPN
20A TPN
63A TPN
100A TPN
100A TPN 100A TPN
WP
WP
WP
WPWP
WP
WP
IT/GSM
ELEC. RM.
F.F.
GARBAGE
STAIR-02
FIREMAN'S LOBBY SE-02 PE-02
SE-01
SER. LOBBY
STAIR-01
PE-05
PE-01PE-03
PE-04 PE-06
F.H.R FHR.
WATER METER.
LIFT MACHINE ROOM
EDB-T3-LL-L10/Y6
(LEVEL-10 TO 16)
EDB-T3-LL-L16/R3
EDB-T3-LL-L10/R6
(LEVEL-10 TO 16) DB-T3-LL-L16/R11
MD
MDEDB-T3-LL-L16/Y5
EDB-T3-LL-L16/Y5
EDB-T3-LL-L16/B5
FINAL LOCATION OF DDC PANEL TO BE
COORDINATED WITH BMS
CONSULTANT
EDB-T3-LL-L16/B5
FINAL LOCATION OF DDC PANEL TO BE
COORDINATED WITH BMS CONSULTANT
20A TPN
WP
FOR MAF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-L16-01/C1
20A TPN
H/L WP
DB-T3-LL-L16/R5 FCU
FOR SEF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-L16-01/C2
20A TPN
H/L WP
FOR SPF-T3-L16-01
FED FROM EMCC-TX5-T3-LL-
L16-01/C3
20A TPN
H/L
WP
DB-T3-LL-L16/Y5
DB-T3-LL-L16/B5FCU
20A TPN
20A TPN
FOR FA-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01/C6
FOR EAF-T3-L16-01
FED FROM MCC-TX5-T3-LL-L16-01/C7
DB-T3-LL-L16/B9
H/L
H/LWP
WP
FCU
FCU
DB-T3-LL-L16/R6
FOR SPF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01/C6
20A TPN
H/L
WP
FCU
CV
DB-T3-LL-L16/R8
DB-T3-LL-L16/Y6
FCU
FOR SEF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01/C5
20A TPN
H/L
H/L
FOR MAF-T3-L16-02
FED FROM EMCC-TX5-T3-LL-L16-01/C4
20A TPN
DB-T3-LL-L16/B6
FCU
DB-T3-LL-L16/Y9 FCU
DB-T3-LL-L16/R7
FCU
DB-T3-LL-L16/R9
FCU
DB-T3-LL-L16/B7
DB-T3-LL-L16/B8
FCU
CV
FCU
CV
DB-T3-LL-L16/Y7
FCU
CV
DB-T3-LL-L16/Y8
FCU
CV
WP
20A SP
FOR CHEMICAL DOSING UNIT
FED FROM ESMDB-TX5-T3-LL-L16
FH C
FH C
FHC
FHC
FHC
FHC
4.200 M FFL
UP
DNDN
DN
UP
UP
DN
DN
DN
DN
QIBLA
N
11.43° FROM
W TOWARDS S
P250201DATE
DRG NO.
SCALE
DRAWING
JOB NO.
LEAD CONSULTANT
DRN. BY CHKD BY REVISION
DATE
PROJECT
DESCRIPTIONREV. NO.
CLIENT
PROJECT
NORTH
SUB CONSULTANT
WORK IN PROGRESS
@ A01 : 100
TOWER 3
FLOOR 19 (LVL 16) MECH FLOOR
POWER LAYOUT
WM-EP-T3-116
50% DETAIL DESIGN
BW KH A
31.08.1750% DETAIL DESIGNA
31.08.17
1 : 100
FLOOR 19 (LVL 16) MECH FLOOR POWER LAYOUT
1