SlideShare ist ein Scribd-Unternehmen logo
1 von 34
“ Working managers, not managed workers,” is the way of the future PARTS MANAGER  JOB GUIDE & BASIC PROCEDURE FLOW
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
select the parts to order– tag line 1 Click & hold mouse drag Click on part and hold mouse -drag-and-drop to On Order
Select the correct Vendor 1 2 Enter expected delivery date ,[object Object],[object Object],3
[object Object],1
PARTS DELIVERED IMPORTANT: Check parts in while Driver is present. 1) Match parts to invoice description – verify part numbers 2) Inspect parts – check for damage/defects/wrong part 3) Sign invoice and keep a copy 4) “Clear” delivery driver to leave 5) Take all parts out and mirror match parts to old parts on disassembly cart . Compare new parts to damaged parts. Verify colors textures, etc. are correct Have the Tech inspect parts with you if needed do not guess  parts is right. Caution: Before throwing away parts boxes or packaging make sure the part(s) is/are installed on vehicle. Pay close attention to sheet metal parts & electrical parts DAMAGED OR WRONG USED PART § If a single part is billed from Vendor & is damaged or wrong you can refuse it at the door. Write  “REFUSED” on the invoice and keep a copy to send  A/P § If there are multiple parts and one is incorrect; accept all parts, identify wrong part (s) on Vendor copy of invoice & our copy, process for a Credit Return.
DAMAGED PARTS PROCEDURE § Parts received from Vendor are damaged § 1 Check with Body Tech/Estimator to determine if part is worth repairing. § 2 If repairable have Tech/Estimator determine time for repair § 3 Contact/Call Vendor and inform § 4 Obtain an approval and a Credit invoice from Vendor § 5  See Posting A Labor Credit NOTE: If the Vendor refuses to allow time to repair part. return the part(s) boxed in re-usable/re-sellable condition POSTING A LABOR CREDIT INVOICE § 1 Select part type (i.e. if credit is from a LKQ Vender select LKQ… etc.) § 2 Part must be received first, right click on part slide down to labor credit § 3 Enter the amount of credit and authorization  code  § 4 Summit will add labor credit in part line and enter as a labor line in the body of the estimate  § 5 Enter description  NOTE - (i.e. Labor Credit for fender damage) Vendor sends the credit for the damaged part (s) Follow , process for a Credit Return Note: Credit Invoice part type and part type in lines must agree.
Part must be received first, right click on part slide down to labor credit 1
Enter the amount of credit and authorization  code  2 1
Summit will add labor credit in part line  & enter  a labor line in the body of the estimate  Note
Enter description  NOTE - (i.e. Labor Credit for fender damage) 1 2
Summit will add labor credit in part line &  enter  a labor line in the body of the estimate  NOTE
PARTS ORDERED ARE NOT NEEDED § Parts received are not needed. § 1 Tag Box  parts in Summit and drag to  CREDIT RETURN § 2 Click return only  (see steps below) § 3 List reason for return and call Vendor for pick up Note:  § Return part(s) in re-usable/re-sellable condition § Return parts in original boxes, packages with tags WRONG (INCORRECT) PARTS PROCEDURE RETURN & REORDER 1) Parts received are incorrect, but are needed. 2) Tag Box  parts in Summit and drag to  CREDIT RETURN 3) Click -RETURN & REORDER 4) Enter Reason Code by Vendor 5) Summit will return line and send to bottom of screen, and return original to On Order. 6) Print two (2) copies of Credit Memo 7) (check vendor information) Reorder new part
Tag Box  parts in Summit and drag to CREDIT RETURN 2 3 1
1 Click return only  or return and re-order
List reason for return and call Vendor  for pick up. if vendor has picked up part click box  (green arrow) 1
1 2 Print two (2) copies of Credit Memo STEP 1 IN CREDIT RETURN TAB  2 CLICK PRINT
3
4
RETURNING PARTS TO VENDOR (S) 1) Contact Vendor and inform them of part(s) return 2) When Vendor driver arrives to pick up part(s) go over the parts with him/her 3) Return part(s) in re-usable/re-sellable condition Return parts in original boxes, packages with tags 4) Driver must sign our copy of the Credit Memo 5) Follow Up - Contact Vendor for credit(s) 6) Attach our Credit Memo to Vendor’s credit invoice
RECEIVING PARTS & POSTING VENDOR INVOICE 1) Locate RO, Click on the Parts button 2) Select parts on screen that correspond to parts on the invoice/bill by clicking the Tag Box  before each part line 3) Verify part description 4) Change part number if necessary (Part number in  Must match part number on bill) 5) Type in our cost in  Actual Cost (what we are paying for  the part) 6) Check the Estimate Price to invoice 7) If List price is different, enter correct price in the Adj. List (never change  Est. List). 8) Once each part cost & part number has been entered, drag-and-drop the last line up to  Received and the Receive Parts screen will appear.   Note: In this screen you will see the following info: § Vendor name (automatically entered) § Invoice number ( must be keyed in)  § Inv Amount ( must be keyed in & match Calc’d Cost at bottom of screen) § If your invoice total and Calc’d Cost do not agree go back to posted items and find your mistake. 9) Click on the –OK- button if all is correct. 10) Go the Job Costs screen double check your entry 11) Verify all info is correct (vendor, invoice #, cost center) 12) Stamp the invoice “POSTED” or “ENTERED” 13) Enter today’s date and your initials on the invoice 14)  You may scan image in parts view or Go to Imaging and scan the invoice NOTE: Changes to Vendor invoice can only be done on the day they are keyed-in/entered.  Changes to Vendor invoices after the date of entry are not allowed.  Note: If changes are necessary you will need to key-in a reversal
Select parts on screen that correspond to parts on the invoice/bill by clicking the Tag Box  before each part line 3) Verify part description 4) Change part number if necessary (Part number in  Must match part number on bill) 5) Type in our cost in Actual Cost (what we are paying for the part) 6) Check the Estimate Price to invoice 7) If List price is different, enter correct price in the Adj. List (never change Est. List). 8) Once each part cost & part number has been entered, drag-and-drop the last line up to Received and the Receive Parts screen will appear.  tag 3 4 5 7 # 8 drag-and-drop
Note: In this screen you will see the following info: § Vendor name (automatically entered) § Invoice number ( must be keyed in)  § Inv Amount ( must be keyed in & match Calc’d Cost at bottom of screen) § If your invoice total and Calc’d Cost do not agree go back to posted items and find your mistake. 9) Click on the –OK- button if all is correct. vendor Invoice # amount cost 9 #14 scan image
status
SCANNING PROCEDURES 1) Place the invoice on the scanner face down & lined up properly. 2) Locate RO, Go to Parts , Select Imaging, Click the SCAN button. 3) Click on the Select button, (the default scanner will appear) 4) Click the SCAN button and a window will appear showing the percentage of scanning complete. 5) When scanning is completed 6) Remove the invoice from the scanner.
TRANSFERRING COST FROM ONE PART TO ANOTHER This process is used when you need to move costs from one line to another. 1) Locate RO 2) Click on the  Parts button 3) Select the part you want to transfer costs to by checking the Tag Box þ 4) Highlight the part you want to transfer costs from 5) Click the  Transfer Cost button on the Utility Bar 6) Caution read the  Confirm window carefully if correct click  Yes 7) The part cost will now be transferred 8) Another confirmation button will appear to ask you if you want to delete the old line. Click  Yes to delete the old line, or  No to continue without deleting the line. Note: Do not delete the old line if the line contains labor. Answering No to delete will leave line and remove the part costing only.
1) Select the part you want to transfer costs to by checking the Tag Box  1 2) Highlight the part you want to transfer costs from 3) Click the Transfer Cost button on the Utility Bar 2 3
Caution read the Confirm window carefully if correct click Yes Note:  The part cost will now be transferred
  Another confirmation button will appear to ask you if you want to delete the old line. Click Yes to delete the old line, or No to continue without deleting the line. Note: Do not delete the old line if the line contains labor. Answering No to delete will leave line and remove the part costing only.
PRINTING AN OUTSTANDING CREDIT REPORT 1) In Summit, Click the Reports button from Main Screen 2) Click on Parts from the menu tree on left side of screen 3) Click Tag Box - þ Outstanding Credit Returns 4) Click Print Icon button – on left upper side of screen 5) At the next menu you will not need to enter any date information.  will pick all open Credits 6) Click OK and you are previewing the report or 7) Click the Print icon and the report will print
1) In Summit, Click the Reports button from Main Screen 2) Click on Parts from the menu tree on left side of screen 1 2
3) Click Tag Box - þ Outstanding Credit Returns 4) Click Print Icon button – on left upper side of screen 3 4
5) At the next menu you will not need to enter any date information.  will pick all open Credits 6) Click save and you are previewing the report or 7) Click the Print icon and the report will print 5 5 6
PRESENTED BY. RANDY  S FERRESE SR  824 BLUEBIRD CIRCLE MAYS LANDING ,NJ 08330 [email_address] [email_address] 609 576 4244 Thank you for giving me the opportunity to train your company

Weitere ähnliche Inhalte

Was ist angesagt?

Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
Timothy Wooi
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
DEEPAK SAHOO
 

Was ist angesagt? (20)

16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 
Kaizen in manufacturing industry
Kaizen in manufacturing industryKaizen in manufacturing industry
Kaizen in manufacturing industry
 
Kaizen
KaizenKaizen
Kaizen
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Internal rejection
Internal rejectionInternal rejection
Internal rejection
 
Automotive service development program part 04 - module 1
Automotive service development program part 04 - module 1Automotive service development program part 04 - module 1
Automotive service development program part 04 - module 1
 
Kaizen Innovation in Manufacturing
Kaizen Innovation in ManufacturingKaizen Innovation in Manufacturing
Kaizen Innovation in Manufacturing
 
kaizen Activities PPT
kaizen Activities PPTkaizen Activities PPT
kaizen Activities PPT
 
APQP
APQPAPQP
APQP
 
Spare parts management
Spare parts management Spare parts management
Spare parts management
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Kaizen
KaizenKaizen
Kaizen
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 

Ähnlich wie Parts SOP

Pss billing overview 1
Pss billing overview 1Pss billing overview 1
Pss billing overview 1
Peeyush Gupta
 
Advanced sap training
Advanced sap trainingAdvanced sap training
Advanced sap training
Drwong1984
 
Sample Oracle Payable User Manual
Sample Oracle Payable User ManualSample Oracle Payable User Manual
Sample Oracle Payable User Manual
Suvrendu Bose
 
Asset capitalisation Process in orion
Asset capitalisation Process in orionAsset capitalisation Process in orion
Asset capitalisation Process in orion
Jitendra Kumar
 
Iprocurement Testcase
Iprocurement TestcaseIprocurement Testcase
Iprocurement Testcase
pavi_tummala
 

Ähnlich wie Parts SOP (20)

Pss billing overview 1
Pss billing overview 1Pss billing overview 1
Pss billing overview 1
 
Systems imlementation for Kasetsart University
Systems imlementation for Kasetsart University Systems imlementation for Kasetsart University
Systems imlementation for Kasetsart University
 
Test case, test sets and test scripts
Test case, test sets and test scriptsTest case, test sets and test scripts
Test case, test sets and test scripts
 
sap migo cancel
sap migo cancelsap migo cancel
sap migo cancel
 
eExpense Training
eExpense TrainingeExpense Training
eExpense Training
 
Advanced sap training
Advanced sap trainingAdvanced sap training
Advanced sap training
 
ATA CARNET USER MANUAL
ATA CARNET USER MANUALATA CARNET USER MANUAL
ATA CARNET USER MANUAL
 
Sample Oracle Payable User Manual
Sample Oracle Payable User ManualSample Oracle Payable User Manual
Sample Oracle Payable User Manual
 
Kitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing proceduresKitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing procedures
 
Peachtree complete instructions
Peachtree complete instructionsPeachtree complete instructions
Peachtree complete instructions
 
Asset capitalisation Process in orion
Asset capitalisation Process in orionAsset capitalisation Process in orion
Asset capitalisation Process in orion
 
Tutorial ic design
Tutorial ic designTutorial ic design
Tutorial ic design
 
Mkmage jet magento integration user guide
Mkmage jet magento integration user guideMkmage jet magento integration user guide
Mkmage jet magento integration user guide
 
Northwell health bidding tutorial (vendors)
Northwell health bidding tutorial (vendors)Northwell health bidding tutorial (vendors)
Northwell health bidding tutorial (vendors)
 
Peachtree complete instructions
Peachtree complete instructionsPeachtree complete instructions
Peachtree complete instructions
 
Planning & Route Sheet.ppt
Planning & Route Sheet.pptPlanning & Route Sheet.ppt
Planning & Route Sheet.ppt
 
O2 c and p2p cycles
O2 c and p2p cyclesO2 c and p2p cycles
O2 c and p2p cycles
 
Warranty Parts Return Presentation 09 2003
Warranty Parts Return Presentation 09 2003Warranty Parts Return Presentation 09 2003
Warranty Parts Return Presentation 09 2003
 
CostingNet specific manual
CostingNet specific manualCostingNet specific manual
CostingNet specific manual
 
Iprocurement Testcase
Iprocurement TestcaseIprocurement Testcase
Iprocurement Testcase
 

Mehr von RANDY FERRESE

Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
RANDY FERRESE
 
What you will need to set up disassembly triage
What you will need to set up disassembly triageWhat you will need to set up disassembly triage
What you will need to set up disassembly triage
RANDY FERRESE
 
When Working With Quick Books
When Working With  Quick BooksWhen Working With  Quick Books
When Working With Quick Books
RANDY FERRESE
 
When Working With Quick Books
When Working With  Quick BooksWhen Working With  Quick Books
When Working With Quick Books
RANDY FERRESE
 
Body Shop Creating and Implementing Team
Body  Shop  Creating and Implementing TeamBody  Shop  Creating and Implementing Team
Body Shop Creating and Implementing Team
RANDY FERRESE
 
Team Creating And Implementing Visions
Team  Creating And Implementing VisionsTeam  Creating And Implementing Visions
Team Creating And Implementing Visions
RANDY FERRESE
 
Training program on 5 S
Training program on 5 STraining program on 5 S
Training program on 5 S
RANDY FERRESE
 
Replenishment buffer management
Replenishment buffer managementReplenishment buffer management
Replenishment buffer management
RANDY FERRESE
 

Mehr von RANDY FERRESE (20)

Body Shop Process Overview
Body Shop Process Overview Body Shop Process Overview
Body Shop Process Overview
 
Randy Ferrese Collision CenterTraining Consultant
Randy Ferrese  Collision CenterTraining Consultant Randy Ferrese  Collision CenterTraining Consultant
Randy Ferrese Collision CenterTraining Consultant
 
Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
Swot 2012-how-to-1325446041-phpapp01-120101140249-phpapp01
 
UNDESTANDING DRUM – BUFFER - ROPE
UNDESTANDING  DRUM – BUFFER - ROPE UNDESTANDING  DRUM – BUFFER - ROPE
UNDESTANDING DRUM – BUFFER - ROPE
 
What you will need to set up disassembly triage
What you will need to set up disassembly triageWhat you will need to set up disassembly triage
What you will need to set up disassembly triage
 
How to use the booth cycle production board
How to use the booth cycle production boardHow to use the booth cycle production board
How to use the booth cycle production board
 
Production tools
Production toolsProduction tools
Production tools
 
SWOT 2012 HOW TO
SWOT 2012 HOW TOSWOT 2012 HOW TO
SWOT 2012 HOW TO
 
eyfisetup-1
eyfisetup-1eyfisetup-1
eyfisetup-1
 
eyfisetup-1
eyfisetup-1eyfisetup-1
eyfisetup-1
 
eyfisetup-1
eyfisetup-1eyfisetup-1
eyfisetup-1
 
When Working With Quick Books
When Working With  Quick BooksWhen Working With  Quick Books
When Working With Quick Books
 
When Working With Quick Books
When Working With  Quick BooksWhen Working With  Quick Books
When Working With Quick Books
 
Body Shop Creating and Implementing Team
Body  Shop  Creating and Implementing TeamBody  Shop  Creating and Implementing Team
Body Shop Creating and Implementing Team
 
Team Creating And Implementing Visions
Team  Creating And Implementing VisionsTeam  Creating And Implementing Visions
Team Creating And Implementing Visions
 
Body Shop Performance Team
Body  Shop  Performance  TeamBody  Shop  Performance  Team
Body Shop Performance Team
 
Continuous Production Model (FIRST DRAFT)
Continuous Production Model (FIRST DRAFT)Continuous Production Model (FIRST DRAFT)
Continuous Production Model (FIRST DRAFT)
 
Training program on 5 S
Training program on 5 STraining program on 5 S
Training program on 5 S
 
SET UP DISASSEMBLY OPERATION
SET UP DISASSEMBLY OPERATIONSET UP DISASSEMBLY OPERATION
SET UP DISASSEMBLY OPERATION
 
Replenishment buffer management
Replenishment buffer managementReplenishment buffer management
Replenishment buffer management
 

Parts SOP

  • 1. “ Working managers, not managed workers,” is the way of the future PARTS MANAGER JOB GUIDE & BASIC PROCEDURE FLOW
  • 2.
  • 3. select the parts to order– tag line 1 Click & hold mouse drag Click on part and hold mouse -drag-and-drop to On Order
  • 4.
  • 5.
  • 6. PARTS DELIVERED IMPORTANT: Check parts in while Driver is present. 1) Match parts to invoice description – verify part numbers 2) Inspect parts – check for damage/defects/wrong part 3) Sign invoice and keep a copy 4) “Clear” delivery driver to leave 5) Take all parts out and mirror match parts to old parts on disassembly cart . Compare new parts to damaged parts. Verify colors textures, etc. are correct Have the Tech inspect parts with you if needed do not guess parts is right. Caution: Before throwing away parts boxes or packaging make sure the part(s) is/are installed on vehicle. Pay close attention to sheet metal parts & electrical parts DAMAGED OR WRONG USED PART § If a single part is billed from Vendor & is damaged or wrong you can refuse it at the door. Write “REFUSED” on the invoice and keep a copy to send A/P § If there are multiple parts and one is incorrect; accept all parts, identify wrong part (s) on Vendor copy of invoice & our copy, process for a Credit Return.
  • 7. DAMAGED PARTS PROCEDURE § Parts received from Vendor are damaged § 1 Check with Body Tech/Estimator to determine if part is worth repairing. § 2 If repairable have Tech/Estimator determine time for repair § 3 Contact/Call Vendor and inform § 4 Obtain an approval and a Credit invoice from Vendor § 5 See Posting A Labor Credit NOTE: If the Vendor refuses to allow time to repair part. return the part(s) boxed in re-usable/re-sellable condition POSTING A LABOR CREDIT INVOICE § 1 Select part type (i.e. if credit is from a LKQ Vender select LKQ… etc.) § 2 Part must be received first, right click on part slide down to labor credit § 3 Enter the amount of credit and authorization code § 4 Summit will add labor credit in part line and enter as a labor line in the body of the estimate § 5 Enter description NOTE - (i.e. Labor Credit for fender damage) Vendor sends the credit for the damaged part (s) Follow , process for a Credit Return Note: Credit Invoice part type and part type in lines must agree.
  • 8. Part must be received first, right click on part slide down to labor credit 1
  • 9. Enter the amount of credit and authorization code 2 1
  • 10. Summit will add labor credit in part line & enter a labor line in the body of the estimate Note
  • 11. Enter description NOTE - (i.e. Labor Credit for fender damage) 1 2
  • 12. Summit will add labor credit in part line & enter a labor line in the body of the estimate NOTE
  • 13. PARTS ORDERED ARE NOT NEEDED § Parts received are not needed. § 1 Tag Box parts in Summit and drag to CREDIT RETURN § 2 Click return only (see steps below) § 3 List reason for return and call Vendor for pick up Note: § Return part(s) in re-usable/re-sellable condition § Return parts in original boxes, packages with tags WRONG (INCORRECT) PARTS PROCEDURE RETURN & REORDER 1) Parts received are incorrect, but are needed. 2) Tag Box parts in Summit and drag to CREDIT RETURN 3) Click -RETURN & REORDER 4) Enter Reason Code by Vendor 5) Summit will return line and send to bottom of screen, and return original to On Order. 6) Print two (2) copies of Credit Memo 7) (check vendor information) Reorder new part
  • 14. Tag Box parts in Summit and drag to CREDIT RETURN 2 3 1
  • 15. 1 Click return only or return and re-order
  • 16. List reason for return and call Vendor for pick up. if vendor has picked up part click box (green arrow) 1
  • 17. 1 2 Print two (2) copies of Credit Memo STEP 1 IN CREDIT RETURN TAB 2 CLICK PRINT
  • 18. 3
  • 19. 4
  • 20. RETURNING PARTS TO VENDOR (S) 1) Contact Vendor and inform them of part(s) return 2) When Vendor driver arrives to pick up part(s) go over the parts with him/her 3) Return part(s) in re-usable/re-sellable condition Return parts in original boxes, packages with tags 4) Driver must sign our copy of the Credit Memo 5) Follow Up - Contact Vendor for credit(s) 6) Attach our Credit Memo to Vendor’s credit invoice
  • 21. RECEIVING PARTS & POSTING VENDOR INVOICE 1) Locate RO, Click on the Parts button 2) Select parts on screen that correspond to parts on the invoice/bill by clicking the Tag Box before each part line 3) Verify part description 4) Change part number if necessary (Part number in Must match part number on bill) 5) Type in our cost in Actual Cost (what we are paying for the part) 6) Check the Estimate Price to invoice 7) If List price is different, enter correct price in the Adj. List (never change Est. List). 8) Once each part cost & part number has been entered, drag-and-drop the last line up to Received and the Receive Parts screen will appear. Note: In this screen you will see the following info: § Vendor name (automatically entered) § Invoice number ( must be keyed in) § Inv Amount ( must be keyed in & match Calc’d Cost at bottom of screen) § If your invoice total and Calc’d Cost do not agree go back to posted items and find your mistake. 9) Click on the –OK- button if all is correct. 10) Go the Job Costs screen double check your entry 11) Verify all info is correct (vendor, invoice #, cost center) 12) Stamp the invoice “POSTED” or “ENTERED” 13) Enter today’s date and your initials on the invoice 14) You may scan image in parts view or Go to Imaging and scan the invoice NOTE: Changes to Vendor invoice can only be done on the day they are keyed-in/entered. Changes to Vendor invoices after the date of entry are not allowed. Note: If changes are necessary you will need to key-in a reversal
  • 22. Select parts on screen that correspond to parts on the invoice/bill by clicking the Tag Box before each part line 3) Verify part description 4) Change part number if necessary (Part number in Must match part number on bill) 5) Type in our cost in Actual Cost (what we are paying for the part) 6) Check the Estimate Price to invoice 7) If List price is different, enter correct price in the Adj. List (never change Est. List). 8) Once each part cost & part number has been entered, drag-and-drop the last line up to Received and the Receive Parts screen will appear. tag 3 4 5 7 # 8 drag-and-drop
  • 23. Note: In this screen you will see the following info: § Vendor name (automatically entered) § Invoice number ( must be keyed in) § Inv Amount ( must be keyed in & match Calc’d Cost at bottom of screen) § If your invoice total and Calc’d Cost do not agree go back to posted items and find your mistake. 9) Click on the –OK- button if all is correct. vendor Invoice # amount cost 9 #14 scan image
  • 25. SCANNING PROCEDURES 1) Place the invoice on the scanner face down & lined up properly. 2) Locate RO, Go to Parts , Select Imaging, Click the SCAN button. 3) Click on the Select button, (the default scanner will appear) 4) Click the SCAN button and a window will appear showing the percentage of scanning complete. 5) When scanning is completed 6) Remove the invoice from the scanner.
  • 26. TRANSFERRING COST FROM ONE PART TO ANOTHER This process is used when you need to move costs from one line to another. 1) Locate RO 2) Click on the Parts button 3) Select the part you want to transfer costs to by checking the Tag Box þ 4) Highlight the part you want to transfer costs from 5) Click the Transfer Cost button on the Utility Bar 6) Caution read the Confirm window carefully if correct click Yes 7) The part cost will now be transferred 8) Another confirmation button will appear to ask you if you want to delete the old line. Click Yes to delete the old line, or No to continue without deleting the line. Note: Do not delete the old line if the line contains labor. Answering No to delete will leave line and remove the part costing only.
  • 27. 1) Select the part you want to transfer costs to by checking the Tag Box 1 2) Highlight the part you want to transfer costs from 3) Click the Transfer Cost button on the Utility Bar 2 3
  • 28. Caution read the Confirm window carefully if correct click Yes Note: The part cost will now be transferred
  • 29. Another confirmation button will appear to ask you if you want to delete the old line. Click Yes to delete the old line, or No to continue without deleting the line. Note: Do not delete the old line if the line contains labor. Answering No to delete will leave line and remove the part costing only.
  • 30. PRINTING AN OUTSTANDING CREDIT REPORT 1) In Summit, Click the Reports button from Main Screen 2) Click on Parts from the menu tree on left side of screen 3) Click Tag Box - þ Outstanding Credit Returns 4) Click Print Icon button – on left upper side of screen 5) At the next menu you will not need to enter any date information. will pick all open Credits 6) Click OK and you are previewing the report or 7) Click the Print icon and the report will print
  • 31. 1) In Summit, Click the Reports button from Main Screen 2) Click on Parts from the menu tree on left side of screen 1 2
  • 32. 3) Click Tag Box - þ Outstanding Credit Returns 4) Click Print Icon button – on left upper side of screen 3 4
  • 33. 5) At the next menu you will not need to enter any date information. will pick all open Credits 6) Click save and you are previewing the report or 7) Click the Print icon and the report will print 5 5 6
  • 34. PRESENTED BY. RANDY S FERRESE SR 824 BLUEBIRD CIRCLE MAYS LANDING ,NJ 08330 [email_address] [email_address] 609 576 4244 Thank you for giving me the opportunity to train your company