Improvement Projects done by Mr.Prabageran Thiagarayah
1. Lead Plant Steering committee in the plant and member to the area steering committee in
the Europe region Hydro Germany, Italy, Norway - Hydro
2. Improving Caster productivity through SMED activity – HYDRO
3. Improving Cold Mill productivity through SMED activity – HYDRO
4. Improving Roll Grinder productivity through SMED activity – HYDRO
5. Improving Foil Mill ( Rolling Mills) productivity through SMED activity – HYDRO
6. Improving Foil Slitter productivity through SMED activity – HYDRO
7. Establish plant wide 5S initiative – Hydro
8. Designing and Implementation of 5S rotation board which consist of
9. 5S periodic audit check
10. Red card and Yellow card implementation
11. 5 minute 5S Activity – Hyrdo
12. Restructuring operation meeting structure for better communication among the
management team and operation - Hydro
13. Established Standard Information / production board across the plant – Hydro
14. Structured and implemented Small Improvement Activity (SIA) for improving quick will
opportunity – Hydro
15. Structured and implemented Continuous Improvement Project ( CIP) – Hydro
16. Structured and implemented the methodology of Project Management and Monitoring
System – Hydro.
17. Cost saving initiative of Scrap Reduction activity – Hydro.
18. Yearly plant wide Policy Deployment Activities – Structuring the KPI’s – Hydro
19. Establish a suggestion program (idea collection, evaluation, implementation, reward) -
Hydro
20. Implementation of Value Stream Management – Foil Focus only – Hydro
21. Implementation of OPMS ( Operational Management System) - 24h meetings based on
22. OEE (overall equipment efficiency) - Hydro
23. Introduce and define the methodology and implemented the HAM Gemba Walk – Hydro
24. Improving and sustaining the consistency of Range To Fault (RTF) equipments –
Flextronics
25. Identify and implement cost saving initiative for DC 34 hand vacuum cleaner – Dyson
Improvement Projects done by Mr.Prabageran Thiagarayah
26. Identify and implement cost saving initiative for Air Multiplier Product – Dyson
27. Qualifying process and production line of Dyson’s OEM’s - ATA, Mayban,SKP plastic
28. Improving and sustaining the consistency of Range To Fault (RTF) equipments of
Xerox– Fletronics
29. Minimizing waste and maximizing efficiency of resources through Cellular
Manufacturing workplace design for Xerox conveyor working line – Flextronics
30. Line balancing activities – Flextronics
31. New line set-up for Xerox’s Jupiter project – Hydro
32. Head count reduction activities through process improvement – Flextronics
33. Establish the repair and troubleshooting traceability record for Xerox Jupiter testers-
Flextronics
34. Warp reduction initiative for Yield Improvement - Maruwa
35. Visual gating gadget – consistency improvement – process capability consistency-
Maruwa
36. Improving the visual process efficiency- Maruwa
37. Sand blasting process capability improvement – surface finish- Maruwa
38. Productivity optimization at heat furnace- Maruwa
39. Yield improvement through scrap reduction- Maruwa
40. Slitting tool and pressing process improvement - Maruwa
41. Alumina ball and substrate raw material mixing standardization. - Maruwa
42. Heat curve matrix for tabulating exact furnace usage- Maruwa
43. Ferrite process improvement by implementing weight block jig and fixture- Maruwa

Weitere ähnliche Inhalte

Ähnlich wie projects done- 1

IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)Asim Aslam
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue PrintingCementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue Printingdzikothunde
 
Lean Improvement Case Study 3
Lean Improvement Case Study 3Lean Improvement Case Study 3
Lean Improvement Case Study 3actionmaster007
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.pptMbabba2
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseComit Projects Ltd
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.pptAlMajhool1
 
production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...SWATI SAXENA
 

Ähnlich wie projects done- 1 (20)

An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Richard clark cv
Richard clark cvRichard clark cv
Richard clark cv
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Work Portfolio 1
Work Portfolio 1Work Portfolio 1
Work Portfolio 1
 
Joined document 24_5
Joined document 24_5Joined document 24_5
Joined document 24_5
 
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue PrintingCementa Ab Applied Process Management Group Iv Report Process Blue Printing
Cementa Ab Applied Process Management Group Iv Report Process Blue Printing
 
V.Kaliselvam.ppt
V.Kaliselvam.pptV.Kaliselvam.ppt
V.Kaliselvam.ppt
 
Lean Improvement Case Study 3
Lean Improvement Case Study 3Lean Improvement Case Study 3
Lean Improvement Case Study 3
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.ppt
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
MY CV
MY CVMY CV
MY CV
 
Bharathi.ppt
Bharathi.pptBharathi.ppt
Bharathi.ppt
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.ppt
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.ppt
 
production_mgmt.ppt
production_mgmt.pptproduction_mgmt.ppt
production_mgmt.ppt
 
production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...
 

projects done- 1

  • 1. Improvement Projects done by Mr.Prabageran Thiagarayah 1. Lead Plant Steering committee in the plant and member to the area steering committee in the Europe region Hydro Germany, Italy, Norway - Hydro 2. Improving Caster productivity through SMED activity – HYDRO 3. Improving Cold Mill productivity through SMED activity – HYDRO 4. Improving Roll Grinder productivity through SMED activity – HYDRO 5. Improving Foil Mill ( Rolling Mills) productivity through SMED activity – HYDRO 6. Improving Foil Slitter productivity through SMED activity – HYDRO 7. Establish plant wide 5S initiative – Hydro 8. Designing and Implementation of 5S rotation board which consist of 9. 5S periodic audit check 10. Red card and Yellow card implementation 11. 5 minute 5S Activity – Hyrdo 12. Restructuring operation meeting structure for better communication among the management team and operation - Hydro 13. Established Standard Information / production board across the plant – Hydro 14. Structured and implemented Small Improvement Activity (SIA) for improving quick will opportunity – Hydro 15. Structured and implemented Continuous Improvement Project ( CIP) – Hydro 16. Structured and implemented the methodology of Project Management and Monitoring System – Hydro. 17. Cost saving initiative of Scrap Reduction activity – Hydro. 18. Yearly plant wide Policy Deployment Activities – Structuring the KPI’s – Hydro 19. Establish a suggestion program (idea collection, evaluation, implementation, reward) - Hydro 20. Implementation of Value Stream Management – Foil Focus only – Hydro 21. Implementation of OPMS ( Operational Management System) - 24h meetings based on 22. OEE (overall equipment efficiency) - Hydro 23. Introduce and define the methodology and implemented the HAM Gemba Walk – Hydro 24. Improving and sustaining the consistency of Range To Fault (RTF) equipments – Flextronics 25. Identify and implement cost saving initiative for DC 34 hand vacuum cleaner – Dyson
  • 2. Improvement Projects done by Mr.Prabageran Thiagarayah 26. Identify and implement cost saving initiative for Air Multiplier Product – Dyson 27. Qualifying process and production line of Dyson’s OEM’s - ATA, Mayban,SKP plastic 28. Improving and sustaining the consistency of Range To Fault (RTF) equipments of Xerox– Fletronics 29. Minimizing waste and maximizing efficiency of resources through Cellular Manufacturing workplace design for Xerox conveyor working line – Flextronics 30. Line balancing activities – Flextronics 31. New line set-up for Xerox’s Jupiter project – Hydro 32. Head count reduction activities through process improvement – Flextronics 33. Establish the repair and troubleshooting traceability record for Xerox Jupiter testers- Flextronics 34. Warp reduction initiative for Yield Improvement - Maruwa 35. Visual gating gadget – consistency improvement – process capability consistency- Maruwa 36. Improving the visual process efficiency- Maruwa 37. Sand blasting process capability improvement – surface finish- Maruwa 38. Productivity optimization at heat furnace- Maruwa 39. Yield improvement through scrap reduction- Maruwa 40. Slitting tool and pressing process improvement - Maruwa 41. Alumina ball and substrate raw material mixing standardization. - Maruwa 42. Heat curve matrix for tabulating exact furnace usage- Maruwa 43. Ferrite process improvement by implementing weight block jig and fixture- Maruwa