SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
R.RAVI	SHANKAR 
 
PP‐12 CCPP Project, P.O.Box 3143, Riyadh, Saudi Arabia.Mb No:+966 592554265.                                         
Contact: INDIA‐ +91 9787486683; Email: rsankar437@gmail.com                                                           
INSTRUMENT & CONTROL ENGINEER 
Seeking challenging assignments as an Instrument & Control Engineer.   
PROFILE  
• A seasoned Electronics & Instrumentation professional having around 12 years of 
experience as Instrument & Control engineer in Thermal Power Plant field including       
3 years in Combined Cycle Power Plant Project Commissioning experience in gulf.
• Currently working as Instrument Commissioning Engineer (DCS) in PP‐12 CCPP Project 
Saudi Electricity Company in Riyadh, Saudi Arabia.
• Possess technical knowledge of DCS architecture and its programming.In specific, 
Having good knowledge over Yokogawa Centum VP dcs system. 
• Review of System architecture, P&IDs, DCS IO assignments, auto control schemes and 
performing the DCS logic Function test.   
• Generation of Control loops logic using Control Narratives, making the dcs graphics as 
per P&ID drawings. 
• Troubleshooting of field instruments problems like MOV, Control valves, Transmitters, 
Switchs 
• Performing the dcs function test of electrical breaker for MV, LV breakers, 
Switchboards, PMCC, HSBTS, ATS. Having the troubleshooting knowledge on electrical 
related DCS IO signals by using electrical schematic drawing. 
• Having knowledge about plant auto start/stop (APS) sequenence .   
• Having knowledge about power plant major control loops and logic like drum level 3 
element control, Steam attemperation control, PRDS control, ACC system logic, HRSG 
bypass steam valve logic, Protection logic like pump, steam turbine.   
• Thermal Power Plant and Combined cycle power plant Process Knowledge. 
Page 1 of 4
CORE COMPETENCIES: 
Project Planning/ Management ~System Analysis ~ DCS ~    Industrial Automation ~ 
Instrumentation & Controls ~ Site Commissioning ~Cross‐functional coordination ~ Thermal 
Power Plant Maintenance ~Combined cycle power plant project and maintenance ~
PROFESSIONAL EXPERIENCE   
GS Engineering & Construction Ltd., Riyadh, Saudi Arabia. 
SINCE  MARCH ʹ 2015
GS E&C is a leading Korean based company provides engineering and construction services to a variety 
of industries around the world.
Instrument Commissioning Engineer (DCS)
Project: PP‐12 Combined Cycle Power Plant (2100MW) – Saudi Electricity Company, Riyadh 
Saudi Arabia.   
•  Installation and Commissioning activities support for Block 1 and Block 2.   
•  Re‐engineering of complex loops due to changed design from EPC.   
• Process functional tests (YOKOGAWA Centum VP dcs) and commissioning of complex 
loops with customer.   
• Electrical breaker functional tests and commissioning for MV,LV breakers and HSBTS, ATS 
•  Involved in Commissioning, Startup Activities and various tests which are carried out   
at site.  
• Troubleshooting of instrument interconnection wiring loops problems.   
• Generation and Debugging of HMI graphics as required by the customer. 
• Assisting of field instrument problems when required. 
• Communicating and discussing with vendor through mail about dcs logic related 
engineering issues which is identified during dcs logic system function check.   
• Major control loops and logic commissioned., those are: Drum level 3 element control, 
Feed water system, Condensate system,Diverter damper, ST & GT interface logic, ACC 
system logic, HRSG bypass steam system, BOP system logic and Protection logic for 
various equipment.   
• DCS logic related punch clearing with customer. 
Page 2 of 4
Cethar Energy Ltd., Trichy ‐ India. 
From Oct ‘2013 To Feb 2015   
Cethar Energy is trichy based company provides Operation and Maintenance (O&M) services to thermal 
power plant in all over india.
Lead Engineer – Instrumentation (Maintenance) 
   
Site: Coal fired thermal power plant – Dalmia Bharat Cement, Dalmiapuram, India.     
• Carried out weekly, quarterly, half yearly, yearly and shutdown, preventive maintenance 
of the plant instruments.   
• Responsible for all the checkups required before the startup of main plant and balance of 
plant equipments 
• Responsible for cause of plant utilities trip 
• Responsible for simulate the desired condition and see to it that all the hardware and 
software are functioning ok 
• Ensure Spares balance and inventory control for all instruments’ spare parts
Hofincons Infotech and Industrial Services Pvt. Ltd., Chennai ‐ India. 
From March ‘2011 To Oct 2013    &    From Feb ‘2008 To Aug 2008     
Hofincons group of companies provide industrial asset management services covering contracted 
Operation Maintenance (O&M) services of thermal power plant in india.
Engineer – Instrumentation (Maintenance)   
 
Site: Coal fired thermal power plant – Ultratech Cement, Ariyalur, India.     
• Testing and Calibration of transmitter like LT, PT, FT,TT, Control valve, and Sensors 
through HART communicator & Source calibrator.   
• Proceeding with the maintenance activities like trouble shooting, replacing, breakdown 
maintenance of various field instruments. 
 
Hyundai Engineering and Construction Ltd., Dubai – United Arab Emirates. 
From Sep ‘2008 To July 2010     
Hyundai E&C is a leading Korean based EPC company provides engineering and construction services 
to a variety of industries around the world. 
Instrument Commissioning Engineer   
 
Project: Phase L‐2 Combined Cycle Power Plant (1200MW) – Dubai Electricity and Water 
Authority, Jebel Ali, Dubai. 
• Performed various commissioning activites like cold & hot loop check, functional check 
of valves, pumps as per dcs logic and punch list clearing. 
• Preparation of EDB (Equipment database), ETS (Equipment technical specification), MDB 
(Material database) and PM (Preventive maintenance) for all instrument and equipment 
of the plant for CMMS as per client required format. 
Page 3 of 4
 
 
 
 
Kothari Sugars and Chemicals Ltd., Trichy ‐ India. 
From Dec ‘2004 To Feb 2008   
Kothari group company is india based manufacturer of sugars and petrochemical which has plants all over 
india.
Assistant Engineer – Instrumentation (Maintenance)   
Site:Sugar and Co generation power plant., Sathamangalam, Ariyalur ‐ India. 
     
• Supervise and coordinate I&C day to‐day maintenance activities, rectifying the defects as 
appropriate, managing emergency repairs via DCS and trouble‐shooting activities to 
immediately determine the cause of failures and identifying how to prevent failures in 
the future. 
• Preparation of all field instrument specifications   
• Calibration of all types of instruments 
• Stroke checking of control valves 
COMPUTER/SOFTWARE SKILLS 
Application  Level 
Microsoft Office and Windows OS  Efficient 
ACADEMIA  
Bachelor Degree in Electronics Instrumentation @ Shri Angalamman Engineering College, 
Trichy, 2003, in First Class 
12th, Bishop Heper Hr.Sec.School, Trichy (T.N), 1998.   
10th, St.Peters Hr.Sec.School, Viragalur (T.N), 1996.   
 
Date of Birth: 14th April 1981; Languages Known: English, Tamil   
Passport No:   K1953869 : Passport Expiry date: 19‐12‐2022 : Marital Status: Married   
Permanent Address: S/O Ramachandran, Karaiveetti, 
Thirumanur, Ariyalur (district), Tamilnadu, India. 
Page 4 of 4

Weitere ähnliche Inhalte

Was ist angesagt?

Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv Yacine Sayad
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument SupervisorSatish Patel
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrGovinda Raman
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of expSubhash +966535838322
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar Patel
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years expParthsarathy vijayan
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
 

Was ist angesagt? (20)

Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
Instrument Technician
Instrument TechnicianInstrument Technician
Instrument Technician
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 
Resume electrical design and site engineer(mep) 9+ years of exp
Resume   electrical design and site engineer(mep) 9+ years of expResume   electrical design and site engineer(mep) 9+ years of exp
Resume electrical design and site engineer(mep) 9+ years of exp
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
INSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISORINSTRUMENT SUPERVISOR
INSTRUMENT SUPERVISOR
 
1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp1 CV for Sr instrument technician in 8 years exp
1 CV for Sr instrument technician in 8 years exp
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 

Andere mochten auch

VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas OffshoreVEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas OffshoreThorne & Derrick UK
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat BoseSaikat Bose
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - CopyPerry Anderson
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)alejandro_lorenzo
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016Hugh McKellar
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015Yamil Avalo
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 

Andere mochten auch (16)

ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
ghazi CV 2015
ghazi CV 2015ghazi CV 2015
ghazi CV 2015
 
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas OffshoreVEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
VEGA Process Measurement (Level, Limit Level & Pressure) - Oil & Gas Offshore
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
Sanjeev Resume (1)
Sanjeev Resume (1)Sanjeev Resume (1)
Sanjeev Resume (1)
 
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA   E & I Construction Manager CV 2015 - CopyAnderson, Perry - PLA   E & I Construction Manager CV 2015 - Copy
Anderson, Perry - PLA E & I Construction Manager CV 2015 - Copy
 
Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)Alejandro Lorenzo Fernandez CV (es)
Alejandro Lorenzo Fernandez CV (es)
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016HMcKellar CV 26th Nov 2016
HMcKellar CV 26th Nov 2016
 
Resume Avalo 2015
Resume Avalo 2015Resume Avalo 2015
Resume Avalo 2015
 
Muhammad Aminudin Ramli
Muhammad Aminudin RamliMuhammad Aminudin Ramli
Muhammad Aminudin Ramli
 
Rinku Gemini
Rinku GeminiRinku Gemini
Rinku Gemini
 
asif sup new (4)
asif sup new (4)asif sup new (4)
asif sup new (4)
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 

Ähnlich wie Ravi Shankar_I&C Engineer (20)

Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
Adil_Abdulla CV
Adil_Abdulla CVAdil_Abdulla CV
Adil_Abdulla CV
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Ozone - Corporate Profile Detailed
Ozone - Corporate Profile DetailedOzone - Corporate Profile Detailed
Ozone - Corporate Profile Detailed
 
kishan update
kishan updatekishan update
kishan update
 
Nirav Sangani CV
Nirav Sangani CVNirav Sangani CV
Nirav Sangani CV
 
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
 
dasu CV(1)
dasu CV(1)dasu CV(1)
dasu CV(1)
 
Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2Kazadi_Mosayi_cv_new2
Kazadi_Mosayi_cv_new2
 
J Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & AutomationJ Tarkeshwar Resume Electrical & Automation
J Tarkeshwar Resume Electrical & Automation
 
Chandru_CV
Chandru_CVChandru_CV
Chandru_CV
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
kvrao resume1
kvrao resume1kvrao resume1
kvrao resume1
 
Duane lee martin
Duane lee martinDuane lee martin
Duane lee martin
 
Instruments & control System Engineer
Instruments & control System EngineerInstruments & control System Engineer
Instruments & control System Engineer
 
Engr.kamran shahid cv
Engr.kamran shahid cvEngr.kamran shahid cv
Engr.kamran shahid cv
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
Balaji Resume
Balaji ResumeBalaji Resume
Balaji Resume
 
Resume103
Resume103Resume103
Resume103
 

Ravi Shankar_I&C Engineer

  • 1. R.RAVI SHANKAR    PP‐12 CCPP Project, P.O.Box 3143, Riyadh, Saudi Arabia.Mb No:+966 592554265.                                          Contact: INDIA‐ +91 9787486683; Email: rsankar437@gmail.com                                                            INSTRUMENT & CONTROL ENGINEER  Seeking challenging assignments as an Instrument & Control Engineer.    PROFILE   • A seasoned Electronics & Instrumentation professional having around 12 years of  experience as Instrument & Control engineer in Thermal Power Plant field including        3 years in Combined Cycle Power Plant Project Commissioning experience in gulf. • Currently working as Instrument Commissioning Engineer (DCS) in PP‐12 CCPP Project  Saudi Electricity Company in Riyadh, Saudi Arabia. • Possess technical knowledge of DCS architecture and its programming.In specific,  Having good knowledge over Yokogawa Centum VP dcs system.  • Review of System architecture, P&IDs, DCS IO assignments, auto control schemes and  performing the DCS logic Function test.    • Generation of Control loops logic using Control Narratives, making the dcs graphics as  per P&ID drawings.  • Troubleshooting of field instruments problems like MOV, Control valves, Transmitters,  Switchs  • Performing the dcs function test of electrical breaker for MV, LV breakers,  Switchboards, PMCC, HSBTS, ATS. Having the troubleshooting knowledge on electrical  related DCS IO signals by using electrical schematic drawing.  • Having knowledge about plant auto start/stop (APS) sequenence .    • Having knowledge about power plant major control loops and logic like drum level 3  element control, Steam attemperation control, PRDS control, ACC system logic, HRSG  bypass steam valve logic, Protection logic like pump, steam turbine.    • Thermal Power Plant and Combined cycle power plant Process Knowledge.  Page 1 of 4
  • 2. CORE COMPETENCIES:  Project Planning/ Management ~System Analysis ~ DCS ~    Industrial Automation ~  Instrumentation & Controls ~ Site Commissioning ~Cross‐functional coordination ~ Thermal  Power Plant Maintenance ~Combined cycle power plant project and maintenance ~ PROFESSIONAL EXPERIENCE    GS Engineering & Construction Ltd., Riyadh, Saudi Arabia.  SINCE  MARCH ʹ 2015 GS E&C is a leading Korean based company provides engineering and construction services to a variety  of industries around the world. Instrument Commissioning Engineer (DCS) Project: PP‐12 Combined Cycle Power Plant (2100MW) – Saudi Electricity Company, Riyadh  Saudi Arabia.    •  Installation and Commissioning activities support for Block 1 and Block 2.    •  Re‐engineering of complex loops due to changed design from EPC.    • Process functional tests (YOKOGAWA Centum VP dcs) and commissioning of complex  loops with customer.    • Electrical breaker functional tests and commissioning for MV,LV breakers and HSBTS, ATS  •  Involved in Commissioning, Startup Activities and various tests which are carried out    at site.   • Troubleshooting of instrument interconnection wiring loops problems.    • Generation and Debugging of HMI graphics as required by the customer.  • Assisting of field instrument problems when required.  • Communicating and discussing with vendor through mail about dcs logic related  engineering issues which is identified during dcs logic system function check.    • Major control loops and logic commissioned., those are: Drum level 3 element control,  Feed water system, Condensate system,Diverter damper, ST & GT interface logic, ACC  system logic, HRSG bypass steam system, BOP system logic and Protection logic for  various equipment.    • DCS logic related punch clearing with customer.  Page 2 of 4
  • 3. Cethar Energy Ltd., Trichy ‐ India.  From Oct ‘2013 To Feb 2015    Cethar Energy is trichy based company provides Operation and Maintenance (O&M) services to thermal  power plant in all over india. Lead Engineer – Instrumentation (Maintenance)      Site: Coal fired thermal power plant – Dalmia Bharat Cement, Dalmiapuram, India.      • Carried out weekly, quarterly, half yearly, yearly and shutdown, preventive maintenance  of the plant instruments.    • Responsible for all the checkups required before the startup of main plant and balance of  plant equipments  • Responsible for cause of plant utilities trip  • Responsible for simulate the desired condition and see to it that all the hardware and  software are functioning ok  • Ensure Spares balance and inventory control for all instruments’ spare parts Hofincons Infotech and Industrial Services Pvt. Ltd., Chennai ‐ India.  From March ‘2011 To Oct 2013    &    From Feb ‘2008 To Aug 2008      Hofincons group of companies provide industrial asset management services covering contracted  Operation Maintenance (O&M) services of thermal power plant in india. Engineer – Instrumentation (Maintenance)      Site: Coal fired thermal power plant – Ultratech Cement, Ariyalur, India.      • Testing and Calibration of transmitter like LT, PT, FT,TT, Control valve, and Sensors  through HART communicator & Source calibrator.    • Proceeding with the maintenance activities like trouble shooting, replacing, breakdown  maintenance of various field instruments.    Hyundai Engineering and Construction Ltd., Dubai – United Arab Emirates.  From Sep ‘2008 To July 2010      Hyundai E&C is a leading Korean based EPC company provides engineering and construction services  to a variety of industries around the world.  Instrument Commissioning Engineer      Project: Phase L‐2 Combined Cycle Power Plant (1200MW) – Dubai Electricity and Water  Authority, Jebel Ali, Dubai.  • Performed various commissioning activites like cold & hot loop check, functional check  of valves, pumps as per dcs logic and punch list clearing.  • Preparation of EDB (Equipment database), ETS (Equipment technical specification), MDB  (Material database) and PM (Preventive maintenance) for all instrument and equipment  of the plant for CMMS as per client required format.  Page 3 of 4      
  • 4.   Kothari Sugars and Chemicals Ltd., Trichy ‐ India.  From Dec ‘2004 To Feb 2008    Kothari group company is india based manufacturer of sugars and petrochemical which has plants all over  india. Assistant Engineer – Instrumentation (Maintenance)    Site:Sugar and Co generation power plant., Sathamangalam, Ariyalur ‐ India.        • Supervise and coordinate I&C day to‐day maintenance activities, rectifying the defects as  appropriate, managing emergency repairs via DCS and trouble‐shooting activities to  immediately determine the cause of failures and identifying how to prevent failures in  the future.  • Preparation of all field instrument specifications    • Calibration of all types of instruments  • Stroke checking of control valves  COMPUTER/SOFTWARE SKILLS  Application  Level  Microsoft Office and Windows OS  Efficient  ACADEMIA   Bachelor Degree in Electronics Instrumentation @ Shri Angalamman Engineering College,  Trichy, 2003, in First Class  12th, Bishop Heper Hr.Sec.School, Trichy (T.N), 1998.    10th, St.Peters Hr.Sec.School, Viragalur (T.N), 1996.      Date of Birth: 14th April 1981; Languages Known: English, Tamil    Passport No:   K1953869 : Passport Expiry date: 19‐12‐2022 : Marital Status: Married    Permanent Address: S/O Ramachandran, Karaiveetti,  Thirumanur, Ariyalur (district), Tamilnadu, India.  Page 4 of 4