SlideShare ist ein Scribd-Unternehmen logo
1 von 5
25/04/16 I
Philip Hudson
23 Easby Close,
Ilkley,
West Yorkshire
LS29 9DJ
Telephone: 01943 600153
Mobile: 07772 786840
E-mail: philhudson1@btconnect.com
PersonalObjective
I am looking for a position within the Construction Industry that would be challenging, rewarding and
where my skills and experience would be a valuable asset to my Employer. Through my experience in
civils, steelwork, utilities, services, telecoms and nuclear decommissioning I am able to use my
knowledge in problem solving and optioneering. I am highly motivated, proactive and enjoy rising to
any challenge. I am a “team player” as well as being able to take full responsibility and to work on my
own initiative.
RelevantSkills
 Thirty five years’ experience as a Quantity Surveyor at all levels both in private practice and in a
contracting environment covering all aspects of quantity surveying from simple domestic
construction to major commercial projects in both public and private sectors.
 Experience of cost planning, budget preparation and value engineering.
 Production of bills of quantities under SMM 5, 6 and 7 and CESMM.
 Measurement and agreement of final accounts.
 Experience of measuring and agreeing work carried out under JCT, NEC, cost plus, target cost and
MOD/PSA measured term contracts.
 Cost/value reporting and monitoring including earned value management.
 Preparing estimates from first principles based on bills of quantities or specification and drawings
from enquiry through to director level presentation.
 Preparing cost models either from scratch or adapting generic models.
 Identification of and pricing project risk.
 Preparing, managing and concluding subcontract packages.
 Claims preparation, negotiation and final settlement from both sides of the contract including
domestic subcontractors.
 Man management skills gained over the last twenty years as a team leader, Area Surveyor and
Contracts Manager.
 SC security cleared.
 IT skills especially in MS Excel, MS Word and MS Project, also experience using Vector
Estimating/CATO software. I have completed Level 2 Certificate in Information Technology for
Business.
ProfessionalQualifications
Professional Associate of the Royal Institution of Chartered Surveyors from 1984 to 1994.
Fellow of Faculty of Building from 1986 to 1994
25/04/16 II
Career History
February 2016 – present Kier MG, Leeds
I agreed to transfer to Leeds to help with the workload on a framework contract with the Canals and
Rivers Trust. I am currently responsible for running four projects, one is for towpath/bank repairs, one
is for a replacement bridge deck and two are for emergency demolition of two bridges following the
Christmas floods. Total value of these works is £1.45million and they are under NEC3.
December 2015 – January 2016 Kier MG, Exeter
Following completion of the South West Water project I was asked to assist the Exeter office on
closing out a flood defence contract for the Environment Agency. My task was to analyse the costs on
forty work packages, apportion these to the various elements of work and then put this information
into bespoke EA forms. The value of this contract was £12million. I also helped put together
subcontract enquiries for a major flood defence tender that was underway..
March 2015 – November 2015 Kier MG, St Austell
I was engaged on a self employed basis as a Senior Quantity Surveyor working on AMP5
Development Services Project for South West Water. My role was to prepare and submit final
accounts for a large number of schemes on the clean water side within an overall NEC 3 framework
contract. Once the accounts had been submitted I reviewed and agreed them with the Clients Auditor.
All accounts were successfully submitted and agreed within the KPI deadline. The value of accounts
submitted was £8.5million.
December 2008 to March 2015 Babcock International, Plymouth
I was engaged on a self-employed basis as a Senior Quantity Surveyor providing estimating and cost
management on a £15 million project for the disposal and recycling of nuclear implicated legacy plant
and equipment. The contract arrangement was cost plus within an overall budget and had to meet
annual control totals which was challenging. The project was innovative and required a high degree of
lateral thinking to overcome problems and select viable options. I had a high degree of autonomy and
carried out the role of Cost Manger reporting to the Project Controls Manager. My duties involved day
to day cost management, preparing various monthly cost reports, forecasts and models, preparing
estimates and business cases and attending joint customer meetings. I was also responsible for day to
day project planning using MS Project and was expected to challenge the project team on progress. I
also deputised for the Project Manager when required including acting as temporary Project Manager
for three months in 2012 for which I received a “Valuing People” Award. Outside of my main project
I also assisted in estimating for various heavy civils projects within the dockyard. I was also involved
in the early stages of the Submarine Disposals Project and carried out the initial cost planning for the
three options under consideration. These were between £0.5 billion and £1.5 billion including life
cycle costing.
January 2008 to December 2008 MOD Defence Estates, Plymouth
I was engaged on a self-employed basis as a consultant quantity surveyor providing cost advice to DE
on the regional prime contract for the South West. This involves checking budgets and tenders for
major schemes and preparing tender and “value for money” reports. The schemes included £4million
25/04/16 III
flood defence scheme, £4million command centre and a £20million hanger replacement. I also
prepared initial cost plans for schemes up to £5million and also one for a £40million refueling jetty.
January 2007 to January 2008 E C Harris, Plymouth
I was employed on secondment to DML in Devonport as part of a small team tendering for
commercial nuclear work. This involved setting up the estimating systems as well as producing
tenders. There were four major schemes; £9million process cells, £1.5million process crane,
£1.75million storage facility and £13.5million LLW waste retrieval system. DML were successful in
winning the last of these projects in a three stage tender process but unfortunately the project was
shelved the day the contract was due to be signed. This resulted in the section closing and I moved
within DML to be change control manager on a £90million super yacht.
October 2004 to January 2007 Interserve Engineering Services, Plymouth
I was employed as Regional Quantity Surveyor for the South West responsible for the commercial
management of M & E services for two major projects, Armada worth £15million to provide new
accommodation for the Navy and Cornwall Schools comprising 15 refurbishments and two new builds
worth £9million. Both of these were PFI schemes with a design and build contract. My duties included
cost/value reporting, subcontract package preparation and management and project cost control. I had
a small team of surveyors and administrators to assist in this.
November 2003 to October 2004 Bam Nuttall Ltd, Scarborough
I was employed on a temporary basis as a senior quantity surveyor on a coastal protection contract in
Scarborough valued at £25million. My main role was to prepare and measure the compensation events
on the contract totaling some £20million. I was directly responsible to the project quantity surveyor.
September 2000 to November 2003 Skanska Construction UK Ltd, Morley, Leeds
Employed as a project quantity surveyor with Skanska in the Telecommunications Division. I was
involved with the 3G infrastructure rollout principally Orange worth £5million and Crown Castle
worth £13million both of which are design and build. I was responsible for a team of four surveyors
and directly responsible to the commercial manager for financial cost/value reporting, preparing and
negotiating budgets, tenders and final accounts with the Client as well as negotiating tenders, carrying
out monthly payments and agreeing final accounts with subcontractors.
October 1997 to 31 August 2000 William Hare Ltd, Scarborough
Quantity surveyor with a major structural steelwork contractor. My role was the post contract control
of major contracts including preparing and agreeing valuations, measuring and agreeing variations,
preparing and negotiating claims, internal cost control, etc. The projects I was involved with were;
4000te £8million Saltend power station; 2500te £5million plastics process plant for BP/Total at
Grangemouth; 2200te £4.5million ethanol process plant for BP at Grangemouth; 1200te £3million
ethanol process plant again for BP. I also was involved with an 800te £2million pharmaceutical plant
for Pfizer. The BP contracts were all Target Cost contracts.
June 1997 to September 1997 Atlas Ward Structures Ltd, Scarborough
Estimator/Quantity Surveyor for the Atlas “package building” system. I was responsible for taking off
quantities, preparing estimates, writing specifications and obtaining quotations using computerised
systems on projects varying from £50,000 to £300,000. On the post contract surveying side my
responsibility was for measuring and pricing variations and agreeing final accounts.
October 1996 to June 1997 McCain Foods (GB) Ltd
Clerical Assistant in Engineering Buying involving ordering engineering items to maintain stock
levels.
25/04/16 IV
August 1995 to September 1996 Self Employed Quantity Surveyor, Scarborough.
During this period I completed a “Training for Work” course in setting up and running a small
business. I also carried out quantity surveying work on a freelance basis for architect colleagues
involving budget preparation, estimating and specification writing on domestic/small commercial
projects. Again I also carried out jobbing building works.
September 1994 to August 1995. Forge Plastics Limited, Scarborough.
Although being initially employed as a Specification Administrator, I recognised a need and was given
the task of writing a spreadsheet application to produce standard specifications. In February 1995 I
was promoted to Contracts Manager responsible for a rolling programme of signage works for Shell
petrol stations covering between ten and twenty sites per week. My task was to lead a small team of
designers and specifiers and carry out the surveying, designing and specification writing as well as to
deal with all the problems arising and to manage the programme which was constantly changing.
June 1991 to September 1994. Self Employed Quantity Surveyor, Thirsk and Scarborough
After being made redundant I made use of my contacts and started up my own practice. I gained a
number of contracts and was able to successfully compete for a time in a very competitive
marketplace. I provided full quantity surveying services on petrol filling station projects for Shell and
Repsol and car dealership refurbishments for Caffyns PLC ranging in value from £50,000 up to
£500,000. I also wrote specifications and prepared pricing schedules for a number of small
commercial/domestic contracts. I also carried out work as a jobbing builder mainly repair work and
minor alterations
April 1990 to April 1991. Mills Taylor Partnership, Harrogate.
Quantity Surveyor
I was employed as a senior quantity surveyor responsible for my own projects reporting back to the
partners. Projects covered mainly pub refurbishment up to £250,000 together with a PSA contract
refurbishing hospital operating theatres worth £450,000.
October 1987 to April 1990. F Parkinson Limited, Blackpool.
Quantity Surveyor
I was initially employed as a senior quantity surveyor responsible for a measured term contract at RAF
Leeming using the PSA Schedule. After six months I was promoted to Yorkshire area quantity
surveyor with responsibility for a team of six surveyors working on MOD and British Telecom
measured term contracts throughout North Yorkshire. I was also responsible for contracts for PSA and
British Rail up to £250,000 in value.
April 1977 to October 1987. Sawyer & Fisher, Maidstone. R J McComb, Gillingham.
Holden & Lee, Blackpool
On leaving polytechnic I started my career in private practice in Kent as a junior quantity surveyor and
progressing to senior quantity surveyor. I carried out the full range of pre and post contract duties for
private, commercial and public sector clients on a wide variety of projects from simple housing
schemes to multimillion hospitals.
PersonalDetails
Marital Status: I am married with two grown up children.
Nationality: British.
Age: 60
Full UK driving licence with no penalties.
25/04/16 V
SecondaryEducation
Scarborough High School for Boys 1966 to 1973.
GCE “O” Levels gained in 1971: - Maths, English, Physics, Biology, History, and Latin
GCE “A” Levels gained in 1973: - Geography ( C ), History ( D ), Economics ( E )
Further Education
Sheffield City Polytechnic 1973 to 1977.
HND Building gained in 1976
Diploma in Construction Management and Economics gained in 1977
Scarborough Sixth Form College 2000 to 2001
RSA Stage 2 Certificate in Integrated Business Technology
Other courses/qualifications
CSCS Construction Surveyor Manager Level.
Skanska Construction Rail Awareness course
Skanska Safety Management course
Skanska Environmental Management/Awareness course
Thomas Telford Preparing for Adjudication course
References
Available on request.

Weitere ähnliche Inhalte

Ähnlich wie Phil Hudson 2015CV

1.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_161.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_16Paul Martin
 
EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015Danny Buxton
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015Phil Morris
 
Project Examples
Project ExamplesProject Examples
Project ExamplesJohn Taylor
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd
 
Resume - David Steele 14.05.15
Resume - David Steele 14.05.15Resume - David Steele 14.05.15
Resume - David Steele 14.05.15David Steele
 
alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)Alan Morrison
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)Andy Coupland
 
Ian Anderson CV December 2016
Ian Anderson CV December 2016Ian Anderson CV December 2016
Ian Anderson CV December 2016Ian Anderson
 
F. King CV- Jan 2015
F. King CV- Jan 2015F. King CV- Jan 2015
F. King CV- Jan 2015Frank King
 
Dixson David August 2010 Ddms
Dixson David   August 2010 DdmsDixson David   August 2010 Ddms
Dixson David August 2010 Ddmsddixson
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CVThomas McCarthy
 

Ähnlich wie Phil Hudson 2015CV (20)

1.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_161.Paul Martin CV 13_04_16
1.Paul Martin CV 13_04_16
 
EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015EMPLOYMENT HISTORY April 2015
EMPLOYMENT HISTORY April 2015
 
CV_PhilMorris_2015
CV_PhilMorris_2015CV_PhilMorris_2015
CV_PhilMorris_2015
 
Project Examples
Project ExamplesProject Examples
Project Examples
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014GNA Surveyors Ltd - Company Presentation 2014
GNA Surveyors Ltd - Company Presentation 2014
 
CV TLS - March 14
CV TLS - March 14CV TLS - March 14
CV TLS - March 14
 
Mathews Ian-CMS-
Mathews Ian-CMS-Mathews Ian-CMS-
Mathews Ian-CMS-
 
Resume - David Steele 14.05.15
Resume - David Steele 14.05.15Resume - David Steele 14.05.15
Resume - David Steele 14.05.15
 
alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)
 
Gary Affleck Ward CV
Gary Affleck Ward CVGary Affleck Ward CV
Gary Affleck Ward CV
 
Peter Dally Aquenta CV
Peter Dally Aquenta CVPeter Dally Aquenta CV
Peter Dally Aquenta CV
 
CV_Andy_Coupland (1)
CV_Andy_Coupland (1)CV_Andy_Coupland (1)
CV_Andy_Coupland (1)
 
Ian Anderson CV December 2016
Ian Anderson CV December 2016Ian Anderson CV December 2016
Ian Anderson CV December 2016
 
CV NB290716
CV NB290716CV NB290716
CV NB290716
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
CV Jonathan Grice
CV Jonathan GriceCV Jonathan Grice
CV Jonathan Grice
 
F. King CV- Jan 2015
F. King CV- Jan 2015F. King CV- Jan 2015
F. King CV- Jan 2015
 
Dixson David August 2010 Ddms
Dixson David   August 2010 DdmsDixson David   August 2010 Ddms
Dixson David August 2010 Ddms
 
44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV44494 Tom McCarthy Master CV
44494 Tom McCarthy Master CV
 

Phil Hudson 2015CV

  • 1. 25/04/16 I Philip Hudson 23 Easby Close, Ilkley, West Yorkshire LS29 9DJ Telephone: 01943 600153 Mobile: 07772 786840 E-mail: philhudson1@btconnect.com PersonalObjective I am looking for a position within the Construction Industry that would be challenging, rewarding and where my skills and experience would be a valuable asset to my Employer. Through my experience in civils, steelwork, utilities, services, telecoms and nuclear decommissioning I am able to use my knowledge in problem solving and optioneering. I am highly motivated, proactive and enjoy rising to any challenge. I am a “team player” as well as being able to take full responsibility and to work on my own initiative. RelevantSkills  Thirty five years’ experience as a Quantity Surveyor at all levels both in private practice and in a contracting environment covering all aspects of quantity surveying from simple domestic construction to major commercial projects in both public and private sectors.  Experience of cost planning, budget preparation and value engineering.  Production of bills of quantities under SMM 5, 6 and 7 and CESMM.  Measurement and agreement of final accounts.  Experience of measuring and agreeing work carried out under JCT, NEC, cost plus, target cost and MOD/PSA measured term contracts.  Cost/value reporting and monitoring including earned value management.  Preparing estimates from first principles based on bills of quantities or specification and drawings from enquiry through to director level presentation.  Preparing cost models either from scratch or adapting generic models.  Identification of and pricing project risk.  Preparing, managing and concluding subcontract packages.  Claims preparation, negotiation and final settlement from both sides of the contract including domestic subcontractors.  Man management skills gained over the last twenty years as a team leader, Area Surveyor and Contracts Manager.  SC security cleared.  IT skills especially in MS Excel, MS Word and MS Project, also experience using Vector Estimating/CATO software. I have completed Level 2 Certificate in Information Technology for Business. ProfessionalQualifications Professional Associate of the Royal Institution of Chartered Surveyors from 1984 to 1994. Fellow of Faculty of Building from 1986 to 1994
  • 2. 25/04/16 II Career History February 2016 – present Kier MG, Leeds I agreed to transfer to Leeds to help with the workload on a framework contract with the Canals and Rivers Trust. I am currently responsible for running four projects, one is for towpath/bank repairs, one is for a replacement bridge deck and two are for emergency demolition of two bridges following the Christmas floods. Total value of these works is £1.45million and they are under NEC3. December 2015 – January 2016 Kier MG, Exeter Following completion of the South West Water project I was asked to assist the Exeter office on closing out a flood defence contract for the Environment Agency. My task was to analyse the costs on forty work packages, apportion these to the various elements of work and then put this information into bespoke EA forms. The value of this contract was £12million. I also helped put together subcontract enquiries for a major flood defence tender that was underway.. March 2015 – November 2015 Kier MG, St Austell I was engaged on a self employed basis as a Senior Quantity Surveyor working on AMP5 Development Services Project for South West Water. My role was to prepare and submit final accounts for a large number of schemes on the clean water side within an overall NEC 3 framework contract. Once the accounts had been submitted I reviewed and agreed them with the Clients Auditor. All accounts were successfully submitted and agreed within the KPI deadline. The value of accounts submitted was £8.5million. December 2008 to March 2015 Babcock International, Plymouth I was engaged on a self-employed basis as a Senior Quantity Surveyor providing estimating and cost management on a £15 million project for the disposal and recycling of nuclear implicated legacy plant and equipment. The contract arrangement was cost plus within an overall budget and had to meet annual control totals which was challenging. The project was innovative and required a high degree of lateral thinking to overcome problems and select viable options. I had a high degree of autonomy and carried out the role of Cost Manger reporting to the Project Controls Manager. My duties involved day to day cost management, preparing various monthly cost reports, forecasts and models, preparing estimates and business cases and attending joint customer meetings. I was also responsible for day to day project planning using MS Project and was expected to challenge the project team on progress. I also deputised for the Project Manager when required including acting as temporary Project Manager for three months in 2012 for which I received a “Valuing People” Award. Outside of my main project I also assisted in estimating for various heavy civils projects within the dockyard. I was also involved in the early stages of the Submarine Disposals Project and carried out the initial cost planning for the three options under consideration. These were between £0.5 billion and £1.5 billion including life cycle costing. January 2008 to December 2008 MOD Defence Estates, Plymouth I was engaged on a self-employed basis as a consultant quantity surveyor providing cost advice to DE on the regional prime contract for the South West. This involves checking budgets and tenders for major schemes and preparing tender and “value for money” reports. The schemes included £4million
  • 3. 25/04/16 III flood defence scheme, £4million command centre and a £20million hanger replacement. I also prepared initial cost plans for schemes up to £5million and also one for a £40million refueling jetty. January 2007 to January 2008 E C Harris, Plymouth I was employed on secondment to DML in Devonport as part of a small team tendering for commercial nuclear work. This involved setting up the estimating systems as well as producing tenders. There were four major schemes; £9million process cells, £1.5million process crane, £1.75million storage facility and £13.5million LLW waste retrieval system. DML were successful in winning the last of these projects in a three stage tender process but unfortunately the project was shelved the day the contract was due to be signed. This resulted in the section closing and I moved within DML to be change control manager on a £90million super yacht. October 2004 to January 2007 Interserve Engineering Services, Plymouth I was employed as Regional Quantity Surveyor for the South West responsible for the commercial management of M & E services for two major projects, Armada worth £15million to provide new accommodation for the Navy and Cornwall Schools comprising 15 refurbishments and two new builds worth £9million. Both of these were PFI schemes with a design and build contract. My duties included cost/value reporting, subcontract package preparation and management and project cost control. I had a small team of surveyors and administrators to assist in this. November 2003 to October 2004 Bam Nuttall Ltd, Scarborough I was employed on a temporary basis as a senior quantity surveyor on a coastal protection contract in Scarborough valued at £25million. My main role was to prepare and measure the compensation events on the contract totaling some £20million. I was directly responsible to the project quantity surveyor. September 2000 to November 2003 Skanska Construction UK Ltd, Morley, Leeds Employed as a project quantity surveyor with Skanska in the Telecommunications Division. I was involved with the 3G infrastructure rollout principally Orange worth £5million and Crown Castle worth £13million both of which are design and build. I was responsible for a team of four surveyors and directly responsible to the commercial manager for financial cost/value reporting, preparing and negotiating budgets, tenders and final accounts with the Client as well as negotiating tenders, carrying out monthly payments and agreeing final accounts with subcontractors. October 1997 to 31 August 2000 William Hare Ltd, Scarborough Quantity surveyor with a major structural steelwork contractor. My role was the post contract control of major contracts including preparing and agreeing valuations, measuring and agreeing variations, preparing and negotiating claims, internal cost control, etc. The projects I was involved with were; 4000te £8million Saltend power station; 2500te £5million plastics process plant for BP/Total at Grangemouth; 2200te £4.5million ethanol process plant for BP at Grangemouth; 1200te £3million ethanol process plant again for BP. I also was involved with an 800te £2million pharmaceutical plant for Pfizer. The BP contracts were all Target Cost contracts. June 1997 to September 1997 Atlas Ward Structures Ltd, Scarborough Estimator/Quantity Surveyor for the Atlas “package building” system. I was responsible for taking off quantities, preparing estimates, writing specifications and obtaining quotations using computerised systems on projects varying from £50,000 to £300,000. On the post contract surveying side my responsibility was for measuring and pricing variations and agreeing final accounts. October 1996 to June 1997 McCain Foods (GB) Ltd Clerical Assistant in Engineering Buying involving ordering engineering items to maintain stock levels.
  • 4. 25/04/16 IV August 1995 to September 1996 Self Employed Quantity Surveyor, Scarborough. During this period I completed a “Training for Work” course in setting up and running a small business. I also carried out quantity surveying work on a freelance basis for architect colleagues involving budget preparation, estimating and specification writing on domestic/small commercial projects. Again I also carried out jobbing building works. September 1994 to August 1995. Forge Plastics Limited, Scarborough. Although being initially employed as a Specification Administrator, I recognised a need and was given the task of writing a spreadsheet application to produce standard specifications. In February 1995 I was promoted to Contracts Manager responsible for a rolling programme of signage works for Shell petrol stations covering between ten and twenty sites per week. My task was to lead a small team of designers and specifiers and carry out the surveying, designing and specification writing as well as to deal with all the problems arising and to manage the programme which was constantly changing. June 1991 to September 1994. Self Employed Quantity Surveyor, Thirsk and Scarborough After being made redundant I made use of my contacts and started up my own practice. I gained a number of contracts and was able to successfully compete for a time in a very competitive marketplace. I provided full quantity surveying services on petrol filling station projects for Shell and Repsol and car dealership refurbishments for Caffyns PLC ranging in value from £50,000 up to £500,000. I also wrote specifications and prepared pricing schedules for a number of small commercial/domestic contracts. I also carried out work as a jobbing builder mainly repair work and minor alterations April 1990 to April 1991. Mills Taylor Partnership, Harrogate. Quantity Surveyor I was employed as a senior quantity surveyor responsible for my own projects reporting back to the partners. Projects covered mainly pub refurbishment up to £250,000 together with a PSA contract refurbishing hospital operating theatres worth £450,000. October 1987 to April 1990. F Parkinson Limited, Blackpool. Quantity Surveyor I was initially employed as a senior quantity surveyor responsible for a measured term contract at RAF Leeming using the PSA Schedule. After six months I was promoted to Yorkshire area quantity surveyor with responsibility for a team of six surveyors working on MOD and British Telecom measured term contracts throughout North Yorkshire. I was also responsible for contracts for PSA and British Rail up to £250,000 in value. April 1977 to October 1987. Sawyer & Fisher, Maidstone. R J McComb, Gillingham. Holden & Lee, Blackpool On leaving polytechnic I started my career in private practice in Kent as a junior quantity surveyor and progressing to senior quantity surveyor. I carried out the full range of pre and post contract duties for private, commercial and public sector clients on a wide variety of projects from simple housing schemes to multimillion hospitals. PersonalDetails Marital Status: I am married with two grown up children. Nationality: British. Age: 60 Full UK driving licence with no penalties.
  • 5. 25/04/16 V SecondaryEducation Scarborough High School for Boys 1966 to 1973. GCE “O” Levels gained in 1971: - Maths, English, Physics, Biology, History, and Latin GCE “A” Levels gained in 1973: - Geography ( C ), History ( D ), Economics ( E ) Further Education Sheffield City Polytechnic 1973 to 1977. HND Building gained in 1976 Diploma in Construction Management and Economics gained in 1977 Scarborough Sixth Form College 2000 to 2001 RSA Stage 2 Certificate in Integrated Business Technology Other courses/qualifications CSCS Construction Surveyor Manager Level. Skanska Construction Rail Awareness course Skanska Safety Management course Skanska Environmental Management/Awareness course Thomas Telford Preparing for Adjudication course References Available on request.