SlideShare ist ein Scribd-Unternehmen logo
1 von 4
102 Fornelius Avenue , Clifton, NJ 07013 •551-206-3519 •PPerehinec@yahoo.com
Peter Perehinec
Experience
09/74-06/15 Lummus CBI
(Previously Lummus ABB, & Lummus
Co. Inc. ) Bloomfield, New Jersey
Titles at Lummus: Sr. Principal Process Technology Engineer / Project Engineer,
Project Engineering Manager
Main Job Functions: Chemical Process P&ID's & related Safety Interlocks. Field & DEC
support. Supervision of and coordination with other office locations P&ID & detailed
engineering work.
Equipment specification for capital improvement / replacement, preparation of drawings
and supervision of installations.
ACCOMPLISHMENTS:
o Organized and presented Engineering Training course for process equipment system
design conditions - 2004.
o Reviewed and provided input on development of Lummus’ first OCU P&ID's. Subsequently
provided input to technology regarding economic impact on piping class of mixed feed
treaters. This resulted in process design change to reduce cost.
o Provided design condition inputs which have been adopted as standards including charge
gas discharge, chilling train, towers with spare reboilers, heat exchanger tube rupture,
design condition margins for systems with preemptive interlocks.
o Provided Input to Annotated / standard P&ID's updating based on ongoing projects
experiences
o Developed recent changes to P&ID piping arrangements for dense phase ethylene for
quench water and refrigerant heat exchanger applications for metallurgy and overpressure
protection considerations.
o Recently Initiated electronic PDF mark up’s of review comments of P&ID’s and other
drawings & documents instead of antiquated hand mark up’s which eliminates making paper
copies for records and sending to persons involved, etc.
ADDITIONAL CONTRIBUTIONS :
Ongoing coordination with safety department & updating P&ID's as needed based on safety
concerns due to recent events and for compliance with code regarding unobstructed over
pressure relief paths.
Field support during construction ~ 3 months summer of 1984 ; Lima Aromatics Project
coordination of answering construction questions regarding pipe routing , field & office
changes.
Expansion Projects experience involving successful detailing of existing plant modifications
and integration of new additional parallel or larger equipment, piping with existing.
551-206-3519•PPerehinec@yahoo.com
Peter Perehinec
Some projects also included entire parallel and additional process units.
RESPONSIBILITIES:
o Provide input to managers and engineers for development of hydrocarbon chemical process
piping and instrumentation flow diagrams. This has included extensive communications via
e-mail, drawing mark ups, telephone of work done mostly in offices Delhi India and
Woodlands Texas.
o Participated in and conducted P&ID review screening meetings.
o Responsible for approval and/or input final P&ID's, pump equipment data, relief valve,
interlocks, control valve data, supporting calculations and plot plans, special piping
arrangement , special piping and valve arrangements when needed.
o Responsibility involves coordination and communication of technical information to
individuals in person, written e-mails, written documents, checklists to review result findings.
Completed P&I drawing sketches & markups. Coordination executed locally in-office and
remotely with other offices.
o Assist Project managers in P&ID related review and scheduling as needed.
o Coordination with Safety/Code, Instrument, Process, Mechanical, Piping specialist
Engineers as needed.
o Project Engineering Manager (~ 3 years) during time when there was Detailed
Engineering in Bloomfield office prior to restructure of organization. This involved some
equipment requisitions, bid evaluation, purchase orders, vendor drawing review, piping
layout review, plot plans, line & insulations schedules, instrument alarm & interlock trip
setting.
o P&ID Technical Information includes:
o Drawing layouts consideration process flow configuration with relative elevations as
needed for a system and operating considerations,
o Mechanical temperature, pressure, vacuum design conditions & materials of
construction. Representation of process control, piping, valves, insulation,
equipment, safety overpressure relief, interlocks.
o P&ID review screening meetings. Approval and/or input final P&ID's, pump
equipment data, safety relief valve data, interlocks, control valve data, supporting
calculations when needed.
o Coordination methods involve communication of technical information to individuals
by person, e-mails, other written documents, checklists, P&I D sketches & mark
ups.
EXPERIENCE:
o P&ID's for Basic Engineering and Some Expansion Projects for following types of
processes:
o Ethylene Plants:
o Gas, liquid, gas & liquid mixed feed cracking heaters (furnaces).
o Heater effluent quenching, recovery /separation sections: gasoline fractionator,
quench tower, quench oil, and quench water systems, fuel oil, pyrolysis gas oil
byproducts.
o Change gas compression, drying, chilling, and separation.
o C2, C3 Binary, Tertiary Refrigeration systems.
o C2 , C3, C4 fractionation systems
o Acetylene & MAPD Converters. C2 Product systems, driers, drier & reactor
regeneration systems.
o OCU Units:
o Reviewed and provided input to first Lummus Bloomfield OCU P&ID's.
o Feed, Feed Treaters, Reactors, Refrigeration, Regeneration systems for reactors &
treaters.
o Reviewed Detailed Engineering Contractor's P&ID's
551-206-3519•PPerehinec@yahoo.com
Peter Perehinec
o C4 Hydro, SHU Units:
o Feed systems, Reactors, regeneration
o Miscellaneous:
o Dense phase C2 feed & product systems.
o P&ID's for products storage tanks.
o Catofin unit familiarity.
o General: Review of and preparation, line schedule's, interlock alarm & trip settings
o Piping pressure drop hydraulic calculation, pump hydraulics and requisition/
purchase data, relief valve case analysis and data sheet preparation.
o Charge Gas Compressor Simulation Process Flow diagram and follow up to P&ID
related work on CPC4 project.
03/74-09/74 Engelhard Industries System Department East Newark, New
Jersey
Project Engineer
• Responsible for design and cost estimation of custom air pollution abatement and gas
purification systems.
06/72-03/74 Allied Chemical Corporation Elizabeth, New
Jersey
Plant Project Engineer
 Responsible for various capital equipment replacement projects.
 Involved in all phases of projects: estimation, requisitions, bid evaluations, purchase orders,
supervising field installation.
 Weekend duty on call for 24 hours/day for 1 weekend each 4 to 5 weeks
Education
1976-1980 Newark College of Engineering Newark, New Jersey
Master of Science – Chemical Engineering
1968-1972
Newark College of Engineering Newark, New Jersey
Bachelor of Science – Chemical Engineering
1967-1968 University of Akron Akron, Ohio
( General 1st
year intended major Architecture )
References
551-206-3519•PPerehinec@yahoo.com
Peter Perehinec
References are available on request.

Weitere ähnliche Inhalte

Was ist angesagt? (20)

cv 2016
cv 2016cv 2016
cv 2016
 
Ariel Pacis CV(2016)
Ariel Pacis CV(2016)Ariel Pacis CV(2016)
Ariel Pacis CV(2016)
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
jordan updated resume 2015
jordan updated resume 2015jordan updated resume 2015
jordan updated resume 2015
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 
2015 Resume Rev 3-15
2015 Resume Rev 3-152015 Resume Rev 3-15
2015 Resume Rev 3-15
 
CV
CVCV
CV
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
resume-ehlibongco_2015e
resume-ehlibongco_2015eresume-ehlibongco_2015e
resume-ehlibongco_2015e
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Episode 32 : Project Execution Part (3)
Episode 32 :  Project Execution Part (3)Episode 32 :  Project Execution Part (3)
Episode 32 : Project Execution Part (3)
 
Resume - RDL 150703
Resume - RDL 150703Resume - RDL 150703
Resume - RDL 150703
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 

Andere mochten auch

Andere mochten auch (7)

BALJINDER kUMAR
BALJINDER kUMARBALJINDER kUMAR
BALJINDER kUMAR
 
desktop support
desktop supportdesktop support
desktop support
 
Da and phonology by via
Da and phonology by viaDa and phonology by via
Da and phonology by via
 
holy cow
holy cowholy cow
holy cow
 
CV OF MR. PRAKASH
CV OF MR. PRAKASHCV OF MR. PRAKASH
CV OF MR. PRAKASH
 
85739894 mining-ee
85739894 mining-ee85739894 mining-ee
85739894 mining-ee
 
My notes of the first unit
My notes of the first unitMy notes of the first unit
My notes of the first unit
 

Ähnlich wie P._Perehinec_3-30-16

2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptxKarenGedalanga
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1craig alden
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
Suman Professional
Suman ProfessionalSuman Professional
Suman ProfessionalSuman Das
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Frank Lemus
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resumeJosé Ruiz
 
Drew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16Tony Lowery
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)Kenneth Thompson
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & FabricationpetroEDGE
 

Ähnlich wie P._Perehinec_3-30-16 (20)

Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1CA_2016_MASTER Rev 1
CA_2016_MASTER Rev 1
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
Marshall Steve (pm)
Marshall Steve (pm)Marshall Steve (pm)
Marshall Steve (pm)
 
Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017Resume Frank Lemus Jan 2017
Resume Frank Lemus Jan 2017
 
David2013resume
David2013resumeDavid2013resume
David2013resume
 
Tito Camps Resume
Tito Camps ResumeTito Camps Resume
Tito Camps Resume
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Jose Ruiz resume
Jose Ruiz resumeJose Ruiz resume
Jose Ruiz resume
 
Drew Whitney Final Presentation
Drew Whitney Final PresentationDrew Whitney Final Presentation
Drew Whitney Final Presentation
 
Tony resume 30 jan16
Tony resume 30 jan16Tony resume 30 jan16
Tony resume 30 jan16
 
Diosdado CV (updated)(1)
Diosdado CV (updated)(1)Diosdado CV (updated)(1)
Diosdado CV (updated)(1)
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
 
DHindmon_Resume2016
DHindmon_Resume2016DHindmon_Resume2016
DHindmon_Resume2016
 

P._Perehinec_3-30-16

  • 1. 102 Fornelius Avenue , Clifton, NJ 07013 •551-206-3519 •PPerehinec@yahoo.com Peter Perehinec Experience 09/74-06/15 Lummus CBI (Previously Lummus ABB, & Lummus Co. Inc. ) Bloomfield, New Jersey Titles at Lummus: Sr. Principal Process Technology Engineer / Project Engineer, Project Engineering Manager Main Job Functions: Chemical Process P&ID's & related Safety Interlocks. Field & DEC support. Supervision of and coordination with other office locations P&ID & detailed engineering work. Equipment specification for capital improvement / replacement, preparation of drawings and supervision of installations. ACCOMPLISHMENTS: o Organized and presented Engineering Training course for process equipment system design conditions - 2004. o Reviewed and provided input on development of Lummus’ first OCU P&ID's. Subsequently provided input to technology regarding economic impact on piping class of mixed feed treaters. This resulted in process design change to reduce cost. o Provided design condition inputs which have been adopted as standards including charge gas discharge, chilling train, towers with spare reboilers, heat exchanger tube rupture, design condition margins for systems with preemptive interlocks. o Provided Input to Annotated / standard P&ID's updating based on ongoing projects experiences o Developed recent changes to P&ID piping arrangements for dense phase ethylene for quench water and refrigerant heat exchanger applications for metallurgy and overpressure protection considerations. o Recently Initiated electronic PDF mark up’s of review comments of P&ID’s and other drawings & documents instead of antiquated hand mark up’s which eliminates making paper copies for records and sending to persons involved, etc. ADDITIONAL CONTRIBUTIONS : Ongoing coordination with safety department & updating P&ID's as needed based on safety concerns due to recent events and for compliance with code regarding unobstructed over pressure relief paths. Field support during construction ~ 3 months summer of 1984 ; Lima Aromatics Project coordination of answering construction questions regarding pipe routing , field & office changes. Expansion Projects experience involving successful detailing of existing plant modifications and integration of new additional parallel or larger equipment, piping with existing.
  • 2. 551-206-3519•PPerehinec@yahoo.com Peter Perehinec Some projects also included entire parallel and additional process units. RESPONSIBILITIES: o Provide input to managers and engineers for development of hydrocarbon chemical process piping and instrumentation flow diagrams. This has included extensive communications via e-mail, drawing mark ups, telephone of work done mostly in offices Delhi India and Woodlands Texas. o Participated in and conducted P&ID review screening meetings. o Responsible for approval and/or input final P&ID's, pump equipment data, relief valve, interlocks, control valve data, supporting calculations and plot plans, special piping arrangement , special piping and valve arrangements when needed. o Responsibility involves coordination and communication of technical information to individuals in person, written e-mails, written documents, checklists to review result findings. Completed P&I drawing sketches & markups. Coordination executed locally in-office and remotely with other offices. o Assist Project managers in P&ID related review and scheduling as needed. o Coordination with Safety/Code, Instrument, Process, Mechanical, Piping specialist Engineers as needed. o Project Engineering Manager (~ 3 years) during time when there was Detailed Engineering in Bloomfield office prior to restructure of organization. This involved some equipment requisitions, bid evaluation, purchase orders, vendor drawing review, piping layout review, plot plans, line & insulations schedules, instrument alarm & interlock trip setting. o P&ID Technical Information includes: o Drawing layouts consideration process flow configuration with relative elevations as needed for a system and operating considerations, o Mechanical temperature, pressure, vacuum design conditions & materials of construction. Representation of process control, piping, valves, insulation, equipment, safety overpressure relief, interlocks. o P&ID review screening meetings. Approval and/or input final P&ID's, pump equipment data, safety relief valve data, interlocks, control valve data, supporting calculations when needed. o Coordination methods involve communication of technical information to individuals by person, e-mails, other written documents, checklists, P&I D sketches & mark ups. EXPERIENCE: o P&ID's for Basic Engineering and Some Expansion Projects for following types of processes: o Ethylene Plants: o Gas, liquid, gas & liquid mixed feed cracking heaters (furnaces). o Heater effluent quenching, recovery /separation sections: gasoline fractionator, quench tower, quench oil, and quench water systems, fuel oil, pyrolysis gas oil byproducts. o Change gas compression, drying, chilling, and separation. o C2, C3 Binary, Tertiary Refrigeration systems. o C2 , C3, C4 fractionation systems o Acetylene & MAPD Converters. C2 Product systems, driers, drier & reactor regeneration systems. o OCU Units: o Reviewed and provided input to first Lummus Bloomfield OCU P&ID's. o Feed, Feed Treaters, Reactors, Refrigeration, Regeneration systems for reactors & treaters. o Reviewed Detailed Engineering Contractor's P&ID's
  • 3. 551-206-3519•PPerehinec@yahoo.com Peter Perehinec o C4 Hydro, SHU Units: o Feed systems, Reactors, regeneration o Miscellaneous: o Dense phase C2 feed & product systems. o P&ID's for products storage tanks. o Catofin unit familiarity. o General: Review of and preparation, line schedule's, interlock alarm & trip settings o Piping pressure drop hydraulic calculation, pump hydraulics and requisition/ purchase data, relief valve case analysis and data sheet preparation. o Charge Gas Compressor Simulation Process Flow diagram and follow up to P&ID related work on CPC4 project. 03/74-09/74 Engelhard Industries System Department East Newark, New Jersey Project Engineer • Responsible for design and cost estimation of custom air pollution abatement and gas purification systems. 06/72-03/74 Allied Chemical Corporation Elizabeth, New Jersey Plant Project Engineer  Responsible for various capital equipment replacement projects.  Involved in all phases of projects: estimation, requisitions, bid evaluations, purchase orders, supervising field installation.  Weekend duty on call for 24 hours/day for 1 weekend each 4 to 5 weeks Education 1976-1980 Newark College of Engineering Newark, New Jersey Master of Science – Chemical Engineering 1968-1972 Newark College of Engineering Newark, New Jersey Bachelor of Science – Chemical Engineering 1967-1968 University of Akron Akron, Ohio ( General 1st year intended major Architecture ) References