SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Page 1 of 1
Rajendra Prajapat
Work Summary:
Skills:
Experience Summary:
Key Expertise:
Diploma Mechanical with 4 years of Experience in Piping design engineering, Experience in
Equipment & Pipinglayouts,Piperouting, Isometric drawings, Section drawing, 3D modeling, Bill
of material, Pipe size & ASME code & standards.
 Currently working as Senior Piping Engineer in Larsen & Toubro Technology , Process
Engineering Dept. Vadodara from Aug 2011 to till date.
 Overall 4 years of experience in Piping Design in EPCM projects of oil & gas and Chemical
plants, food.
 Worked extensively in creating 3D Models using different software tools.
 Prepared piping & equipment layout, isometric, GA drawing, BOQ, section drawings.
 Adapt to challenging conditions with quick learning attitude.
 Exceptional leadership skills,Motivational,problemsolvingand decision makingcapabilities,
coupled with excellent communication and interpersonal skills.
 Currently working for Stepan, US for Greenfield project.
 Prepared 3d model for various discipline like Piping, Equipment, Plumbing, HVAC,
Firefighting.
 Extensive working experience in tools like AutoCAD (2D & 3D) & AutoCAD plant 3D, AutoCAD
MEP, and Auto Plant Bently.
 Preparation of Piping BOQ.
 Generation of Piping Isometrics and Piping layouts and Sectional Views from 3D model.
 Good written and oral communication skills
 Co-ordination with Client, Vendors and Contractors.
Domain Piping Engineer
Tools
 Auto Cad MEP
 Auto Cad Plant 3D
 Auto Cad (2D & 3D)
 Autodesk Inventor
 Auto plant Bentley
 CEASER (Basic)
 SP 3D
 Navisworks Freedom & Manage
Page 2 of 2
Rajendra Prajapat
Project Details:
Project 1:-
Project 2:
Project Name Mondelez (DDC)
Duration 5 Months
Team Size 15 people
Description Greenfield project for MONDELEZ international , Aravalli
Role &
Contribution
Role: Piping & Layouting Design Engineer
Responsibilities:
 Preparation of conceptual equipment layouts.
 Pipe lineroutingas per P&IDs in AutoCAD plant3D.
 Prepared 3d model for piping& process equipment.
 Pipe sizing& prepared UFD for utility system.
 Preparation of PipingBOQ.
 Generation of Pipinglayouts and Sectional Views from 3D model.
 Pipe span calculationsand selection of supports
 Pipe load calculation.
 Co-ordination internally (with Electrical,HVAC & Phe, firefighting, lighting)
and with clientfor clash free 3D modeling.
 Prepared GA drawing for piping.
Project Name PepsiCo south GF
Duration 6 months
Team Size 10 people
Description Auto cad MEP Modeling for Piping, Equipment, PHE, Firefighting.
Role &
Contribution
Role : Piping Design Engineer
Responsibilities:
 Pipe lineroutingas per P&IDs in AutoCAD MEP.
 3D Modelingof plantEquipment on AutoCAD.
 3D Modelingof PHE (public health engg.) on AutoCAD MEP.
 3D Modelingof firefightingon AutoCAD MEP.
 Co-ordination with other disciplinefor clash free3D modeling.
 Clash check & clash resolution for all discipline.
 Extraction of Pipinglayouts and Sectional Views from 3D model.
 Review of 3D Model in Navisworks.
Tools AutoCAD & AutoCAD MEP
Page 3 of 3
Rajendra Prajapat
 Checking of vendor drawings and approvingthe same.
 On Site co-ordination duringthe execution phase.
 Prepared equipment layoutas per process requirement.
 Extraction of Isometric drawings from 3D model
Tools AutoCAD & AutoCAD plant 3d.
Project 3:
Project Name Continental tire India limited
Duration 7 Months
Team Size 9 people
Description 3d modeling in AutoCAD MEP & piping layout
Role&
Contribution
Role: Piping Design Engineer
Responsibilities:
 Preparation of conceptual equipment layouts.
 3D Modeling of equipment, piping, ducting, structure & cable tray.
 Generation of Piping layouts and Sectional Views from 3D model
 Extraction of Isometric drawings from 3D model
 Checking of civil drawings with reference to equipment layouts
 Preparation of General Arrangement Drawing with sections
 Preparation of Piping BOQ
 On Site co-ordination duringthe execution phase.
 Interdisciplinary co-ordination for clash check.
 Checking and approve the contractor & vendor drawings.
Tools AutoCAD Plant 3D , AutoCAD MEP & AutoCAD
Project 4:
Project Name
ADDAR
CUSTOMBER NAME: Addar Specialty Chemical
Production Plant, Jubail, Saudi Arabia.
Duration 8 Months
Team Size 9 people
Description 3d modeling & layout detailing.
Role&
Contribution
Role: Piping design Engineer
Responsibilities:
 Preparation of plot plan layout,tank farmequipment layouts.
 Preparation of 3D Modeling of Equipment, Structure, pipingwith
reference to equipment layouts,GA drawings and civil drawings.
 Regular co-ordination with Clientand Other Disciplinesfor deliverables
Page 4 of 4
Rajendra Prajapat
and inputs requirement etc.,
 Regular co-ordination with project manager & mechanical coordinator for
the project requirements.
Tools  AutoCAD & AutoCAD plant3d
Project 5:
Project Name Nerolac Paints Limited , Hosur,Tamil Nadu
Duration 6 Months
Team Size 5 people
Description 3d modeling & layout detailing.
Role&
Contribution
Role: Trainee
Responsibilities:
 Preparation of conceptual equipment layout
 Pipe rack routingwith sections and pipingloads
 Modeling of Equipment’s, piping,supports and equipment, GA drawings
and civil drawings.
 Generation of Pipinglayouts and Sectional Views from 3D model
 Preparation of Typical pipingdrawings
 Generation of Isometric drawings from 3D model
 Preparation of PipingBOQ
Tools AutoCAD & AutoCAD plant 3d
Project 6:
Project Name
Stepan FEl-3 GULF COAST GREENFIELD
ALKOXYLATION PROJECT GEISMER, LOUISIANA
Duration 7 Months
Team
Size
6
people,onging
Description Piping & equipment layout detailing.
Role&
Contribution
Role: piping lead engineer
Responsibilities:
 Prepared piping material specification in Autocad plant3d.(Admin work).
 Prepared piping & equipment 3d model in Autocad plant3d.
 Pipe rack design & rack load calculation.
Tools AutoCAD & AutoCAD plant 3d
Page 5 of 5
Rajendra Prajapat
Educational Qualification & Certifications:
Project 7:
Project Name Chevron EGTL
Duration 2 Months
Team Size 8 people
Description Isometric & P&id
Role&
Contribution
Role: team member
Responsibilities:
 Generation of Isometric drawings form 2d layoutdrawings in Auto cad.
 Preparation of Piping P&id in Auto cad.
Tools AutoCAD
Project 8:
Project Name Cargill-Alphonso & Dora-Dora
Duration 4 Months
Team Size 8 people
Description 3D Model review & 3d modeling on Auto plant Bentley
Role&
Contribution
Role: Team member
Responsibilities:
 3D modeling of equipment & pipingon Auto plantBentley.
 Extraction of isometric from 3d model on Auto plantBentley.
 Extraction of pipingBOM on Auto plantBentley.
 3D model review .
Tools Auto plant Bently
B.E A.M.I.E (The Institution of Engineers, India)-Pursuing
Diploma
Mechanical EngineeringCompleted in 2011 from Govt. R.C. khetan Polytechnic college
Jaipur (RAJ).
Page 6 of 6
Rajendra Prajapat
Personal information:
E-mail Rajendra.prajapat4@gmail.com
Languages known English,Hindi
Passport no. Z2952888
Mob. no. +91-9722706025,8758592523

Weitere ähnliche Inhalte

Was ist angesagt? (20)

SIDDAPPA JIRANKALAGI
SIDDAPPA JIRANKALAGISIDDAPPA JIRANKALAGI
SIDDAPPA JIRANKALAGI
 
AbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD DesignerAbdulKalamAzad - CAD Designer
AbdulKalamAzad - CAD Designer
 
Dhayanidhy_resume
Dhayanidhy_resumeDhayanidhy_resume
Dhayanidhy_resume
 
Resume_VPrabu
Resume_VPrabuResume_VPrabu
Resume_VPrabu
 
Ajay 3
Ajay 3Ajay 3
Ajay 3
 
David Choi
David ChoiDavid Choi
David Choi
 
Resume_VSR
Resume_VSRResume_VSR
Resume_VSR
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
Anil- PIPING
Anil- PIPINGAnil- PIPING
Anil- PIPING
 
Sharana basava.d (design engineer)
Sharana basava.d (design engineer)Sharana basava.d (design engineer)
Sharana basava.d (design engineer)
 
Prasad_Resume
Prasad_ResumePrasad_Resume
Prasad_Resume
 
BAPIN NARAYANKAR 5 YRS EXP 2016
BAPIN NARAYANKAR 5 YRS EXP 2016BAPIN NARAYANKAR 5 YRS EXP 2016
BAPIN NARAYANKAR 5 YRS EXP 2016
 
SANTHOSH
SANTHOSHSANTHOSH
SANTHOSH
 
Resume_Gaurav Deshpande
Resume_Gaurav DeshpandeResume_Gaurav Deshpande
Resume_Gaurav Deshpande
 
sarayunadh
sarayunadhsarayunadh
sarayunadh
 
IMTIYAZ_ Process Engineer
IMTIYAZ_ Process EngineerIMTIYAZ_ Process Engineer
IMTIYAZ_ Process Engineer
 
1454150403654Resume_Nagalingegowda
1454150403654Resume_Nagalingegowda1454150403654Resume_Nagalingegowda
1454150403654Resume_Nagalingegowda
 
anil resume
anil resumeanil resume
anil resume
 
GST_March_2016
GST_March_2016GST_March_2016
GST_March_2016
 
5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)
 

Andere mochten auch

Amul Tumde Resume PPT 1
Amul Tumde Resume PPT 1Amul Tumde Resume PPT 1
Amul Tumde Resume PPT 1
Amul Tumde
 
Electrical_Resume_03082015
Electrical_Resume_03082015Electrical_Resume_03082015
Electrical_Resume_03082015
Daniel Monroe
 
John Braconnier Resume August 2016
John Braconnier Resume August 2016John Braconnier Resume August 2016
John Braconnier Resume August 2016
John Braconnier
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
Michael Najarian
 
Top 8 assistant manager resume samples
Top 8 assistant manager resume samplesTop 8 assistant manager resume samples
Top 8 assistant manager resume samples
DemiLovato999
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
vipin joy
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - Resume
Amy Calliss
 

Andere mochten auch (19)

Visual Resume
Visual ResumeVisual Resume
Visual Resume
 
Amul Tumde Resume PPT 1
Amul Tumde Resume PPT 1Amul Tumde Resume PPT 1
Amul Tumde Resume PPT 1
 
Electrical_Resume_03082015
Electrical_Resume_03082015Electrical_Resume_03082015
Electrical_Resume_03082015
 
John Braconnier Resume August 2016
John Braconnier Resume August 2016John Braconnier Resume August 2016
John Braconnier Resume August 2016
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
 
Top 8 assistant manager resume samples
Top 8 assistant manager resume samplesTop 8 assistant manager resume samples
Top 8 assistant manager resume samples
 
Desmond Ford's Visual Resume
Desmond Ford's Visual ResumeDesmond Ford's Visual Resume
Desmond Ford's Visual Resume
 
2015 Resume
2015 Resume2015 Resume
2015 Resume
 
Resume_Main
Resume_MainResume_Main
Resume_Main
 
Top 8 proposals engineer resume samples
Top 8 proposals engineer resume samplesTop 8 proposals engineer resume samples
Top 8 proposals engineer resume samples
 
Resume
ResumeResume
Resume
 
CV Julien Daveloose
CV Julien DavelooseCV Julien Daveloose
CV Julien Daveloose
 
Resume - Vipin Parkash
Resume - Vipin ParkashResume - Vipin Parkash
Resume - Vipin Parkash
 
Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)Resume-Piyush_Agarwal (1)
Resume-Piyush_Agarwal (1)
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Resume package Cpd (Surendr)
Resume package Cpd (Surendr)Resume package Cpd (Surendr)
Resume package Cpd (Surendr)
 
Carnes tw resume_05_21_2015
Carnes tw resume_05_21_2015Carnes tw resume_05_21_2015
Carnes tw resume_05_21_2015
 
Prabaa Resume
Prabaa ResumePrabaa Resume
Prabaa Resume
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - Resume
 

Ähnlich wie RESUME_RAJENDRA PRAJAPAT

Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
mandar date
 
kamalakannan_piping designer
kamalakannan_piping designerkamalakannan_piping designer
kamalakannan_piping designer
Kamal Selvam
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman muthu
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.
RENUKARAJU K.B.S
 
Vikram_design_4Yrs
Vikram_design_4YrsVikram_design_4Yrs
Vikram_design_4Yrs
Vikram A R
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resume
Pradeep C
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
Rahul Thosar
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
Rahul Thosar
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
Sharvan kumar
 
Cabrera, Edsil II G. Resume
Cabrera, Edsil II G. ResumeCabrera, Edsil II G. Resume
Cabrera, Edsil II G. Resume
Edsil II Cabrera
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
Deepak kumar
 

Ähnlich wie RESUME_RAJENDRA PRAJAPAT (20)

RESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPATRESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPAT
 
Date Mandar ( CV )
Date Mandar ( CV ) Date Mandar ( CV )
Date Mandar ( CV )
 
Vijay_C-CV
Vijay_C-CVVijay_C-CV
Vijay_C-CV
 
SUYOG_2015
SUYOG_2015SUYOG_2015
SUYOG_2015
 
kamalakannan_piping designer
kamalakannan_piping designerkamalakannan_piping designer
kamalakannan_piping designer
 
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinatorJanakiraman.M _Process Designer & SPP&ID Co-ordinator
Janakiraman.M _Process Designer & SPP&ID Co-ordinator
 
Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.Resume_Design Engineer with 4.8 Years of Exp.
Resume_Design Engineer with 4.8 Years of Exp.
 
Vivek_Kukade
Vivek_KukadeVivek_Kukade
Vivek_Kukade
 
Vikram_design_4Yrs
Vikram_design_4YrsVikram_design_4Yrs
Vikram_design_4Yrs
 
Pradeep Kumar C resume
Pradeep Kumar C resumePradeep Kumar C resume
Pradeep Kumar C resume
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
 
RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1RAHUL DESIGN RESUME-1
RAHUL DESIGN RESUME-1
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
Cabrera, Edsil II G. Resume
Cabrera, Edsil II G. ResumeCabrera, Edsil II G. Resume
Cabrera, Edsil II G. Resume
 
Ansari Merajuddin
Ansari MerajuddinAnsari Merajuddin
Ansari Merajuddin
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
VINCE RESUME
VINCE RESUMEVINCE RESUME
VINCE RESUME
 
CV_Vijaya Kumar
CV_Vijaya KumarCV_Vijaya Kumar
CV_Vijaya Kumar
 
Resume_Akshay Naphade
Resume_Akshay NaphadeResume_Akshay Naphade
Resume_Akshay Naphade
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
 

RESUME_RAJENDRA PRAJAPAT

  • 1. Page 1 of 1 Rajendra Prajapat Work Summary: Skills: Experience Summary: Key Expertise: Diploma Mechanical with 4 years of Experience in Piping design engineering, Experience in Equipment & Pipinglayouts,Piperouting, Isometric drawings, Section drawing, 3D modeling, Bill of material, Pipe size & ASME code & standards.  Currently working as Senior Piping Engineer in Larsen & Toubro Technology , Process Engineering Dept. Vadodara from Aug 2011 to till date.  Overall 4 years of experience in Piping Design in EPCM projects of oil & gas and Chemical plants, food.  Worked extensively in creating 3D Models using different software tools.  Prepared piping & equipment layout, isometric, GA drawing, BOQ, section drawings.  Adapt to challenging conditions with quick learning attitude.  Exceptional leadership skills,Motivational,problemsolvingand decision makingcapabilities, coupled with excellent communication and interpersonal skills.  Currently working for Stepan, US for Greenfield project.  Prepared 3d model for various discipline like Piping, Equipment, Plumbing, HVAC, Firefighting.  Extensive working experience in tools like AutoCAD (2D & 3D) & AutoCAD plant 3D, AutoCAD MEP, and Auto Plant Bently.  Preparation of Piping BOQ.  Generation of Piping Isometrics and Piping layouts and Sectional Views from 3D model.  Good written and oral communication skills  Co-ordination with Client, Vendors and Contractors. Domain Piping Engineer Tools  Auto Cad MEP  Auto Cad Plant 3D  Auto Cad (2D & 3D)  Autodesk Inventor  Auto plant Bentley  CEASER (Basic)  SP 3D  Navisworks Freedom & Manage
  • 2. Page 2 of 2 Rajendra Prajapat Project Details: Project 1:- Project 2: Project Name Mondelez (DDC) Duration 5 Months Team Size 15 people Description Greenfield project for MONDELEZ international , Aravalli Role & Contribution Role: Piping & Layouting Design Engineer Responsibilities:  Preparation of conceptual equipment layouts.  Pipe lineroutingas per P&IDs in AutoCAD plant3D.  Prepared 3d model for piping& process equipment.  Pipe sizing& prepared UFD for utility system.  Preparation of PipingBOQ.  Generation of Pipinglayouts and Sectional Views from 3D model.  Pipe span calculationsand selection of supports  Pipe load calculation.  Co-ordination internally (with Electrical,HVAC & Phe, firefighting, lighting) and with clientfor clash free 3D modeling.  Prepared GA drawing for piping. Project Name PepsiCo south GF Duration 6 months Team Size 10 people Description Auto cad MEP Modeling for Piping, Equipment, PHE, Firefighting. Role & Contribution Role : Piping Design Engineer Responsibilities:  Pipe lineroutingas per P&IDs in AutoCAD MEP.  3D Modelingof plantEquipment on AutoCAD.  3D Modelingof PHE (public health engg.) on AutoCAD MEP.  3D Modelingof firefightingon AutoCAD MEP.  Co-ordination with other disciplinefor clash free3D modeling.  Clash check & clash resolution for all discipline.  Extraction of Pipinglayouts and Sectional Views from 3D model.  Review of 3D Model in Navisworks. Tools AutoCAD & AutoCAD MEP
  • 3. Page 3 of 3 Rajendra Prajapat  Checking of vendor drawings and approvingthe same.  On Site co-ordination duringthe execution phase.  Prepared equipment layoutas per process requirement.  Extraction of Isometric drawings from 3D model Tools AutoCAD & AutoCAD plant 3d. Project 3: Project Name Continental tire India limited Duration 7 Months Team Size 9 people Description 3d modeling in AutoCAD MEP & piping layout Role& Contribution Role: Piping Design Engineer Responsibilities:  Preparation of conceptual equipment layouts.  3D Modeling of equipment, piping, ducting, structure & cable tray.  Generation of Piping layouts and Sectional Views from 3D model  Extraction of Isometric drawings from 3D model  Checking of civil drawings with reference to equipment layouts  Preparation of General Arrangement Drawing with sections  Preparation of Piping BOQ  On Site co-ordination duringthe execution phase.  Interdisciplinary co-ordination for clash check.  Checking and approve the contractor & vendor drawings. Tools AutoCAD Plant 3D , AutoCAD MEP & AutoCAD Project 4: Project Name ADDAR CUSTOMBER NAME: Addar Specialty Chemical Production Plant, Jubail, Saudi Arabia. Duration 8 Months Team Size 9 people Description 3d modeling & layout detailing. Role& Contribution Role: Piping design Engineer Responsibilities:  Preparation of plot plan layout,tank farmequipment layouts.  Preparation of 3D Modeling of Equipment, Structure, pipingwith reference to equipment layouts,GA drawings and civil drawings.  Regular co-ordination with Clientand Other Disciplinesfor deliverables
  • 4. Page 4 of 4 Rajendra Prajapat and inputs requirement etc.,  Regular co-ordination with project manager & mechanical coordinator for the project requirements. Tools  AutoCAD & AutoCAD plant3d Project 5: Project Name Nerolac Paints Limited , Hosur,Tamil Nadu Duration 6 Months Team Size 5 people Description 3d modeling & layout detailing. Role& Contribution Role: Trainee Responsibilities:  Preparation of conceptual equipment layout  Pipe rack routingwith sections and pipingloads  Modeling of Equipment’s, piping,supports and equipment, GA drawings and civil drawings.  Generation of Pipinglayouts and Sectional Views from 3D model  Preparation of Typical pipingdrawings  Generation of Isometric drawings from 3D model  Preparation of PipingBOQ Tools AutoCAD & AutoCAD plant 3d Project 6: Project Name Stepan FEl-3 GULF COAST GREENFIELD ALKOXYLATION PROJECT GEISMER, LOUISIANA Duration 7 Months Team Size 6 people,onging Description Piping & equipment layout detailing. Role& Contribution Role: piping lead engineer Responsibilities:  Prepared piping material specification in Autocad plant3d.(Admin work).  Prepared piping & equipment 3d model in Autocad plant3d.  Pipe rack design & rack load calculation. Tools AutoCAD & AutoCAD plant 3d
  • 5. Page 5 of 5 Rajendra Prajapat Educational Qualification & Certifications: Project 7: Project Name Chevron EGTL Duration 2 Months Team Size 8 people Description Isometric & P&id Role& Contribution Role: team member Responsibilities:  Generation of Isometric drawings form 2d layoutdrawings in Auto cad.  Preparation of Piping P&id in Auto cad. Tools AutoCAD Project 8: Project Name Cargill-Alphonso & Dora-Dora Duration 4 Months Team Size 8 people Description 3D Model review & 3d modeling on Auto plant Bentley Role& Contribution Role: Team member Responsibilities:  3D modeling of equipment & pipingon Auto plantBentley.  Extraction of isometric from 3d model on Auto plantBentley.  Extraction of pipingBOM on Auto plantBentley.  3D model review . Tools Auto plant Bently B.E A.M.I.E (The Institution of Engineers, India)-Pursuing Diploma Mechanical EngineeringCompleted in 2011 from Govt. R.C. khetan Polytechnic college Jaipur (RAJ).
  • 6. Page 6 of 6 Rajendra Prajapat Personal information: E-mail Rajendra.prajapat4@gmail.com Languages known English,Hindi Passport no. Z2952888 Mob. no. +91-9722706025,8758592523