The information management solutions are specific group of projects which standart testing methods are rarely applicable for. We are going to investigate a case study with a bank application that will put the QA team in front of many challenges: no user interface, big volume of information fetched, and a high speed of processing this data needed. Even more, the calculations made and the system security are critical as we are talking about a bank product.
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Veselin Berov - Testing in the World of Information Management
1. Testing in the IM worldTesting in the IM world
Veselin Berov – Project Manager Adastra BulgariaVeselin Berov – Project Manager Adastra Bulgaria
2. The Challenge
2
You are selected to be a QA Lead in a project for
implementing Basel Capital Adequacy Reporting (BCAR)
solution in a big North American Bank with presence in USA,
Canada and UK. The BCAR solution should be implemented
following the Basel III regulation: International Framework
for Capital Adequacy, Stress Testing & Market Liquidity Risk.
Project duration is estimated as 10 months.
Your team is located in Bulgaria and there are 12 QA-s.
6. Test Strategy
6
Test Team and RolesTest Team and RolesTest Team and RolesTest Team and Roles
Exit CriteriaExit CriteriaExit CriteriaExit Criteria
Test ObjectivesTest ObjectivesTest ObjectivesTest Objectives
Test PlanTest Plan
Test LevelsTest Levels
Subjects for TestingSubjects for Testing
Acceptance CriteriaAcceptance Criteria
Test EnvironmentsTest Environments
Test ApproachTest Approach