 DVC COMMAND AREA - 24,235 sq.kms.
 POWER MANAGEMENT
Total Installed Capacity - 2796.5MW
Thermal power station - Four
Thermal capacity - 2570MW
Hydelpower station - Three
Hydelcapacity - 147.2
Sub-stations -
At 220 KV - 11
At 132 KV - 33
Transmission lines
At 220 KV - 1342 Ckt. Kms
At 132 KV - 3419 Ckt. Kms
DVC INFRASTRUCTURE AT A GLANCE
NAME (Hydel) LOCATION EXISTING CAPACITY
Tilaiya River- Barakar
District –Hazaribagh 4 MW
State - Jharkhand (2*2 MW)
River - Barakar
Maithon District -Bardwan 60MW
State -West Bengal ( 3*20 MW)
Panchet River –Damodar
District -Dhanbad 80 MW
State-Jharkhand (2* 40 MW)
Total Hydel 144 MW
DVC AT A GLANCE
DVC POWER DISTRIBUTION MAP
Power Generation
 Entrusted with the responsibilities of providing the vital
input power for industrial growth in the resource rich
Damodar Valley region, DVC has been practically operating as
a pioneer, using latest available technologies to supply bulk
power at reasonable rates to the major industries.
 DVC has maintained its lead role in the eastern region by
adopting itself to the challenges of time and technology
during the course of last 59 years. DVC has been generating
and transmitting power since 1953 and has succeeded not
only in meeting the needs of consumers but has also helped
to increase the demand of power which itself is an index of
development.
GENERATION OVERVIEW
Maithon Hydal Power Station is
located on the river Barakar 12.9 km
above its confluence with the
Damodar near the border of Dhanbad
and Burdwan districts of the state
of Jharkhand and West Bengal
respectively. The unique feature of
this hydal power station is that it is
located underground in the left bank
of the river and is the first of its kind
in India. The Power station has a total
generating capacity of 60 MW with 3
units of 20 MW each.
Dam
Elements of Hydro Power plant
Storage
Reservoir
Spill way
In take
Pen
Stock
Turbine & Generator
Section
TransmissionLine
How Hydropower Works
Turbine is
connected to
a generator.
Power
generated is
transmitted ove
r power lines
RESERVOIR
WATER
through
PENSTOCK
Turbine
WATER TURBINE:
water turbines are used to convert the energy of falling
water into mechanical energy.
PENSTOCK:
It is a closed conduit which connects the fore bay or surge tank to the scroll
case of the turbine.
The Maithon Gas turbine has been setup by DVC in October 1989,
Constructed & commissioned by m/s GE, USA on Turnkey basis with total
cost of setup of $ 27024329 plus Rs. 57196697- Rs.4085 lacs. The main
purpose of plant setup is to serve as standby & emergency source of
power.
TECHNICAL OVERVIEW:-
Date of commissioning :- October 1989 e
No. of Unit: - 3 nos.
Capacity :- It comprises 3 units of 30MW (27.5MW nominally rated)
each
Type of FUEL:- Presently dual fuel basis (HSD-Naphtha) but capable of
conversion to gas and other liquid fuel.
Special feature: -
1.The emission meets the Ambient Air pollution norm. in terms of
decibel of sound, it conforms to sound pollution norm
2. Since the units run with hazardous fuel, the fire fighting network
is so designed (as per API standard) to achieve Non-combustible
atmosphere in less than a minute time.
OVERVIEW OF MAITHON GAS TURBINE UNITS
GT units run on peak cycle that is “Brayton Cycle” with 3 storage impulse turbine and 17 stage
axial compressor mounted on same shaft. It has 630 Hp starting diesel engine, 10nos. annular
combustion chamber. Turbine speed, 5082 RPM is reduced to 3000 RPM with reducing gear box.
Power evacuation system:
 Connected to grid through 132 KV- 2 lines to MHS & 2 lines to
patherdih .
 3 No.s 38MVA step up transformer 11.5KV/132KV.
 One 10mva station Auxiliary, Transformer 132KV/11KV.
 Station Source:
1) Station Auxiliary 2) Right Bank Source 3) Emergency D.G set
Exhaust System:
 Affluent: NIL.
 Exhaust Temp. 564 C
Combustion- Complete.
 Height of stack: 10.5 m
Fire protection System:
Halon and carbon dioxide system for GT units.
Foam, Hydrant point (17no.s) for plant.
Cooling water package:
In built cooling water system being integral part of line
package with cooling effect 15-20 C
Fuel :-
HSD: C.V- 10,300 K. Cal/Kg
Naphtha: C.V- 11,300K.cal/Kg
Specific Oil consumption: 0.39-
0.43 Lt/Kwh
Fuel transported by Road from
IOC, Rajbandh.
Storage Tank Capacity:
Naphtha: 2 x 4100 m3
H.S.D: 1700M3, 840 m3
The Load Dispatch Department is the nerve centre for the operation,
planning, monitoring and control of the power system. Electricity cannot
be stored and has to be produced when it is needed. It is therefore
essential that power system is planned and operated optimally &
economically.
This is the main objective of Load Dispatch Centre.
The objective of Load Dispatch Department
1. Matching the power demand with system
integrity, reliability and security of generation
and transmission facilities.
2. Regulating the system frequency.
3. Optimum utilization of resources.
4.Quick restoration of normalcy after system
disturbances.
Responsibilities of State Load Despatch Centre :
. Demand Estimation for operational purpose.
. Scheduling for Merit Order dispatch.
. Regulating Generation Load Balance.
. Schedule for Central Sector Drawl & Regulate it.
. Monitor bilateral power supply agreement.
. Maintain system frequency in 49.0 Hz to 50.5 Hz range.
. Outage planning and monitoring.
. Reactive power management and voltage control.
. Load Shedding Implementation.
. Coordination with RLDC and other constituents.
Central Testing Center at Maithon has two distinct divisions
namely
1. Central Relay and Instrument Testing Laboratory
(CRITL) and
2. Central Relay and Instrument Testing Mobile (CRITM).
The above two divisions take care of commissioning and
proper maintenance of the entire protection and metering
system, fault analysis as well as periodical testing of all types
of relays and meters including tariff meters of the entire
DVC network including power houses.
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in IndiaRavijesh Kumar
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant sagar20jain
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Debanjan Kishore Roy
 
MTDC Systems: Control & Protection of MTDC Systems
MTDC Systems: Control & Protection of MTDC SystemsMTDC Systems: Control & Protection of MTDC Systems
MTDC Systems: Control & Protection of MTDC SystemsAsif Jamadar
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In BangladeshSayanton Vhaduri
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in IndiaIPPAI
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reformsPSPCL
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
power sector issues in Haryana and in India
power sector issues in Haryana and in Indiapower sector issues in Haryana and in India
power sector issues in Haryana and in IndiaKamaljit Singh
 
Unit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSUnit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSS.Vijaya Bhaskar
 
Small hydro power in india
Small hydro power in indiaSmall hydro power in india
Small hydro power in indiaAshish Verma
 
Nuclear Power Plant in Bangladesh
Nuclear Power Plant in BangladeshNuclear Power Plant in Bangladesh
Nuclear Power Plant in Bangladeshtanzidshawon
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 

Was ist angesagt? (20)

Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)
 
MTDC Systems: Control & Protection of MTDC Systems
MTDC Systems: Control & Protection of MTDC SystemsMTDC Systems: Control & Protection of MTDC Systems
MTDC Systems: Control & Protection of MTDC Systems
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
Ppt on present energy scenario
Ppt on present energy scenarioPpt on present energy scenario
Ppt on present energy scenario
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in India
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
hydro power plant
hydro power planthydro power plant
hydro power plant
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
DABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdfDABHOL POWER PLANT.pdf
DABHOL POWER PLANT.pdf
 
power sector issues in Haryana and in India
power sector issues in Haryana and in Indiapower sector issues in Haryana and in India
power sector issues in Haryana and in India
 
Unit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSUnit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTS
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Small hydro power in india
Small hydro power in indiaSmall hydro power in india
Small hydro power in india
 
Nuclear Power Plant in Bangladesh
Nuclear Power Plant in BangladeshNuclear Power Plant in Bangladesh
Nuclear Power Plant in Bangladesh
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 

Ähnlich wie Training PPT on DVC Maithon

MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docxAjmal Khan
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docxAjmal Khan
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docxAjmal Khan
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTSohail Akhtar
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandShadab Khan
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
NTPC Barh Training Report .pptx
NTPC Barh Training Report .pptxNTPC Barh Training Report .pptx
NTPC Barh Training Report .pptxRahulRaj598351
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhandijsrd.com
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Ajeet Chaurasia
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plantYuvraj Singh
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid indiaVaibhav Jain
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTSuryanshu Jain
 

Ähnlich wie Training PPT on DVC Maithon (20)

MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
MAHI REPORT.docx
MAHI REPORT.docxMAHI REPORT.docx
MAHI REPORT.docx
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPT
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
UNIT-1-PPT.pptx
UNIT-1-PPT.pptxUNIT-1-PPT.pptx
UNIT-1-PPT.pptx
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
NTPC Barh Training Report .pptx
NTPC Barh Training Report .pptxNTPC Barh Training Report .pptx
NTPC Barh Training Report .pptx
 
My training ppt
My training pptMy training ppt
My training ppt
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhand
 
Ntpc barh (bstpp)
Ntpc barh (bstpp)Ntpc barh (bstpp)
Ntpc barh (bstpp)
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plant
 
O&m of hvdc station power grid india
O&m of hvdc station power grid indiaO&m of hvdc station power grid india
O&m of hvdc station power grid india
 
naps narora
naps naroranaps narora
naps narora
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORT
 

Kürzlich hochgeladen

2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 

Kürzlich hochgeladen (20)

2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 

Training PPT on DVC Maithon

  • 1. SANAKAEDUCATIONALTRUST’SGROUP OFINSTITUTIONS DAMODAR VALLEY CORPORATION ON ABINASH KR. MAHATO(EEE) ABHAY BHUCHASIYA(EE) HARE KRISHNA PANDIT(EE) AADIL AKHLAQ AHMAD(EE) MD. QAMRE ALAM ANSARI(EEE) Mr. SAROJ KUMAR BAYEN(LECT.) Mr. SANDEEP MANDAL ( H.O.D OF ELECTRICAL ENGG. )
  • 2.  DVC COMMAND AREA - 24,235 sq.kms.  POWER MANAGEMENT Total Installed Capacity - 2796.5MW Thermal power station - Four Thermal capacity - 2570MW Hydelpower station - Three Hydelcapacity - 147.2 Sub-stations - At 220 KV - 11 At 132 KV - 33 Transmission lines At 220 KV - 1342 Ckt. Kms At 132 KV - 3419 Ckt. Kms DVC INFRASTRUCTURE AT A GLANCE
  • 3. NAME (Hydel) LOCATION EXISTING CAPACITY Tilaiya River- Barakar District –Hazaribagh 4 MW State - Jharkhand (2*2 MW) River - Barakar Maithon District -Bardwan 60MW State -West Bengal ( 3*20 MW) Panchet River –Damodar District -Dhanbad 80 MW State-Jharkhand (2* 40 MW) Total Hydel 144 MW DVC AT A GLANCE
  • 5. Power Generation  Entrusted with the responsibilities of providing the vital input power for industrial growth in the resource rich Damodar Valley region, DVC has been practically operating as a pioneer, using latest available technologies to supply bulk power at reasonable rates to the major industries.  DVC has maintained its lead role in the eastern region by adopting itself to the challenges of time and technology during the course of last 59 years. DVC has been generating and transmitting power since 1953 and has succeeded not only in meeting the needs of consumers but has also helped to increase the demand of power which itself is an index of development. GENERATION OVERVIEW
  • 6. Maithon Hydal Power Station is located on the river Barakar 12.9 km above its confluence with the Damodar near the border of Dhanbad and Burdwan districts of the state of Jharkhand and West Bengal respectively. The unique feature of this hydal power station is that it is located underground in the left bank of the river and is the first of its kind in India. The Power station has a total generating capacity of 60 MW with 3 units of 20 MW each.
  • 7. Dam Elements of Hydro Power plant Storage Reservoir Spill way In take Pen Stock Turbine & Generator Section TransmissionLine
  • 8. How Hydropower Works Turbine is connected to a generator. Power generated is transmitted ove r power lines RESERVOIR WATER through PENSTOCK Turbine
  • 9. WATER TURBINE: water turbines are used to convert the energy of falling water into mechanical energy.
  • 10. PENSTOCK: It is a closed conduit which connects the fore bay or surge tank to the scroll case of the turbine.
  • 11. The Maithon Gas turbine has been setup by DVC in October 1989, Constructed & commissioned by m/s GE, USA on Turnkey basis with total cost of setup of $ 27024329 plus Rs. 57196697- Rs.4085 lacs. The main purpose of plant setup is to serve as standby & emergency source of power.
  • 12. TECHNICAL OVERVIEW:- Date of commissioning :- October 1989 e No. of Unit: - 3 nos. Capacity :- It comprises 3 units of 30MW (27.5MW nominally rated) each Type of FUEL:- Presently dual fuel basis (HSD-Naphtha) but capable of conversion to gas and other liquid fuel. Special feature: - 1.The emission meets the Ambient Air pollution norm. in terms of decibel of sound, it conforms to sound pollution norm 2. Since the units run with hazardous fuel, the fire fighting network is so designed (as per API standard) to achieve Non-combustible atmosphere in less than a minute time.
  • 13. OVERVIEW OF MAITHON GAS TURBINE UNITS GT units run on peak cycle that is “Brayton Cycle” with 3 storage impulse turbine and 17 stage axial compressor mounted on same shaft. It has 630 Hp starting diesel engine, 10nos. annular combustion chamber. Turbine speed, 5082 RPM is reduced to 3000 RPM with reducing gear box. Power evacuation system:  Connected to grid through 132 KV- 2 lines to MHS & 2 lines to patherdih .  3 No.s 38MVA step up transformer 11.5KV/132KV.  One 10mva station Auxiliary, Transformer 132KV/11KV.  Station Source: 1) Station Auxiliary 2) Right Bank Source 3) Emergency D.G set Exhaust System:  Affluent: NIL.  Exhaust Temp. 564 C Combustion- Complete.  Height of stack: 10.5 m Fire protection System: Halon and carbon dioxide system for GT units. Foam, Hydrant point (17no.s) for plant. Cooling water package: In built cooling water system being integral part of line package with cooling effect 15-20 C Fuel :- HSD: C.V- 10,300 K. Cal/Kg Naphtha: C.V- 11,300K.cal/Kg Specific Oil consumption: 0.39- 0.43 Lt/Kwh Fuel transported by Road from IOC, Rajbandh. Storage Tank Capacity: Naphtha: 2 x 4100 m3 H.S.D: 1700M3, 840 m3
  • 14. The Load Dispatch Department is the nerve centre for the operation, planning, monitoring and control of the power system. Electricity cannot be stored and has to be produced when it is needed. It is therefore essential that power system is planned and operated optimally & economically. This is the main objective of Load Dispatch Centre.
  • 15. The objective of Load Dispatch Department 1. Matching the power demand with system integrity, reliability and security of generation and transmission facilities. 2. Regulating the system frequency. 3. Optimum utilization of resources. 4.Quick restoration of normalcy after system disturbances.
  • 16. Responsibilities of State Load Despatch Centre : . Demand Estimation for operational purpose. . Scheduling for Merit Order dispatch. . Regulating Generation Load Balance. . Schedule for Central Sector Drawl & Regulate it. . Monitor bilateral power supply agreement. . Maintain system frequency in 49.0 Hz to 50.5 Hz range. . Outage planning and monitoring. . Reactive power management and voltage control. . Load Shedding Implementation. . Coordination with RLDC and other constituents.
  • 17. Central Testing Center at Maithon has two distinct divisions namely 1. Central Relay and Instrument Testing Laboratory (CRITL) and 2. Central Relay and Instrument Testing Mobile (CRITM). The above two divisions take care of commissioning and proper maintenance of the entire protection and metering system, fault analysis as well as periodical testing of all types of relays and meters including tariff meters of the entire DVC network including power houses.