PANGASINAN STATE UNIVERSITY
COLLEGE OF ENGINEERING AND ARCHITECTURE
URDANETA CITY CAMPUS
IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE
DEGREE OF BACHELOR OF SCIENCE IN CIVIL ENGINEERING
A FEASIBILITY STUDY OF A PROPOSED TWO-
STOREY EVACUATION CENTER
IN BRGY. BARACCA VILLASIS, PANGASINAN
PRESENTED BY:
BAYYA, CHRISTIAN V.
ILDEFONSO, JEFFERSON A.
BSCE – 5A
ENGR. RESURRECCION V. GARROTE
CONSULTANT
BACKGROUND OF THE STUDY
NINE YEARS AGO, ON OCTOBER 7TH, TROPICAL STORM "PEPENG"
RAVAGE OUR PROVINCE (PANGASINAN), SUBMERGING AREAS LIKE VILLASIS IN
FLOODS AND CAUSED ENORMOUS DAMAGES IN INFRASTRUCTURES, AND
AGRICULTURE. RAIN AND WATER RELEASED FROM THE DAMS CAUSED WATER
LEVEL TO RISE QUICKLY AND FLOODED EVEN THE GYMNASIUM WHICH SERVED
AS EVACUATION CENTER . DUE TO THE SAID EVENT, WE'RE PROPOSING A NEW
EVACUATION CENTER WITH ELEVATION AND INCREASE ITS CAPACITY TO
ACCOMMODATE.
THE EVACUATION CENTER WILL PROVIDE SAFE EMERGENCY SHELTER
FOR A SHORT TIME BEFORE THE DISASTER STRIKES. IN PRINCIPLE,
EVACUATION CENTERS WILL PROVIDE SAFE SHELTER TO COMMUNITIES AT
POTENTIAL RISK OF DISASTER (CYCLONE, FLASH FLOOD, FIRE, ETC.). THE
EVACUATION CENTER WILL PROVIDE LIFESAVING SHELTER TO AFFECTED OR
VULNERABLE COMMUNITIES AND PEOPLE OF THE BARANGAY AND AT THE POINT
ONSET OF NATURAL DISASTERS FOR A FEW HOURS TO A FEW DAYS.THE
PROPOSED PROJECT WILL BE FUNDED BY THE LOCAL GOVERNMENT OF
VILLASIS.
PROJECT LOCATION
TECHNICAL
ASPECT
SITE DEVELOPMENT PLAN
VICINITY MAP
GROUND FLOOR PLAN
SECOND FLOOR PLAN
FACADE
RIGHT SIDE ELEVATION
LEFT SIDE ELEVATION
REAR ELEVATION
SCOPE OF WORKS
TOTAL PROJECT COST
FINANCIAL
ASPECT
COST BENEFIT
PRO-FORMA FINANCIAL ASPECT
MANAGEMENT
ASPECT
DURING FEASIBILITY
STUDY
DURING CONSTRUCTION
DURING OPERATION
SOCIO-ECONOMIC
ASPECT
OVERALL BENEFIT
• THE PROPOSED PROJECT WILL SHOULDER THE NEEDS OF THE
RESIDENTS IN TIMES OF CALAMITIES AND OTHER DISASTERS. IT
WILL HELP THE COMMUNITY TO HAVE A PLACE TO STAY RATHER
THAN STAYING ON ROOFS OR LOITERING AT THE STREETS.
INSTEAD, THEY WILL HAVE A SHELTER TO STOPOVER IN A CERTAIN
PERIOD OF TIME. IT WILL ALSO PROVIDE HE NEEDS OF THE
EVACUEES LIKE, A PLACE FOR THEIR FAMILY, MEDICAL CARE, AND
OTHER NECESSITY NEEDS.
• THE EVACUATION CENTER WILL PROVIDE SAFE EMERGENCY
SHELTER FOR A SHORT TIME BEFORE THE DISASTER STRIKES. IN
PRINCIPLE, EVACUATION CENTERS WILL PROVIDE SAFE SHELTER
TO COMMUNITIES AT POTENTIAL RISK OF DISASTER (CYCLONE,
FLASH FLOOD, FIRE, ETC.). EVACUATION CENTERS WILL PROVIDE
LIFESAVING SHELTER TO IDPS/AFFECTED OR VULNERABLE
COMMUNITIES AND AT THE POINT ONSET OF NATURAL DISASTERS
FOR A FEW HOURS TO A FEW DAYS.
• THE PROJECT WILL UPLIFT THE LIVING STANDARD AND
LIFESTYLE OF THE PEOPLE IN THE BARANGAY, IN TERMS OF
EMPLOYMENT AND FAST DEVELOPMENT OF LIVING
CONDITIONS & EVEN IN TERMS OF FUTURE INDUSTRIAL AND
COMMERCIAL DEVELOPMENT. THE WILL ENHANCE THE LIVES
OF PEOPLE LIVING NEARBY IN TERMS OF HIGHER INCOME
ACCUMULATED FROM EMPLOYMENT ON THE DEVELOPMENT
AND MAINTENANCE OF THE BUILDING.
• THE ESTABLISHMENT WILL CHANGE THE PERSPECIVE OF
THE CONVENTIONAL EVACUATION AREA. THE PROPOSED
PROJECT WILL ACCOMMODATE NOT ONLY THE NEEDS OF
COMMUNITY IT WILL ALSO CATER THE NECESSITIES OF THE
UNEMPLOYED INDIVIDUAL OF VILLASIS PANGASINAN.
PROJECT
SUMMARY
A. NAME OF THE PROJECT
VILLASIS EVACUATION CENTER
THE PROPOSED PROJECT IS TO BE NAMED “VILLASIS
EVACUATION CENTER”. IT IS OWNED BY THE GOVERNMENT UNDER
THE SUPERVISON OF MUNICIPALITY OF VILLASIS.
B. LOCATION
BRGY. BARACCA VILLASIS, PANGASINAN
THE PROPOSED PROJECT IS TO BE LOCATED IN BRGY.
BARACCA VILLASIS, PANGASINAN. IT IS BEST FITTED AS THE LOCATION
BECAUSE IT IS LOCATED ON STABLE GEOTECHNICAL LAND, NOT
SUBJECT TO POTENTIAL LANDSLIP OR EXPOSED TO POTENTIAL
LANDSLIDES OF ADJACENT LAND; HAVE NO NEARBY LARGE TREES,
STRUCTURES, POWER LINES (OR OTHER POTENTIAL HAZARDS) THAT
MIGHT REPRESENT A THREAT; NOT BE CLOSE TO FACILITIES THAT
MANUFACTURE, USE OR STORE HAZARDOUS MATERIALS; BE EASILY
ACCESSIBLE BY VEHICLE AND FOOT, AND FOR THOSE WITH DISABILITY
(FOR ALL TYPES OF A HAZARD EVENT, WHETHER CYCLONE, FLOODING
OR TSUNAMI); AND HAS BEEN ASSESSED AS BEING FREE FROM
NATURAL HAZARDS.
C. DESCRIPTIVE DEFINITION OF
THE PROJECT
EVACUATION CENTERS PLAY A FUNDAMENTAL ROLE
IN MANAGING THE IMPACTS OF A NATURAL DISASTER
AND IN PROTECTING THE LIVES OF VULNERABLE
COMMUNITIES AT RISK BEFORE SUCH A DISASTER.
THE PROPOSED PROJECT WILL BE AN IMPROVED
CYCLONE AND EARTHQUAKE RESISTANCE IN
DESIGNS LOCATED AT BRGY. BARACCA VILLASIS
PANGASINAN.
D. PROJECT’S LONG-RANGE
OBJECTIVES
THIS PROJECT WILL SURELY UPLIFT THE
LIVING STANDARD AND LIFESTYLE OF THE PEOPLE IN
THE BARANGAY IN THE LONG RUN, IN TERMS OF
EMPLOYMENT AND FAST DEVELOPMENT OF LIVING
CONDITIONS & EVEN IN TERMS OF FUTURE
INDUSTRIAL AND COMMERCIAL DEVELOPMENT. IN
TEN YEARS, TIME, THE PROJECT IS EXPECTED TO
ENHANCE THE LIVES OF PEOPLE LIVING NEARBY IN
TERMS OF HIGHER INCOME ACCUMULATED FROM
EMPLOYMENT ON THE DEVELOPMENT AND
MAINTENANCE OF THE BUILDING.
E. FEASIBILITY CRITERIA
• ENVIRONMENTAL FACTOR, PUBLIC ASSISTANCE CONCERNS, AND
ECONOMICAL IMPROVEMENT SPECIFICALLY TO THE RESIDENTS OF
THE BARANGAY ARE THE SIGNIFICANT FACTORS CONSIDERED TO
THE FEASIBILITY OF THIS PROPOSED PROJECT. IT IS PROFITABLE IN
THE SENSE THAT IT WILL PROVIDE IMPROVEMENT TO THE
LIFESTYLE SPECIALLY THE EMPLOYMENT OF THE PEOPLE DURING
THE CONSTRUCTION AND IN THE DEVELOPMENT AND
MAINTENANCE OF THE PROPOSED PROJECT ON THE SAID
LOCATION.
• THE ABOVE SAID SIGNIFICANT FACTORS ARE THE BASIS THAT
THE PROPOSED PROJECT ISNDESIGNED WITH THE
CONSIDERATIONS OF THE SOCIO – ECONOMIC ENVIRONMENT. SO,
THE CONTRIBUTION TO SOCIO – ECONOMIC ENVIRONMENT IS
SERIOUSLY CONSIDERED WHEN EVALUATING THIS STUDY.
ALTHOUGH THE PROFITABILITY OF THE PROJECT IS GOOD, IT
IS ONLY THE SECOND CONSIDERATION.
F. HIGHLIGHTS OF THE
PROJECT
• PHILIPPINES EXPERIENCES AT LEAST 25 TYPHOONS IN A YEAR, AND
THERE IS ALSO THE FACTOR OF POPULATION THAT IS RAPIDLY
GROWING NOWADAYS AND THE NEEDS OF THE PEOPLE ARE ALSO
INCREASING. THE PUBLIC IN NEED OF EVACUATION CENTER IS WAY
UP TO THE LIMITS OF THE PRESENT FACILITY IN THE MUN ICIPALITY.
OVERCROWDED CENTERS, LIMITED SPACES PER FAMILY, VIRUSES
THAT ARE HURRIEDLY SPREADING AND MEDICAL ASSISTANCE ARE
INSUFFICIENT TO THE EVACUEES.
• DUE TO LACK OF EQUIPMENT OF THE EVACUATION CENTERS
AND MINIMAL SPACES OF THE FACILITY. IT IS HARD TO FIND A PLACE
FOR THEM TO REST. THE RESIDENTS HAVE NO CHOICE BUT TO STAY
IN THE ROOF OF THEIR HOUSES INSTEAD OF GOING TO
EVACUATION AREAS. TO PREVENT SUCH CIRCUMSTANCES, AN
EVACUATION CENTER IS DESIGNED MAINLY TO PROVIDE PROPER
ASSISTANCE TO THE RESIDENTS OF THE MUNICIPALTY DURING
CALAMITIES AND NATURAL DISASTERS.
• THE CONSTRUCTION PHASE WILL TAKE ABOUT ONE YEAR
AND NINE MONTHS EXPECTED TO BE FULLY OPERATIONAL
ON THE LAST QUARTER OF 2020.
• THE SOURCE OF FUND OF THE PROJECT WILL COME
FROM THE LOCAL GOVERNMENT UNIT FUNDS, AND WILL BE
AIDED BY THE DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS FOR THE INFRASTRUCTURE DEVELOPMENT. THIS
PROPOSED PROJECT OVERALL COST IS ₱46,167,820.53
INCLUDING ITS MATERIALS COST, LABOR COST,
CONTRACTOR’S PROFIT, CONTINGENCY COST, TAXES, LAND
COST, EQUIPMENT COST AND AMENITIES COST.
MAJOR ASSUMPTIONS AND SUMMARY
OF FINDINGS AND CONCLUSION
• TECHNICAL FEASIBILITY:
THE MATERIALS TO BE USED FOR THE CONSTRUCTION
OF EVACUATION CENTER SUCH AS SAND AND GRAVEL ARE
READILY AVAILABLE WITHIN THE AREA. THE OTHER
CONSTRUCTION MATERIALS ARE AVAILABLE AT SOME
CONSTRUCTION SUPPLY AT THE TOWN PROPER OF VILLASIS AS
WELL AS AT THE CITY OF URDANETA WHICH IS 8-9 KM AWAY
FROM THE SITE.
FOR THE MANPOWER, THERE ARE CONSIDERABLE
NUMBER OF SKILLED AND UNSKILLED WORKERS AT THE AREA
OF WHICH THEY COULD BE HIRED ON DAILY BASIS.
PROFESSIONALS AND OTHER MANPOWER MAY BE HIRED
WITHIN THE MUNICIPALITY OR AT NEARBY CITIES OR
MUNICIPALITIES.
• MANAGEMENT FEASIBILITY:
THE PROPOSED PROJECT WILL BE MANAGED
BY THE PROPONENTS, THE DEVELOPERS OF THE
PROJECT AND WITH THE COOPERATION OF THE
LOCAL GOVERNMENT UNIT OF THE VILLASIS. ALSO,
DURING THE CONSTRUCTION, THE REQUIRED
MANPOWER ARE AVAILABLE. THE SALARY RATE
SHALL CONFORM TO THE SALARY STANDARD SET BY
THE REGIONAL TRIPARTITE WAGE BOARD.
• FINANCIAL FEASIBILITY:
THIS PROPOSED PROJECT OVERALL COST IS
₱46,167,820.53 INCLUDING ITS MATERIALS COST,
LABOR COST, CONTRACTOR’S PROFIT,
CONTINGENCY COST, TAXES, LAND COST,
EQUIPMENT COST AND AMENITIES COST WHICH WILL
BE FUNDED BY THE LOCAL GOVERNMENT UNIT, WITH
THE AID OF DPWH. WITH A RETURN OF INVESTMENT
(ROI) OF 10.225% AND A PAYBACK PERIOD OF 9.78
SAY 10 YEARS.
• SOCIO-ECONOMIC FEASIBILITY:
THE PROJECT CONTRIBUTED IN THE
SOLUTION OF UNEMPLOYMENT PROBLEMS
DURING ITS DEVELOPMENT, CONSTRUCTION
AND OPERATION OF THIS PROPOSED
PROJECT AND HELPS ALLEVIATE POVERTY IN
THE MUNICIPALITY AND IN THE DIFFERENT
BARANGAYS.
CONCLUSION AND
RECOMMENDATION
THE PROPOSED VILLASIS EVACUATION CENTER IS
HIGHLY RECOMMENDED AND VIABLE BASED ON ITS TECHNICAL,
FINANCIAL AND SOCIO-ECONOMIC ASPECTS. THIS EVACUATION
CENTER HAS A GREAT SOCIAL AND ECONOMIC BENEFITS TO
THE BARANGAYS AS WELL AS TO THE NEARBY TOWNS
THROUGH OPPORTUNITIES IT GIVES. THE NECESSITY OF THE
CONSTRUCTION OF THE EVACUATION CENTER HAS BEEN
POINTED OUT TO UPLIFT THE LIVING STANDARD AND LIFESTYLE
OF THE RESIDENTS WITHIN THE AREA. IT IS IMPORTANT AND A
MUST TO FOLLOW ALL THE REQUIRED PLANS ESPECIALLY FOR
THE OPERATION FOR THE SAID PROJECT TO REACH ITS
FUNCTIONS.

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesIntroduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesAllona Alejandre
 
Cultural Beliefs in Housing
Cultural Beliefs in HousingCultural Beliefs in Housing
Cultural Beliefs in HousingVah Sentillas
 
Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)SQSY
 
Architectural thesis-manual
Architectural thesis-manualArchitectural thesis-manual
Architectural thesis-manualLawrence Ting
 
Manila Comprehensive Land Use Plan
Manila Comprehensive Land Use PlanManila Comprehensive Land Use Plan
Manila Comprehensive Land Use PlanJeannifer Villanueva
 
Spp 202-regular design services
Spp 202-regular design servicesSpp 202-regular design services
Spp 202-regular design servicesMelvin Patawaran
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied servicesKatrina Bibe
 
Quezon Memorial Circle Case Study
Quezon Memorial Circle Case StudyQuezon Memorial Circle Case Study
Quezon Memorial Circle Case Studyrktkp816
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Gus Agosto
 
ZONING ORDINANCE IN QUEZON CITY
ZONING ORDINANCE IN QUEZON CITY ZONING ORDINANCE IN QUEZON CITY
ZONING ORDINANCE IN QUEZON CITY Karyll Mitra
 
FINAL_SCHEME_ParasyutDesignTeam.compressed
FINAL_SCHEME_ParasyutDesignTeam.compressedFINAL_SCHEME_ParasyutDesignTeam.compressed
FINAL_SCHEME_ParasyutDesignTeam.compressedRita L Borges
 
Community Architecture
Community ArchitectureCommunity Architecture
Community ArchitectureNick Wates
 
Green Urban Design for Brgy Lapaz, Makati City, Philippines
Green Urban Design for Brgy Lapaz, Makati City, PhilippinesGreen Urban Design for Brgy Lapaz, Makati City, Philippines
Green Urban Design for Brgy Lapaz, Makati City, PhilippinesArch. Ma. Elena E. Lamasan
 
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanTLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanJuan Miguel Palero
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminalsIndrajit Koner
 

Was ist angesagt? (20)

Introduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery ProcessesIntroduction to Housing: Housing And Delivery Processes
Introduction to Housing: Housing And Delivery Processes
 
Cultural Beliefs in Housing
Cultural Beliefs in HousingCultural Beliefs in Housing
Cultural Beliefs in Housing
 
Site Selection Criteria
Site Selection CriteriaSite Selection Criteria
Site Selection Criteria
 
Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)Economic and Socialized Housing BP 220 (04)
Economic and Socialized Housing BP 220 (04)
 
Architectural thesis-manual
Architectural thesis-manualArchitectural thesis-manual
Architectural thesis-manual
 
Manila Comprehensive Land Use Plan
Manila Comprehensive Land Use PlanManila Comprehensive Land Use Plan
Manila Comprehensive Land Use Plan
 
Spp 202-regular design services
Spp 202-regular design servicesSpp 202-regular design services
Spp 202-regular design services
 
3.2_LEGAL CONSIDERATION.pdf
3.2_LEGAL CONSIDERATION.pdf3.2_LEGAL CONSIDERATION.pdf
3.2_LEGAL CONSIDERATION.pdf
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied services
 
Quezon Memorial Circle Case Study
Quezon Memorial Circle Case StudyQuezon Memorial Circle Case Study
Quezon Memorial Circle Case Study
 
Site planning
Site planningSite planning
Site planning
 
Site location, map reading and lot plotting,
Site location, map reading and lot plotting, Site location, map reading and lot plotting,
Site location, map reading and lot plotting,
 
Pd 957 slides
Pd 957 slidesPd 957 slides
Pd 957 slides
 
ZONING ORDINANCE IN QUEZON CITY
ZONING ORDINANCE IN QUEZON CITY ZONING ORDINANCE IN QUEZON CITY
ZONING ORDINANCE IN QUEZON CITY
 
FINAL_SCHEME_ParasyutDesignTeam.compressed
FINAL_SCHEME_ParasyutDesignTeam.compressedFINAL_SCHEME_ParasyutDesignTeam.compressed
FINAL_SCHEME_ParasyutDesignTeam.compressed
 
Community Architecture
Community ArchitectureCommunity Architecture
Community Architecture
 
Green Urban Design for Brgy Lapaz, Makati City, Philippines
Green Urban Design for Brgy Lapaz, Makati City, PhilippinesGreen Urban Design for Brgy Lapaz, Makati City, Philippines
Green Urban Design for Brgy Lapaz, Makati City, Philippines
 
EKISTICS
EKISTICSEKISTICS
EKISTICS
 
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development PlanTLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
TLE 9 (Technical Drafting) - Theory and Concepts of Site Development Plan
 
Standards for bus terminals
Standards for bus terminalsStandards for bus terminals
Standards for bus terminals
 

Ähnlich wie Evacuation Center Field Study.ppt

Community based water resource management
Community based water resource managementCommunity based water resource management
Community based water resource managementIshan Gupta
 
Urban and Rural sanitation in india
Urban and Rural sanitation in indiaUrban and Rural sanitation in india
Urban and Rural sanitation in indiaTryambakesh Shukla
 
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...Global Risk Forum GRFDavos
 
Disaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.pptDisaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.pptSomu Somu
 
Climate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerClimate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerShashanka Saadi
 
Michael deca importance of aboriginal tradition in recovery of species web
Michael deca importance of aboriginal tradition in recovery of species webMichael deca importance of aboriginal tradition in recovery of species web
Michael deca importance of aboriginal tradition in recovery of species webSustainable Prosperity
 
Disaster Risk Governance
Disaster Risk GovernanceDisaster Risk Governance
Disaster Risk GovernanceSejuti Basu
 
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...jo bitonio
 
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...Global Landscapes Forum (GLF)
 

Ähnlich wie Evacuation Center Field Study.ppt (20)

Community based water resource management
Community based water resource managementCommunity based water resource management
Community based water resource management
 
Urban and Rural sanitation in india
Urban and Rural sanitation in indiaUrban and Rural sanitation in india
Urban and Rural sanitation in india
 
A FRAMEWORK FOR THE END GAME OF DISASTER RESILIENCE: LEARNING FROM GLOBAL DI...
A FRAMEWORK FOR THE END GAME OF DISASTER RESILIENCE:  LEARNING FROM GLOBAL DI...A FRAMEWORK FOR THE END GAME OF DISASTER RESILIENCE:  LEARNING FROM GLOBAL DI...
A FRAMEWORK FOR THE END GAME OF DISASTER RESILIENCE: LEARNING FROM GLOBAL DI...
 
GLOBAL VOLCANO DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION OF ...
GLOBAL VOLCANO DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION OF ...GLOBAL VOLCANO DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION OF ...
GLOBAL VOLCANO DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION OF ...
 
Disaster Resilient Megacities
Disaster Resilient MegacitiesDisaster Resilient Megacities
Disaster Resilient Megacities
 
post conflict rehab
post conflict rehabpost conflict rehab
post conflict rehab
 
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...
Have we finally found the elusive "Higgs Boson" particle of disaster risk Red...
 
Disaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.pptDisaster related and management situation by pralay janaPralay.ppt
Disaster related and management situation by pralay janaPralay.ppt
 
Climate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answerClimate hazard resilient cluster village – an answer
Climate hazard resilient cluster village – an answer
 
Disaster nursing
Disaster nursingDisaster nursing
Disaster nursing
 
Current Practices by VNIT Nagpur
Current Practices by VNIT NagpurCurrent Practices by VNIT Nagpur
Current Practices by VNIT Nagpur
 
Michael deca importance of aboriginal tradition in recovery of species web
Michael deca importance of aboriginal tradition in recovery of species webMichael deca importance of aboriginal tradition in recovery of species web
Michael deca importance of aboriginal tradition in recovery of species web
 
2013 strategies for disaster resilience: Putting a face on educational surges
2013 strategies for disaster resilience: Putting a face on educational surges2013 strategies for disaster resilience: Putting a face on educational surges
2013 strategies for disaster resilience: Putting a face on educational surges
 
ALRMP Jan 08.ppt
ALRMP Jan 08.pptALRMP Jan 08.ppt
ALRMP Jan 08.ppt
 
Disaster Risk Governance
Disaster Risk GovernanceDisaster Risk Governance
Disaster Risk Governance
 
Law of the chain
Law of the chainLaw of the chain
Law of the chain
 
Meeting The Challenge Of Our Time In The 21st Century
Meeting The Challenge Of Our Time In The 21st CenturyMeeting The Challenge Of Our Time In The 21st Century
Meeting The Challenge Of Our Time In The 21st Century
 
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...
The Nueva Segovia Consortium of Cooperatives (NSCC) Response to the COVID19 P...
 
Vinalhaven dart report
Vinalhaven dart reportVinalhaven dart report
Vinalhaven dart report
 
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...
Understanding the Interconnectedness Between the Ongoing Desert Locust Crisis...
 

Mehr von RayRabara

health3rdquarter-7777777190106122527.pptx
health3rdquarter-7777777190106122527.pptxhealth3rdquarter-7777777190106122527.pptx
health3rdquarter-7777777190106122527.pptxRayRabara
 
NEW YEAR, NEW COMMITTMENT ON LIVING.pptx
NEW YEAR, NEW COMMITTMENT ON LIVING.pptxNEW YEAR, NEW COMMITTMENT ON LIVING.pptx
NEW YEAR, NEW COMMITTMENT ON LIVING.pptxRayRabara
 
02-FUNCTIONS-OF-MANAGEMENT.pptx
02-FUNCTIONS-OF-MANAGEMENT.pptx02-FUNCTIONS-OF-MANAGEMENT.pptx
02-FUNCTIONS-OF-MANAGEMENT.pptxRayRabara
 
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptxRayRabara
 
JESUS IS OUR SHEPHERD.pptx
JESUS IS OUR SHEPHERD.pptxJESUS IS OUR SHEPHERD.pptx
JESUS IS OUR SHEPHERD.pptxRayRabara
 
Minimal Brown · SlidesMania.pptx
Minimal Brown · SlidesMania.pptxMinimal Brown · SlidesMania.pptx
Minimal Brown · SlidesMania.pptxRayRabara
 
Individual-Accomplishment-Report-in-MAPEH-1.pptx
Individual-Accomplishment-Report-in-MAPEH-1.pptxIndividual-Accomplishment-Report-in-MAPEH-1.pptx
Individual-Accomplishment-Report-in-MAPEH-1.pptxRayRabara
 
f19156944.pptx
f19156944.pptxf19156944.pptx
f19156944.pptxRayRabara
 
resurrection hope.pptx
resurrection hope.pptxresurrection hope.pptx
resurrection hope.pptxRayRabara
 
JESUS IS COMING.pptx
JESUS IS COMING.pptxJESUS IS COMING.pptx
JESUS IS COMING.pptxRayRabara
 
guatemala_english_ecosoc_final.ppt
guatemala_english_ecosoc_final.pptguatemala_english_ecosoc_final.ppt
guatemala_english_ecosoc_final.pptRayRabara
 
Angles.ppt No 2 topic.ppt
Angles.ppt No 2 topic.pptAngles.ppt No 2 topic.ppt
Angles.ppt No 2 topic.pptRayRabara
 
Jewish-Israel-Wedding-and-Other-Customs.pptx
Jewish-Israel-Wedding-and-Other-Customs.pptxJewish-Israel-Wedding-and-Other-Customs.pptx
Jewish-Israel-Wedding-and-Other-Customs.pptxRayRabara
 
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptx
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptxINSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptx
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptxRayRabara
 
Designmix.pptx
Designmix.pptxDesignmix.pptx
Designmix.pptxRayRabara
 
Plastic.pptx
Plastic.pptxPlastic.pptx
Plastic.pptxRayRabara
 
Concrete.pptx
Concrete.pptxConcrete.pptx
Concrete.pptxRayRabara
 
Bituminous Materials and Mixtures.ppt
Bituminous Materials and Mixtures.pptBituminous Materials and Mixtures.ppt
Bituminous Materials and Mixtures.pptRayRabara
 
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptx
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptxParallel Lines Cut by a Transversal PPT 1-9-2018.pptx
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptxRayRabara
 

Mehr von RayRabara (20)

health3rdquarter-7777777190106122527.pptx
health3rdquarter-7777777190106122527.pptxhealth3rdquarter-7777777190106122527.pptx
health3rdquarter-7777777190106122527.pptx
 
NEW YEAR, NEW COMMITTMENT ON LIVING.pptx
NEW YEAR, NEW COMMITTMENT ON LIVING.pptxNEW YEAR, NEW COMMITTMENT ON LIVING.pptx
NEW YEAR, NEW COMMITTMENT ON LIVING.pptx
 
02-FUNCTIONS-OF-MANAGEMENT.pptx
02-FUNCTIONS-OF-MANAGEMENT.pptx02-FUNCTIONS-OF-MANAGEMENT.pptx
02-FUNCTIONS-OF-MANAGEMENT.pptx
 
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx
01-INTRODUCTION-TO-ENGINEERING-MANAGEMENT.pptx
 
JESUS IS OUR SHEPHERD.pptx
JESUS IS OUR SHEPHERD.pptxJESUS IS OUR SHEPHERD.pptx
JESUS IS OUR SHEPHERD.pptx
 
Minimal Brown · SlidesMania.pptx
Minimal Brown · SlidesMania.pptxMinimal Brown · SlidesMania.pptx
Minimal Brown · SlidesMania.pptx
 
Individual-Accomplishment-Report-in-MAPEH-1.pptx
Individual-Accomplishment-Report-in-MAPEH-1.pptxIndividual-Accomplishment-Report-in-MAPEH-1.pptx
Individual-Accomplishment-Report-in-MAPEH-1.pptx
 
f19156944.pptx
f19156944.pptxf19156944.pptx
f19156944.pptx
 
resurrection hope.pptx
resurrection hope.pptxresurrection hope.pptx
resurrection hope.pptx
 
JESUS IS COMING.pptx
JESUS IS COMING.pptxJESUS IS COMING.pptx
JESUS IS COMING.pptx
 
guatemala_english_ecosoc_final.ppt
guatemala_english_ecosoc_final.pptguatemala_english_ecosoc_final.ppt
guatemala_english_ecosoc_final.ppt
 
Angles.ppt No 2 topic.ppt
Angles.ppt No 2 topic.pptAngles.ppt No 2 topic.ppt
Angles.ppt No 2 topic.ppt
 
Jewish-Israel-Wedding-and-Other-Customs.pptx
Jewish-Israel-Wedding-and-Other-Customs.pptxJewish-Israel-Wedding-and-Other-Customs.pptx
Jewish-Israel-Wedding-and-Other-Customs.pptx
 
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptx
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptxINSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptx
INSULATOR-CONDUCTOR-AND-SEMICONDUCTORreport.pptx
 
Designmix.pptx
Designmix.pptxDesignmix.pptx
Designmix.pptx
 
STEEL.ppt
STEEL.pptSTEEL.ppt
STEEL.ppt
 
Plastic.pptx
Plastic.pptxPlastic.pptx
Plastic.pptx
 
Concrete.pptx
Concrete.pptxConcrete.pptx
Concrete.pptx
 
Bituminous Materials and Mixtures.ppt
Bituminous Materials and Mixtures.pptBituminous Materials and Mixtures.ppt
Bituminous Materials and Mixtures.ppt
 
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptx
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptxParallel Lines Cut by a Transversal PPT 1-9-2018.pptx
Parallel Lines Cut by a Transversal PPT 1-9-2018.pptx
 

Kürzlich hochgeladen

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Kürzlich hochgeladen (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Evacuation Center Field Study.ppt

  • 1. PANGASINAN STATE UNIVERSITY COLLEGE OF ENGINEERING AND ARCHITECTURE URDANETA CITY CAMPUS IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF SCIENCE IN CIVIL ENGINEERING A FEASIBILITY STUDY OF A PROPOSED TWO- STOREY EVACUATION CENTER IN BRGY. BARACCA VILLASIS, PANGASINAN PRESENTED BY: BAYYA, CHRISTIAN V. ILDEFONSO, JEFFERSON A. BSCE – 5A ENGR. RESURRECCION V. GARROTE CONSULTANT
  • 2. BACKGROUND OF THE STUDY NINE YEARS AGO, ON OCTOBER 7TH, TROPICAL STORM "PEPENG" RAVAGE OUR PROVINCE (PANGASINAN), SUBMERGING AREAS LIKE VILLASIS IN FLOODS AND CAUSED ENORMOUS DAMAGES IN INFRASTRUCTURES, AND AGRICULTURE. RAIN AND WATER RELEASED FROM THE DAMS CAUSED WATER LEVEL TO RISE QUICKLY AND FLOODED EVEN THE GYMNASIUM WHICH SERVED AS EVACUATION CENTER . DUE TO THE SAID EVENT, WE'RE PROPOSING A NEW EVACUATION CENTER WITH ELEVATION AND INCREASE ITS CAPACITY TO ACCOMMODATE. THE EVACUATION CENTER WILL PROVIDE SAFE EMERGENCY SHELTER FOR A SHORT TIME BEFORE THE DISASTER STRIKES. IN PRINCIPLE, EVACUATION CENTERS WILL PROVIDE SAFE SHELTER TO COMMUNITIES AT POTENTIAL RISK OF DISASTER (CYCLONE, FLASH FLOOD, FIRE, ETC.). THE EVACUATION CENTER WILL PROVIDE LIFESAVING SHELTER TO AFFECTED OR VULNERABLE COMMUNITIES AND PEOPLE OF THE BARANGAY AND AT THE POINT ONSET OF NATURAL DISASTERS FOR A FEW HOURS TO A FEW DAYS.THE PROPOSED PROJECT WILL BE FUNDED BY THE LOCAL GOVERNMENT OF VILLASIS.
  • 14.
  • 15.
  • 25. OVERALL BENEFIT • THE PROPOSED PROJECT WILL SHOULDER THE NEEDS OF THE RESIDENTS IN TIMES OF CALAMITIES AND OTHER DISASTERS. IT WILL HELP THE COMMUNITY TO HAVE A PLACE TO STAY RATHER THAN STAYING ON ROOFS OR LOITERING AT THE STREETS. INSTEAD, THEY WILL HAVE A SHELTER TO STOPOVER IN A CERTAIN PERIOD OF TIME. IT WILL ALSO PROVIDE HE NEEDS OF THE EVACUEES LIKE, A PLACE FOR THEIR FAMILY, MEDICAL CARE, AND OTHER NECESSITY NEEDS. • THE EVACUATION CENTER WILL PROVIDE SAFE EMERGENCY SHELTER FOR A SHORT TIME BEFORE THE DISASTER STRIKES. IN PRINCIPLE, EVACUATION CENTERS WILL PROVIDE SAFE SHELTER TO COMMUNITIES AT POTENTIAL RISK OF DISASTER (CYCLONE, FLASH FLOOD, FIRE, ETC.). EVACUATION CENTERS WILL PROVIDE LIFESAVING SHELTER TO IDPS/AFFECTED OR VULNERABLE COMMUNITIES AND AT THE POINT ONSET OF NATURAL DISASTERS FOR A FEW HOURS TO A FEW DAYS.
  • 26. • THE PROJECT WILL UPLIFT THE LIVING STANDARD AND LIFESTYLE OF THE PEOPLE IN THE BARANGAY, IN TERMS OF EMPLOYMENT AND FAST DEVELOPMENT OF LIVING CONDITIONS & EVEN IN TERMS OF FUTURE INDUSTRIAL AND COMMERCIAL DEVELOPMENT. THE WILL ENHANCE THE LIVES OF PEOPLE LIVING NEARBY IN TERMS OF HIGHER INCOME ACCUMULATED FROM EMPLOYMENT ON THE DEVELOPMENT AND MAINTENANCE OF THE BUILDING. • THE ESTABLISHMENT WILL CHANGE THE PERSPECIVE OF THE CONVENTIONAL EVACUATION AREA. THE PROPOSED PROJECT WILL ACCOMMODATE NOT ONLY THE NEEDS OF COMMUNITY IT WILL ALSO CATER THE NECESSITIES OF THE UNEMPLOYED INDIVIDUAL OF VILLASIS PANGASINAN.
  • 28. A. NAME OF THE PROJECT VILLASIS EVACUATION CENTER THE PROPOSED PROJECT IS TO BE NAMED “VILLASIS EVACUATION CENTER”. IT IS OWNED BY THE GOVERNMENT UNDER THE SUPERVISON OF MUNICIPALITY OF VILLASIS.
  • 29. B. LOCATION BRGY. BARACCA VILLASIS, PANGASINAN THE PROPOSED PROJECT IS TO BE LOCATED IN BRGY. BARACCA VILLASIS, PANGASINAN. IT IS BEST FITTED AS THE LOCATION BECAUSE IT IS LOCATED ON STABLE GEOTECHNICAL LAND, NOT SUBJECT TO POTENTIAL LANDSLIP OR EXPOSED TO POTENTIAL LANDSLIDES OF ADJACENT LAND; HAVE NO NEARBY LARGE TREES, STRUCTURES, POWER LINES (OR OTHER POTENTIAL HAZARDS) THAT MIGHT REPRESENT A THREAT; NOT BE CLOSE TO FACILITIES THAT MANUFACTURE, USE OR STORE HAZARDOUS MATERIALS; BE EASILY ACCESSIBLE BY VEHICLE AND FOOT, AND FOR THOSE WITH DISABILITY (FOR ALL TYPES OF A HAZARD EVENT, WHETHER CYCLONE, FLOODING OR TSUNAMI); AND HAS BEEN ASSESSED AS BEING FREE FROM NATURAL HAZARDS.
  • 30. C. DESCRIPTIVE DEFINITION OF THE PROJECT EVACUATION CENTERS PLAY A FUNDAMENTAL ROLE IN MANAGING THE IMPACTS OF A NATURAL DISASTER AND IN PROTECTING THE LIVES OF VULNERABLE COMMUNITIES AT RISK BEFORE SUCH A DISASTER. THE PROPOSED PROJECT WILL BE AN IMPROVED CYCLONE AND EARTHQUAKE RESISTANCE IN DESIGNS LOCATED AT BRGY. BARACCA VILLASIS PANGASINAN.
  • 31. D. PROJECT’S LONG-RANGE OBJECTIVES THIS PROJECT WILL SURELY UPLIFT THE LIVING STANDARD AND LIFESTYLE OF THE PEOPLE IN THE BARANGAY IN THE LONG RUN, IN TERMS OF EMPLOYMENT AND FAST DEVELOPMENT OF LIVING CONDITIONS & EVEN IN TERMS OF FUTURE INDUSTRIAL AND COMMERCIAL DEVELOPMENT. IN TEN YEARS, TIME, THE PROJECT IS EXPECTED TO ENHANCE THE LIVES OF PEOPLE LIVING NEARBY IN TERMS OF HIGHER INCOME ACCUMULATED FROM EMPLOYMENT ON THE DEVELOPMENT AND MAINTENANCE OF THE BUILDING.
  • 32. E. FEASIBILITY CRITERIA • ENVIRONMENTAL FACTOR, PUBLIC ASSISTANCE CONCERNS, AND ECONOMICAL IMPROVEMENT SPECIFICALLY TO THE RESIDENTS OF THE BARANGAY ARE THE SIGNIFICANT FACTORS CONSIDERED TO THE FEASIBILITY OF THIS PROPOSED PROJECT. IT IS PROFITABLE IN THE SENSE THAT IT WILL PROVIDE IMPROVEMENT TO THE LIFESTYLE SPECIALLY THE EMPLOYMENT OF THE PEOPLE DURING THE CONSTRUCTION AND IN THE DEVELOPMENT AND MAINTENANCE OF THE PROPOSED PROJECT ON THE SAID LOCATION. • THE ABOVE SAID SIGNIFICANT FACTORS ARE THE BASIS THAT THE PROPOSED PROJECT ISNDESIGNED WITH THE CONSIDERATIONS OF THE SOCIO – ECONOMIC ENVIRONMENT. SO, THE CONTRIBUTION TO SOCIO – ECONOMIC ENVIRONMENT IS SERIOUSLY CONSIDERED WHEN EVALUATING THIS STUDY. ALTHOUGH THE PROFITABILITY OF THE PROJECT IS GOOD, IT IS ONLY THE SECOND CONSIDERATION.
  • 33. F. HIGHLIGHTS OF THE PROJECT • PHILIPPINES EXPERIENCES AT LEAST 25 TYPHOONS IN A YEAR, AND THERE IS ALSO THE FACTOR OF POPULATION THAT IS RAPIDLY GROWING NOWADAYS AND THE NEEDS OF THE PEOPLE ARE ALSO INCREASING. THE PUBLIC IN NEED OF EVACUATION CENTER IS WAY UP TO THE LIMITS OF THE PRESENT FACILITY IN THE MUN ICIPALITY. OVERCROWDED CENTERS, LIMITED SPACES PER FAMILY, VIRUSES THAT ARE HURRIEDLY SPREADING AND MEDICAL ASSISTANCE ARE INSUFFICIENT TO THE EVACUEES. • DUE TO LACK OF EQUIPMENT OF THE EVACUATION CENTERS AND MINIMAL SPACES OF THE FACILITY. IT IS HARD TO FIND A PLACE FOR THEM TO REST. THE RESIDENTS HAVE NO CHOICE BUT TO STAY IN THE ROOF OF THEIR HOUSES INSTEAD OF GOING TO EVACUATION AREAS. TO PREVENT SUCH CIRCUMSTANCES, AN EVACUATION CENTER IS DESIGNED MAINLY TO PROVIDE PROPER ASSISTANCE TO THE RESIDENTS OF THE MUNICIPALTY DURING CALAMITIES AND NATURAL DISASTERS.
  • 34. • THE CONSTRUCTION PHASE WILL TAKE ABOUT ONE YEAR AND NINE MONTHS EXPECTED TO BE FULLY OPERATIONAL ON THE LAST QUARTER OF 2020. • THE SOURCE OF FUND OF THE PROJECT WILL COME FROM THE LOCAL GOVERNMENT UNIT FUNDS, AND WILL BE AIDED BY THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOR THE INFRASTRUCTURE DEVELOPMENT. THIS PROPOSED PROJECT OVERALL COST IS ₱46,167,820.53 INCLUDING ITS MATERIALS COST, LABOR COST, CONTRACTOR’S PROFIT, CONTINGENCY COST, TAXES, LAND COST, EQUIPMENT COST AND AMENITIES COST.
  • 35. MAJOR ASSUMPTIONS AND SUMMARY OF FINDINGS AND CONCLUSION • TECHNICAL FEASIBILITY: THE MATERIALS TO BE USED FOR THE CONSTRUCTION OF EVACUATION CENTER SUCH AS SAND AND GRAVEL ARE READILY AVAILABLE WITHIN THE AREA. THE OTHER CONSTRUCTION MATERIALS ARE AVAILABLE AT SOME CONSTRUCTION SUPPLY AT THE TOWN PROPER OF VILLASIS AS WELL AS AT THE CITY OF URDANETA WHICH IS 8-9 KM AWAY FROM THE SITE. FOR THE MANPOWER, THERE ARE CONSIDERABLE NUMBER OF SKILLED AND UNSKILLED WORKERS AT THE AREA OF WHICH THEY COULD BE HIRED ON DAILY BASIS. PROFESSIONALS AND OTHER MANPOWER MAY BE HIRED WITHIN THE MUNICIPALITY OR AT NEARBY CITIES OR MUNICIPALITIES.
  • 36. • MANAGEMENT FEASIBILITY: THE PROPOSED PROJECT WILL BE MANAGED BY THE PROPONENTS, THE DEVELOPERS OF THE PROJECT AND WITH THE COOPERATION OF THE LOCAL GOVERNMENT UNIT OF THE VILLASIS. ALSO, DURING THE CONSTRUCTION, THE REQUIRED MANPOWER ARE AVAILABLE. THE SALARY RATE SHALL CONFORM TO THE SALARY STANDARD SET BY THE REGIONAL TRIPARTITE WAGE BOARD.
  • 37. • FINANCIAL FEASIBILITY: THIS PROPOSED PROJECT OVERALL COST IS ₱46,167,820.53 INCLUDING ITS MATERIALS COST, LABOR COST, CONTRACTOR’S PROFIT, CONTINGENCY COST, TAXES, LAND COST, EQUIPMENT COST AND AMENITIES COST WHICH WILL BE FUNDED BY THE LOCAL GOVERNMENT UNIT, WITH THE AID OF DPWH. WITH A RETURN OF INVESTMENT (ROI) OF 10.225% AND A PAYBACK PERIOD OF 9.78 SAY 10 YEARS.
  • 38. • SOCIO-ECONOMIC FEASIBILITY: THE PROJECT CONTRIBUTED IN THE SOLUTION OF UNEMPLOYMENT PROBLEMS DURING ITS DEVELOPMENT, CONSTRUCTION AND OPERATION OF THIS PROPOSED PROJECT AND HELPS ALLEVIATE POVERTY IN THE MUNICIPALITY AND IN THE DIFFERENT BARANGAYS.
  • 40. THE PROPOSED VILLASIS EVACUATION CENTER IS HIGHLY RECOMMENDED AND VIABLE BASED ON ITS TECHNICAL, FINANCIAL AND SOCIO-ECONOMIC ASPECTS. THIS EVACUATION CENTER HAS A GREAT SOCIAL AND ECONOMIC BENEFITS TO THE BARANGAYS AS WELL AS TO THE NEARBY TOWNS THROUGH OPPORTUNITIES IT GIVES. THE NECESSITY OF THE CONSTRUCTION OF THE EVACUATION CENTER HAS BEEN POINTED OUT TO UPLIFT THE LIVING STANDARD AND LIFESTYLE OF THE RESIDENTS WITHIN THE AREA. IT IS IMPORTANT AND A MUST TO FOLLOW ALL THE REQUIRED PLANS ESPECIALLY FOR THE OPERATION FOR THE SAID PROJECT TO REACH ITS FUNCTIONS.