SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Downloaden Sie, um offline zu lesen
Randy Lay Project List 2010 to 2015
Value Range Scope Of Work
5-12 Million
3-5 Million
.5-1 Million Directional Signage, Pylons and Pillars
5-12 Million
2-3.5 Million
200-300 Million
300-500 Thousand
500-700 ThousandOperations Manager Removal and Replacement Of Existing Roof System, Coordinate with Facility Manager for
Crane Lifts/Traffic Plan and Demobilization. Project was a weekend and after hours.Rockwall ISD High School
ReRoof
Operations Manager
Lockheed Martin Admin
Building
Removal and Replacement Of Existing Roof System, Scaffolding Access and Chute System,
Coordinate with Facility for Crane Lifts/Traffic Plan and Demobilization
Operations Manager
Lockheed Martin Flight Line
Metal ReRoof
Removal and Replacement Of Existing Roof System, Coordinate with Construction
Manager for Crane Lifts/Traffic Plan and Demobilization. Project was Critical FOD Project.
Senior Estimator
DFW Terminal A Dart Station
Pedestrian Walkway & Train
Architectural Canopies Over The Train Station, Bus Stop and Terminal A Walkways
Senior Estimator
DFW Airport Airfield Lighting
Improvements FY 2012
Airfield Lighting, Controls, Duct Banks, Borings, Concrete Removal & Replacements and
Runway Shut Downs
DFW Terminal B TRIP MEP
Hydronic Piping Loop
Senior Estimator
DFW Terminal A TRIP
Wayfinding Signage Terminal A
Phase 1
Senior Estimator
Architectural, Structural Hydronic Pipe Supports, Piers, Concrete Removal and
Replacement, Roofing Pavers and Core Penetrations For Duct Work & Piping
Architectural, Structural Hydronic Pipe Supports, Piers, Concrete Removal and
Replacement and Core Penetrations For Duct Work & Piping
Responsibility / Project
Senior Estimator
DFW Terminal A TRIP TDPM JV
MEP Phase 1,2 & 3
Randy Lay Project List 2010 to 2015
500-800 Thousand
1-1.5 MillionOperations Manager
TDCJ ReRoof of Prison Facility
Removal and Replacement Of Existing Roof System, Coordinate with State's PA for
Employee Access Application's, Submittals, QC Compliance, P6 Scheduling Coordination,
SOV's, RFI Material Recommendations and Crew Coordination
Operations Manager Removal and Replacement Of Existing Roof System, Coordinate with Construction
Manager on System CriteriaGrapevine-Colleyville ISD
Elementary School ReRoof

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
AFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAEAFTAB CURRICULAM VITAE
AFTAB CURRICULAM VITAE
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
CV Pawel CV New(land)
CV Pawel CV New(land)CV Pawel CV New(land)
CV Pawel CV New(land)
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Resume - Schoregge
Resume - SchoreggeResume - Schoregge
Resume - Schoregge
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
RESUME_ARP
RESUME_ARPRESUME_ARP
RESUME_ARP
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
 
Senior Land surveyor
Senior Land surveyorSenior Land surveyor
Senior Land surveyor
 
CV-BASHIR-2016
CV-BASHIR-2016CV-BASHIR-2016
CV-BASHIR-2016
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
RESJC2015
RESJC2015RESJC2015
RESJC2015
 
Mohamed Morshed
Mohamed MorshedMohamed Morshed
Mohamed Morshed
 

Ähnlich wie Projects List 2010 to 2015

PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
Paul Blaetz
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
Robson Lima
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
Robert Sleeman
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
William Faoro PE
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
Simon Barkley
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
Amir pia
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
John Sinclair
 
Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3
Patrick Asiedu
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
Lloyd Guillory
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
Alistair Howson
 
Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015
Emilio Hoyos
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
Larry Wicker
 

Ähnlich wie Projects List 2010 to 2015 (20)

Jamie Resume
Jamie ResumeJamie Resume
Jamie Resume
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
 
CMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement ProgramCMAA OHare and Midway International Airports Capital Improvement Program
CMAA OHare and Midway International Airports Capital Improvement Program
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
IBC1677
IBC1677IBC1677
IBC1677
 
William Faoro - 4pResumeM1
William Faoro - 4pResumeM1William Faoro - 4pResumeM1
William Faoro - 4pResumeM1
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
 
Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3
 
resume lloyd guillory06-28-15
resume lloyd guillory06-28-15resume lloyd guillory06-28-15
resume lloyd guillory06-28-15
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015Emilio Hoyos RESUME 2 2015
Emilio Hoyos RESUME 2 2015
 
Jim Elliston CV
Jim Elliston CVJim Elliston CV
Jim Elliston CV
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
David's CV, 2017
David's CV, 2017David's CV, 2017
David's CV, 2017
 

Projects List 2010 to 2015

  • 1. Randy Lay Project List 2010 to 2015 Value Range Scope Of Work 5-12 Million 3-5 Million .5-1 Million Directional Signage, Pylons and Pillars 5-12 Million 2-3.5 Million 200-300 Million 300-500 Thousand 500-700 ThousandOperations Manager Removal and Replacement Of Existing Roof System, Coordinate with Facility Manager for Crane Lifts/Traffic Plan and Demobilization. Project was a weekend and after hours.Rockwall ISD High School ReRoof Operations Manager Lockheed Martin Admin Building Removal and Replacement Of Existing Roof System, Scaffolding Access and Chute System, Coordinate with Facility for Crane Lifts/Traffic Plan and Demobilization Operations Manager Lockheed Martin Flight Line Metal ReRoof Removal and Replacement Of Existing Roof System, Coordinate with Construction Manager for Crane Lifts/Traffic Plan and Demobilization. Project was Critical FOD Project. Senior Estimator DFW Terminal A Dart Station Pedestrian Walkway & Train Architectural Canopies Over The Train Station, Bus Stop and Terminal A Walkways Senior Estimator DFW Airport Airfield Lighting Improvements FY 2012 Airfield Lighting, Controls, Duct Banks, Borings, Concrete Removal & Replacements and Runway Shut Downs DFW Terminal B TRIP MEP Hydronic Piping Loop Senior Estimator DFW Terminal A TRIP Wayfinding Signage Terminal A Phase 1 Senior Estimator Architectural, Structural Hydronic Pipe Supports, Piers, Concrete Removal and Replacement, Roofing Pavers and Core Penetrations For Duct Work & Piping Architectural, Structural Hydronic Pipe Supports, Piers, Concrete Removal and Replacement and Core Penetrations For Duct Work & Piping Responsibility / Project Senior Estimator DFW Terminal A TRIP TDPM JV MEP Phase 1,2 & 3
  • 2. Randy Lay Project List 2010 to 2015 500-800 Thousand 1-1.5 MillionOperations Manager TDCJ ReRoof of Prison Facility Removal and Replacement Of Existing Roof System, Coordinate with State's PA for Employee Access Application's, Submittals, QC Compliance, P6 Scheduling Coordination, SOV's, RFI Material Recommendations and Crew Coordination Operations Manager Removal and Replacement Of Existing Roof System, Coordinate with Construction Manager on System CriteriaGrapevine-Colleyville ISD Elementary School ReRoof