It’s Christmas time. But, what about the party? Stuck in a chaos with so much to do in so little time? Did you ever wonder how the biggest project manager of them all is able to manage this chaos all on his own? We are talking about Santa Claus here. Check out this presentation and know these 6 project management tips from Santa.
11. Notes
Through notes Santa gathers different images,
documents, and all other innovative thoughts
at one place.
12. Quickies
Santa use quickies as sticky notes where he
jots all the random information that was
otherwise scattered everywhere and not found
when needed.
17. Share feedback
Instantly
Santa shares and receives feedback easily and
instantly which saves a lot of time and efforts
of his team with the help of the proofing tool.
27. Gantt charts
Santa uses Gantt chart tool to connect tasks,
set dependencies, and track the progress to
make sure that project deadline is met every
time.
28. Time Tracking
Santa keeps a check on who has spent how
much time on which task through the online
time tracking tool.
29. Reports
Reports let’s Santa analyze all the important
project information in the form of bar graphs,
line graphs, pie charts etc.; which provides
him an overall picture of the projects.
30. Want to know more how Santa's
Christmas this year?
Have a look at:
A day in the life of Santa Claus during Christmas with ProofHub
How to plan a rocking Christmas party with ProofHub