› Chain traversing:
› Compass traversing: Fore bearings and back bearings
between the traverse leg are measured
› Theodolite traversing: Horizontal angles between the
traverse legs are measured. The length of the traverse legs are
measured by chain/tape or by stadia method
› Plane table traversing: Plane table is set at every traverse
station in clockwise and anticlockwise direction and the circuit
is finally closed. During traversing the sides of the traverse are
plotted according to any suitable scale.
15 m
 True meridian: Line or plane
passing through geographical
north pole and geographical south
pole
 Magnetic meridian: When the
magnetic needle is suspended
freely and balanced properly,
unaffected by magnetic
substances, it indicates a
direction. This direction is known
as magnetic meridian. The angle
between the magnetic meridian
and a line is known as magnetic
bearing or simple bearing of the
line.
North
pole
True meridian
Magnetic meridian
True bearing
Magnetic bearing
 Arbitrary meridian: Convenient direction is assumed as a
meridian.
 Grid meridian: Sometimes for preparing a map some
state agencies assume several lines parallel to the true
meridian for a particular zone these lines are termed as
grid meridian.
 Designation of magnetic bearing
› Whole circle bearing (WCB)
› Quadrantal bearing (QB)
 WCB: The magnetic bearing of a line measured clockwise from
the North Pole towards the line is known as WCB. Varies 0-360°
 Quadrantal Bearing: The magnetic bearing of a line
measured clockwise or anticlockwise from NP or SP
(whichever is nearer to the line) towards the east or west is
known as QB. This system consists of 4-quadrants NE, SE,
NW, SW. The values lie between 0-90°
› QB of OA = N a E
 Reduced Bearing: When the whole circle bearing of a line
is converted to quadrantal bearing it is termed as reduced
bearing.
 Fore and Back Bearing:
› In WCB the difference between FB and BB should be
exactly 180°
› BB=FB+/-180°
› Use the +ve sign when FB<180°
› Use the –ve sign when FB> 180°
 Magnetic declination: The horizontal angle between the magnetic
meridian and true meridian is known as magnetic declination.
 Dip of the magnetic needle: If the needle is perfectly balanced
before magnetisation, it does not remain in the balanced position after
it is magnetised. This is due to the magnetic influence of the earth. The
needle is found to be inclined towards the pole. This inclination of
the needle with the horizontal is known as dip of the magnetic
needle.
 Method of correction for traverse:
› First method: Sum of the interior angle should be equal to (2n-
4) x 90. if not than distribute the total error equally to all interior
angles of the traverse. Then starting from unaffected line the
bearings of all the lines are corrected using corrected interior
angles.
› Second method: Unaffected line is first detected. Then,
commencing from the unaffected line, the bearing of other affected
lines are corrected by finding the amount of correction at each
station.
 Check on closed traverse:
› Sum of the measured interior angles (2n-4) x 90°
› Sum of the measured exterior angles (2n+4) x 90 °
› The algebric sum of the deflection angles should be
equal to 360°. Right hand deflection is considered
+ve, left hand deflection –ve
 Check on linear measurement
› The lines should be measured once each on two
different days (along opposite directions). Both
measurement should tally.
› Linear measurement should also be taken by the
stadia method. The measurement by chaining and
stadia method should tally.
 Taking cut-off lines:
measured the bearings and
lengths of cut off lines after
plotting and tally with actual
values.
 Taking an auxiliary point:
Take P permanent point as
auxiliary point measured
bearings and lengths of P
from each traverse point. If
survey is accurate, while
plotting all the measured
bearing of P should meet at
P.
 Convert the following WCBs to QBs
› (a) WCB of AB = 45°30’
(Ans 45°30’)
› (b) WCB of BC = 125°45’
(Ans 180- 125°45’ = 54° 15’)
 Fore bearing of the following lines are given. Find back bearing
› AB=S 30°30’ E
› BC=N 40°30’ W
 The magnetic bearing of a line AB is 135°30’ what will be the true bearing,
if the declination is 5°15’ W.
Included angle at A= 280-180-40=60
=FB of DA-180-FB of AB
Included angle at B= 40+180-70= 150
=FB of AB+180-FB of BC
Included angle at C= 70+180-210
=FB of BC+180-FB of CD
Formula: FB of previous line+/-180-
FB of next line
Compass Survaying
Compass Survaying

Weitere ähnliche Inhalte

Was ist angesagt?

Math12 lesson201[1]
Math12 lesson201[1]Math12 lesson201[1]
Math12 lesson201[1]
KathManarang
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
Savitha Pradeep
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
Arun Kama
 
Cam displacement diagram 002
Cam displacement diagram 002Cam displacement diagram 002
Cam displacement diagram 002
physics101
 
Cam displacement diagram
Cam displacement diagramCam displacement diagram
Cam displacement diagram
physics101
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
Ahmed Eid
 

Was ist angesagt? (20)

Traverse surveiying
Traverse surveiyingTraverse surveiying
Traverse surveiying
 
Math12 lesson201[1]
Math12 lesson201[1]Math12 lesson201[1]
Math12 lesson201[1]
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Circular motion slides
Circular motion slidesCircular motion slides
Circular motion slides
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Surveying theodolite basics
Surveying  theodolite basicsSurveying  theodolite basics
Surveying theodolite basics
 
3.compass surveying
3.compass surveying3.compass surveying
3.compass surveying
 
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabusPrismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
Prismetic compass ppt 3rd sem diploma and b.tech as per mdu and hsbte syllabus
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
Compass survey part 1
Compass survey part 1Compass survey part 1
Compass survey part 1
 
Medidas Angulares
Medidas AngularesMedidas Angulares
Medidas Angulares
 
Theodolite
TheodoliteTheodolite
Theodolite
 
Gs
GsGs
Gs
 
Cam displacement diagram 002
Cam displacement diagram 002Cam displacement diagram 002
Cam displacement diagram 002
 
Theodolite
TheodoliteTheodolite
Theodolite
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
solids when axis inclined to V.P
solids when axis inclined to V.Psolids when axis inclined to V.P
solids when axis inclined to V.P
 
Cam displacement diagram
Cam displacement diagramCam displacement diagram
Cam displacement diagram
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 

Andere mochten auch (11)

Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 
Types of construction
Types of constructionTypes of construction
Types of construction
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Suveying Chain Method
Suveying Chain MethodSuveying Chain Method
Suveying Chain Method
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Brick Masonary ppt presentation by Abhishek Bagul
Brick Masonary ppt presentation by Abhishek BagulBrick Masonary ppt presentation by Abhishek Bagul
Brick Masonary ppt presentation by Abhishek Bagul
 
Brick masonary
Brick masonaryBrick masonary
Brick masonary
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Surveying instruments
Surveying instrumentsSurveying instruments
Surveying instruments
 
Surveying
Surveying Surveying
Surveying
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 

Ähnlich wie Compass Survaying

Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
Bahzad5
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
OKOKILOUISmefgi
 
S2 4 angle and directions
S2 4 angle and directionsS2 4 angle and directions
S2 4 angle and directions
Est
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
Ayushsharma131736
 

Ähnlich wie Compass Survaying (20)

Compass surveying.ppt
Compass surveying.pptCompass surveying.ppt
Compass surveying.ppt
 
Compass surveying (1).ppt
Compass surveying (1).pptCompass surveying (1).ppt
Compass surveying (1).ppt
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
Compasssurveying 160050106053
Compasssurveying 160050106053Compasssurveying 160050106053
Compasssurveying 160050106053
 
types of bearing
types of bearingtypes of bearing
types of bearing
 
Traverse Computations
Traverse ComputationsTraverse Computations
Traverse Computations
 
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptxUnit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
Unit3AngularMeasurementpptx__2022_01_08_11_22_11.pptx
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Compass Surveying.ppt
Compass Surveying.pptCompass Surveying.ppt
Compass Surveying.ppt
 
Compass survey part 2
Compass survey part 2Compass survey part 2
Compass survey part 2
 
COMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYINGCOMPASS AND PLANE TABLE SURVEYING
COMPASS AND PLANE TABLE SURVEYING
 
S2 4 angle and directions
S2 4 angle and directionsS2 4 angle and directions
S2 4 angle and directions
 
Chapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptxChapter No. 04 - Angles and Directions.pptx
Chapter No. 04 - Angles and Directions.pptx
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
chain and compass traversing.pptx
chain and compass traversing.pptxchain and compass traversing.pptx
chain and compass traversing.pptx
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 
COMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptxCOMPASS SURVEYING btech civil ...-I.pptx
COMPASS SURVEYING btech civil ...-I.pptx
 
Angular measurement
Angular measurementAngular measurement
Angular measurement
 
COMPASS ERROR
COMPASS ERRORCOMPASS ERROR
COMPASS ERROR
 

Kürzlich hochgeladen

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Kürzlich hochgeladen (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Compass Survaying

  • 2. Our Group:- 14ME010 Jalpit Vaghela 14ME011 Ravi Pipariya 14ME012 Ankit parmar
  • 3. › Chain traversing: › Compass traversing: Fore bearings and back bearings between the traverse leg are measured › Theodolite traversing: Horizontal angles between the traverse legs are measured. The length of the traverse legs are measured by chain/tape or by stadia method › Plane table traversing: Plane table is set at every traverse station in clockwise and anticlockwise direction and the circuit is finally closed. During traversing the sides of the traverse are plotted according to any suitable scale. 15 m
  • 4.  True meridian: Line or plane passing through geographical north pole and geographical south pole  Magnetic meridian: When the magnetic needle is suspended freely and balanced properly, unaffected by magnetic substances, it indicates a direction. This direction is known as magnetic meridian. The angle between the magnetic meridian and a line is known as magnetic bearing or simple bearing of the line. North pole True meridian Magnetic meridian True bearing Magnetic bearing
  • 5.  Arbitrary meridian: Convenient direction is assumed as a meridian.  Grid meridian: Sometimes for preparing a map some state agencies assume several lines parallel to the true meridian for a particular zone these lines are termed as grid meridian.  Designation of magnetic bearing › Whole circle bearing (WCB) › Quadrantal bearing (QB)  WCB: The magnetic bearing of a line measured clockwise from the North Pole towards the line is known as WCB. Varies 0-360°
  • 6.  Quadrantal Bearing: The magnetic bearing of a line measured clockwise or anticlockwise from NP or SP (whichever is nearer to the line) towards the east or west is known as QB. This system consists of 4-quadrants NE, SE, NW, SW. The values lie between 0-90° › QB of OA = N a E  Reduced Bearing: When the whole circle bearing of a line is converted to quadrantal bearing it is termed as reduced bearing.  Fore and Back Bearing: › In WCB the difference between FB and BB should be exactly 180° › BB=FB+/-180° › Use the +ve sign when FB<180° › Use the –ve sign when FB> 180°
  • 7.  Magnetic declination: The horizontal angle between the magnetic meridian and true meridian is known as magnetic declination.  Dip of the magnetic needle: If the needle is perfectly balanced before magnetisation, it does not remain in the balanced position after it is magnetised. This is due to the magnetic influence of the earth. The needle is found to be inclined towards the pole. This inclination of the needle with the horizontal is known as dip of the magnetic needle.  Method of correction for traverse: › First method: Sum of the interior angle should be equal to (2n- 4) x 90. if not than distribute the total error equally to all interior angles of the traverse. Then starting from unaffected line the bearings of all the lines are corrected using corrected interior angles. › Second method: Unaffected line is first detected. Then, commencing from the unaffected line, the bearing of other affected lines are corrected by finding the amount of correction at each station.
  • 8.
  • 9.
  • 10.
  • 11.  Check on closed traverse: › Sum of the measured interior angles (2n-4) x 90° › Sum of the measured exterior angles (2n+4) x 90 ° › The algebric sum of the deflection angles should be equal to 360°. Right hand deflection is considered +ve, left hand deflection –ve  Check on linear measurement › The lines should be measured once each on two different days (along opposite directions). Both measurement should tally. › Linear measurement should also be taken by the stadia method. The measurement by chaining and stadia method should tally.
  • 12.  Taking cut-off lines: measured the bearings and lengths of cut off lines after plotting and tally with actual values.  Taking an auxiliary point: Take P permanent point as auxiliary point measured bearings and lengths of P from each traverse point. If survey is accurate, while plotting all the measured bearing of P should meet at P.
  • 13.  Convert the following WCBs to QBs › (a) WCB of AB = 45°30’ (Ans 45°30’) › (b) WCB of BC = 125°45’ (Ans 180- 125°45’ = 54° 15’)  Fore bearing of the following lines are given. Find back bearing › AB=S 30°30’ E › BC=N 40°30’ W  The magnetic bearing of a line AB is 135°30’ what will be the true bearing, if the declination is 5°15’ W.
  • 14.
  • 15.
  • 16.
  • 17. Included angle at A= 280-180-40=60 =FB of DA-180-FB of AB Included angle at B= 40+180-70= 150 =FB of AB+180-FB of BC Included angle at C= 70+180-210 =FB of BC+180-FB of CD Formula: FB of previous line+/-180- FB of next line