SlideShare ist ein Scribd-Unternehmen logo
1 von 18
PROSEDUR PERENCANAAN KAPAL


TAHAPAN PROSES PRA-PERENCANAAN
1. BASIC DESIGN
   * CONCEPT DESIGN
   * PRELIMINARY DESIGN

2.   CONTRACT DESIGN

3. DETAIL DESIGN
BASIC DESIGN
CONCEPT DESIGN
  MENTERJEMAHKAN GENERAL REQUIREMENT
   KEDALAM PARAMETER DASAR PERENCANAAN KAPAL
  PERLUNYA FEASIBILITY STUDY

PRELIMINARY DESIGN
   PEMERIKSAAN DIKAITKAN DENGAN BIAYA

SCOPE OF BASIC DESIGN
  ESTIMASI : DISPLACEMENT, MAIN DIMENSION,
   LINESPLAN, POWER CALCULATION, GENERAL
   ARRANGEMENT, STABILITAS, STRUCTURE, WEIGHT
   CALCULATION, COST
CONTRACT DESIGN
DOKUMEN KONTRAK PEMBANGUNAN
  EVALUASI DISERTAI DENGAN PENGUJIAN
  DETAIL BERAT & TITIK BERAT, GENERAL ARRANGEMENT,
   SPESIFIKASI STANDAR KUALITAS, METODE PENGUJIAN

SCOPE OF CONTRACT DESIGN
  HULL SECTION
    LINES PLAN, STABILITAS, GENERAL ARRANGEMENT, DETAIL KONSTRUKSI
    & KEKUATAN MEMANJANG, CAPACITY PLAN

   MACHINERY SECTION
    HEAT BALANCE, LAY OUT MACHINERY ROOM, MACHINERY SYSTEM PLAN
    DIAGRAM, HULL PIPING SYSTEM, VENTILATION, AC, PROPELLER

   ELECTRICAL SECTION
    POWER & LIGHTING SYSTEM, GENERAL LOAD ANALYSIS, WIRING
    DIAGRAM, DETAIL OF ELECTRICAL SPESIFICATION
DETAIL DESIGN
WORKING / YARD PLAN
  PERINTAH / INSTRUKSI KERJA
  CUTTER, WELDER, OUT FITTER, MACHINERY FENDOR

SCOPE OF DETAIL DESIGN
  FAIRING THE LINES
  PLATING MODEL
  PERCOBAAN MODEL ( PROPELLER, TAHANAN)
  DETAIL WEIGHT CALCULATION
  LAUNCHING CALCULATION
  URUT-URUTAN TEST (SEA TRIAL)
  PETUNJUK OPERASI PERLENGKAPAN KAPAL (SAFETY
   EQUIPMENT)
FLOWCHART MANUAL DESIGN
                   PERFORMANCE
           START                  A   HIDROSTATIC TERPENUHI


      DESIGN CONDITION
                                          FRAME SYSTEM

PRINCIPAL DIEMSION (ESTIMATION)
                                           LINES PLAN

  SPEED POWER PREDICTION

                                       DRAFT MEMENUHI SYARAT
   KECEPATAN TERCAPAI ?

                                      FREEBOARD CALCULATION
  LIGHT WEIGHT ESTIMATION


  DEAD WEIGHT ESTIMATION                  DISPL = LWT + DWT ?
FLOWCHART MANUAL DESIGN
                  PERFORMANCE
                                                       B
                               G/A
            A
                                           PERHITUNGAN TERPENUHI ?


     WATER TIGHT BHD
                                         TRIM, STABILITY & LONG STRENGTH

FLOODABLE LENGTH CALCULATION
                                            LIGHT WEIGHT CALC & DISTRIB
                                     C
  PERHITUNGAN TERPENUHI                  CROSS CURVE OF STABILITY CALC



   CAPACITY PLAN / TANK                       PERHITUNGAN SESUAI



   KAPASITAS TERPENUHI                       TONAGE CALCULATION
FLOWCHART MANUAL DESIGN
              PERFORMANCE


              B


  PERLU PERHIT PELUNCURAN ?


   LAUNCHING CALCULATION


        INCLINING TEST
                                           STOP



MEMPENGARUHI PERHIT SEBELUMNYA   PENYUSUNAN LOADING MANUAL
GENERAL REQUIREMENT
1.   OWNER REQUIREMENT
     # KECEPATAN
     # DWT KAPAL
     # RUTE PELAYARAN, DLL.

2.   CLASS REQUIREMENT
     # SUB DIVISION
     # CONSTRUCTION
     # MATERIAL CONSTRUCTION
     # SURVEY

3.   GOVERNMENT REQUIREMENT
     # TAX
     # WORKING

4.   IMO, ASSURANCE, SYAHBANDAR
     # KESELAMATAN PELAYARAN
     # PENCEGAHAN PENCEMARAN LAUT
DISTRIBUSI GAMBAR KERJA DI PT. PAL

             SHIP PERFORMANCE



                 KEY PLAN                   OWNER


                 YARD PLAN                  CLASS




PRODUCTION DRAWING       ELECTRICAL OUTFITTING


           MACHINERY OUTFITTING        ACCOMODATION DIVISION / QA




   BENGKEL                   BENGKEL                BENGKEL
DISTRIBUSI GAMBAR KERJA DI PT. PAL


1.    SHIP PERFORMANCE

2.    KEYPLAN

3.    YARDPLAN

4.    GAMBAR KERJA ( PD, MO, EO & QA )
SHIP PERFORMANCE

1. LINESPLAN + DATA OFFSET
2. GENERAL ARRANGEMENT
3. INNER CONTOUR
4. TANK CONDITION
5. STABILITAS
6. FREEBOARD CALCULATION
7. LIGHT WEIGHT ESTIMATION
KEY PLAN

1.   MIDSHIP SECTION
2.   STEEL PLAN
3.   TRANSVERSAL BULKHEAD
4.   SHELL EXPANTION
5.   BLOCK DIVISION
6.   MATERIAL ESTIMATION
7.   DOCKING PLAN
8.   X-RAY PLAN / POSITION
YARD PLAN

1.   FORE CONSTRUCTION
2.   CARGO HOLD CONSTRUCTION
     # CARGO HOLD FORE CONSTRUCTION
     # CARGO HOLD MIDDLE CONSTRUCTION
     # CARGO HOLD AFT CONSTRUCTION
3.   E/R CONSTRUCTION
     # DOUBLE BOTTOM IN E/R CONSTRUCTION
     # SIDE SHELL IN E/R CONSTRUCTION
4.   AFT CONSTRUCTION
5.   ACCOMODATION CONSTRUCTION
6.   RUDDER CONSTRUCTION
7.   LIGHT WEIGHT CALCULATION
PRODUCTION DRAWING

1.   WORKING DRAWING
2.   MATERIAL LIST
3.   MARKING LIST
4.   PIECE DRAWING
5.   NESTING PLAN
6.   STEEL LIST
7.   JIG INFORMATION
8.   BENDING TEMPLATE
     # RAMBU BENDING
     # INVERS BENDING
CONTRACT DESIGN


STANDARD CONTRACT :
1.   AWES  : ASSOCIATION OF WEST EUROPEAN
           SHIPBUILDERS
2.   MARAD : MARITIME ADMINSTRATION USA
3.   SAJ   : SHIPOWNERS ASSOCIATION OF
           JAPAN
DESCRIPTION OF AWES

1.    SUBJECT OF CONTRACT
2.    INSPECTION & APPROVAL
3.    MODIFICATIONS
4.    TRIALS
5.    GUARANTEE
6.    DELIVERY
7.    PRICE
8.    PROPERTY
9.    INSURANCE
10.   DEFAULT BY THE CONTRACTOR
11.   GUARANTEE AFTER DELIVERY
12.   CONTRACT EXPENSES
13.   PATENTS
14.   REFERENCE TO EXPERT & ARBITRATION
15.   CONDITION FOR CONTRACT
16.   LEGAL DOMICILE ( OF PURCHASER )
17.   ASSIGMNET
SHIP CONTRACT


JENIS PEMBAYARAN :
1.   10 %   : SIGNING CONTRACT
2.   10 %   : ARRIVAL OF MATERIALS ON SITE
3.   10 %   : KEEL LAYING
4.   20 %   : LAUNCHING
5.   50 %   : DELIVERY
PROSES PERENCANAAN
   (SPIRAL DESIGN)

                              GENERAL
                            REQUIREMENT
                   MAIN                      COST
                DIMENSION                 ESTIMATION




    LINES
                                                       STABILITY
    PLAN




HIDRO                         DETAIL
                                                           CAPACITIES
STATIC                        DESIGN




 FREEBOARD &                                             WEIGHT
 SUB DIVISION                                          ESTIMATION




              GENERAL
                                          POWERING
            ARRAGEMENT
                                CON
                             STRUCTION

Weitere ähnliche Inhalte

Was ist angesagt?

Kapal perikanan dan niaga beserta strukturnya
Kapal perikanan dan niaga beserta strukturnyaKapal perikanan dan niaga beserta strukturnya
Kapal perikanan dan niaga beserta strukturnya
Fazrin Heros
 
Belajar sendiri-sap2000-versi-10
Belajar sendiri-sap2000-versi-10Belajar sendiri-sap2000-versi-10
Belajar sendiri-sap2000-versi-10
Muhammad Umari
 
1 hardjanto pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
1 hardjanto   pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...1 hardjanto   pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
1 hardjanto pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
Didik Purwiyanto Vay
 
Perencanaan pelayaran dan voyage calculation km dharma ferry ii
Perencanaan pelayaran dan voyage calculation km dharma ferry iiPerencanaan pelayaran dan voyage calculation km dharma ferry ii
Perencanaan pelayaran dan voyage calculation km dharma ferry ii
Hoki agustinus
 

Was ist angesagt? (20)

Kelompok-13-Kapal-Penumpang-Dan-Kapal-Pesiar-1.pptx
Kelompok-13-Kapal-Penumpang-Dan-Kapal-Pesiar-1.pptxKelompok-13-Kapal-Penumpang-Dan-Kapal-Pesiar-1.pptx
Kelompok-13-Kapal-Penumpang-Dan-Kapal-Pesiar-1.pptx
 
Kapal perikanan dan niaga beserta strukturnya
Kapal perikanan dan niaga beserta strukturnyaKapal perikanan dan niaga beserta strukturnya
Kapal perikanan dan niaga beserta strukturnya
 
Proses pembuatan kapal
Proses pembuatan kapalProses pembuatan kapal
Proses pembuatan kapal
 
Koefisien bentuk kapal
Koefisien bentuk kapalKoefisien bentuk kapal
Koefisien bentuk kapal
 
Tugas merancang kapal ii rencana umum
Tugas merancang kapal ii   rencana umumTugas merancang kapal ii   rencana umum
Tugas merancang kapal ii rencana umum
 
Alas ganda (double bottom)
Alas ganda (double bottom)Alas ganda (double bottom)
Alas ganda (double bottom)
 
7. fender dan alat penambat
7. fender dan alat penambat7. fender dan alat penambat
7. fender dan alat penambat
 
Perhitungan Beban Kapal
Perhitungan Beban KapalPerhitungan Beban Kapal
Perhitungan Beban Kapal
 
Peraturan pencegahan tubrukan di laut atau p2 tl
Peraturan pencegahan tubrukan di laut atau p2 tlPeraturan pencegahan tubrukan di laut atau p2 tl
Peraturan pencegahan tubrukan di laut atau p2 tl
 
Perhitungan daun kemudi
Perhitungan daun kemudiPerhitungan daun kemudi
Perhitungan daun kemudi
 
Belajar sendiri-sap2000-versi-10
Belajar sendiri-sap2000-versi-10Belajar sendiri-sap2000-versi-10
Belajar sendiri-sap2000-versi-10
 
Sistem Navigasi hiperbola
Sistem Navigasi hiperbolaSistem Navigasi hiperbola
Sistem Navigasi hiperbola
 
1 hardjanto pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
1 hardjanto   pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...1 hardjanto   pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
1 hardjanto pengaruh kelebihan dan pergeseran muatan di atas kapal terhadap...
 
Contoh Presentasi Tugas Akhir
Contoh Presentasi Tugas AkhirContoh Presentasi Tugas Akhir
Contoh Presentasi Tugas Akhir
 
Modul 3
Modul 3Modul 3
Modul 3
 
Perencanaan pelayaran dan voyage calculation km dharma ferry ii
Perencanaan pelayaran dan voyage calculation km dharma ferry iiPerencanaan pelayaran dan voyage calculation km dharma ferry ii
Perencanaan pelayaran dan voyage calculation km dharma ferry ii
 
laporan Tugas Rencana Garis
laporan Tugas Rencana Garislaporan Tugas Rencana Garis
laporan Tugas Rencana Garis
 
Sni 2827 2008 cara uji penetrasi lapangan dengan alat sondir
Sni 2827 2008 cara uji penetrasi lapangan dengan alat sondirSni 2827 2008 cara uji penetrasi lapangan dengan alat sondir
Sni 2827 2008 cara uji penetrasi lapangan dengan alat sondir
 
Sistem keamanan dan keselamatan kapal
Sistem keamanan dan keselamatan kapalSistem keamanan dan keselamatan kapal
Sistem keamanan dan keselamatan kapal
 
Alat Tangkap Trawl.pptx
Alat Tangkap Trawl.pptxAlat Tangkap Trawl.pptx
Alat Tangkap Trawl.pptx
 

Ähnlich wie 01 prosedur perencanaan kapal

0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
OFFSHORE VN
 
Guidelines for marine lifting operations
Guidelines for marine lifting operationsGuidelines for marine lifting operations
Guidelines for marine lifting operations
zombie399
 
Guidelines for marine lifting operation noble denton
Guidelines for marine lifting operation noble dentonGuidelines for marine lifting operation noble denton
Guidelines for marine lifting operation noble denton
OFFSHORE VN
 
Weyburn-Midale and Aquistore, Canada
Weyburn-Midale and Aquistore, CanadaWeyburn-Midale and Aquistore, Canada
Weyburn-Midale and Aquistore, Canada
Global CCS Institute
 

Ähnlich wie 01 prosedur perencanaan kapal (20)

0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
0030 ndi rev 3 - 15 april 2009 guidelines for marine transportations
 
Norma cmaa 70
Norma cmaa 70Norma cmaa 70
Norma cmaa 70
 
Control techniques
Control techniquesControl techniques
Control techniques
 
Index adp 2
Index adp 2Index adp 2
Index adp 2
 
Guidelines for marine lifting operations
Guidelines for marine lifting operationsGuidelines for marine lifting operations
Guidelines for marine lifting operations
 
Guidelines for marine lifting operation noble denton
Guidelines for marine lifting operation noble dentonGuidelines for marine lifting operation noble denton
Guidelines for marine lifting operation noble denton
 
The life of an oil and gas field
The life of an oil and gas fieldThe life of an oil and gas field
The life of an oil and gas field
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
Time Matters Webinar Slides
Time Matters Webinar SlidesTime Matters Webinar Slides
Time Matters Webinar Slides
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
Weyburn-Midale and Aquistore, Canada
Weyburn-Midale and Aquistore, CanadaWeyburn-Midale and Aquistore, Canada
Weyburn-Midale and Aquistore, Canada
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...
 
Belyaev
BelyaevBelyaev
Belyaev
 
Bapl Presentation
Bapl PresentationBapl Presentation
Bapl Presentation
 
MULTI-POINT DESIGN OF A SUPERSONIC WING USING MODIFIED PARSEC AIRFOIL REPRESE...
MULTI-POINT DESIGN OF A SUPERSONIC WING USING MODIFIED PARSEC AIRFOIL REPRESE...MULTI-POINT DESIGN OF A SUPERSONIC WING USING MODIFIED PARSEC AIRFOIL REPRESE...
MULTI-POINT DESIGN OF A SUPERSONIC WING USING MODIFIED PARSEC AIRFOIL REPRESE...
 
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
Taking the Bull by the Horns with Reliability Centered Maintenance - Trino Pe...
 
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-144fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
 
Global Solar Summit
Global Solar SummitGlobal Solar Summit
Global Solar Summit
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Dfma
DfmaDfma
Dfma
 

Kürzlich hochgeladen

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
Only Cash On Delivery Call Girls In Sikandarpur Gurgaon ❤️8448577510 ⊹Escorts...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 

01 prosedur perencanaan kapal

  • 1. PROSEDUR PERENCANAAN KAPAL TAHAPAN PROSES PRA-PERENCANAAN 1. BASIC DESIGN * CONCEPT DESIGN * PRELIMINARY DESIGN 2. CONTRACT DESIGN 3. DETAIL DESIGN
  • 2. BASIC DESIGN CONCEPT DESIGN  MENTERJEMAHKAN GENERAL REQUIREMENT KEDALAM PARAMETER DASAR PERENCANAAN KAPAL  PERLUNYA FEASIBILITY STUDY PRELIMINARY DESIGN  PEMERIKSAAN DIKAITKAN DENGAN BIAYA SCOPE OF BASIC DESIGN  ESTIMASI : DISPLACEMENT, MAIN DIMENSION, LINESPLAN, POWER CALCULATION, GENERAL ARRANGEMENT, STABILITAS, STRUCTURE, WEIGHT CALCULATION, COST
  • 3. CONTRACT DESIGN DOKUMEN KONTRAK PEMBANGUNAN  EVALUASI DISERTAI DENGAN PENGUJIAN  DETAIL BERAT & TITIK BERAT, GENERAL ARRANGEMENT, SPESIFIKASI STANDAR KUALITAS, METODE PENGUJIAN SCOPE OF CONTRACT DESIGN  HULL SECTION LINES PLAN, STABILITAS, GENERAL ARRANGEMENT, DETAIL KONSTRUKSI & KEKUATAN MEMANJANG, CAPACITY PLAN  MACHINERY SECTION HEAT BALANCE, LAY OUT MACHINERY ROOM, MACHINERY SYSTEM PLAN DIAGRAM, HULL PIPING SYSTEM, VENTILATION, AC, PROPELLER  ELECTRICAL SECTION POWER & LIGHTING SYSTEM, GENERAL LOAD ANALYSIS, WIRING DIAGRAM, DETAIL OF ELECTRICAL SPESIFICATION
  • 4. DETAIL DESIGN WORKING / YARD PLAN  PERINTAH / INSTRUKSI KERJA  CUTTER, WELDER, OUT FITTER, MACHINERY FENDOR SCOPE OF DETAIL DESIGN  FAIRING THE LINES  PLATING MODEL  PERCOBAAN MODEL ( PROPELLER, TAHANAN)  DETAIL WEIGHT CALCULATION  LAUNCHING CALCULATION  URUT-URUTAN TEST (SEA TRIAL)  PETUNJUK OPERASI PERLENGKAPAN KAPAL (SAFETY EQUIPMENT)
  • 5. FLOWCHART MANUAL DESIGN PERFORMANCE START A HIDROSTATIC TERPENUHI DESIGN CONDITION FRAME SYSTEM PRINCIPAL DIEMSION (ESTIMATION) LINES PLAN SPEED POWER PREDICTION DRAFT MEMENUHI SYARAT KECEPATAN TERCAPAI ? FREEBOARD CALCULATION LIGHT WEIGHT ESTIMATION DEAD WEIGHT ESTIMATION DISPL = LWT + DWT ?
  • 6. FLOWCHART MANUAL DESIGN PERFORMANCE B G/A A PERHITUNGAN TERPENUHI ? WATER TIGHT BHD TRIM, STABILITY & LONG STRENGTH FLOODABLE LENGTH CALCULATION LIGHT WEIGHT CALC & DISTRIB C PERHITUNGAN TERPENUHI CROSS CURVE OF STABILITY CALC CAPACITY PLAN / TANK PERHITUNGAN SESUAI KAPASITAS TERPENUHI TONAGE CALCULATION
  • 7. FLOWCHART MANUAL DESIGN PERFORMANCE B PERLU PERHIT PELUNCURAN ? LAUNCHING CALCULATION INCLINING TEST STOP MEMPENGARUHI PERHIT SEBELUMNYA PENYUSUNAN LOADING MANUAL
  • 8. GENERAL REQUIREMENT 1. OWNER REQUIREMENT # KECEPATAN # DWT KAPAL # RUTE PELAYARAN, DLL. 2. CLASS REQUIREMENT # SUB DIVISION # CONSTRUCTION # MATERIAL CONSTRUCTION # SURVEY 3. GOVERNMENT REQUIREMENT # TAX # WORKING 4. IMO, ASSURANCE, SYAHBANDAR # KESELAMATAN PELAYARAN # PENCEGAHAN PENCEMARAN LAUT
  • 9. DISTRIBUSI GAMBAR KERJA DI PT. PAL SHIP PERFORMANCE KEY PLAN OWNER YARD PLAN CLASS PRODUCTION DRAWING ELECTRICAL OUTFITTING MACHINERY OUTFITTING ACCOMODATION DIVISION / QA BENGKEL BENGKEL BENGKEL
  • 10. DISTRIBUSI GAMBAR KERJA DI PT. PAL 1. SHIP PERFORMANCE 2. KEYPLAN 3. YARDPLAN 4. GAMBAR KERJA ( PD, MO, EO & QA )
  • 11. SHIP PERFORMANCE 1. LINESPLAN + DATA OFFSET 2. GENERAL ARRANGEMENT 3. INNER CONTOUR 4. TANK CONDITION 5. STABILITAS 6. FREEBOARD CALCULATION 7. LIGHT WEIGHT ESTIMATION
  • 12. KEY PLAN 1. MIDSHIP SECTION 2. STEEL PLAN 3. TRANSVERSAL BULKHEAD 4. SHELL EXPANTION 5. BLOCK DIVISION 6. MATERIAL ESTIMATION 7. DOCKING PLAN 8. X-RAY PLAN / POSITION
  • 13. YARD PLAN 1. FORE CONSTRUCTION 2. CARGO HOLD CONSTRUCTION # CARGO HOLD FORE CONSTRUCTION # CARGO HOLD MIDDLE CONSTRUCTION # CARGO HOLD AFT CONSTRUCTION 3. E/R CONSTRUCTION # DOUBLE BOTTOM IN E/R CONSTRUCTION # SIDE SHELL IN E/R CONSTRUCTION 4. AFT CONSTRUCTION 5. ACCOMODATION CONSTRUCTION 6. RUDDER CONSTRUCTION 7. LIGHT WEIGHT CALCULATION
  • 14. PRODUCTION DRAWING 1. WORKING DRAWING 2. MATERIAL LIST 3. MARKING LIST 4. PIECE DRAWING 5. NESTING PLAN 6. STEEL LIST 7. JIG INFORMATION 8. BENDING TEMPLATE # RAMBU BENDING # INVERS BENDING
  • 15. CONTRACT DESIGN STANDARD CONTRACT : 1. AWES : ASSOCIATION OF WEST EUROPEAN SHIPBUILDERS 2. MARAD : MARITIME ADMINSTRATION USA 3. SAJ : SHIPOWNERS ASSOCIATION OF JAPAN
  • 16. DESCRIPTION OF AWES 1. SUBJECT OF CONTRACT 2. INSPECTION & APPROVAL 3. MODIFICATIONS 4. TRIALS 5. GUARANTEE 6. DELIVERY 7. PRICE 8. PROPERTY 9. INSURANCE 10. DEFAULT BY THE CONTRACTOR 11. GUARANTEE AFTER DELIVERY 12. CONTRACT EXPENSES 13. PATENTS 14. REFERENCE TO EXPERT & ARBITRATION 15. CONDITION FOR CONTRACT 16. LEGAL DOMICILE ( OF PURCHASER ) 17. ASSIGMNET
  • 17. SHIP CONTRACT JENIS PEMBAYARAN : 1. 10 % : SIGNING CONTRACT 2. 10 % : ARRIVAL OF MATERIALS ON SITE 3. 10 % : KEEL LAYING 4. 20 % : LAUNCHING 5. 50 % : DELIVERY
  • 18. PROSES PERENCANAAN (SPIRAL DESIGN) GENERAL REQUIREMENT MAIN COST DIMENSION ESTIMATION LINES STABILITY PLAN HIDRO DETAIL CAPACITIES STATIC DESIGN FREEBOARD & WEIGHT SUB DIVISION ESTIMATION GENERAL POWERING ARRAGEMENT CON STRUCTION