INDEX OBJECT OF THIS HOUSING SCHEME
 Excavation
 Dewatering
 Foundation
 Column
 Plinth beam
 Beam design
 shuttering
 Slab
 Stair case
 Masonry work
 Plaster
 Door & window frame
 Electric & sanitary layouts
 Septic tank
 Tile flooring
 Color washing
 Materials
 machinery
OBJECT:-
CONTENTS OF BUILDING
:
2BHK FLATES
 One hall
 One kitchen
 One bathroom
 Two w.c.
 One balcony
 Two bedroom
3 BHK FLATS
 One hall
 One kitchen
 One bathroom
 Two w.c.
 One balcony
 Three bedroom
PLAN OF BUILDING:
ELEVATION OF THE BUILDING:
ELEVATION & SECTIONAL VIEW :
EXCAVATION:-
EXACAVATION
DRAWING OF EXCAVATION WORK
DEWATERING
DEWATERING PROCESS
FOUNDATION
• Isolated Footing
• Combined Footing
• Well Footing
• Pile footing
• Pier footing
• Raft footing
RAFT FOUNDATION
 WHAT IS RAFT FOTING
 WHERE IT IS USED
DESIGN OF RAFT FOOTING
COLUMN
DESIGN
COLUMN :
WHAT IS COLUMN
ARRANEMENT OF BARS FOR THE
COLUMN
ARRANGEMENT OF BARS FOR COLUMN
SHUTTERING FOR COLUMN
CONCRETING IN COLUMN WITH
NEEDLE VIBRATOR
CURING OF COLUMN WITH JUTE
METS
STARTER
BEAM DESIGN
BEAM :
Beam is a flexural member .
Flexural means which support the
bending moment and shear force
due to the over coming load .
It transfers the overcoming load to
the column .
FORM WORK FOR BEAM :
ARRANGEMENT OF BARS FOR BEAM
BEAM AFTER CONCRETING:
SHUTTERING
TYPES OF SHUTTERING
Two types of shuttering are used in
construction .Mainly used are
following :
1) Wooden shuttering
2) Metal shuttering
Metal shuttering is more safer than
wooden shuttering .
METAL SHUTTERING
WOODEN SHUTTERING
SLAB DESIGN
FORM WORK FOR SLAB :
SLAB
 It is the top most member placed above the column.
 After making the walls, slab is placed over it so that
it become a complete bounded area called as room.
 It helps to protect the building from seasonal
effects .
 Types of slab :
(1) One way slab
(2) Two way slab
(3) Flat slab
(4) Circular slab
REINFORCED FOR SLAB
CONSILE FITTING BEFORE
CONCRETING
PRECAST
SLAB
PRECAST SLAB :
DESIGN OF
STAIR CASE :
TYPES OF STAIRS :
1. Straight stairs
2. Turning stairs :
(a) Quarter turn stairs
(b) Half turn stairs
(Dog legged or open well stairs)
(c) Three quarter turn stairs
(d) Bifurcated stairs
LAYOUT PLAN OF STAIR CASE
FORMWORK FOR STAIRCASE:-
MASONRY
WORK
MASONRY WORK :
 Masonry may be of :-
1. brick masonry
2. stone masonry
BRICK MASONRY
 In this scheme Fly ash bricks are used for brick
masonry work because govt. provide subsidary on it
& it is economical for construction .
 English bond is used for wall thickness .this bond
is consider to be stronger.
 English bond consists of alternate courses of
headers & stretchers .
BRICK MASONRY WORK :
PLASTER
WORK
TYPES OF PLASTER WORK :
1. Lime mortar
2. Cement mortar
3. Lime Cement mortar
CEMENT MORTAR :
 Cement mortar is best mortar for external
plaster work as it is non - absorbant .
 It is also preffered for bathrooms and at the
place of damp climates.
 Generally mix proportion (cement : sand) of 1:4
used as per theoritical aspect but practicallly at
site we use plaster mix of 1:6 .
 When water is mixed , mortar should be used
within 30 minutes .
 M-20 grade of cement is used at site.
OBJECT OF PLASTER :
PLASTER WORK :
GROOVES :
Groove introduced in plaster work .
It absorb cracks .
It is necessary to provide grooves in
big buildings so that cracks will not
cause any serious damage in
building .
GROOVES :
DOOR-WINDOW
FRAMES
&
RAILING FITINGS
DOORS :
Steel or Iron door frames are used at our site
.
Battened and ledged doors are used at site .
It is the simplest form of the door &
specially suitable for narrow openings.
It provides good circulation for human and
air .
It provide security and privacy .
WINDOWS :
 It consists of :-
(1) window frame
(2) Sashes or shutter frame
 Function of window is to admit light and air to the
room and to give a view to outside .
 It also provide insulation against heat loss and in
some cases against sound .
 Size ,shape , location and number of windows in a
room depends on utility and location of the room.
DESIGN OF DOOR AND WINDOW
ELECTRIC &
SANITARY
LAYOUTS
ELECTRIC LAYOUT
SANITARY LAYOUT
TILE
FLOORING /
TILING
TILE WORK:-
DIFFERENT TILES :
WALL TILE : FLOOR TILE :
CURING OF TILES & MIXTURE FOR
TILING
COLOR
WASHING:
PAINTING:
DRAINAGE
SYSTEM :
DRAINAGE SYSTEM:
 It is an important part in a building design to
introduce a proper drainage system for building
.
 Survey is necessary for proper drainage pipe
alignment .
 It is required to maintain a gap after every10
pipes .
 the length of gap provided after every 10 pipes is
equal to the length of one pipe.
 Proper drainage keeps good sanitary
environment .
ALIGNMENT OF PIPES FOR
DRAINAGE :
MATERIALS USED IN
CONSTRUCTION
CEMENT
SAND
FLY ASH BRICKS
FLY ASH :
FLY ASH is finely divided residue
resulting from the combustion of
powdered coal and transported by the
flue gases and collected by electrostatic
precipitator.
Fly ash is the most widely used
pozzolanic material in all over world.
ADVANTAGES OF FLY ASH BRICKS :
Fly ash bricks are quite cheap .
Easily available from thermal power
plant .
Manufacturing cost is less than the
other bricks .
It requires more curing to gain
strength .
AGGREGATES & STONES
AGGREGATE :
 Aggregates are mainly of following types according
to shape:
(1) Rounded
(2) Angular
(3) Square
 According to size :
(1) Fine aggregate
(2) coarse aggregate
 Angular shaped aggregates are used because it
provide good bonding with cement and sand.
 FINE AGGREGATE :
the aggregate which passes through the 4.75
mm sieve is called fine aggregate .
 COARSE AGGREGATE :
The aggregate which retained in 4.75 mm
sieve is called coarse aggregate .
MORTAR MIXTURE
MACHINERY USED IN
CONSTRUCTION
STEEL PIPE CUTTER :
CONCRETE MIXER:-
NEEDLE VIBRATER :
TILE CUTTER :
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION
PROJECT ON Construction of a multistory building POWER POINT PRESENTATION

Weitere ähnliche Inhalte

Was ist angesagt?

TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)vishal prakash
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteRAVI KUMAR
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report Poojan Patel
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanAnis Rahman Khokan
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential ConstructionMayank Walecha
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.JAPJEETSINGH13
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training reportAnshul Shakya
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential buildingsuraj jha
 
PPT on industrial summer training in civil engineer
PPT  on industrial summer training in civil engineer PPT  on industrial summer training in civil engineer
PPT on industrial summer training in civil engineer ramit raj
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile FoundationSubham Kundu
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION Ved Jangid
 

Was ist angesagt? (20)

TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Summer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction SiteSummer Internship Report of Civil Engineering in Construction Site
Summer Internship Report of Civil Engineering in Construction Site
 
final year civil engineering training report
final year civil engineering training report final year civil engineering training report
final year civil engineering training report
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
ppt on training civil report on shuttering
ppt on training civil report on shutteringppt on training civil report on shuttering
ppt on training civil report on shuttering
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Casting yard
Casting yardCasting yard
Casting yard
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Summer training report
Summer training reportSummer training report
Summer training report
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
Industrial training report of construction of the residential building
Industrial training report of construction of the residential buildingIndustrial training report of construction of the residential building
Industrial training report of construction of the residential building
 
PPT on industrial summer training in civil engineer
PPT  on industrial summer training in civil engineer PPT  on industrial summer training in civil engineer
PPT on industrial summer training in civil engineer
 
Concrete Batching Plant
Concrete Batching Plant Concrete Batching Plant
Concrete Batching Plant
 
Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
PRESENTATION ON SUMMER INTERNSHIP ON MULTISTOREY BUILDING CONSTRUCTION
 

Ähnlich wie PROJECT ON Construction of a multistory building POWER POINT PRESENTATION

Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frameBurkaDinka
 
Advance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAdvance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAr. Manisha Khandelwal
 
2 brick,brick masonary and manufacturing of bricks - copy
2 brick,brick masonary and manufacturing of bricks - copy2 brick,brick masonary and manufacturing of bricks - copy
2 brick,brick masonary and manufacturing of bricks - copymuhammadumairallahdi
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - editmuhammadumairallahdi
 
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN) CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN) Hamza Waheed
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesSayedaAmrin
 
Bricks Monsonary
Bricks MonsonaryBricks Monsonary
Bricks Monsonarystooty s
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameAbdul Rahman
 
sustainable materials with building construction details
sustainable materials with building construction detailssustainable materials with building construction details
sustainable materials with building construction detailskhizharp
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)mty917
 

Ähnlich wie PROJECT ON Construction of a multistory building POWER POINT PRESENTATION (20)

Upload a presentation to download Space frame
Upload a presentation to download Space frameUpload a presentation to download Space frame
Upload a presentation to download Space frame
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
 
road drainage
road drainageroad drainage
road drainage
 
Concrete
ConcreteConcrete
Concrete
 
Unit 1
Unit 1Unit 1
Unit 1
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Advance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAdvance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishes
 
2 brick,brick masonary and manufacturing of bricks - copy
2 brick,brick masonary and manufacturing of bricks - copy2 brick,brick masonary and manufacturing of bricks - copy
2 brick,brick masonary and manufacturing of bricks - copy
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - edit
 
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN) CONSTRUCTION PROCESSES  in CIVIL ENGINEERING (HISTORICAL AND MODERN)
CONSTRUCTION PROCESSES in CIVIL ENGINEERING (HISTORICAL AND MODERN)
 
Precast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examplesPrecast Concrete Structure: Architectural examples
Precast Concrete Structure: Architectural examples
 
Bricks Monsonary
Bricks MonsonaryBricks Monsonary
Bricks Monsonary
 
Vgvgvgvgv
VgvgvgvgvVgvgvgvgv
Vgvgvgvgv
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Composite construction or Composite Structure/Frame
Composite construction or Composite Structure/FrameComposite construction or Composite Structure/Frame
Composite construction or Composite Structure/Frame
 
Concrete
Concrete Concrete
Concrete
 
sustainable materials with building construction details
sustainable materials with building construction detailssustainable materials with building construction details
sustainable materials with building construction details
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)
 
Bricks
BricksBricks
Bricks
 

Kürzlich hochgeladen

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 

Kürzlich hochgeladen (20)

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 

PROJECT ON Construction of a multistory building POWER POINT PRESENTATION