SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
This checklist comprises of most common points which are checked by port state control officer. The
checklist has to be completed by senior officer before arriving to a port or prior to PSC inspection.
ISPS CHECKS
Checks to be done Yes No N.A Comment
Security level is displayed near Gangway
Gangway watch is always maintained
ID is noted for any outside person and
ship’s ID card is issued
ISPS equipment are present and working
OK
All crew know his/ her ISPS duties for
different security level
DOCUMENTS CHECK
Safe Manning Certificates and STCW
Certificates
All Valid Trading Certificates of ship
Rest Hours of Crew
ISM and emergency preparedness (record
of drills)
ISPS Certificate
SOEPEP certificate and plan
MLC certificate
BRIDGE CHECKS
Valid and up-to-date charts
All required nautical publication
Navigation lights and sounds are working
correctly
ECDIS as per regulation
EPIRB, SART and other emergency
indications are as per requirement
Cargo hold fire detection alarm system is
in operational condition
www.marineinsight.com
PORT STATE INSPECTION PREPERATION CHECKLIST
Fire pump is operational from bridge and
required pressure is generated
ECDIS as per regulation
EPIRB, SART and other emergency
indications are as per requirement
DECK CHECKS
No corrosion of deck plates, hatches and
openings visible
Cargo hatch is in good condition and
watertight integrity is maintained
All other openings in the deck are
weather and water tight and operating
correctly
ECDIS as per regulation
Sounding pipes, vent pipes, air pipes etc.
are in good condition and their closing
arrangement is working fine
Cat walks, railings, bulwarks etc. are not
corroded and in good condition
Gangway is in good condition and safety
net is used while rigging the gangway
Navigation lights and sounds are working
correctly
Fire hydrant and hoses are in good
working condition with no leakages
All fire dampers accessed from deck are
functioning properly
Funnel flap is in working condition
SOPEP locker is provided with all
pollution prevention equipment
Pain room is provided with fire fighting
arrangement and well arranged
Pump room inspection is carried out for
safety purpose
Bunker area is cleaned and pressure
PORT STATE INSPECTION PREPERATION CHECKLIST
www.marineinsight.com
testing dates on bunker line is stenciled
Lifeboats and rafts are in good condition
including lifeboat accessories
All crew is aware of Lifeboat drill and
duties
Snap back zone is marked in the mooring
stations
Good crane and davit condition
ENGINE ROOM CHECKS
General cleanliness of engine room is
well maintained
Record of retention of oil on board is
maintained
No oil leakage from machinery or system
All high temperature fuel pipe system are
jacketed as per regulations
All high temperature fuel pipes joints are
protected with anti splashing tapes
All steam pipes are insulated
All pollution prevention equipment are
operational
No oil traces in the overboard pipe of
OWS
OWS 15 ppm alarm working and logged
Oil Record book is up-to-date and signed
by master and chief engineer
Fire pump and emergency fire pump is in
good working condition and developing
required pressure
No untagged/ unlogged flexible hoses are
present in the engine room
PORT STATE INSPECTION PREPERATION CHECKLIST
www.marineinsight.com
All engineers knows emergency
maneuvering operation
All ships crew knows the emergency
steering operation
All low location lightings are in working
condition
Fire pump and emergency fire pump is in
good working condition and developing
required pressure
No untagged/ unlogged flexible hoses are
present in the engine room
All engineers know emergency
maneuvering operation
All ships crew knows the emergency
steering operation
All low location lightings are in working
condition
Water-tight doors inside engine room is in
operational condition
Engine room sounding pipes are provided
with self closing caps
All alarms and indicating lights are
working
Fire call point are operational
Garbage inside engine room is segregated
as per GMP
ACCOMMODATION CHECKS
Self closing doors are working fine and
operates when fire alarm sounds
Accommodation is well-maintained and
clean
PORT STATE INSPECTION PREPERATION CHECKLIST
www.marineinsight.com
Galley fire flaps are operational and crew
knows the fire fighting system provided
for galley
Required posters are pasted inside
accommodation
Duties of crew is posted in his/her room
EEBD and lifejackets are provided as per
requirement
All alarms and indicating lights inside
accommodation are working
Fire call point are inside accommodation
and operational
Garbage management plan is pasted and
followed
CHIEF ENGINEER: ___________________ MASTER:_________________________
PORT STATE INSPECTION PREPERATION CHECKLIST
www.marineinsight.com

Weitere ähnliche Inhalte

Was ist angesagt?

Ship handling basics
Ship handling basicsShip handling basics
Ship handling basicsmoney2j
 
Fire Extinguishers Inspection
Fire Extinguishers InspectionFire Extinguishers Inspection
Fire Extinguishers InspectionLearnmarine
 
Aviation Safety Mangement
Aviation Safety MangementAviation Safety Mangement
Aviation Safety Mangementhggowtham
 
Session no. 3 safety management standards
Session no. 3 safety management standardsSession no. 3 safety management standards
Session no. 3 safety management standardssameh shalash
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionLearnmarine
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety managementS P Singh
 
Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)Pawanexh Kohli
 
LIFE SAVING APPLIANCES by Capt Aung Myin Moe
LIFE SAVING APPLIANCES by Capt Aung Myin MoeLIFE SAVING APPLIANCES by Capt Aung Myin Moe
LIFE SAVING APPLIANCES by Capt Aung Myin MoeCaptAMM
 
Taking over a navigational watch lrg
Taking over a  navigational watch lrg Taking over a  navigational watch lrg
Taking over a navigational watch lrg Lance Grindley
 

Was ist angesagt? (20)

ISPS CODE
ISPS CODEISPS CODE
ISPS CODE
 
Ship handling basics
Ship handling basicsShip handling basics
Ship handling basics
 
Fire Extinguishers Inspection
Fire Extinguishers InspectionFire Extinguishers Inspection
Fire Extinguishers Inspection
 
Safety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: BasicsSafety Management Systems (SMS) Fundamentals: Basics
Safety Management Systems (SMS) Fundamentals: Basics
 
Aviation Safety Mangement
Aviation Safety MangementAviation Safety Mangement
Aviation Safety Mangement
 
Session no. 3 safety management standards
Session no. 3 safety management standardsSession no. 3 safety management standards
Session no. 3 safety management standards
 
Fire Hoses and Hydrants Inspection
Fire Hoses and Hydrants InspectionFire Hoses and Hydrants Inspection
Fire Hoses and Hydrants Inspection
 
Fire Drill
Fire DrillFire Drill
Fire Drill
 
Practicas de taller en mantenimiento de aeronaves
Practicas de taller en mantenimiento de aeronavesPracticas de taller en mantenimiento de aeronaves
Practicas de taller en mantenimiento de aeronaves
 
Maritime Security and Security Responsibilities
Maritime Security and Security ResponsibilitiesMaritime Security and Security Responsibilities
Maritime Security and Security Responsibilities
 
Aviation safety management
Aviation safety managementAviation safety management
Aviation safety management
 
Safety Management Systems (SMS) Fundmentals: Policy
Safety Management Systems (SMS) Fundmentals: PolicySafety Management Systems (SMS) Fundmentals: Policy
Safety Management Systems (SMS) Fundmentals: Policy
 
On board safety
   On board safety    On board safety
On board safety
 
Colregs 1972
Colregs 1972Colregs 1972
Colregs 1972
 
Internal audit ctpf
Internal audit ctpfInternal audit ctpf
Internal audit ctpf
 
Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)Ship Security Training Manual (Sample)
Ship Security Training Manual (Sample)
 
ISPS REVIVE
ISPS REVIVEISPS REVIVE
ISPS REVIVE
 
CArgo tank atmosphere.ppt
CArgo tank atmosphere.pptCArgo tank atmosphere.ppt
CArgo tank atmosphere.ppt
 
LIFE SAVING APPLIANCES by Capt Aung Myin Moe
LIFE SAVING APPLIANCES by Capt Aung Myin MoeLIFE SAVING APPLIANCES by Capt Aung Myin Moe
LIFE SAVING APPLIANCES by Capt Aung Myin Moe
 
Taking over a navigational watch lrg
Taking over a  navigational watch lrg Taking over a  navigational watch lrg
Taking over a navigational watch lrg
 

Andere mochten auch

Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)diegocely700615
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklistNor Masyiah
 
Vessel insepction checklist os 5a
Vessel insepction checklist os 5aVessel insepction checklist os 5a
Vessel insepction checklist os 5awais iyeh saleh
 
Ballast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptBallast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptIwl Pcu
 
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement planMDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement planMustafa Bello
 
Safety Tips for People New to Boating
Safety Tips for People New to BoatingSafety Tips for People New to Boating
Safety Tips for People New to BoatingDarin H. Mangum
 
Ship-to-Shore Solutions
Ship-to-Shore SolutionsShip-to-Shore Solutions
Ship-to-Shore SolutionsJon Marcy
 
Striegel 2011 gws presentation compressed
Striegel 2011 gws  presentation compressedStriegel 2011 gws  presentation compressed
Striegel 2011 gws presentation compressedMary Striegel
 
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry ApplicationsVEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry ApplicationsThorne & Derrick UK
 
MDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSELMDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSELMustafa Bello
 
Kevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill HazardsKevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill HazardsKevnuk
 
Anti Piracy Solutions
Anti Piracy SolutionsAnti Piracy Solutions
Anti Piracy SolutionsShyam Paliwal
 
Measurement of exhaust emissions
Measurement of exhaust emissionsMeasurement of exhaust emissions
Measurement of exhaust emissionsDENNY OTTARACKAL
 

Andere mochten auch (20)

Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)Maintenance guide checklist_(rev1)
Maintenance guide checklist_(rev1)
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklist
 
Mi ebook
Mi ebookMi ebook
Mi ebook
 
Vessel insepction checklist os 5a
Vessel insepction checklist os 5aVessel insepction checklist os 5a
Vessel insepction checklist os 5a
 
Ballast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptBallast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.ppt
 
Simple Ballast Plan
Simple Ballast PlanSimple Ballast Plan
Simple Ballast Plan
 
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement planMDSSL HUBO 7500DWT chemical tanker general arrangement plan
MDSSL HUBO 7500DWT chemical tanker general arrangement plan
 
LPG CARRIER
LPG CARRIERLPG CARRIER
LPG CARRIER
 
Safety Tips for People New to Boating
Safety Tips for People New to BoatingSafety Tips for People New to Boating
Safety Tips for People New to Boating
 
Ship-to-Shore Solutions
Ship-to-Shore SolutionsShip-to-Shore Solutions
Ship-to-Shore Solutions
 
Striegel 2011 gws presentation compressed
Striegel 2011 gws  presentation compressedStriegel 2011 gws  presentation compressed
Striegel 2011 gws presentation compressed
 
Life saving signals
Life saving signalsLife saving signals
Life saving signals
 
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry ApplicationsVEGA Pressure & Level Measurement – Shipbuilding Industry Applications
VEGA Pressure & Level Measurement – Shipbuilding Industry Applications
 
MDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSELMDSSL HUBO 7500 DW CHEMICAL VESSEL
MDSSL HUBO 7500 DW CHEMICAL VESSEL
 
Kevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill HazardsKevins Presentation on GIS and Oil Spill Hazards
Kevins Presentation on GIS and Oil Spill Hazards
 
Fire drill information
Fire drill informationFire drill information
Fire drill information
 
Anti Piracy Solutions
Anti Piracy SolutionsAnti Piracy Solutions
Anti Piracy Solutions
 
Measurement of exhaust emissions
Measurement of exhaust emissionsMeasurement of exhaust emissions
Measurement of exhaust emissions
 
Drill Board
Drill BoardDrill Board
Drill Board
 
Somali pirates
Somali piratesSomali pirates
Somali pirates
 

Ähnlich wie Psc checklist

CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...sailorizzhere
 
inspection routine engine powered fork lift
 inspection routine engine powered fork lift inspection routine engine powered fork lift
inspection routine engine powered fork liftMohamed Saad Gelbana
 
ERNESTO DOMNGOS JOSE CAMILO CV
ERNESTO DOMNGOS JOSE CAMILO CVERNESTO DOMNGOS JOSE CAMILO CV
ERNESTO DOMNGOS JOSE CAMILO CVErnesto Camilo
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.pptssuser9e9be71
 
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15FAA Safety Team Central Florida
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)jesu lambert
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - SwethaSwetha Sundaram
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptxNeethu241454
 
Inspection activites
Inspection activitesInspection activites
Inspection activitesNguyen Tri
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5Paulo P
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5Paulo P
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operatorKamlesh Bhatt
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Jr. Vacaro
 
M7 Maintenance Practices essay (CAT A1)
M7 Maintenance Practices essay (CAT A1) M7 Maintenance Practices essay (CAT A1)
M7 Maintenance Practices essay (CAT A1) Nik Danial Aiman
 
Shaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb AbdulvahabShaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb Abdulvahabshaikh soaeb
 
chiller presentation [Read-Only] part 23-44.pdf
chiller presentation [Read-Only] part 23-44.pdfchiller presentation [Read-Only] part 23-44.pdf
chiller presentation [Read-Only] part 23-44.pdfRichliHarley
 

Ähnlich wie Psc checklist (20)

CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
CE oral Q&A .pdf which give oral preparation QA for MCA chief engineer oral e...
 
inspection routine engine powered fork lift
 inspection routine engine powered fork lift inspection routine engine powered fork lift
inspection routine engine powered fork lift
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
ERNESTO DOMNGOS JOSE CAMILO CV
ERNESTO DOMNGOS JOSE CAMILO CVERNESTO DOMNGOS JOSE CAMILO CV
ERNESTO DOMNGOS JOSE CAMILO CV
 
Antro
AntroAntro
Antro
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
control valve functional testing - Swetha
control valve functional testing - Swethacontrol valve functional testing - Swetha
control valve functional testing - Swetha
 
Profile kumaresan
Profile        kumaresanProfile        kumaresan
Profile kumaresan
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx
 
A320.pdf
A320.pdfA320.pdf
A320.pdf
 
Inspection activites
Inspection activitesInspection activites
Inspection activites
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
Presentation chapter 5
Presentation chapter 5Presentation chapter 5
Presentation chapter 5
 
Tankfarm terminal operator
Tankfarm  terminal operatorTankfarm  terminal operator
Tankfarm terminal operator
 
Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)Angel Vacaro Jr. RESUME (Autosaved)
Angel Vacaro Jr. RESUME (Autosaved)
 
M7 Maintenance Practices essay (CAT A1)
M7 Maintenance Practices essay (CAT A1) M7 Maintenance Practices essay (CAT A1)
M7 Maintenance Practices essay (CAT A1)
 
Shaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb AbdulvahabShaikh Mohammed Soaeb Abdulvahab
Shaikh Mohammed Soaeb Abdulvahab
 
chiller presentation [Read-Only] part 23-44.pdf
chiller presentation [Read-Only] part 23-44.pdfchiller presentation [Read-Only] part 23-44.pdf
chiller presentation [Read-Only] part 23-44.pdf
 

Psc checklist

  • 1. This checklist comprises of most common points which are checked by port state control officer. The checklist has to be completed by senior officer before arriving to a port or prior to PSC inspection. ISPS CHECKS Checks to be done Yes No N.A Comment Security level is displayed near Gangway Gangway watch is always maintained ID is noted for any outside person and ship’s ID card is issued ISPS equipment are present and working OK All crew know his/ her ISPS duties for different security level DOCUMENTS CHECK Safe Manning Certificates and STCW Certificates All Valid Trading Certificates of ship Rest Hours of Crew ISM and emergency preparedness (record of drills) ISPS Certificate SOEPEP certificate and plan MLC certificate BRIDGE CHECKS Valid and up-to-date charts All required nautical publication Navigation lights and sounds are working correctly ECDIS as per regulation EPIRB, SART and other emergency indications are as per requirement Cargo hold fire detection alarm system is in operational condition www.marineinsight.com PORT STATE INSPECTION PREPERATION CHECKLIST
  • 2. Fire pump is operational from bridge and required pressure is generated ECDIS as per regulation EPIRB, SART and other emergency indications are as per requirement DECK CHECKS No corrosion of deck plates, hatches and openings visible Cargo hatch is in good condition and watertight integrity is maintained All other openings in the deck are weather and water tight and operating correctly ECDIS as per regulation Sounding pipes, vent pipes, air pipes etc. are in good condition and their closing arrangement is working fine Cat walks, railings, bulwarks etc. are not corroded and in good condition Gangway is in good condition and safety net is used while rigging the gangway Navigation lights and sounds are working correctly Fire hydrant and hoses are in good working condition with no leakages All fire dampers accessed from deck are functioning properly Funnel flap is in working condition SOPEP locker is provided with all pollution prevention equipment Pain room is provided with fire fighting arrangement and well arranged Pump room inspection is carried out for safety purpose Bunker area is cleaned and pressure PORT STATE INSPECTION PREPERATION CHECKLIST www.marineinsight.com
  • 3. testing dates on bunker line is stenciled Lifeboats and rafts are in good condition including lifeboat accessories All crew is aware of Lifeboat drill and duties Snap back zone is marked in the mooring stations Good crane and davit condition ENGINE ROOM CHECKS General cleanliness of engine room is well maintained Record of retention of oil on board is maintained No oil leakage from machinery or system All high temperature fuel pipe system are jacketed as per regulations All high temperature fuel pipes joints are protected with anti splashing tapes All steam pipes are insulated All pollution prevention equipment are operational No oil traces in the overboard pipe of OWS OWS 15 ppm alarm working and logged Oil Record book is up-to-date and signed by master and chief engineer Fire pump and emergency fire pump is in good working condition and developing required pressure No untagged/ unlogged flexible hoses are present in the engine room PORT STATE INSPECTION PREPERATION CHECKLIST www.marineinsight.com
  • 4. All engineers knows emergency maneuvering operation All ships crew knows the emergency steering operation All low location lightings are in working condition Fire pump and emergency fire pump is in good working condition and developing required pressure No untagged/ unlogged flexible hoses are present in the engine room All engineers know emergency maneuvering operation All ships crew knows the emergency steering operation All low location lightings are in working condition Water-tight doors inside engine room is in operational condition Engine room sounding pipes are provided with self closing caps All alarms and indicating lights are working Fire call point are operational Garbage inside engine room is segregated as per GMP ACCOMMODATION CHECKS Self closing doors are working fine and operates when fire alarm sounds Accommodation is well-maintained and clean PORT STATE INSPECTION PREPERATION CHECKLIST www.marineinsight.com
  • 5. Galley fire flaps are operational and crew knows the fire fighting system provided for galley Required posters are pasted inside accommodation Duties of crew is posted in his/her room EEBD and lifejackets are provided as per requirement All alarms and indicating lights inside accommodation are working Fire call point are inside accommodation and operational Garbage management plan is pasted and followed CHIEF ENGINEER: ___________________ MASTER:_________________________ PORT STATE INSPECTION PREPERATION CHECKLIST www.marineinsight.com