1. RAVI SHANKAR KUMAR
Present Add.: Flat No.-808, Islamabad Restaurant Building, Abu Shagara, Sharjah, UAE.
Permanent Add: 1/14, Mahiskapur Road, B-Zone, Durgapur, District – Burdwan, West Bengal-713205, INDIA.
Mob: +971 563880801
E-mail: ravishankarkumar.ee@gmail.com
OBJECTIVE
To work consistently and effectively in a reputed organization as an Electrical Engineer where I can deliver and utilize
my skills through which I can contribute to the organization and enhance my technical as well as professional skills and
knowledge.
ACADEMIC PROFILE
MBA in Operations Management (Distance Education Mode) (2010-2012) from ICFAI University,
Sikkim.
B.Tech. in Electrical engineering (2001-2005) from Dr.B.C. Roy Engineering College, Durgapur under
West Bengal University of Technology(WBUT), West Bengal, India with 8.09 DGPA in 2005.
12th
from WBCHSE Board with 64.3% (PCM) in 2001.
10th
from WBBSE Board with 74.6% in 1999.
WORK EXPERIENCE
1. Organization : W S ATKINS & Partners Overseas, Sharjah (UAE).
Position : Electrical Engineer
Period : From 11th
Aug 2015 till date.
1.1 PROJECTS HANDLED
Conceptual Studies & Design for Replacement of Cooling Water Network for ZADCO located at
Zirku Island, Abu Dhabi.
FEED to revamp the existing Sewage Treatment Units for ZADCO located at Upper Zakum & Umm
Al-Dalkh, Abu Dhabi.
Detailed Engineering of Master Gas System Expansion Phase II Pipeline Project for Saudi Aramco
located at Saudi Arabia.
1.2 JOB RESPONSIBILITIES
Preparation of Load Adequacy Report, Tie-schedule for the new loads.
Preparation of Electrical Design Basis, Scope of Work (SOW) for Detailed Engineering.
Preparation of Load Schedule, Cable Schedule, Cable Sizing Calculation, Solar Sizing Calculation,
Earthing Calculation, Lightining Protection Calculation, UPS & Battery Sizing Calculation, Material
Take-off.
Preparation of datasheet for LV Switchgear, Switch rack, AC UPS, DC UPS, Transformer, Motor and
power panel board, Power and Control Cables.
Preparation of Material Requisition for Transformer, AC UPS, DC UPS, Motor, LV Switchgear, Panel
boards, Power and Control Cables, Lighting Materials etc.
Preparation of SOW for Photovoltaic System, Cathodic Protection System & 13.8kV Overhead
transmission line.
Preparation of Technical Clarification (TC) and Technical Bid Evaluation (TBE) of electrical equipments.
Preparation of Single line diagram, cable trays layout, equipments layout, earthing layout.
System Studies for Load Flow, Short Circuit and Arc Flash using ETAP 14.1 version.
2. Organization : Fluor Daniel India Pvt. Ltd.
- 1 -
2. Position : Associate Design Engineer III – Electrical
Period : From 30th
July 2012 to 17th
July 2015.
2.1 PROJECTS HANDLED
Reliance Gasification Project for Reliance Industries Ltd. located at Jamnagar, India.
Al Karaana Petrochemicals Complex FEED Project for Qatar Petroleum / Shell Chemicals located at
Ras Laffan, Qatar.
Quest Carbon Capture and Storage for Shell Canada located at Alberta, Canada.
2.2 JOB RESPONSIBILITIES
Preparation of Datasheet and Specification for Transformer, NER, LV & HV Switchboard, PFC Panel, AC
& DC UPS, EDG etc.
Cable Sizing calculation for 6.6kV, 11kV, 33kV & 132kV.
Preparation of HV and LV Switchgear Schedule.
Preparation of Substation layout.
Preparation of Hazardous Area Classification layout.
Electrical Heat Tracing (EHT) calculation for SR cables of piping isometric using TraceCalc Pro and
generation of Push up data.
Review of cable schedule, panel schedule, Field wiring diagram, power point & RTD layout for EHT.
Review of Single Line diagram, lighting layout, Earthing layout, Convenience and Welding receptacle
layout, Cable tray and trench layout etc.
Preparation of MTO for bulk materials like lighting fixtures, power and control cables, convenience &
welding receptacles, junction boxes, cable trays, earthing materials, conduits, LCS etc.
3. Organization : SHAW India Ltd.
Position : Sr. Design Engineer I – Electrical
Period : From 4th
July 2011 to 26th
July 2012.
3.1 POJECTS HANDLED
Maissan and Kirkuk Refinery Feed Project for Ministry of Iraq located in Iraq.
3.2 JOB RESPONSIBILITIES
Electrical system study using ETAP software like Load Flow, Short Circuit, Motor Starting.
HV & LV Cable sizing, Load List, Batch load association, cable routine and cable schedule etc. using
Smart Plant Electrical (SPEL).
Electrical equipments sizing calculation as per load list like Transformer, Diesel Generator, AC & DC
UPS, PFC Panel, NER etc.
Preparation of Datasheet and Specification for Transformer, NER, LV & HV Switchboard, PFC Panel, AC
& DC UPS etc.
Technical bid evaluation of quotations from vendors & provide technical recommendation for the same.
Review of SLDs for Power, Lighting & UPS distribution system.
Calculations for Earthing and Lighting.
Review of Substation layout, Hazardous area classification layout.
Review of layouts for Welding and Convenience receptacles, Earthing, Cables trays & trenches and
lighting fixtures.
Preparation of MTO for Light fixtures & Sockets, HV & LV Cables, Earthing materials, cable trays &
conduit etc.
4. Organization : Techint India Pvt. Ltd.
Position : Design Engineer – Electrical
Period : From 16th
June 2010 to 1st
July 2011.
4.1 POJECTS HANDLED
- 2 -
3. Sulfur and Coke Handling Unit for Yanbu Export and Refinery Project (YERP) located in Saudi
Arabia.
4.2 JOB RESPONSIBILITIES
ETAP study for Short circuit, Load flow and motor starting.
Preparation of Main Electrical Distribution and Sub-distribution system with interlocking as per load list
and client requirements.
Electrical equipments sizing calculation as per load list like Transformer, Diesel Generator, UPS etc
Preparation of Datasheet for Transformer, NER, LV & HV Switchboard, PFC Panel, AC & DC UPS, EDG
and other electrical equipments.
Calculations for Earthing, Cable sizing and Lighting.
Design of SLDs for Power, Lighting & UPS distribution system.
Design of Layouts for Substation, Power outlets, Earthing, Cables tray and lighting.
Technical evaluation of quotations from vendors & preparation of technical recommendation.
Preparation of MTO for Light fixtures & Sockets, HV & LV Cables, Earthing materials, conduits and
cable trays etc.
5. Organization : Reliance Industries Ltd, Navi Mumbai
Position : Sr. Executive – Electrical
Period : From 16th
January 2006 to 12th
June 2010.
5.1 POJECTS HANDLED
cGMP-4A, Plasma Fractionation Plant (cGMP Grade) at Navi Mumbai.
cGMP4B, Cohn Fractionation Plant (cGMP Grade) at Navi Mumbai.
cGMP-2, Fill Finish Area (cGMP Grade) at Navi Mumbai.
Plant -5, Halronic Acid (GMP Grade) at Navi Mumbai.
Central Quality Control Lab at Navi Mumbai.
BA/BE Clinical Research Facility at Navi Mumbai.
5.2 JOB RESPONSIBILITIES
Detailed electrical engineering for the cGMP 4A & 4B projects with the Consultants M/s Jacobs H & G.
Review of electrical equipments sizing calculation as per load list like Transformer, UPS, DG set, and PFC
etc.
Review of overall SLD for the substation and sub distribution system for Power, Lighting & UPS
distribution system.
Review of Layouts for power points, earthing, cables tray and lighting.
Finalization of enquiry specifications for LV Panels, Cables, UPS, Light Fixtures.
Finalization of Logics & Layouts for Fire Alarm, Public Address System, CCTV and Access control
system.
Technical evaluation of quotations from vendors & preparation of technical recommendation.
FAT and SAT of electrical panels (PCC, BEPP, PCC and APFC Panel), UPS systems, transformers, DG
set etc and generate proper documents for the same.
Relay co-ordination, troubleshooting and electrical system commissioning of the plants.
Planning & Execution of electrical work as per schedule with proper co-ordination of Consultants,
contractors and different internal departments.
Create Purchase Requisition, measurement and bill finalization of contractors, Service entry of
contractors’ bills, Closure of contract of contractors and handing over project to maintenance department.
5.3 ERECTION & COMMISSIONING ACTIVITIES
Erection, Testing and Commissioning of 22KV/415V Substation.
- 3 -
4. Erection, Testing and Commissioning of 22 KV, 1250A, Vacuum Circuit Breaker.
Erection, Testing and Commissioning of 2.5 MVA, 22KV/415V Transformers with OLTC
Erection, Testing and Commissioning of L.T. Panels with different rating of Air Circuit Breakers
(PCC and MCC panels).
Erection, Testing and Commissioning of 60 KVA UPS (110V and 415V).
Erection, Testing and Commissioning of 700 KVAr APFC Panel.
Erection, Testing and Commissioning of 2.5 MVA Diesel-Generator Set.
Commissioning of VFDs (ABB make-ACS550 & ACH550 series and Siemens make-Micromaster 440
series) for AHUs and Process equipments.
PROFESSIONAL TRAININGS & LEARNINGS
YEP (Young Engineering Professional) course in Reliance Life Sciences, RIL (Jan,’06 – Jan,’07).
Three weeks vocational training in Durgapur Steel Plant, SAIL.
ACADEMIC HONORS
First prize in Inter College Electrical quiz competition organized by Dr. B. C. Roy Engineering
College, Durgapur.
SOFTWARE SKILLS
Platforms: MS-DOS, Windows-98/XP/Vista/7.
Software: MS-Office, MS-Projects, DiaLUX, Smart Plant Electrical (SPEL), Smart Plant Review
(SPR), Smart Sketch (Basic), ETAP, TraceCalc Pro, AutoCAD (Basic).
PERSONAL SKILLS
Excellent Analytical & Technical skills.
Excellent Planning & Managerial skills.
Excellent written and Communication skills.
Quick decision making and problem solving capabilities.
PERSONAL DETAILS
Father’s Name : Bhrigunath Kumar
Date of birth : 21st
April 1982
Nationality : Indian
Gender : Male
Marital Status : Single
Passport No. : H8289086
Languages Known : English, Hindi and Bengali
Hobbies and other interest : Listening music, playing cricket, internet surfing etc.
REFERENCES
1. Mr. Anupkumar Nelaturi
Projects Head, Jaccob H & G. (Singapore)
E-mail id: anupkumar.n@gmail.com
2. Mr. Santosh Arankalle
Sr. Manager (Electrical Projects & Maintenance Head), Serum Institutes of India. (Pune)
E-mail id: santosharankalle@rediffmail.com
- 4 -
5. DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
Place:
Date: Ravi Shankar Kumar
- 5 -
6. DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
Place:
Date: Ravi Shankar Kumar
- 5 -