1. Curriculum vitae
Name: P.Paulpandy. Total Years of Experience: 23 Years.
Qualification: D.E.E.E., D.Ma.E.M. Post Applied: Elect. Engr. Comm. Or Maint.
Objective :
Committed to work sincere & dedication to enhance quality and safe work for company.
Seeking a better opportunity in electrical commissioning or operation & maintenance
department as back bone of organization growth.
My Profile :
I have excellent experience in commissioning, operation & maintenance in Oil, Gas, Power,
Petro Chemical & Gold Mine projects worked in JGC Gas project in Qatar, Saudi Aramco
world largest curd oil project in SaudiArabia, 2600 MW CCGT Power project GE& Hyundai
in Kuwait, 1600 MW CCGT Power project SIEMENS & DAEWOO in Abu Dhabi, UAE, world
largest petrochemical project in Al-Jubail, Saudi Arabia, Gold mine project in Al-Duwaihat,
Saudi Arabia and all type of industries. I can interact with other department like design,
material, Q/A & Q/C., planning & vendors to give best quality and to avoid delay & rework.
Working with PMC as well as Client till hand over the project.
My Strength :
Leadership quality, Fulfilling responsibility, Listening capacity, Specialty in priority work,
maintaining good relationship with people, Very well planning of work, Training the
people, Sincere and Dedicated working nature. I know many languages.
Work Experience Details:
M/S. MAADEN,
Period : From 25-03-2015 to 31-05-2015
Designation : Electrical Engineer-Commissioning.
Project : Maaden Gold Project, Al-Duwaihat, Saudi Arabia.
Work Done : Pre-commissioning, commissioning & energization of 13.8 KV
switchgears, 1.5, 2.5 and 3 MVA oil filled transformers, 4.16 KV neutral grounding resisters,
480 Volts. motor control centers, UPS, battery Chargers, power distribution panels, lightings
panels for main sub-station, 1200 crusher area sub-station, 2000 mill area sub-station,
3000 leach area sub-station, 4000 gold room sub-station, 5100 thickener area sub-station,
1
2. 5200 dewatering area sub-station, 7000 service one area sub-station and 7000 service two
area sub-station.
Authorized energization engineer approved by client.
Worked with PMC as well as Client till hand over the project.
Preparing for the motor solo run test like continuity, insulation resistance test for the
power and control cables, insulation resistance and winding resistance test for the
motors.
Functional test for the motors by local & remote operation. Relay & breakers
protection settings of all motors & non-motors feeders in MCC buckets.
Functional and solo run test for the variable frequency drive motors.
Protection testing and settings for all transformers and switchgears.
Coordinating with vendors for commissioning the equipments.
Trouble shooting to fix all type of faults and problems.
Preparing test reports & checks sheets for all equipments for turn over package.
M/S. SADARA (Saudi Aramco & Dow)
Period : From 12-04-2014 to 12-03-2015.
Designation : Electrical Technician-Commissioning.
Project : World Largest Petro Chemical Complex.
Work Done : Pre-commissioning and testing of 13.8, 4.16 & 0.480 KV Switch
Gears, 80, 14, 3.75 MVA transformers, 75 KVA power & lighting Transformers, Protection
relay testing & setting. Observing construction activities in V2504, V2505, V2501, V2503
N&S, U4306 and SS465 sub-stations and plants in Chem 1 & 2 and plastic.
Doing Hi-Pot test for MV & HV cables.
Pre-commissioning done for motor control centre & cubicles.
Functional test done MV & LV switch gears with auto transfer system.
Insulation resistance & continuity test for cables, insulation resistance & winding
resistance test for motors for doing solo run test.
Doing RFI’s.
Preparing pre-commissioning tracking tools list.
Witnessing all pre-commissioning and commissioning being a client.
M/S. Daewoo E&C and Siemens AG.,
Period : From 11-10-2012 to 31-10-2013.
Designation : Electrical Engineer-Commissioning.
2
3. Project : 1600 MW combined cycle gas turbine power project, S3, Suweighat,
Abu Dhabi - UAE.
Work Done : Commissioning of sea water intake motors, GT & STG building over head
cranes, Fuel gas compressor container, GT lube oil system, GT UPS, GT Generator Circuit
Breakers and 81, 82, 71&72.GT Air Intake System.
Maintaining documents.
Authorized energization engineer approved by client.
Worked with PMC as well as client till hand over the project.
M/S. Hyundai Heavy Industries Ltd.,
Period : From 23-03-2010 to 01-05-2012.
Designation : Electrical Engineer-Commissioning.
Project : 2600 MW combined cycle gas turbine power project, Sabiya, Kuwait.
Work Done : Pre-commissioning and commissioning of transformers, switchgears, UPS,
Battery chargers, power distribution panels, mcc and lighting systems.
Doing hi-pot test for MV & HV cables.
Preparing and ding solo run tests for motors.
Functional test & protection relay setting in motor cubicles.
Preparing test reports & checks sheet for turn over package.
Maintaining documents.
Worked with PMC as well as till hand over the project.
M/S. Saudi Arabia Kentz Co Ltd,
Period : From 18-03-2008 to 05-09-2009.
Designation : Electrical Supervisor- Commissioning.
Project : World largest curd oil project, Saudi Aramco, Saudi Arabia.
Work Done : Pre-commissioning of transformers, switchgears, UPS, battery chargers,
mcc’s, lighting transformers.
Doing hi-pot test for MV & HV cables.
Doing functional test for mcc motor & non-motor feeders.
Preparing & doing for motors solo run test.
Pre-commissioning & energization for indoor & outdoor lighting circuits.
Maintaining documents.
3
4. Worked with PMC as well as till hand over the project.
M/S. Kentz W.L.L. Qatar.
Period : From 25-05-2006 to 15-02-2007.
Designation : Electrical Supervisor-Commissioning.
Project : Gas Project, Japan Gas Corporation, Qatar.
Work Done : Pre-commissioning of transformers, switchgears, mcc’s, power & lighting
panels. Continuity & Insulation resistance test done for power & control cables. Doing hi-pot
test for MV & HV cables. Preparing and doing solo run test for motors.
M/S. Bahavan Engineering Company LLC, Rubi, Muscut, Oman.
Period : From 03-05-2005 to 10-05-2006.
Designation : Supervisor-Maintenance..
Responsibility : Site In-charge of Electrical & Mechanical maintenance.
Work Done : Operation and Maintenance of 11 KV/ 440 Volts transformer 80
Nos. , OHT cranes 8 Nos. , Compressors, Ship lifting equipments, Switch Gears.
Additional Work: Preparing scope of work, costing, executing worth 70000
Riyals of Oman Navel Base additional work.
M/S.Automotive Coaches and Components Ltd., Gummudipoondi, Tamil Nadu.
(Joint Venture of M/S. Ashok Leyland and TIDCO)
Period : From 15-11-1999 to 01-05-2005.
Designation : Executive Maintenance.
Responsibility : Head of Electrical and Mechanical maintenance, commissioning
& installation Dept. (Reporting to General Manger. Mfg.)
Work Done : Operation and Maintenance of 11 KV/ 433 Volts. sub-station,
O.C.B's, 750 KVA transformer, MV Panels, Automatic Capacitor Panel, 380 KVA, generators
with Synchronous Panel, S.S.B's, 30 HP reciprocating compressor, 50 HP Kirlosker
reciprocating compressor, 40 & 60 HP. Atlas cop-co screw compressor, Paint booth ovens,
exhaust fan and blowers etc.
Maintenance of 7.5 ton gantry cranes, 2 ton OHT cranes, 400 & 250 amps. CO2 mig
welding m/c's, 400 amps. arc welding m/c's, 8mm,7mm and 4mm shearing m/c's,
lathe, milling, radial drilling m/c's, fork lift's, escort cranes etc.
Doing predictive and preventive maintenance.
Preparing preventive maintenance schedule by analyzing break down and m/c's
history.
4
5. Reducing down time and cost of m/c's by doing continuous improvement through
proper route cause.
Full filling company statutory requirements like compressors, receiver, fork lift, OHT
cranes, chain pulley block, paint booth, paint booth exhaust fans, and other safety
equipments.
Full filling I.E. Rule 63, 46, inspection, getting drawing approval and safety
certificate.
Identification of electrical & mechanical spares & coordination with purchase
department to procure correct and quality materials.
I was the main ISO audite to maintain ISO 9001-2000 standard.
Achievements:
I got third prize for reducing power consumption and maximum demand by
improving power factor from .9 to .99.
Project Work:
Installation of panels, cable trays, glanding, termination & equipments connected
loads 150 KVA. Commissioning, conducting inspection & getting drawing approval
and Electricity Board safety certificates.
Installation & commissioning of connected loads 250 KVA equipments like,
11KV/4OO amps O.C.B's, MV panels, M.C.C, automatic power factor controller,
glanding & terminations. Getting drawing approval and safety certificate.
Re-installation and re-commissioning of existing m/c's from one area to another
area. Rearrangement of electrical connected loads drawing approval and safety
certificate.
M/S. Norton Group, Gummidipoondi, Tamil Nadu.
5
6. Period : From 24-11-1997 to 25-10-1999
Designation : Engineer Maintenance.
Responsibility: In-charge of Electrical and Mechanical maintenance, commissioning
&installation department reporting to Works Manager.
Work Done :
Northern Electrical: Maintenance of 250 KVA generators, 10 HP compressor, wire
drawing m/c’s and tubular m/c's.
Klassic Polymers: Maintenance of 62.5 KVA generator, 5 HP compressor,
power looms, winding m/c's, extruders & LV switch gears.
Norton Polymers: Maintenance of 160 KVA generator, 10 compressor,
power looms, winding m/c's, extruders & LV switch gears.
Southern Latex Ltd.: Maintenance 125 KVA generator, 20 HP compressor,
hydraulic press, motors & LV switch gears etc.
Installation & commissioning of 1000 KVA diesel generator with automatic control
panel.
Trouble shooting to fix all type of faults & problems.
M/S. SIBAR Autoparts Ltd., Tirupathi, Andhra Pradesh.
Period : From 29-03-1995 to 21-11-1997
Designation : Engineer Maintenance.
Responsibility : In-charge of Electrical and Mechanical maintenance, commissioning
&installation department. (Reporting to Works Manager)
Work Done :
6
7. Sub-Station: Operation & Maintenance of 500 KVA transformers, MV panels, 300
KVA generators, capacitor banks, LT switchgears.
Machine Shop: Maintenance of hydraulic honing m/c's., special purpose
m/c's., lathes, drilling m/c’s.
Heat Treatment Plant: Maintenance of 60 KW pit type furnaces, 30 KW
muffle furnaces, 36 KW degreasing plant.
Plating Section: Maintenance of 100 amps. Auto transformers, 4000 amps.
rectifiers, 2 ton cranes, special purpose acid centrifugal pumps, 3000 watts lead
immersion heaters, remote control operated panels.
Foundry : Maintenance of bale out furnaces, tilting furnaces, electrical
holding furnaces capacity 24 KW, 25 HP Elgi screw type & 25 HP Atlas cop co
compressors, PLC operated core shooting m/c's., 125 KVA & 62.5 KVA generators.
Achievement:
I got award for reducing maintenance cost in plating section.
Project Work :
Installation and commissioning of H.T. structure, 500 KVA transformer, M.V. panels,
SSB's, LDB'S, DB's, Installation of cable trays, cables, glanding & termination of 490
KVA connected load.
Installation and commissioning of 300 KVA generators.
Installation and commissioning of Pit type and Muffle type heat treatment furnaces.
Installation and commissioning of hard chrome plating section equipments like Step
down auto transformers, 4000 amps. DC rectifiers and control panels.
Installation and commissioning of m/c. like lathe, milling, hydraulic honing, and
screw type compressors.
M/S. Kowtha Steel Products, Vijayawada, Andhra Pradesh.
7
8. Period : From 01-07-1992 to 26-03-1995.
Designation : Engineer Maintenance.
Responsibility : Maintenance of Electrical and Mechanical department.
(Reporting to GM Foundry)
Work Done : Operation and Maintenance of Induction Furnaces, 11 KV Sub-
station, 150 KVA, 250 KVA, 500 KVA transformers, OCB's, MV panels, LV panels, 2 & 5 ton
OHT cranes, 100 KW heat treatment furnaces, Shot blasting m/c's.
Trouble shooting to fix all type of faults & problems.
Found the route cause to fix the main contactor of induction furnace fault & frequent
break down of furnace.
Changed the old model contactor to new model contactor to solve the major problem
permanently.
M/S. Tamil Nadu Electricity Board, Chennai , Tamil Nadu.
Period : From 15-05-1991 to 19-06-1990.
Designation : Trainee (Electrical Engineer)
Work Done : Repairing, Testing and Maintenance of transformers from 63
KVA to 2000 KVA, OCB's, PT's, CT's. Calibration and testing of energy meters and trivector
meters. Operation and Maintenance of 110/11 KV sub- station.
Date of Birth : 30-04-1970.
Marital Status : Married.
Address : # 2, Srivenkateshwara Illam, Muthusamy Servai Street,
B.K.Pudhur, Kuniyamuthur, Coimbatore, Tamil Nadu, India.
Post Box #: 641008
Pass Port Details : Pass Port #: J5549606, Date of Issue : 14-06-2011.
Place of issue: Kuwait, Date of Expiry: 13-06-2021.
"C" License Details : " C " License # 16765, Valid Till: 2016. (Government electrical
license to work in live equipment)
Language Known : English, Hindi, Tamil, Telugu, Kannada, & Malayalam.
Contact Mobile # : In KSA +966 538573306, +966 564996890
In India +91 9952162247, +91 9500377352
E-Mail ID : paulpandy6666@gmail.com
Srinarayana9999@gmail.com
Educational Qualification:
Exam Passed Name of Institution /
University
Year of
Passed
% Of Marks
Diploma in Electrical & V.S.V.N. Polytechnic, April, 1989. 69.4%
8
9. Electronics Engineering. Virudhunagar.
Diploma in Maintenance
Engineering and
Management.
Annamalai University,
Chidambaram.
May, 2004. 56.5%
Declaration:
I hereby declared that the above information’s are true and correct to the best
of my knowledge.
Place: Coimbatore. Yours Faith Fully,
Date : 17-06-2015. P.Paulpandy.
9
10. Electronics Engineering. Virudhunagar.
Diploma in Maintenance
Engineering and
Management.
Annamalai University,
Chidambaram.
May, 2004. 56.5%
Declaration:
I hereby declared that the above information’s are true and correct to the best
of my knowledge.
Place: Coimbatore. Yours Faith Fully,
Date : 17-06-2015. P.Paulpandy.