6. DRAFT Plan 4 Bathymetry 1.0 0.5 0.0 -0.5 -1.0 Base Bathymetry Difference Difference, m Increased elevation Decreased elevation 0 -2 10 Initial Final Final-Initial=-12 (negative: land built) 10.0 5.0 0.0 -2.0 Depth, m Land Water
13. Plaquemines Parish Protection & Restoration Program Reach B-2 Reach B-2 (Forested Ridge) Approximately : 8 Miles in Length 500 Feet Wide 10 Feet High 8.5 Million Cubic Yards of Fill Cost: $ 50 Million