1. Primas White Jr.
34177 Camelina St. Lake Elsinore CA, 92532
702-275-9869 or 951-246-0226
Email: athumpn1@gmail.com
Objective
Accomplished professional seeking to leverage extensive background in Facilities management,
Warehousing, Contract Management Construction Maintenance & Facilities Services industry. Recognized
for teamwork,critical thinking, and strict attention to safety. Possesses the unique combination of
Architectural Designer, Space Planner, Ergonomic Specialist and creative skills, which I use effectively in
resolving challenges and knocking downbarriers.
Education
Grambling State University, Music Performance,General Education
International Professional Schoolof Bodywork,Certified Massage Technician
AutoCAD, Architectural Design and Space Planning
Skills & Abilities
DURINGMY CAREER I HAVE:
• SUPERVISEDANDMANAGED:MANUAL UNION,NON-UNIONCRAFTS, AND NON-MANUAL PERSONNEL.
• SUPERVISEDANDMANAGEDFACILITIESMAINTENANCE AND CONSTRUCTION.
• PERFORMCOSTCOMPARISONS FOR OUTSIDE CONTRACTORSAND ON-SITE CRAFT, ORDERED AND
EXPEDITEDMATERIAL, GENERATEDWORKPROCEDURES,REWROTE ANDMODIFIEDCONTRACTS,
MANAGED LUMP SUM,TIME AND MATERIALCONTRACTS, PERFORMEDMAN-LOADING,GENERATED
JOBPROPOSALS,DETAILINGESTIMATESAND SCHEDULES,AND MANAGING PROJECTSFROMJOB
MOBILIZATIONTOINITIALDESIGNAND FINAL INSPECTION
I WAS A FACILITIESMANAGER, PROJECTMANAGER,CONSTRUCTIONMATERIALCOORDINATOR,
CONTRACTS MANAGER, ARCHITECTURAL DESIGNER,SPACE PLANNER,ERGONOMICSPECIALIST,
WAREHOUSE SUPERVISOR,INVENTORY CONTROL SPECIALIST,STATIONACCOUNTINGCLERKAND A
FORKLIFTOPERATOR/TRAINER.I’MHIGHLY SKILLED AND A GREAT MOTIVATOR.
·
LEADERSHIP
· MANAGES THE BUILDINGSAND GROUNDSAT THE SAN ONOFRE NUCLEAR GENERATIONSTATION.
PRIMARY RESPONSIBILITIESINCLUDE MANAGINGTHE PERFORMANCE OFCONTRACTORS FOR
FACILITIESRELATEDSERVICESSUCH AS HOUSEKEEPING,LANDSCAPING,LOCK-SMITING,TRAIN,
RAIL, EVENT,AND TOURSUPPORT.WASA MEMBEROFTHE SONGS EMERGENCY RESPONSE
ORGANIZATION,ACTIVELY PARTICIPATESINPROFESSIONALRESOURCESFOROUTAGES(PROS)IN
2. Page 2
SUPPORTOFTURBINE AND REFUELINGMAINTENANCE. ATTENDSOPERATIONSTURNOVER
MEETINGREPRESENTINGSITE SUPPORTSERVICESANDMAINTENANCE,DURINGOUTAGES.SHARES
IN WEEKENDEMERGENCY CALLOUTWORKBY RAPIDLY RESPONDINGASFACILITIESWEEKEND
DUTY MANAGER AND MAINTENANCE DEPARTMENT.
· I HAVE BEENRESPONSIBLE FORA NUMBEROFLARGE PROJECTSOVERTHE YEARS. THIS INCLUDED
PLANNINGOF RESOURCES,DECISIONMAKING, ACCOUNTABILITY ANDGUIDANCE, ALL WITH
SUCCESSFUL RESULTS.ALL OF THESE PROJECTSREQUIREDME TOLEADAND BUILDCROSS
FUNCTIONALTEAMS, PROVIDE CONSTANTOVERSIGHT,DEVELOP COMMUNICATIONPLANS,UPDATE
SCOPE,MAKE AND ENFORCE SCHEDULESAND BE ACCOUNTABLE FOR RESULTS.THEY ALL
INCLUDEDMULTIPLE CONTRACTORSANDDISCIPLINESWITHSTRICT ADHERENCE TOBUDGETAND
TURNOVERTOTHE CLIENT.
OF MY ACCOMPLISHMENTSAMONG MANY WAS BEINGRESPONSIBLE FOR DESIGNINGAND
OVERSEEINGTHE CONSTRUCTIONOFTHE NEWEXECUTIVE’SOFFICES,WORKSPACE PLANNING,
ARCHITECTURALDESIGN AND THE SITE ERGONOMICS. I WAS OFTENASKED TO TAKE ON THE
LARGE PROJECTSTHATWERE OFHIGH VISIBILITY.AS A FACILITIESMANAGER, MY FIRST PROJECT
WAS TO TURNA MILLIONDOLLARFURNITURE WAREHOUSE INTOANORGANIZEDWORKABLE
WAREHOUSE THATWOULD SAVE TIME,SPACE AND MONEY,IT BECAME A SHOWPLACE!
Experience
| CONTRACT MANAGER:
SOUTHERNCALIFORNIA EDISON(SCE)
2010 – 2013 SAN ONOFRE NUCLEARGENERATINGSTATION
|FACILITIESMANAGER:
SOUTHERNCALIFORNIA EDISON(SCE)
1998 – 2010 SAN ONOFRE NUCLEARGENERATINGSTATION
WAREHOUSE MANAGER:
SOUTHERNCALIFORNIA EDISON(SCE)
1983 – 1998 SAN ONOFRE NUCLEARGENERATINGSTATION
CUSTOMERASSOIATE II:
LOWE’SMENIFEE,PAINT DEPARTMENT
FEBUARY 2016 to PRESENT