PROBLEMS IN BORED PILE  CONSTRUCTION  ,[object Object],[object Object],[object Object]
SCOPE 1. EXCAVATION OF PILE BORE 2. DESIGN AND LOWERING OF PILE REINFORCEMENT 3. CONCRETING THE PILE
TABLE OF CONTENTS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
2.DESIGN AND LOWERING OF PILE  REINFORCEMENT 2.1 DESIGN OF PILE REINFORCEMENT   2.2 LOWERING OF PILE REINFORCEMENT
3. CONCRETING THE PILE BORE 3.1 QUALITY OF CONCRETE 3.2 PLACING OF CONCRETE 3.3 EXTRACTING TEMPORAEY CASING 3.4 PROBLEMS IN SOFT GROUND
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
WET DRILLING  BY REVERSE ROTARY
[object Object],[object Object],[object Object],[object Object],[object Object]
OVER BREAK
  1.4 BASE OF BOREHOLE ,[object Object],[object Object],[object Object],[object Object],[object Object]
1.5 EFFECT OF W/T In dry drilling of borehole ingress of small quantity of water from sides of the borehole reduces the Skin Friction and from the bottom of borehole reduces the End Bearing. In this condition concreting should be carried out with Tremmie Pipe otherwise segregation of concrete may occur as shown in Fig. SEGREGATION OF CONCRETE
2. DESIGN & LOWERING OF PILE  REINFORCEMENT  ,[object Object],[object Object],[object Object],[object Object],[object Object]
SPACING DRAGS DOWNWARD
2.2 LOWERING OF PILE REINFORCEMENT ,[object Object],[object Object]
LAP OF CAGE
3. CONCRETING THE PILE Concreting of cost-in-situ piles is a special operation and it requires considerable skill and correct concrete mix design. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SLUMP TEST
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
OVERFLOW OF CONCRETE
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONDUCTOR PIPE
3.4 PROBLEMS IN SOFT GROUND In soft ground having undrained shear strength less than 15kn/m 2  causing the squeezing of the pile section near the head because lateral pressure of soil is more than the lateral pressure of concrete as shown in Fig.  SQUEEZING OF THE PILE SECTION
CONCLUSIONS Full time supervision of pile construction should be carried out by an experienced Engineer which gives us the designed pile capacity
THANKS THANKS THANKS
ANY QUESTION?

Weitere ähnliche Inhalte

Was ist angesagt?

Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile FoundationSubham Kundu
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920INTEZAAR ALAM
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concreteAyaz khan
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)KHK karimi
 
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored PilesAhmed Zanaty
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignUmer Farooq
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Dr.Youssef Hammida
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundationSourabh Jain
 
Cube test for compressive strength of concrete
Cube test for compressive strength of concreteCube test for compressive strength of concrete
Cube test for compressive strength of concreteAyaz khan
 
Study of Prefabricated Vertical Drains
Study of Prefabricated Vertical DrainsStudy of Prefabricated Vertical Drains
Study of Prefabricated Vertical DrainsNatarajaSaiCharan1
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining wallsRitesh Chinchawade
 
Non destructive testing in concrete
Non destructive testing in concreteNon destructive testing in concrete
Non destructive testing in concreteHEMANT AVHAD
 

Was ist angesagt? (20)

Report on Pile Foundation
Report on Pile FoundationReport on Pile Foundation
Report on Pile Foundation
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Pull out test for concrete
Pull out test for concretePull out test for concrete
Pull out test for concrete
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Compaction of concrete
Compaction of concreteCompaction of concrete
Compaction of concrete
 
Reinforced column design
Reinforced column design Reinforced column design
Reinforced column design
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)
 
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored Piles
 
Diaphragm wall: Construction and Design
Diaphragm wall: Construction and DesignDiaphragm wall: Construction and Design
Diaphragm wall: Construction and Design
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
Cube test for compressive strength of concrete
Cube test for compressive strength of concreteCube test for compressive strength of concrete
Cube test for compressive strength of concrete
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Diaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By GaganDiaphragm Wall Presentation By Gagan
Diaphragm Wall Presentation By Gagan
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Study of Prefabricated Vertical Drains
Study of Prefabricated Vertical DrainsStudy of Prefabricated Vertical Drains
Study of Prefabricated Vertical Drains
 
Modes of failure of retaining walls
Modes of failure of retaining wallsModes of failure of retaining walls
Modes of failure of retaining walls
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Non destructive testing in concrete
Non destructive testing in concreteNon destructive testing in concrete
Non destructive testing in concrete
 

Ähnlich wie Problem in bored pile

Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concreteErankajKumar
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concreteErankajKumar
 
Abrasion, erotion and cavitation
Abrasion, erotion and cavitationAbrasion, erotion and cavitation
Abrasion, erotion and cavitationChetan1357
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingRishabh Lala
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building constructionKiran Hadiya
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.pptRaju S
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavementsAglaia Connect
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measuressabnisajit
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesZaid Ansari
 

Ähnlich wie Problem in bored pile (20)

Module on Special and high performance concrete
Module on Special and high performance concreteModule on Special and high performance concrete
Module on Special and high performance concrete
 
special concrete and high performance concrete
special concrete and high performance concretespecial concrete and high performance concrete
special concrete and high performance concrete
 
Cementation
CementationCementation
Cementation
 
Unitone 140120111824-phpapp01
Unitone 140120111824-phpapp01Unitone 140120111824-phpapp01
Unitone 140120111824-phpapp01
 
Cip
CipCip
Cip
 
Concrete
ConcreteConcrete
Concrete
 
Abrasion, erotion and cavitation
Abrasion, erotion and cavitationAbrasion, erotion and cavitation
Abrasion, erotion and cavitation
 
Concrete
ConcreteConcrete
Concrete
 
CONCRETE
CONCRETECONCRETE
CONCRETE
 
Concrete- Classification,Properties and Testing
Concrete- Classification,Properties and TestingConcrete- Classification,Properties and Testing
Concrete- Classification,Properties and Testing
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
 
Unit one
Unit oneUnit one
Unit one
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.ppt
 
Crack repair in building construction
Crack repair in building constructionCrack repair in building construction
Crack repair in building construction
 
Workability of Concrete.ppt
Workability of Concrete.pptWorkability of Concrete.ppt
Workability of Concrete.ppt
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Types of failure in rigid pavements
Types of failure in rigid pavementsTypes of failure in rigid pavements
Types of failure in rigid pavements
 
Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
CONCRETE Technology
CONCRETE TechnologyCONCRETE Technology
CONCRETE Technology
 
Distress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniquesDistress of concrete structures & their repair techniques
Distress of concrete structures & their repair techniques
 

Mehr von Rizwan Khurram

Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Rizwan Khurram
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11Rizwan Khurram
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10Rizwan Khurram
 
Information Technology Project Management - part 09
Information Technology Project Management - part 09Information Technology Project Management - part 09
Information Technology Project Management - part 09Rizwan Khurram
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08Rizwan Khurram
 
Information Technology Project Management - part 07
Information Technology Project Management - part 07Information Technology Project Management - part 07
Information Technology Project Management - part 07Rizwan Khurram
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05Rizwan Khurram
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04Rizwan Khurram
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02Rizwan Khurram
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01Rizwan Khurram
 
Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management Rizwan Khurram
 
Total employee involvement
Total employee involvementTotal employee involvement
Total employee involvementRizwan Khurram
 

Mehr von Rizwan Khurram (20)

Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.Exploring the risk factors associated with peb projects in lahore.
Exploring the risk factors associated with peb projects in lahore.
 
Information Technology Project Management - part 11
Information Technology Project Management - part 11Information Technology Project Management - part 11
Information Technology Project Management - part 11
 
Information Technology Project Management - part 10
Information Technology Project Management - part 10Information Technology Project Management - part 10
Information Technology Project Management - part 10
 
Information Technology Project Management - part 09
Information Technology Project Management - part 09Information Technology Project Management - part 09
Information Technology Project Management - part 09
 
Information Technology Project Management - part 08
Information Technology Project Management - part  08Information Technology Project Management - part  08
Information Technology Project Management - part 08
 
Information Technology Project Management - part 07
Information Technology Project Management - part 07Information Technology Project Management - part 07
Information Technology Project Management - part 07
 
Information Technology Project Management - part 05
Information Technology Project Management - part 05Information Technology Project Management - part 05
Information Technology Project Management - part 05
 
Information Technology Project Management - part 04
Information Technology Project Management - part 04Information Technology Project Management - part 04
Information Technology Project Management - part 04
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
Information Technology Project Management - part 01
Information Technology Project Management - part 01Information Technology Project Management - part 01
Information Technology Project Management - part 01
 
Information Technology Project Management - part 12
Information Technology Project Management - part 12Information Technology Project Management - part 12
Information Technology Project Management - part 12
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Strategic Delivery of Change Management
Strategic Delivery of Change Management Strategic Delivery of Change Management
Strategic Delivery of Change Management
 
Vision and mission
Vision and missionVision and mission
Vision and mission
 
Total employee involvement
Total employee involvementTotal employee involvement
Total employee involvement
 

Problem in bored pile

  • 1.
  • 2. SCOPE 1. EXCAVATION OF PILE BORE 2. DESIGN AND LOWERING OF PILE REINFORCEMENT 3. CONCRETING THE PILE
  • 3.
  • 4. 2.DESIGN AND LOWERING OF PILE REINFORCEMENT 2.1 DESIGN OF PILE REINFORCEMENT 2.2 LOWERING OF PILE REINFORCEMENT
  • 5. 3. CONCRETING THE PILE BORE 3.1 QUALITY OF CONCRETE 3.2 PLACING OF CONCRETE 3.3 EXTRACTING TEMPORAEY CASING 3.4 PROBLEMS IN SOFT GROUND
  • 6.
  • 7. WET DRILLING BY REVERSE ROTARY
  • 8.
  • 10.
  • 11. 1.5 EFFECT OF W/T In dry drilling of borehole ingress of small quantity of water from sides of the borehole reduces the Skin Friction and from the bottom of borehole reduces the End Bearing. In this condition concreting should be carried out with Tremmie Pipe otherwise segregation of concrete may occur as shown in Fig. SEGREGATION OF CONCRETE
  • 12.
  • 14.
  • 16.
  • 18.
  • 20.
  • 22. 3.4 PROBLEMS IN SOFT GROUND In soft ground having undrained shear strength less than 15kn/m 2 causing the squeezing of the pile section near the head because lateral pressure of soil is more than the lateral pressure of concrete as shown in Fig. SQUEEZING OF THE PILE SECTION
  • 23. CONCLUSIONS Full time supervision of pile construction should be carried out by an experienced Engineer which gives us the designed pile capacity