QUALIFICATION OF TABLET COMPRESSION
MACHINE
Prepared By,
Mr. Pritam P. Kolge
M.Pharm First Year (SemII)
Department of Pharmaceutical Quality
Assurance
Bharati Vidyapeeth College of Pharmacy,
Kolhapur
6/29/2020
1
Guided By,
Dr. Mrs. N.M.Bhatia
Professor and Head,
Department of Pharmaceutical Quality
Assurance
CONTENT
Introduction
Design Qualification
Installation Qualification
Operational Qualification
Performance Qualification
Case Study
Conclusion
Reference
6/29/2020
2
INTRODUCTION
6/29/2020
3
Qualification an ideal step for equipment validation is the action undertaken to demonstrate
the intended use and performance of the utilities and equipment. The individual steps of
qualification such as design, installation, operational and performance qualification were
done in order to qualify the equipment. Blue print of equipment validation was also
included. The compression parameters such as compression force, turret rpm and feeder
rpm were studied. The process capability of the equipment was studied by observing the
weight of 20 tablets, disintegration time, friability, individual weight variation, thickness
and hardness. These parameters were studied at three different speeds and the best results
were obtained at the optimum speed (40 rpm).
Design Qualification
 Providing documented evidence that the design of the facility and equipment meet
the requirements of the user specification and GMP.
 The purpose of the Design Qualification (DQ) is to define the functional
specifications of the system and document the vendor selection process.
 Documentation and verification of procedures required to fulfill the protocol.
 Execution of protocol and data collection, interpretation and review of data for
accuracy, completeness and cGMP compliance.
 Approval of original protocol formats, approval for the final summaries and
system qualification statement.
6/29/2020
4
Installation Qualification (IQ):
 The information required for an IQ evaluation is
• Equipment identification,
• Required documentation,
• Equipment utility requirements,
• Major component specifications,
• Component material,
• Lubricants and equipment safety features.
6/29/2020
5
 Equipment Identification:
Record the equipment identification numbers, along with the following information:
▪ Model number
▪ Serial number
▪ Company assigned equipment number and
▪ Location of the equipment
 Required Documentation:
Record the equipment manufacturer's operation and maintenance manual and
drawings. Record the SOP that cover the setup, operation and cleaning of the tablet
press.
 Equipment Utility Requirements:
Compare the manufacturer's specified volts (V) and amps (A) requirements to their
conditions at the time of qualification testing and record. Also record the location of the
power supply source.
6/29/2020
6
 Major Component Specifications:
The component specifications section of the protocol verifies that the tablet
press components purchased were delivered and installed.
 Component material:
Record the material of each component that contacts the product.
 Lubricants:
Record the lubricants used to operate the tablet press and indicate if they
make contact with the product.
 Equipment Safety Features:
The objective of testing equipment safety features is to verify that the safety
features on the tablet press function according to the manufacturer's specifications.
This test is performed with the tablet press empty. Verify that all of the guards are
present and record the results.
6/29/2020
7
Operational Qualification (OQ):
 An OQ evaluation should establish that the equipment can operate within specified tolerances
and limits. The mechanical ranges of the tablet press are challenged, along with the basic tablet
press operations. The tablet press will be validated for its operating ability. Information required
for the OQ evaluation is:
• calibration of the instruments used to control the tablet press
• equipment control functions (switches and push buttons)
• equipment operation (cam tracks, upper punches, lower punches, feed frames, take off bars,
rotor head direction, tablet press speed).
 Calibration requirements
Verify that all the critical instruments on the equipment have been logged into the calibration
system, have calibration procedures in place and are in calibration at the time of qualification
testing. Record all information for calibrated instruments used to control the tablet press.
 Equipment Control Functions
The objective of testing equipment control functions is to verify that the switches and push
buttons on the tablet press operate per the manufacturer's specifications. The tests will be
performed with the tablet press empty. Operate each control and verify its proper position.
6/29/2020
8
 Equipment Operation:
 A) Cam Tracks Test
The objective of the cam track test is to verify that the upper and lower cam tracks make
contact with the upper punches according to the manufacturer's specification.
• Install the punches and verify that the cams are contacting the punch head angles on the
both the sides of the double-sided cams.
 B) Upper Punch Test
The objective of the upper punch test is to verify that the upper punch penetration is
according to the manufacturer's specification. A vernier caliper is required for this test,
which is performed as follows:
• Attach a piece of tape to mark the depth of penetration of an upper punch when it is set
to a standard depth.
• Remove the upper punch and use a calibrated vernier caliper to measure the depth of
penetration into the die. Record the results and instrument used to measure the depth.
6/29/2020
9
 C) Lower Punch Test
The objective of the lower punch test is to verify that the lower punch height is set
according to the manufacturer's specification. A dial indicator test is required. Measure the
height of the lower punch above the die with a dial indicator and record the results and the
instrument used to measure the height.
 D) Take Off Bar Test
The objective of the take-off bar test is to verify that the take-off bars do not make
contact with the lower punches. Turn the tablet press by hand and verify that the takeoff
bars do not make contact with the lower punches. Record the results.
 E) Feed Frame Test
The objective of the feed frame test is to verify that the feed frame distance above
the rotor head is according to the manufacturer's specification. Feeler gauge test: Measure
the clearance between the feed frame and the motor head with a feeler gauge and record
the results and the instrument used to measure the clearance.
6/29/2020
10
 F) Tablet Press Rotation Direction
The objective of the rotation direction test is to verify that the rotor head
rotates in the proper direction. The tests will be performed with the tablet press
empty. Press the start switch and observe the direction of the rotation of the rotor
head as viewed from front of the press and record the results.
 G) Tablet Press Speed
The objective of the speed test is to verify that the measured speeds are
within ± 10 % of the manufacturer's specification of a minimum of 9 rpm and a
maximum of 36 rpm. This test will be performed with the press empty. A stop
watch is required for this test. Measure the speed of the rotor head with a
calibrated stopwatch. Verify that the measured speeds are within ± 10 % of the
manufacturer's specification and record the results and the instrument used to
measure the speed.
6/29/2020
11
6/29/2020
12
Take off Bar Feed Frame
Dial Indicator
Feeler Gauge
Performance Qualification:
6/29/2020
13
 The blend/dummy material is unloaded into the hoppers on the both sides and the
compression machine is operated at low speed (20RPM) as per operating instructions.
Then the machine is set to run for 20 minutes continuously after adjusting the following
parameters.
1. Individual tablet weight variation
2. Weight of 20 tablets
3. Hardness
4. Thickness
5. Disintegration time
6. Friability
6/29/2020
14
 Then the experiment was repeated at both medium (40RPM) and high speed (60RPM)
with same set of parameters and the parameters were checked at different speeds (low,
medium and high rpm).
 Sampling Plan
Collect 100 tablets for every 05 minutes.
Case Study- sticking issues in tablet production
 The problem
The Italian division of Novartis approached I Holland Company and local agent Vis Viva with
a sticking issue on an antiepileptic drug in the form of a coated tablet.
Novartis reported a strong sticking/picking problem causing the press to be stopped several
times during manufacture for cleaning and maintenance of the punches, which resulted in
production downtime. Sticking and picking halted production
These two problems can be caused by various factors related to the physicochemical properties
of the formulation components, the surface characteristics of punch face, as well as factors related
to the machinery and the environment, for example, compression force and speed, temperature
and humidity.
It has a negative effect on tablet appearance and often results in the removal of tablet tooling
from production for regular cleaning and maintenance, as experienced by Novartis.
6/29/2020
15
6/29/2020
16
Picking was another problem encountered by the company — this is when compressed
granule that has adhered to the detail on the punch face, results in ‘picking out’ of parts
from the tablet face.
 The Solution
The selected anti-stick coating was used on the punches and applied to the tooling
by using an electron beam process. This is one of the smoothest and most defect-free
methods of applying a PVD coating as it does not create droplets during the
atomization process. The atomic particles are attracted to the tooling leaving an even
surface which is far less susceptible to breakaway defects.
From the first trial of the new design and tooling using PharmaCote CN+,
improvements were seen and all sticking/picking issues were instantly resolved
resulting in a 25% increase in production. This was achieved over a five-day
working week, with reduced hours, resulting in a full day’s production time saved.
Before the implementation of the new tablet design and tool coating, four batches of
the tablet were produced during a 6-day working week. This included the extra time
required for cleaning and maintenance due to the original sticking/picking problem.
Once I Holland’s improvements were adopted, a further batch was produced in the
same time-period with a total of five batches manufactured without the need to stop
production.
As a result of this outcome, Novartis is now looking at further products to be
analyzed to improve production and reduce down-time. 6/29/2020
17
CONCLUSION
 The parameters studied under the compression process are such as compression
force, turret rpm and feeder rpm. These are set at three different speeds and
analyzed on both sides to assess the exact parameters.
 The samples were collected from both the sides (LHS, RHS) to qualify the two
press stations and the observations made from the results were found to be in
specified limits as per the ICH specifications
 From this we conclude that the equipment is successfully qualified and can be
used for production of further batches.
 The result is considerable variation in the way pharmaceutical companies
approach the qualification of laboratory equipment and requirements.
6/29/2020
18
REFERENCES
 EQUIPMENT QUALIFICATION AND VALIDATION OF TABLET
COMPRESSION MACHINE, WORLD JOURNAL OF PHARMACY AND
PHARMACEUTICAL SCIENCES, Volume 2, Issue 6, 5412-5418., ISSN 2278 –
4357, P.Ramasubramaniyan, N.Sharanya, et.al.
 A REVIEW ON QUALIFICATION OF AUTOCLAVE, RMG, FBD, CONE
BLENDER, TABLET COMPRESSION MACHINE, Journal of Global Trends in
Pharmaceutical Sciences, Volume 5, Issue 1, pp-1450-1459, January-March 2014,
ISSN: 2230-7346, B.Venkateswara Reddy, B.Rasmitha Reddy et al.
 I HOLLAND TABLETING SCIENCE, tablettingscience.com
6/29/2020
19
6/29/2020
20

Weitere ähnliche Inhalte

Was ist angesagt?

QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 
Qualification of tablet compression (machine) & Capsule filling machine
Qualification of tablet compression (machine) & Capsule filling machineQualification of tablet compression (machine) & Capsule filling machine
Qualification of tablet compression (machine) & Capsule filling machineYash Menghani
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validationDhruviParmar
 
Qualification of Dry Powder Mixer.pptx
Qualification of Dry Powder Mixer.pptxQualification of Dry Powder Mixer.pptx
Qualification of Dry Powder Mixer.pptxDhruvi50
 
Pharmaceutical Industry Development
Pharmaceutical Industry DevelopmentPharmaceutical Industry Development
Pharmaceutical Industry DevelopmentRohitKoli27
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
Process validation of Tablets and Lquids
Process validation of Tablets and LquidsProcess validation of Tablets and Lquids
Process validation of Tablets and LquidsRaheem Kurikkal
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaPritam Kolge
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachRx Ayush Sharma
 
Advanced sterile product manufacturing technology
Advanced sterile product manufacturing technologyAdvanced sterile product manufacturing technology
Advanced sterile product manufacturing technologyPriyankaSananse
 
STERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSTERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSagar Savale
 
IPQC of Sterile Ointment.pptx
IPQC of Sterile Ointment.pptxIPQC of Sterile Ointment.pptx
IPQC of Sterile Ointment.pptxDhruvi50
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipmentsPranali Polshettiwar
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbdpriyanka odela
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxDhruvi50
 
Fda initiative on process analytical technology
Fda initiative on process analytical technologyFda initiative on process analytical technology
Fda initiative on process analytical technologyVaishaliMundhe1
 

Was ist angesagt? (20)

QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Vendor Audites
Vendor AuditesVendor Audites
Vendor Audites
 
Qualification of tablet compression (machine) & Capsule filling machine
Qualification of tablet compression (machine) & Capsule filling machineQualification of tablet compression (machine) & Capsule filling machine
Qualification of tablet compression (machine) & Capsule filling machine
 
Pharmaceutical validation
Pharmaceutical validationPharmaceutical validation
Pharmaceutical validation
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Qualification of Dry Powder Mixer.pptx
Qualification of Dry Powder Mixer.pptxQualification of Dry Powder Mixer.pptx
Qualification of Dry Powder Mixer.pptx
 
Process validation of capsule
Process validation of capsuleProcess validation of capsule
Process validation of capsule
 
Pharmaceutical Industry Development
Pharmaceutical Industry DevelopmentPharmaceutical Industry Development
Pharmaceutical Industry Development
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Process validation of Tablets and Lquids
Process validation of Tablets and LquidsProcess validation of Tablets and Lquids
Process validation of Tablets and Lquids
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production Area
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approach
 
Advanced sterile product manufacturing technology
Advanced sterile product manufacturing technologyAdvanced sterile product manufacturing technology
Advanced sterile product manufacturing technology
 
STERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATIONSTERILE PROCESS OF VALIDATION
STERILE PROCESS OF VALIDATION
 
IPQC of Sterile Ointment.pptx
IPQC of Sterile Ointment.pptxIPQC of Sterile Ointment.pptx
IPQC of Sterile Ointment.pptx
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipments
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbd
 
Qualification of Dry Powder Mixture
Qualification of Dry Powder Mixture Qualification of Dry Powder Mixture
Qualification of Dry Powder Mixture
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptx
 
Fda initiative on process analytical technology
Fda initiative on process analytical technologyFda initiative on process analytical technology
Fda initiative on process analytical technology
 

Ähnlich wie Qualification of tablet compression machine

Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.MayuriGhavate
 
KcjZIZ1NTR9MTIfD811.pptx
KcjZIZ1NTR9MTIfD811.pptxKcjZIZ1NTR9MTIfD811.pptx
KcjZIZ1NTR9MTIfD811.pptxAmitMasand5
 
Development of PLC based Transdermal Patch Evaluation System
Development of PLC based Transdermal Patch Evaluation SystemDevelopment of PLC based Transdermal Patch Evaluation System
Development of PLC based Transdermal Patch Evaluation SystemIRJET Journal
 
Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Aditi Roy
 
Process validation of tablet compression
Process validation of tablet compressionProcess validation of tablet compression
Process validation of tablet compressionSanket Shinde
 
Pilot plant Scale up techniques
Pilot plant Scale up techniquesPilot plant Scale up techniques
Pilot plant Scale up techniquesROHIT
 
Validation of dissolution apparatus
Validation of dissolution apparatusValidation of dissolution apparatus
Validation of dissolution apparatusDHRUV GANDHI
 
PHAR11001 Foundations Of Pharmacy.docx
PHAR11001 Foundations Of Pharmacy.docxPHAR11001 Foundations Of Pharmacy.docx
PHAR11001 Foundations Of Pharmacy.docxwrite5
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...IJERA Editor
 
Top 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCsTop 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCsJohn Niggl
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validationaqsa fatima
 
Optimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessOptimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessIRJET Journal
 
Pilot plant scale up techniques
Pilot plant scale up techniquesPilot plant scale up techniques
Pilot plant scale up techniquesRavish Yadav
 
Qualification Of Tablet Compression Machine by Fauzan.pptx
Qualification Of Tablet Compression Machine by Fauzan.pptxQualification Of Tablet Compression Machine by Fauzan.pptx
Qualification Of Tablet Compression Machine by Fauzan.pptxfauzan7385
 
Unit 1 chapter 1 final ppt for pilot plant scale up techniques
Unit 1 chapter 1 final ppt for pilot plant scale up techniquesUnit 1 chapter 1 final ppt for pilot plant scale up techniques
Unit 1 chapter 1 final ppt for pilot plant scale up techniquesAudumbar Mali
 

Ähnlich wie Qualification of tablet compression machine (20)

Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.Validation of cone blender, mixer granulator and tablet compression machine.
Validation of cone blender, mixer granulator and tablet compression machine.
 
Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
KcjZIZ1NTR9MTIfD811.pptx
KcjZIZ1NTR9MTIfD811.pptxKcjZIZ1NTR9MTIfD811.pptx
KcjZIZ1NTR9MTIfD811.pptx
 
Process validation of tablets
Process validation of tabletsProcess validation of tablets
Process validation of tablets
 
Development of PLC based Transdermal Patch Evaluation System
Development of PLC based Transdermal Patch Evaluation SystemDevelopment of PLC based Transdermal Patch Evaluation System
Development of PLC based Transdermal Patch Evaluation System
 
Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .Validation of dry_powder_mixer_ .
Validation of dry_powder_mixer_ .
 
Process validation of tablet compression
Process validation of tablet compressionProcess validation of tablet compression
Process validation of tablet compression
 
1ST
1ST1ST
1ST
 
Pilot plant Scale up techniques
Pilot plant Scale up techniquesPilot plant Scale up techniques
Pilot plant Scale up techniques
 
Validation of dissolution apparatus
Validation of dissolution apparatusValidation of dissolution apparatus
Validation of dissolution apparatus
 
Top 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCsTop 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCs
 
PHAR11001 Foundations Of Pharmacy.docx
PHAR11001 Foundations Of Pharmacy.docxPHAR11001 Foundations Of Pharmacy.docx
PHAR11001 Foundations Of Pharmacy.docx
 
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
Analysis of Process Parameters for Optimization of Plastic Extrusion in Pipe ...
 
Top 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCsTop 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCs
 
Top 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCsTop 5 Tests for Tablet PCs
Top 5 Tests for Tablet PCs
 
solid tablet validation
solid tablet validationsolid tablet validation
solid tablet validation
 
Optimization of PVC Pipes Production Process
Optimization of PVC Pipes Production ProcessOptimization of PVC Pipes Production Process
Optimization of PVC Pipes Production Process
 
Pilot plant scale up techniques
Pilot plant scale up techniquesPilot plant scale up techniques
Pilot plant scale up techniques
 
Qualification Of Tablet Compression Machine by Fauzan.pptx
Qualification Of Tablet Compression Machine by Fauzan.pptxQualification Of Tablet Compression Machine by Fauzan.pptx
Qualification Of Tablet Compression Machine by Fauzan.pptx
 
Unit 1 chapter 1 final ppt for pilot plant scale up techniques
Unit 1 chapter 1 final ppt for pilot plant scale up techniquesUnit 1 chapter 1 final ppt for pilot plant scale up techniques
Unit 1 chapter 1 final ppt for pilot plant scale up techniques
 

Mehr von Pritam Kolge

Flame Photometric Estimation
Flame Photometric EstimationFlame Photometric Estimation
Flame Photometric EstimationPritam Kolge
 
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...Evaluation of antioxidant and antiradical properties of pomegranate (punica g...
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...Pritam Kolge
 
Evaluation of antioxidant properties of pomegranate peel extract in compariso...
Evaluation of antioxidant properties of pomegranate peel extract in compariso...Evaluation of antioxidant properties of pomegranate peel extract in compariso...
Evaluation of antioxidant properties of pomegranate peel extract in compariso...Pritam Kolge
 
Forms of stress in 21st century
Forms of stress in 21st centuryForms of stress in 21st century
Forms of stress in 21st centuryPritam Kolge
 
International youth day presentation on depression and higher education guidance
International youth day presentation on depression and higher education guidanceInternational youth day presentation on depression and higher education guidance
International youth day presentation on depression and higher education guidancePritam Kolge
 
Biological warfare
Biological warfareBiological warfare
Biological warfarePritam Kolge
 
Maldi (matrix attested laser desorption ionization technique
Maldi (matrix attested laser desorption ionization techniqueMaldi (matrix attested laser desorption ionization technique
Maldi (matrix attested laser desorption ionization techniquePritam Kolge
 
Analysis of Raw Materials
Analysis of Raw MaterialsAnalysis of Raw Materials
Analysis of Raw MaterialsPritam Kolge
 
Technology Tranfer models
Technology Tranfer modelsTechnology Tranfer models
Technology Tranfer modelsPritam Kolge
 

Mehr von Pritam Kolge (12)

Flame Photometric Estimation
Flame Photometric EstimationFlame Photometric Estimation
Flame Photometric Estimation
 
Aseptic Packaging
Aseptic PackagingAseptic Packaging
Aseptic Packaging
 
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...Evaluation of antioxidant and antiradical properties of pomegranate (punica g...
Evaluation of antioxidant and antiradical properties of pomegranate (punica g...
 
Evaluation of antioxidant properties of pomegranate peel extract in compariso...
Evaluation of antioxidant properties of pomegranate peel extract in compariso...Evaluation of antioxidant properties of pomegranate peel extract in compariso...
Evaluation of antioxidant properties of pomegranate peel extract in compariso...
 
Forms of stress in 21st century
Forms of stress in 21st centuryForms of stress in 21st century
Forms of stress in 21st century
 
Chi sqaure test
Chi sqaure testChi sqaure test
Chi sqaure test
 
International youth day presentation on depression and higher education guidance
International youth day presentation on depression and higher education guidanceInternational youth day presentation on depression and higher education guidance
International youth day presentation on depression and higher education guidance
 
Biological warfare
Biological warfareBiological warfare
Biological warfare
 
Air based hazards
Air based hazardsAir based hazards
Air based hazards
 
Maldi (matrix attested laser desorption ionization technique
Maldi (matrix attested laser desorption ionization techniqueMaldi (matrix attested laser desorption ionization technique
Maldi (matrix attested laser desorption ionization technique
 
Analysis of Raw Materials
Analysis of Raw MaterialsAnalysis of Raw Materials
Analysis of Raw Materials
 
Technology Tranfer models
Technology Tranfer modelsTechnology Tranfer models
Technology Tranfer models
 

Kürzlich hochgeladen

Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 

Kürzlich hochgeladen (20)

Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 

Qualification of tablet compression machine

  • 1. QUALIFICATION OF TABLET COMPRESSION MACHINE Prepared By, Mr. Pritam P. Kolge M.Pharm First Year (SemII) Department of Pharmaceutical Quality Assurance Bharati Vidyapeeth College of Pharmacy, Kolhapur 6/29/2020 1 Guided By, Dr. Mrs. N.M.Bhatia Professor and Head, Department of Pharmaceutical Quality Assurance
  • 2. CONTENT Introduction Design Qualification Installation Qualification Operational Qualification Performance Qualification Case Study Conclusion Reference 6/29/2020 2
  • 3. INTRODUCTION 6/29/2020 3 Qualification an ideal step for equipment validation is the action undertaken to demonstrate the intended use and performance of the utilities and equipment. The individual steps of qualification such as design, installation, operational and performance qualification were done in order to qualify the equipment. Blue print of equipment validation was also included. The compression parameters such as compression force, turret rpm and feeder rpm were studied. The process capability of the equipment was studied by observing the weight of 20 tablets, disintegration time, friability, individual weight variation, thickness and hardness. These parameters were studied at three different speeds and the best results were obtained at the optimum speed (40 rpm).
  • 4. Design Qualification  Providing documented evidence that the design of the facility and equipment meet the requirements of the user specification and GMP.  The purpose of the Design Qualification (DQ) is to define the functional specifications of the system and document the vendor selection process.  Documentation and verification of procedures required to fulfill the protocol.  Execution of protocol and data collection, interpretation and review of data for accuracy, completeness and cGMP compliance.  Approval of original protocol formats, approval for the final summaries and system qualification statement. 6/29/2020 4
  • 5. Installation Qualification (IQ):  The information required for an IQ evaluation is • Equipment identification, • Required documentation, • Equipment utility requirements, • Major component specifications, • Component material, • Lubricants and equipment safety features. 6/29/2020 5
  • 6.  Equipment Identification: Record the equipment identification numbers, along with the following information: ▪ Model number ▪ Serial number ▪ Company assigned equipment number and ▪ Location of the equipment  Required Documentation: Record the equipment manufacturer's operation and maintenance manual and drawings. Record the SOP that cover the setup, operation and cleaning of the tablet press.  Equipment Utility Requirements: Compare the manufacturer's specified volts (V) and amps (A) requirements to their conditions at the time of qualification testing and record. Also record the location of the power supply source. 6/29/2020 6
  • 7.  Major Component Specifications: The component specifications section of the protocol verifies that the tablet press components purchased were delivered and installed.  Component material: Record the material of each component that contacts the product.  Lubricants: Record the lubricants used to operate the tablet press and indicate if they make contact with the product.  Equipment Safety Features: The objective of testing equipment safety features is to verify that the safety features on the tablet press function according to the manufacturer's specifications. This test is performed with the tablet press empty. Verify that all of the guards are present and record the results. 6/29/2020 7
  • 8. Operational Qualification (OQ):  An OQ evaluation should establish that the equipment can operate within specified tolerances and limits. The mechanical ranges of the tablet press are challenged, along with the basic tablet press operations. The tablet press will be validated for its operating ability. Information required for the OQ evaluation is: • calibration of the instruments used to control the tablet press • equipment control functions (switches and push buttons) • equipment operation (cam tracks, upper punches, lower punches, feed frames, take off bars, rotor head direction, tablet press speed).  Calibration requirements Verify that all the critical instruments on the equipment have been logged into the calibration system, have calibration procedures in place and are in calibration at the time of qualification testing. Record all information for calibrated instruments used to control the tablet press.  Equipment Control Functions The objective of testing equipment control functions is to verify that the switches and push buttons on the tablet press operate per the manufacturer's specifications. The tests will be performed with the tablet press empty. Operate each control and verify its proper position. 6/29/2020 8
  • 9.  Equipment Operation:  A) Cam Tracks Test The objective of the cam track test is to verify that the upper and lower cam tracks make contact with the upper punches according to the manufacturer's specification. • Install the punches and verify that the cams are contacting the punch head angles on the both the sides of the double-sided cams.  B) Upper Punch Test The objective of the upper punch test is to verify that the upper punch penetration is according to the manufacturer's specification. A vernier caliper is required for this test, which is performed as follows: • Attach a piece of tape to mark the depth of penetration of an upper punch when it is set to a standard depth. • Remove the upper punch and use a calibrated vernier caliper to measure the depth of penetration into the die. Record the results and instrument used to measure the depth. 6/29/2020 9
  • 10.  C) Lower Punch Test The objective of the lower punch test is to verify that the lower punch height is set according to the manufacturer's specification. A dial indicator test is required. Measure the height of the lower punch above the die with a dial indicator and record the results and the instrument used to measure the height.  D) Take Off Bar Test The objective of the take-off bar test is to verify that the take-off bars do not make contact with the lower punches. Turn the tablet press by hand and verify that the takeoff bars do not make contact with the lower punches. Record the results.  E) Feed Frame Test The objective of the feed frame test is to verify that the feed frame distance above the rotor head is according to the manufacturer's specification. Feeler gauge test: Measure the clearance between the feed frame and the motor head with a feeler gauge and record the results and the instrument used to measure the clearance. 6/29/2020 10
  • 11.  F) Tablet Press Rotation Direction The objective of the rotation direction test is to verify that the rotor head rotates in the proper direction. The tests will be performed with the tablet press empty. Press the start switch and observe the direction of the rotation of the rotor head as viewed from front of the press and record the results.  G) Tablet Press Speed The objective of the speed test is to verify that the measured speeds are within ± 10 % of the manufacturer's specification of a minimum of 9 rpm and a maximum of 36 rpm. This test will be performed with the press empty. A stop watch is required for this test. Measure the speed of the rotor head with a calibrated stopwatch. Verify that the measured speeds are within ± 10 % of the manufacturer's specification and record the results and the instrument used to measure the speed. 6/29/2020 11
  • 12. 6/29/2020 12 Take off Bar Feed Frame Dial Indicator Feeler Gauge
  • 13. Performance Qualification: 6/29/2020 13  The blend/dummy material is unloaded into the hoppers on the both sides and the compression machine is operated at low speed (20RPM) as per operating instructions. Then the machine is set to run for 20 minutes continuously after adjusting the following parameters. 1. Individual tablet weight variation 2. Weight of 20 tablets 3. Hardness 4. Thickness 5. Disintegration time 6. Friability
  • 14. 6/29/2020 14  Then the experiment was repeated at both medium (40RPM) and high speed (60RPM) with same set of parameters and the parameters were checked at different speeds (low, medium and high rpm).  Sampling Plan Collect 100 tablets for every 05 minutes.
  • 15. Case Study- sticking issues in tablet production  The problem The Italian division of Novartis approached I Holland Company and local agent Vis Viva with a sticking issue on an antiepileptic drug in the form of a coated tablet. Novartis reported a strong sticking/picking problem causing the press to be stopped several times during manufacture for cleaning and maintenance of the punches, which resulted in production downtime. Sticking and picking halted production These two problems can be caused by various factors related to the physicochemical properties of the formulation components, the surface characteristics of punch face, as well as factors related to the machinery and the environment, for example, compression force and speed, temperature and humidity. It has a negative effect on tablet appearance and often results in the removal of tablet tooling from production for regular cleaning and maintenance, as experienced by Novartis. 6/29/2020 15
  • 16. 6/29/2020 16 Picking was another problem encountered by the company — this is when compressed granule that has adhered to the detail on the punch face, results in ‘picking out’ of parts from the tablet face.
  • 17.  The Solution The selected anti-stick coating was used on the punches and applied to the tooling by using an electron beam process. This is one of the smoothest and most defect-free methods of applying a PVD coating as it does not create droplets during the atomization process. The atomic particles are attracted to the tooling leaving an even surface which is far less susceptible to breakaway defects. From the first trial of the new design and tooling using PharmaCote CN+, improvements were seen and all sticking/picking issues were instantly resolved resulting in a 25% increase in production. This was achieved over a five-day working week, with reduced hours, resulting in a full day’s production time saved. Before the implementation of the new tablet design and tool coating, four batches of the tablet were produced during a 6-day working week. This included the extra time required for cleaning and maintenance due to the original sticking/picking problem. Once I Holland’s improvements were adopted, a further batch was produced in the same time-period with a total of five batches manufactured without the need to stop production. As a result of this outcome, Novartis is now looking at further products to be analyzed to improve production and reduce down-time. 6/29/2020 17
  • 18. CONCLUSION  The parameters studied under the compression process are such as compression force, turret rpm and feeder rpm. These are set at three different speeds and analyzed on both sides to assess the exact parameters.  The samples were collected from both the sides (LHS, RHS) to qualify the two press stations and the observations made from the results were found to be in specified limits as per the ICH specifications  From this we conclude that the equipment is successfully qualified and can be used for production of further batches.  The result is considerable variation in the way pharmaceutical companies approach the qualification of laboratory equipment and requirements. 6/29/2020 18
  • 19. REFERENCES  EQUIPMENT QUALIFICATION AND VALIDATION OF TABLET COMPRESSION MACHINE, WORLD JOURNAL OF PHARMACY AND PHARMACEUTICAL SCIENCES, Volume 2, Issue 6, 5412-5418., ISSN 2278 – 4357, P.Ramasubramaniyan, N.Sharanya, et.al.  A REVIEW ON QUALIFICATION OF AUTOCLAVE, RMG, FBD, CONE BLENDER, TABLET COMPRESSION MACHINE, Journal of Global Trends in Pharmaceutical Sciences, Volume 5, Issue 1, pp-1450-1459, January-March 2014, ISSN: 2230-7346, B.Venkateswara Reddy, B.Rasmitha Reddy et al.  I HOLLAND TABLETING SCIENCE, tablettingscience.com 6/29/2020 19