SlideShare ist ein Scribd-Unternehmen logo
1 von 13
Kathmandu University
Department of Civil and Geomatics Engineering
PREPARATION OF 3D MODEL OF INTERNATIONAL SPACE
STATION
Proposal Defense
Presenters : Supervisors :
Shrestha Rabi [25] Mr. Uma shankar Pandey
Subedi Anil[26] Mr. Nawaraj Shrestha
Tamang Bipul [27]
Thapa Mukesh [28]
Kathmandu University
Department of Civil and Geomatics Engineering
INTRODUCTION
International Space Station
Artificial satellite in low earth orbit
Spacecraft capable of supporting crewmembers
Collects datas and images of earth
2
2
International
Space Station
Source: Google Photos
Kathmandu University
Department of Civil and Geomatics Engineering
•Features of ISS
•It is large spacecraft in orbit around earth.
•It orbits earth at an average altitude of approximately
250 miles.
•It travels at 17,500 mph(i.e every 90 minute)
•The space station covers the area of football field
including the end zones.
•The 75 to 90 kilowatts of power for the ISS is supplied
by an acre of solar panels.
•Fifty-two computers control the systems on the ISS.
3
Kathmandu University
Department of Civil and Geomatics Engineering
International Space Station
4
Source: Google Photos
Kathmandu University
Department of Civil and Geomatics Engineering
Objectives
Primary Objectives:-
To develop the 3D model of international space station
Secondary Objectives:-
To learn preparation of 3D modelling.
To apply the basic engineering skills learned so far in practical life.
5
Kathmandu University
Department of Civil and Geomatics Engineering
Methodology
Preliminary Research
Consultation
Data collection
Cost estimation
Materials collection
Rough designing of Model
Working on the Model
Painting and finishing the model
Submission of the model
6
Kathmandu University
Department of Civil and Geomatics Engineering
Methedological Flow Chart
Kathmandu University
Department of Civil and Geomatics Engineering
Materials Required and cost estimation
S.
N
Materials Required Rate Quantity Cost
1 Globe 1000 1 1000
2 Measuring tape 150 1 150
3 Ball Bearing 100 1 100
4 Wire 50 4m 200
5 Paint & brush 500 1 500
6 Bowl 100 1 100
7 Fevicol 300 1 300
8 Iron Rod 100 1 100
9 Card Board 500 1 500
10 Glass 150 1 150
TOTAL 3100
7
Kathmandu University
Department of Civil and Geomatics Engineering
LOGICAL FRAME ANALYSIS
Objective 1:To study the working mechanism of space station Objective 2:To prepare 3D Model of ISS
Methodology:
Literature Review
1:Data and materials collection
2.Construction of 3D Model
Activities:
1.Searching through the internet about working mechanism of space station
2:watching Youtube videos
Activities:
1.Collection of data and information from study
2.Consulting with supervisor
3.listing and collection of materials required
4.Working on model
5.Painting and finishing up
6Submission to supervisors, preparation of report and final
presentation
Who:
Literature review : All
Who:
Data collection: Rabi Shrestha
Bipul Tamang
Material collection: Mukesh Thapa
Anil Subedi
Construction of 3D model: All
When: from 1st day to till the submission of project. When: After the approval of proposal to till the submission of
project and final report.
Risk: The data gained may not be accurate. Risk: Materials required may be costly.
Solution: Data can be gained from reliable sources and authentic websites. Solution: Alternatives, easily available and low costly material
can be used.
Kathmandu University
Department of Civil and Geomatics Engineering
Expected outcome
• The 3D model of international space station is expected outcome. We
will give our best about international space station. Our project will
be enough to make people clear how the ISS work.
Kathmandu University
Department of Civil and Geomatics Engineering
Conclusion
•Construction of 3D model of the space station helps
us to gain idea about 3D modeling and also will help
us to enhance knowledge and working mechanism
of ISS and Application of ISS in our day to day lives
navigation, astronomy,weather forecasting and
various research.
9
Kathmandu University
Department of Civil and Geomatics Engineering
Limitations
• Ground stations are not in scale.
• Satellite and earth do not rotate separately.
• Secondary source of data collection may always not be reliable as
primary source of data collection is not possible.
10
Kathmandu University
Department of Civil and Geomatics Engineering
References
• Gerson, S. G.(2014) Technical Communication: Research. New York:
Pearson Education., Print
• Faculty members, Seniors
• Internet
• https://en.wikipedia.org/wiki/International_Space_Station
• https://www.space.com/16748-international-space-station.html
12

Weitere ähnliche Inhalte

Ähnlich wie Preparation of 3 d model of international space station

B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20
Rohit Singh
 
Muhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-ResumeMuhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-Resume
Shamsul Kamal
 
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar SoonthornthumGalaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
ILOAHawaii
 
2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk
Thomas Sølund
 
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Biplov Bhandari
 

Ähnlich wie Preparation of 3 d model of international space station (20)

3D Model preparation of a landscape
3D Model preparation of a landscape3D Model preparation of a landscape
3D Model preparation of a landscape
 
Final year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powerFinal year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro power
 
Cv avishek
Cv avishekCv avishek
Cv avishek
 
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
Pre-3rd Mission Idea Contest for micro/nano satellite utilization (Pre-MIC3)...
 
Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016Mercury CubeSat Presentation for ASAT2016
Mercury CubeSat Presentation for ASAT2016
 
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
A COMPARATIVE STUDY OF CONVENTIONAL SURVEYING TECHNIQUES WITH TOTAL STATION A...
 
B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20B.tech. 2nd year civil engg aicte model curriculum 2019 20
B.tech. 2nd year civil engg aicte model curriculum 2019 20
 
Terrestrial laser scanning
Terrestrial laser scanningTerrestrial laser scanning
Terrestrial laser scanning
 
Miklovicz thesis defence 2017
Miklovicz thesis defence 2017Miklovicz thesis defence 2017
Miklovicz thesis defence 2017
 
ISM2014
ISM2014ISM2014
ISM2014
 
Muhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-ResumeMuhammad Shamsul Kamal-Resume
Muhammad Shamsul Kamal-Resume
 
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat MissionApplying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
Applying the Systems Engineering Process to a Conceptual Merucry CubeSat Mission
 
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptxCIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
CIVIL_NAAC_06-9-2016_V2 (2) (1).pptx
 
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
Civil_Geotech Engg Proposal of new and details of existing PG programmes afte...
 
Electronic Atlas and its Types
Electronic Atlas and its TypesElectronic Atlas and its Types
Electronic Atlas and its Types
 
CV Aritra 08-2020
CV Aritra 08-2020CV Aritra 08-2020
CV Aritra 08-2020
 
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar SoonthornthumGalaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
Galaxy Forum SEA Indonesia - Boonrucksar Soonthornthum
 
2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk2015-07-08 Paper 38 - ICVS Talk
2015-07-08 Paper 38 - ICVS Talk
 
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
Prediction of Elastic modulus using Finite Element Modeling and Artificial Ne...
 
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
Multisource Data Integration To Prepare Interactive 3D Model Of Kathmandu Uni...
 

Kürzlich hochgeladen

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Kürzlich hochgeladen (20)

Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
457503602-5-Gas-Well-Testing-and-Analysis-pptx.pptx
 

Preparation of 3 d model of international space station

  • 1. Kathmandu University Department of Civil and Geomatics Engineering PREPARATION OF 3D MODEL OF INTERNATIONAL SPACE STATION Proposal Defense Presenters : Supervisors : Shrestha Rabi [25] Mr. Uma shankar Pandey Subedi Anil[26] Mr. Nawaraj Shrestha Tamang Bipul [27] Thapa Mukesh [28]
  • 2. Kathmandu University Department of Civil and Geomatics Engineering INTRODUCTION International Space Station Artificial satellite in low earth orbit Spacecraft capable of supporting crewmembers Collects datas and images of earth 2 2 International Space Station Source: Google Photos
  • 3. Kathmandu University Department of Civil and Geomatics Engineering •Features of ISS •It is large spacecraft in orbit around earth. •It orbits earth at an average altitude of approximately 250 miles. •It travels at 17,500 mph(i.e every 90 minute) •The space station covers the area of football field including the end zones. •The 75 to 90 kilowatts of power for the ISS is supplied by an acre of solar panels. •Fifty-two computers control the systems on the ISS. 3
  • 4. Kathmandu University Department of Civil and Geomatics Engineering International Space Station 4 Source: Google Photos
  • 5. Kathmandu University Department of Civil and Geomatics Engineering Objectives Primary Objectives:- To develop the 3D model of international space station Secondary Objectives:- To learn preparation of 3D modelling. To apply the basic engineering skills learned so far in practical life. 5
  • 6. Kathmandu University Department of Civil and Geomatics Engineering Methodology Preliminary Research Consultation Data collection Cost estimation Materials collection Rough designing of Model Working on the Model Painting and finishing the model Submission of the model 6
  • 7. Kathmandu University Department of Civil and Geomatics Engineering Methedological Flow Chart
  • 8. Kathmandu University Department of Civil and Geomatics Engineering Materials Required and cost estimation S. N Materials Required Rate Quantity Cost 1 Globe 1000 1 1000 2 Measuring tape 150 1 150 3 Ball Bearing 100 1 100 4 Wire 50 4m 200 5 Paint & brush 500 1 500 6 Bowl 100 1 100 7 Fevicol 300 1 300 8 Iron Rod 100 1 100 9 Card Board 500 1 500 10 Glass 150 1 150 TOTAL 3100 7
  • 9. Kathmandu University Department of Civil and Geomatics Engineering LOGICAL FRAME ANALYSIS Objective 1:To study the working mechanism of space station Objective 2:To prepare 3D Model of ISS Methodology: Literature Review 1:Data and materials collection 2.Construction of 3D Model Activities: 1.Searching through the internet about working mechanism of space station 2:watching Youtube videos Activities: 1.Collection of data and information from study 2.Consulting with supervisor 3.listing and collection of materials required 4.Working on model 5.Painting and finishing up 6Submission to supervisors, preparation of report and final presentation Who: Literature review : All Who: Data collection: Rabi Shrestha Bipul Tamang Material collection: Mukesh Thapa Anil Subedi Construction of 3D model: All When: from 1st day to till the submission of project. When: After the approval of proposal to till the submission of project and final report. Risk: The data gained may not be accurate. Risk: Materials required may be costly. Solution: Data can be gained from reliable sources and authentic websites. Solution: Alternatives, easily available and low costly material can be used.
  • 10. Kathmandu University Department of Civil and Geomatics Engineering Expected outcome • The 3D model of international space station is expected outcome. We will give our best about international space station. Our project will be enough to make people clear how the ISS work.
  • 11. Kathmandu University Department of Civil and Geomatics Engineering Conclusion •Construction of 3D model of the space station helps us to gain idea about 3D modeling and also will help us to enhance knowledge and working mechanism of ISS and Application of ISS in our day to day lives navigation, astronomy,weather forecasting and various research. 9
  • 12. Kathmandu University Department of Civil and Geomatics Engineering Limitations • Ground stations are not in scale. • Satellite and earth do not rotate separately. • Secondary source of data collection may always not be reliable as primary source of data collection is not possible. 10
  • 13. Kathmandu University Department of Civil and Geomatics Engineering References • Gerson, S. G.(2014) Technical Communication: Research. New York: Pearson Education., Print • Faculty members, Seniors • Internet • https://en.wikipedia.org/wiki/International_Space_Station • https://www.space.com/16748-international-space-station.html 12