Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 1
Republic of the Philippines
Province of Bohol
Municipality of Mabini
International Forum for Rural Transport and Development Organization
Propose Project-Philippines
FARM-TO-MARKET ROAD PROJECT
Barangay Abaca
( Barangay Abaca Proper - Sitio Kaigong - Sitio Kabangahan Road)
Mabini, Bohol
I. Description
A. Brief Summary of the Project
o This propose barangay road development project addresses the difficult situation of access
road towards Mabini Farmers and eventually lessens the burden of the farmers residing
from Sitio Kabangahan and its influence barangays. Potential farm produce from these
sitio are palm oil in more than 240 hectares, cassava planted in more than 120 hectares,
the stable corn planted in more than 80 hectares and few hectares of upland rice. These
permanent crops planted are partly harvestable and portion of which are in 2 years from
now, will also be harvestable. Other crops are already yielding which include the root
crops and other fruit bearing trees. Mostly, all resident have livestock such as cows, goats
and chicken.
o The existing condition of the proposed farm to market is muddy, especially during rainy
season and dilapidated yet still passable during dry season but not in good condition. Road
surface have canals of water caused by erosion during heavy rains that caused the road
nearly impassable.
o This project supports the local government in its push to economic development in terms
of agriculture through massive cultivation of plants mentioned. Through this project, it
would also encourage more land owners to develop and cultivate their land, venture into
other varieties of produce and livestock farming. This would also encourage the residents
to go back to school to seek higher education and consequently help alleviate their poor
living condition.
o This project will make investors discover other potential development of the area as well
as the neighboring areas. Highland as it is, and without obstruction from sunlight, it has a
large coverage that connects the towns of Alicia and Ubay, obviously has the potential for
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 2
solar energy farming that will somehow address the province's erratic power supply. The
location which has 100-200 meters elevation also boasts of a 360° unobstructed view of
the area's vicinity. On the East is where you can see Mabini Fish Port, two of the town's
islets which boasts of white sand shoreline and the neighboring Leyte island. The North
side faces Surigao province in Mindanao. West-side is the uplands of the town of Alicia
while on the South is the fast-growing town of Ubay wherein the proposed site of a
Korean-owned development company Hanjin's shipyard will be constructed. Present in the
area are several fresh-water springs which can be developed into water fun resorts and
may also be tapped as an additional source of the town's water supply. Grassy areas are
extensive and are suitable for ranching of different grazing livestock.
o The proposed Farm-to-Market road having 10 meters total width including shoulder and
open ditch both side and 1800 meters length. The road structure composed of 200 mm
Portland cement concrete pavement in both lane with 2.5 meters width, 150 mm thickness
aggregate base course and 300 mm thickness sub-grade preparation.
B. Project Goals and Objectives
Goal: To improve the socio-economic condition of the farmers of the said barangay and the
neighboring areas.
Specific Objectives
o To increase the household income of the farmers per annum
o To improve mobility and reduce transportation and hauling cost of farmer's products .
o To reduce the risk of road mishaps and improve accessibility for all the residents.
o To discover other potentials for developments in agricultural, industrial and even tourism.
C. Target Beneficiaries
o Direct beneficiaries 385 farmer households ( Sitio Kabangahan, Sitio
Kaigong and sitio Kabugnayan)
o Indirect beneficiaries 780 elementary pupils and high school students
Project Benefits
o Increase farmer's income
o Reduced transportation and hauling expenses
o Improve mobility and accessibility of residents
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 3
D. Project Partner's
o Project partners include IFTRD (International Forum for Rural Transport and Development
Organization) , Mabini Local Government Unit (LGU), Barangay Abaca Government Unit,
Abaca Farmer's Association and SMI Batch '96 Association.
o The LGU of Municipality of Mabini and SMI Batch '96 Association through their
counterpart support in Engineering supervision and other incurring cost necessary for
project implementation all for the realization of the proposed farm to market road that
addresses the economic problem of the farmers in the area.
o The Barangay Abaca Government Unit and Abaca Farmers Association support voluntary
labor force during construction and maintenance operation to sustain longer life span and
condition of the said project.
II. Project Scope of Works and Technical Specification
o See Annex 01-Document No. 2015-RJF-002
III. Project Quality Control Policy and Quality Assurance Plan
o See Annex 02-Document No. 2015-RJF-003
IV. Project Design Drawing and Detail
o See Annex 03-Document No. 2015-RJF-004
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 4
V. Site Location Map
II. Project Components and Implementation Schedule
No. Major Components/ Activities Proposed Time frame Responsible Parties
I
Documentary Requirements:
• Engineering , Publication
Posting, Bid Opening, Bid
Evaluation, Post
Qualification, Notice to
Commence & Others
July 20, 2015 LGU Mabini,
SMI Batch 96 Alumni
Association
II
Project Commencement
• Supervision
• Project Monitoring
• Quality Control
September 15, 2015 IFTRD Organization,
LGU Mabini, Barangay
Abaca Gov't Unit, SMI
Site
Location
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 5
• HSE Batch 96 Alumni
Association,
Abaca Farmers
Association
III Project Turn-over and Acceptance
• Handling over
documentation
• Operation Maintenance
Support
• Voluntary works
January 30, 2016 and
onwards
IFTRD Organization,
LGU Mabini, Barangay
Abaca Gov't Unit, SMI
Batch 96 Alumni
Association,
Abaca Farmers
Association
IV Sustainability Evaluation
• Regular joint evaluation for
sustainability of the project
January 30, 2016 and
onwards
Abaca Gov't Unit, SMI
Batch 96 Alumni
Association,
Abaca Farmers
Association
III. Scope and Financial Plan
Line Items Amount PHP
1. Direct Cost
a. Mobilization/ Demobilization
b. Design Engineering & Geotechnical Study
c. Item 102- Site preparation and Earthworks
d. Item 105- Sub-grade preparation
e. Item 201- Coarse Aggregates Base Course
f. Item 311- Portland Cement Concrete Pavement
g. Item 500- Road Crossing Drainage
h. Item 504- Erosion Control-Grouted Riprap
PHP 1,854,600.00
0.00
990,000.00
1,382,400.00
2,527,000.00
10,962,000.00
129,600.00
168,000.00
2. Indirect Cost
a. Contractor Profit
b. OCM
c. VAT
1,801,360.00
1,441,088.00
2,702,040.00
TOTAL PHP 23,958,088.00
USD 528,876.00
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 6
IV. Project Management
In the implementation of the project, the IFTRD Organization, SMI Batch 96 Alumni
Association and Local Chief Executive EO No. 8 series 2014 chaired by the Project Engineer,
Municipal Engineer -Engr. Raymond Melicor with its members.
A regular monitoring during the implementation shall be conducted by the
Implementing Unit. Upon its completion, the project shall be turned-over to the barangay
government unit headed by the Brgy. Captain, shall be responsible in project maintenance
with support of farmers association.
V. Project Sustainability
To ensure project sustainability, the municipal and barangay government unit in
partnership with IFTRD Org-SMI Batch 96 Association and Farmer's Association of Barangay
Abaca shall organize Operation and Maintenance Group for the project. Maintenance
operation, schedule and activity plan has to be prepared by the group leader and its
members.
Regular evaluation has to be conducted by the maintenance group and submit
reports to Barangay Officials or Local Chief Executive for updates of project situation and
status.
VI. Risk Analysis
The weather condition and natural calamities are considered as major risks that
could cause delay in the implementation. There might be days that the construction
operation would cease due to high intensity of rainfall which leaves the ground saturated
thereby rendering it unsuitable for earthwork operations as well as mobility of
construction equipments. This may cause undue delay of project duration and
completion.
Safety and security of the project's construction materials should be of utmost
consideration. In this aspect, the farmers association and barangay government officials
shall ensure the security of these said project materials. All project partners/contractors
shall also be held responsible and liable on this concern.
Farm -to-Market Road Project 2015
Rjf | Project Proposal-IFTRD Org.-Philippines 7
VII. Environmental, Safety and Health
General
Sufficient welfare facilities including cool drinking water, shaded rest areas and toilets
shall be provided in close proximity to the workers. Members of the construction team will
be issued with personal protective equipment (PPE).
Traffic
Barriers and warning signs will be provided as appropriate measure. Barriers will be used
for edge protection, tape will be used as a warning of danger.
Driver and equipment operators shall be trained competently.
Flagmen directing vehicles and equipment shall be trained. Vehicles and equipment shall
be inspected regularly and prior to starting operation to ensure good working condition.
Dust Control
Use all necessary means at the site under occupation to control the dust. Thoroughly
moisten all surfaced as required to prevent dust a nuisance or a hazard to the residents and
properties.
Erosion Control
The work shall consist of procuring, installing and maintaining a silt fence type sediment
barrier in accordance with the technical specification and construction details, and as
shown on the approved erosion, sedimentation and pollution control plan (ESPC plans
Proposed and Prepared by:
RANDY JUBAC FOSTANES
Civil Engineer, PRC No. 92378
Cel. No. (Phil.) : +639496884319
(Gab.) : +24104090749
Email add. : ran.fostanes@gmail.com
: rjf92378@yahoo.com
Skype : randy.fostanes

Weitere ähnliche Inhalte

Was ist angesagt?

National Solid Waste Management Status Report (2008-2015)
National Solid Waste Management Status Report (2008-2015)National Solid Waste Management Status Report (2008-2015)
National Solid Waste Management Status Report (2008-2015)EnP Ragene Andrea Palma
 
326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.pptbenito procia
 
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptx
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptxSK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptx
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptxBryan James Necesito
 
Barangay Project Documentation
Barangay Project DocumentationBarangay Project Documentation
Barangay Project DocumentationErika-Marie Garcia
 
Solicitation letters
Solicitation lettersSolicitation letters
Solicitation lettersIris Navarro
 
Barangay participation
Barangay participationBarangay participation
Barangay participationsimplygood
 
Economic sector, CLUP, comprehensive land use plan
Economic sector, CLUP, comprehensive land use planEconomic sector, CLUP, comprehensive land use plan
Economic sector, CLUP, comprehensive land use planCherry Belle Milagrosa
 
Barangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay Hall
 
SK-Resolution-10.docx
SK-Resolution-10.docxSK-Resolution-10.docx
SK-Resolution-10.docxBarangayMukas
 
Samples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesSamples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesJohanna Manzo
 
GAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxGAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxJaveGeneDeAquino1
 
Sample Letter Request for Additional Units for Working Scholars
Sample Letter Request for Additional Units for Working ScholarsSample Letter Request for Additional Units for Working Scholars
Sample Letter Request for Additional Units for Working Scholarseiramespi07
 
Assembly report final (1 st sem)
Assembly report final (1 st sem)Assembly report final (1 st sem)
Assembly report final (1 st sem)mineallison
 
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...BPA ABATAYO Land Surveying Services
 

Was ist angesagt? (20)

National Solid Waste Management Status Report (2008-2015)
National Solid Waste Management Status Report (2008-2015)National Solid Waste Management Status Report (2008-2015)
National Solid Waste Management Status Report (2008-2015)
 
326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt326918375-Barangay-Development-Planning.ppt
326918375-Barangay-Development-Planning.ppt
 
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptx
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptxSK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptx
SK-Guidelines-on-Monitoring-the-LYDP-CBYDP-and-ABYIP.pptx
 
Barangay Project Documentation
Barangay Project DocumentationBarangay Project Documentation
Barangay Project Documentation
 
Solicitation letters
Solicitation lettersSolicitation letters
Solicitation letters
 
Land use planning in the philippines
Land use planning in the philippinesLand use planning in the philippines
Land use planning in the philippines
 
Barangay participation
Barangay participationBarangay participation
Barangay participation
 
The sangguniang barangay
The sangguniang barangayThe sangguniang barangay
The sangguniang barangay
 
ABYIP 2021.docx
ABYIP 2021.docxABYIP 2021.docx
ABYIP 2021.docx
 
Economic sector, CLUP, comprehensive land use plan
Economic sector, CLUP, comprehensive land use planEconomic sector, CLUP, comprehensive land use plan
Economic sector, CLUP, comprehensive land use plan
 
Rationalized Planning System
Rationalized Planning SystemRationalized Planning System
Rationalized Planning System
 
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
Gulayaan sa Paaralan Project [GPP] - Project Proposal for FY 2014
 
Barangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management Plan
 
SK-Resolution-10.docx
SK-Resolution-10.docxSK-Resolution-10.docx
SK-Resolution-10.docx
 
Samples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the PhilippinesSamples of Decided Administrative Cases in the Philippines
Samples of Decided Administrative Cases in the Philippines
 
GAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxGAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docx
 
Sample Letter Request for Additional Units for Working Scholars
Sample Letter Request for Additional Units for Working ScholarsSample Letter Request for Additional Units for Working Scholars
Sample Letter Request for Additional Units for Working Scholars
 
Approval sheet (action research)
Approval sheet (action research)Approval sheet (action research)
Approval sheet (action research)
 
Assembly report final (1 st sem)
Assembly report final (1 st sem)Assembly report final (1 st sem)
Assembly report final (1 st sem)
 
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
 

Andere mochten auch

10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal WritingTony
 
Proposal format
Proposal formatProposal format
Proposal formatMr SMAK
 
Project Research Proposal Design of 4.5km road
Project Research Proposal  Design of 4.5km  roadProject Research Proposal  Design of 4.5km  road
Project Research Proposal Design of 4.5km roadSyed Hazoor Ali Shah
 
School activity and project proposals maryjoy nazaro
School activity and project proposals maryjoy nazaroSchool activity and project proposals maryjoy nazaro
School activity and project proposals maryjoy nazaroMaryjoy Nazaro
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project ProposalGhulam Qadir
 
Sample Project Proposal Design Document
Sample Project Proposal Design DocumentSample Project Proposal Design Document
Sample Project Proposal Design DocumentArturo Pelayo
 
road construction project
road construction projectroad construction project
road construction projectnishant singh
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal Formmanouchecalovena
 
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)Development Communications Consultant
 
RESUME Santos, Paula 2016
RESUME Santos, Paula 2016RESUME Santos, Paula 2016
RESUME Santos, Paula 2016Paula Santos
 
Local and oral history presentation
Local and oral history presentationLocal and oral history presentation
Local and oral history presentationNeo Justine Orofeo
 
Proposed Green Wall along Rafael Palma Elementary School
Proposed  Green Wall along  Rafael Palma Elementary School Proposed  Green Wall along  Rafael Palma Elementary School
Proposed Green Wall along Rafael Palma Elementary School Arch. Ma. Elena E. Lamasan
 

Andere mochten auch (20)

10 Project Proposal Writing
10 Project Proposal Writing10 Project Proposal Writing
10 Project Proposal Writing
 
Proposal format
Proposal formatProposal format
Proposal format
 
Project Research Proposal Design of 4.5km road
Project Research Proposal  Design of 4.5km  roadProject Research Proposal  Design of 4.5km  road
Project Research Proposal Design of 4.5km road
 
Nstp project proposal
Nstp project proposalNstp project proposal
Nstp project proposal
 
School activity and project proposals maryjoy nazaro
School activity and project proposals maryjoy nazaroSchool activity and project proposals maryjoy nazaro
School activity and project proposals maryjoy nazaro
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Writing Successful Project Proposal
Writing Successful Project ProposalWriting Successful Project Proposal
Writing Successful Project Proposal
 
Sample Project Proposal Design Document
Sample Project Proposal Design DocumentSample Project Proposal Design Document
Sample Project Proposal Design Document
 
Project proposal
Project proposalProject proposal
Project proposal
 
Project proposal
Project proposalProject proposal
Project proposal
 
road construction project
road construction projectroad construction project
road construction project
 
Senior Project Proposal Form
Senior Project Proposal FormSenior Project Proposal Form
Senior Project Proposal Form
 
Pundar sikap
Pundar sikapPundar sikap
Pundar sikap
 
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)
"Pagbag-o Sang Baryo" (Transformation of a Community) (inside book pages)
 
Irr nstp2006
Irr nstp2006Irr nstp2006
Irr nstp2006
 
Nstp
NstpNstp
Nstp
 
Research proposal
Research proposalResearch proposal
Research proposal
 
RESUME Santos, Paula 2016
RESUME Santos, Paula 2016RESUME Santos, Paula 2016
RESUME Santos, Paula 2016
 
Local and oral history presentation
Local and oral history presentationLocal and oral history presentation
Local and oral history presentation
 
Proposed Green Wall along Rafael Palma Elementary School
Proposed  Green Wall along  Rafael Palma Elementary School Proposed  Green Wall along  Rafael Palma Elementary School
Proposed Green Wall along Rafael Palma Elementary School
 

Ähnlich wie Farm-to-Market Road Project

Improved version of gandachara 20 20 initiative
Improved version of gandachara 20 20 initiativeImproved version of gandachara 20 20 initiative
Improved version of gandachara 20 20 initiativeSandeep Mahatme
 
Lihir Team visit to New Ireland PP
Lihir Team visit to New Ireland PPLihir Team visit to New Ireland PP
Lihir Team visit to New Ireland PPHenry Baraka
 
Industrial development of SRP
Industrial development of SRPIndustrial development of SRP
Industrial development of SRPVia86
 
Assessment of Yield Enhancement Intervention under National Rice Program and ...
Assessment of Yield Enhancement Intervention under National Rice Program and ...Assessment of Yield Enhancement Intervention under National Rice Program and ...
Assessment of Yield Enhancement Intervention under National Rice Program and ...IJAEMSJORNAL
 
Land & Environmental Claims Report
Land & Environmental Claims Report Land & Environmental Claims Report
Land & Environmental Claims Report Nickey Oosthuizen
 
Presentation - 9th Roundtable on financing water, Rukan Manaz
Presentation - 9th Roundtable on financing water, Rukan ManazPresentation - 9th Roundtable on financing water, Rukan Manaz
Presentation - 9th Roundtable on financing water, Rukan ManazOECD Environment
 
PADPIE Analysis LINAW Project.pptx
PADPIE Analysis LINAW Project.pptxPADPIE Analysis LINAW Project.pptx
PADPIE Analysis LINAW Project.pptxAVAbraham1
 
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...Kyle Thomas
 
Integrated-Area-Development-IAD.pptx
Integrated-Area-Development-IAD.pptxIntegrated-Area-Development-IAD.pptx
Integrated-Area-Development-IAD.pptxPatrickOmarBErestain
 
Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016ifadseahub
 
AgriSmart end of project report world heritage final
AgriSmart end of project report world heritage finalAgriSmart end of project report world heritage final
AgriSmart end of project report world heritage finalEmanual Van Wyk
 
120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narithNarith Por
 
DARUBAY JULY- AUGUST 2014 ISSUE
DARUBAY JULY- AUGUST 2014 ISSUE DARUBAY JULY- AUGUST 2014 ISSUE
DARUBAY JULY- AUGUST 2014 ISSUE darro5info
 
Commencing of tourist resort
Commencing of tourist resortCommencing of tourist resort
Commencing of tourist resortAkash Abraham
 

Ähnlich wie Farm-to-Market Road Project (20)

Rdt-Agenda.pdf
Rdt-Agenda.pdfRdt-Agenda.pdf
Rdt-Agenda.pdf
 
06 snrmpep
06 snrmpep06 snrmpep
06 snrmpep
 
06 snrmpep
06 snrmpep06 snrmpep
06 snrmpep
 
Improved version of gandachara 20 20 initiative
Improved version of gandachara 20 20 initiativeImproved version of gandachara 20 20 initiative
Improved version of gandachara 20 20 initiative
 
Lihir Team visit to New Ireland PP
Lihir Team visit to New Ireland PPLihir Team visit to New Ireland PP
Lihir Team visit to New Ireland PP
 
Industrial development of SRP
Industrial development of SRPIndustrial development of SRP
Industrial development of SRP
 
Assessment of Yield Enhancement Intervention under National Rice Program and ...
Assessment of Yield Enhancement Intervention under National Rice Program and ...Assessment of Yield Enhancement Intervention under National Rice Program and ...
Assessment of Yield Enhancement Intervention under National Rice Program and ...
 
Land & Environmental Claims Report
Land & Environmental Claims Report Land & Environmental Claims Report
Land & Environmental Claims Report
 
Presentation - 9th Roundtable on financing water, Rukan Manaz
Presentation - 9th Roundtable on financing water, Rukan ManazPresentation - 9th Roundtable on financing water, Rukan Manaz
Presentation - 9th Roundtable on financing water, Rukan Manaz
 
PADPIE Analysis LINAW Project.pptx
PADPIE Analysis LINAW Project.pptxPADPIE Analysis LINAW Project.pptx
PADPIE Analysis LINAW Project.pptx
 
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...
Bush Order Provision Ltd presentation on GROW: Yellowknife Food and Agricultu...
 
Irrigation development and agricultural water management in Africa: transitio...
Irrigation development and agricultural water management in Africa: transitio...Irrigation development and agricultural water management in Africa: transitio...
Irrigation development and agricultural water management in Africa: transitio...
 
Integrated-Area-Development-IAD.pptx
Integrated-Area-Development-IAD.pptxIntegrated-Area-Development-IAD.pptx
Integrated-Area-Development-IAD.pptx
 
Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016Snrmpep presentation to mission april 2016
Snrmpep presentation to mission april 2016
 
AgriSmart end of project report world heritage final
AgriSmart end of project report world heritage finalAgriSmart end of project report world heritage final
AgriSmart end of project report world heritage final
 
120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith120717 group assigment on cambodida agriculture strategic plan por narith
120717 group assigment on cambodida agriculture strategic plan por narith
 
DARUBAY JULY- AUGUST 2014 ISSUE
DARUBAY JULY- AUGUST 2014 ISSUE DARUBAY JULY- AUGUST 2014 ISSUE
DARUBAY JULY- AUGUST 2014 ISSUE
 
Dutch Support to Bangladesh: Past and the Future
Dutch Support to Bangladesh: Past and the FutureDutch Support to Bangladesh: Past and the Future
Dutch Support to Bangladesh: Past and the Future
 
Commencing of tourist resort
Commencing of tourist resortCommencing of tourist resort
Commencing of tourist resort
 
GOV SOPA.pdf
GOV SOPA.pdfGOV SOPA.pdf
GOV SOPA.pdf
 

Farm-to-Market Road Project

  • 1. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 1 Republic of the Philippines Province of Bohol Municipality of Mabini International Forum for Rural Transport and Development Organization Propose Project-Philippines FARM-TO-MARKET ROAD PROJECT Barangay Abaca ( Barangay Abaca Proper - Sitio Kaigong - Sitio Kabangahan Road) Mabini, Bohol I. Description A. Brief Summary of the Project o This propose barangay road development project addresses the difficult situation of access road towards Mabini Farmers and eventually lessens the burden of the farmers residing from Sitio Kabangahan and its influence barangays. Potential farm produce from these sitio are palm oil in more than 240 hectares, cassava planted in more than 120 hectares, the stable corn planted in more than 80 hectares and few hectares of upland rice. These permanent crops planted are partly harvestable and portion of which are in 2 years from now, will also be harvestable. Other crops are already yielding which include the root crops and other fruit bearing trees. Mostly, all resident have livestock such as cows, goats and chicken. o The existing condition of the proposed farm to market is muddy, especially during rainy season and dilapidated yet still passable during dry season but not in good condition. Road surface have canals of water caused by erosion during heavy rains that caused the road nearly impassable. o This project supports the local government in its push to economic development in terms of agriculture through massive cultivation of plants mentioned. Through this project, it would also encourage more land owners to develop and cultivate their land, venture into other varieties of produce and livestock farming. This would also encourage the residents to go back to school to seek higher education and consequently help alleviate their poor living condition. o This project will make investors discover other potential development of the area as well as the neighboring areas. Highland as it is, and without obstruction from sunlight, it has a large coverage that connects the towns of Alicia and Ubay, obviously has the potential for
  • 2. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 2 solar energy farming that will somehow address the province's erratic power supply. The location which has 100-200 meters elevation also boasts of a 360° unobstructed view of the area's vicinity. On the East is where you can see Mabini Fish Port, two of the town's islets which boasts of white sand shoreline and the neighboring Leyte island. The North side faces Surigao province in Mindanao. West-side is the uplands of the town of Alicia while on the South is the fast-growing town of Ubay wherein the proposed site of a Korean-owned development company Hanjin's shipyard will be constructed. Present in the area are several fresh-water springs which can be developed into water fun resorts and may also be tapped as an additional source of the town's water supply. Grassy areas are extensive and are suitable for ranching of different grazing livestock. o The proposed Farm-to-Market road having 10 meters total width including shoulder and open ditch both side and 1800 meters length. The road structure composed of 200 mm Portland cement concrete pavement in both lane with 2.5 meters width, 150 mm thickness aggregate base course and 300 mm thickness sub-grade preparation. B. Project Goals and Objectives Goal: To improve the socio-economic condition of the farmers of the said barangay and the neighboring areas. Specific Objectives o To increase the household income of the farmers per annum o To improve mobility and reduce transportation and hauling cost of farmer's products . o To reduce the risk of road mishaps and improve accessibility for all the residents. o To discover other potentials for developments in agricultural, industrial and even tourism. C. Target Beneficiaries o Direct beneficiaries 385 farmer households ( Sitio Kabangahan, Sitio Kaigong and sitio Kabugnayan) o Indirect beneficiaries 780 elementary pupils and high school students Project Benefits o Increase farmer's income o Reduced transportation and hauling expenses o Improve mobility and accessibility of residents
  • 3. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 3 D. Project Partner's o Project partners include IFTRD (International Forum for Rural Transport and Development Organization) , Mabini Local Government Unit (LGU), Barangay Abaca Government Unit, Abaca Farmer's Association and SMI Batch '96 Association. o The LGU of Municipality of Mabini and SMI Batch '96 Association through their counterpart support in Engineering supervision and other incurring cost necessary for project implementation all for the realization of the proposed farm to market road that addresses the economic problem of the farmers in the area. o The Barangay Abaca Government Unit and Abaca Farmers Association support voluntary labor force during construction and maintenance operation to sustain longer life span and condition of the said project. II. Project Scope of Works and Technical Specification o See Annex 01-Document No. 2015-RJF-002 III. Project Quality Control Policy and Quality Assurance Plan o See Annex 02-Document No. 2015-RJF-003 IV. Project Design Drawing and Detail o See Annex 03-Document No. 2015-RJF-004
  • 4. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 4 V. Site Location Map II. Project Components and Implementation Schedule No. Major Components/ Activities Proposed Time frame Responsible Parties I Documentary Requirements: • Engineering , Publication Posting, Bid Opening, Bid Evaluation, Post Qualification, Notice to Commence & Others July 20, 2015 LGU Mabini, SMI Batch 96 Alumni Association II Project Commencement • Supervision • Project Monitoring • Quality Control September 15, 2015 IFTRD Organization, LGU Mabini, Barangay Abaca Gov't Unit, SMI Site Location
  • 5. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 5 • HSE Batch 96 Alumni Association, Abaca Farmers Association III Project Turn-over and Acceptance • Handling over documentation • Operation Maintenance Support • Voluntary works January 30, 2016 and onwards IFTRD Organization, LGU Mabini, Barangay Abaca Gov't Unit, SMI Batch 96 Alumni Association, Abaca Farmers Association IV Sustainability Evaluation • Regular joint evaluation for sustainability of the project January 30, 2016 and onwards Abaca Gov't Unit, SMI Batch 96 Alumni Association, Abaca Farmers Association III. Scope and Financial Plan Line Items Amount PHP 1. Direct Cost a. Mobilization/ Demobilization b. Design Engineering & Geotechnical Study c. Item 102- Site preparation and Earthworks d. Item 105- Sub-grade preparation e. Item 201- Coarse Aggregates Base Course f. Item 311- Portland Cement Concrete Pavement g. Item 500- Road Crossing Drainage h. Item 504- Erosion Control-Grouted Riprap PHP 1,854,600.00 0.00 990,000.00 1,382,400.00 2,527,000.00 10,962,000.00 129,600.00 168,000.00 2. Indirect Cost a. Contractor Profit b. OCM c. VAT 1,801,360.00 1,441,088.00 2,702,040.00 TOTAL PHP 23,958,088.00 USD 528,876.00
  • 6. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 6 IV. Project Management In the implementation of the project, the IFTRD Organization, SMI Batch 96 Alumni Association and Local Chief Executive EO No. 8 series 2014 chaired by the Project Engineer, Municipal Engineer -Engr. Raymond Melicor with its members. A regular monitoring during the implementation shall be conducted by the Implementing Unit. Upon its completion, the project shall be turned-over to the barangay government unit headed by the Brgy. Captain, shall be responsible in project maintenance with support of farmers association. V. Project Sustainability To ensure project sustainability, the municipal and barangay government unit in partnership with IFTRD Org-SMI Batch 96 Association and Farmer's Association of Barangay Abaca shall organize Operation and Maintenance Group for the project. Maintenance operation, schedule and activity plan has to be prepared by the group leader and its members. Regular evaluation has to be conducted by the maintenance group and submit reports to Barangay Officials or Local Chief Executive for updates of project situation and status. VI. Risk Analysis The weather condition and natural calamities are considered as major risks that could cause delay in the implementation. There might be days that the construction operation would cease due to high intensity of rainfall which leaves the ground saturated thereby rendering it unsuitable for earthwork operations as well as mobility of construction equipments. This may cause undue delay of project duration and completion. Safety and security of the project's construction materials should be of utmost consideration. In this aspect, the farmers association and barangay government officials shall ensure the security of these said project materials. All project partners/contractors shall also be held responsible and liable on this concern.
  • 7. Farm -to-Market Road Project 2015 Rjf | Project Proposal-IFTRD Org.-Philippines 7 VII. Environmental, Safety and Health General Sufficient welfare facilities including cool drinking water, shaded rest areas and toilets shall be provided in close proximity to the workers. Members of the construction team will be issued with personal protective equipment (PPE). Traffic Barriers and warning signs will be provided as appropriate measure. Barriers will be used for edge protection, tape will be used as a warning of danger. Driver and equipment operators shall be trained competently. Flagmen directing vehicles and equipment shall be trained. Vehicles and equipment shall be inspected regularly and prior to starting operation to ensure good working condition. Dust Control Use all necessary means at the site under occupation to control the dust. Thoroughly moisten all surfaced as required to prevent dust a nuisance or a hazard to the residents and properties. Erosion Control The work shall consist of procuring, installing and maintaining a silt fence type sediment barrier in accordance with the technical specification and construction details, and as shown on the approved erosion, sedimentation and pollution control plan (ESPC plans Proposed and Prepared by: RANDY JUBAC FOSTANES Civil Engineer, PRC No. 92378 Cel. No. (Phil.) : +639496884319 (Gab.) : +24104090749 Email add. : ran.fostanes@gmail.com : rjf92378@yahoo.com Skype : randy.fostanes