SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
Gapura batas desa, kawasan wisata, dan selo asri
1. GSEducationalVersion
PROJECT
LOCATION
ARCHITECT
NAME
SCALE
GAPURA
BATAS DESA
DESA SEBORO
KKN UII UNIT 277
1 : 20
TAMPAK ATAS
TAMPAK DEPAN
RYSKY N. PINEM 16410470
AULIA FARIS M. 16321100
M. RIFQI RAMADHANI 16523200
ANGGORO D. S. 16525016
ULFA D. MIRANDA 16313062
PUTRI R. CITANINGATI 16423028
GALUH A. WARDHANI 15611137
NAFAIZAH K. A. P. 16512061
1,000
1,200
1,100
1,200
0,3001,0500,4000,750
2,500
0,900
1,200
TAMPAK ATAS
SKALA 1 : 20
TAMPAK DEPAN
SKALA 1 : 20
2. GSEducationalVersion
PROJECT
LOCATION
ARCHITECT
NAME
SCALE
GAPURA
KAWASAN WISATA
DESA SEBORO
KKN UII UNIT 277
1 : 50
TAMPAK ATAS
TAMPAK DEPAN
RYSKY N. PINEM 16410470
AULIA FARIS M. 16321100
M. RIFQI RAMADHANI 16523200
ANGGORO D. S. 16525016
ULFA D. MIRANDA 16313062
PUTRI R. CITANINGATI 16423028
GALUH A. WARDHANI 15611137
NAFAIZAH K. A. P. 16512061
0,300
0,500
0,550 1,200 5,000 1,200 0,050
8,000
0,800
5,500
4,400
1,200 5,000 1,200
7,400
TAMPAK DEPAN
SKALA 1 : 50
TAMPAK ATAS
SKALA 1 : 50
3. GSEducationalVersion
PROJECT
LOCATION
ARCHITECT
NAME
SCALE
GAPURA
SELO ASRI
DESA SEBORO
KKN UII UNIT 277
1 : 50
TAMPAK ATAS
TAMPAK DEPAN
RYSKY N. PINEM 16410470
AULIA FARIS M. 16321100
M. RIFQI RAMADHANI 16523200
ANGGORO D. S. 16525016
ULFA D. MIRANDA 16313062
PUTRI R. CITANINGATI 16423028
GALUH A. WARDHANI 15611137
NAFAIZAH K. A. P. 16512061
0,800
0,800 3,500 0,800
4,750
1,0000,2500,7750,7500,7501,000
0,450 0,675 2,500 0,675 0,450
0,600 3,700 0,600
4,500
4,900
TAMPAK ATAS
SKALA 1 : 50
TAMPAK DEPAN
SKALA 1 : 50
4. RENCANA ANGGARAN BIAYA
PEMBANGUNAN GAPURA DESA WISATA SEBORO
KECAMATAN SADANG, KABUPATEN KEBUMEN
A. RENCANA ANGGARAN BIAYA BATAS WILAYAH DESA SEBORO
No Jenis Pekerjaan Satuan Volume
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Total Harga
(Rp)
A Pekerjaan Pondasi Rp 547.559
1 Batu Bata Merah (5x 11 x 22 cm) m³ 1,000 Rp 500.000 Rp 500.000
2 Portland Cement (Merk I 50 Kg) Kg 0,150 Rp 54.600 Rp 8.190
3 Pasir Pasang Lokal m³ 0,050 Rp 346.500 Rp 17.325
4 Tukang OH 0,250 Rp 77.000 Rp 19.250
5 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
6 Mandor OH 0,013 Rp 88.000 Rp 1.144
B Pekerjaan Pondasi Atas Tanah Rp 207.010
1 Batu Bata Merah (5 x 11 x 22 cm) m³ 0,252 Rp 500.000 Rp 126.000
2 Portland Cement (Merk I 50 Kg) Kg 0,038 Rp 54.600 Rp 54.600
3 Pasir Pasang Lokal m³ 0,013 Rp 346.500 Rp 4.366
4 Tukang OH 0,250 Rp 77.000 Rp 19.250
5 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
6 Mandor OH 0,013 Rp 88.000 Rp 1.144
C Pekerjaan Dinding Samping Rp 1.668.796
1 Batu Bata Merah (5 x 11 x 22 cm) m³ 0,990 Rp 500.000 Rp 495.000
2 Portland Cement (Merk I 50 Kg) Kg 0,149 Rp 54.600 Rp 54.600
3 Pasir Pasang Lokal m³ 0,050 Rp 346.500 Rp 17.152
4 Besi Beton (8 mm x 6 m) BH 10,000 Rp 108.000 Rp 1.080.000
5 Tukang OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
7 Mandor OH 0,013 Rp 88.000 Rp 1.144
D Pekerjaan Dinding Tengah Rp 452.222
1 Batu Bata Merah (5 x 11 x 22 cm) m³ 0,726 Rp 500.000 Rp 363.000
2 Portland Cement (Merk I 50 Kg) Kg 0,109 Rp 54.600 Rp 54.600
3 Pasir Pasang Lokal m³ 0,036 Rp 346.500 Rp 12.578
4 Tukang OH 0,250 Rp 77.000 Rp 19.250
5 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
6 Mandor OH 0,013 Rp 88.000 Rp 1.144
E Pekerjaan Besi Rp 414.656
1 Plat Besi (2,90 mm x 4' x 8') m² 0,880 Rp 471.200 Rp 414.656
F Pekerjaan Tulisan Rp 3.275.000
1
Huruf Timbul Acrylic, belakang
Stainless (tebal: 3mm x 0.8mm;
tinggi: 7 cm)
Bh 37,000 Rp 87.500 Rp 3.237.500
2 Jasa Tukang Ahli OH 0,250 Rp 150.000 Rp 37.500
G Pekerjaan Lingkaran Rp 92.970
1 Portland Cement (Merk I 50 Kg) Kg 0,008 Rp 54.600 Rp 54.600
2 Pasir Pasang Lokal m³ 0,003 Rp 346.500 Rp 870
3 Jasa Tukang Ahli OH 0,250 Rp 150.000 Rp 37.500
M Final Finishing Rp 48.510
1 Cat (5 Kg) Kg 2,000 Rp 24.255 Rp 48.510
Sub Total Rp 6.706.723
dibulatkan Rp 6.706.000
5. B. REKAPITULASI RAB BATAS WILAYAH DESA SEBORO
No Jenis Pekerjaan Harga (Rp)
A Pekerjaan Pondasi Rp 3.431.844
B Pekerjaan Pondasi atas Tanah Rp 289.926
C Pekerjaan Dinding Samping Rp 1.994.679
D Pekerjaan Dinding Tengah Rp 691.203
A Pekerjaan Besi Rp 414.656
B Pekerjaan Tulisan Rp 3.275.000
C Pekerjaan Lingkaran Rp 109.508
D Pekerjaan Finishing Rp 48.510
Total Jumlah Rp 10.255.326
dibulatkan Rp 10.255.000
6. C. RENCANA ANGGARAN BIAYA GAPURA KAWASAN WISATA SEBORO
No Jenis Pekerjaan Satuan Volume
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Total Harga
(Rp)
Dinding Sebelah Kiri
A Pekerjaan Pondasi Rp 760.786
1 Batu Belah (15 x 20 cm) m³ 1,950 Rp 323.400 Rp 630.630
2 Portland Cement (Merk I 50 Kg) Kg 0,390 Rp 54.600 Rp 21.294
3 Pasir Pasang Lokal m³ 0,195 Rp 346.500 Rp 67.568
4 Tukang OH 0,250 Rp 77.000 Rp 19.250
5 Tukang Batu OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
7 Mandor OH 0,013 Rp 88.000 Rp 1.144
B Pekerjaan Besi Rp 69.650
1 Besi Hollow (l: 4 cm, t: 0,3 mm x 6 m) BH 9,000 Rp 25.200 Rp 50.400
2 Tukang OH 0,250 Rp 77.000 Rp 19.250
C Pekerjaan Dinding Rp 2.773.654
1 Batu Bata Merah (5 x 11 x 22 cm) m³ 1,950 Rp 500.000 Rp 975.000
2 Portland Cement (Merk I 50 Kg) Kg 0,293 Rp 54.600 Rp 15.971
3 Pasir Pasang Lokal m³ 0,098 Rp 346.500 Rp 33.784
4 Besi Beton (8 mm x 6 m) BH 16,000 Rp 108.000 Rp 1.728.000
5 Tukang OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
D Pekerjaan Plester Dinding Rp 109.284
1 Portland Cement (Merk I 50 Kg) Kg 0,293 Rp 54.600 Rp 54.600
2 Pasir Pasang Lokal m³ 0,098 Rp 346.500 Rp 33.784
3 Tukang OH 0,250 Rp 77.000 Rp 19.250
4 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
E Pekerjaan Besi Tulang Cor Rp 5.604.213
1 Besi Beton (8 mm x 6 m) BH 16,000 Rp 108.000 Rp 1.728.000
2 Kawat Bendrat Kg 1,950 Rp 21.400 Rp 41.730
3 Begel (8 x 8 cm) Bh 110,000 Rp 23.300 Rp 2.563.000
4 Kayu Papan Cor (2 x 18 cm x 4 m) m² 6,600 Rp 233.400 Rp 466.800
6 Pasir Cor m³ 0,293 Rp 315.000 Rp 92.138
7 Portland Cement (Merk I 50 Kg) Kg 0,293 Rp 54.600 Rp 15.971
8 Koral Beton m³ 1,950 Rp 346.500 Rp 675.675
9 Tukang OH 0,250 Rp 77.000 Rp 19.250
10 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
Dinding Sebelah Kanan
F Pekerjaan Pondasi Rp 1.267.064
1 Batu Belah (15 x 20 cm) m³ 3,120 Rp 323.400 Rp 1.009.008
2 Portland Cement (Merk I 50 Kg) Kg 0,624 Rp 54.600 Rp 54.600
3 Pasir Pasang Lokal m³ 0,468 Rp 346.500 Rp 162.162
4 Tukang OH 0,250 Rp 77.000 Rp 19.250
5 Tukang Batu OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
7 Mandor OH 0,013 Rp 88.000 Rp 1.144
G Pekerjaan Dinding Rp 2.850.673
1 Batu Bata Merah (5 x 11 x 22 cm) m³ 1,980 Rp 500.000 Rp 990.000
2 Portland Cement (Merk I 50 Kg) Kg 0,495 Rp 54.600 Rp 54.600
3 Pasir Pasang Lokal m³ 0,165 Rp 346.500 Rp 57.173
4 Besi Beton (8 mm x 6 m) Bh 16,000 Rp 108.000 Rp 1.728.000
5 Tukang OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
H Pekerjaan Plester Dinding Rp 132.673
1 Portland Cement (Merk I 50 Kg) Kg 0,495 Rp 54.600 Rp 54.600
2 Pasir Pasang Lokal m³ 0,165 Rp 346.500 Rp 57.173
3 Tukang OH 0,250 Rp 77.000 Rp 19.250
4 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
I Pekerjaan Penempelan Batu Alam Rp 11.848.200
1 Portland Cement (Merk I 50 Kg) Kg 0,468 Rp 54.600 Rp 54.600
2 Batu Andesit Bintik Bakar (15 x 30 cm) m² 6,240 Rp1.890.000 Rp11.793.600
J Plang Nama Rp 6.701.140
1 Besi Beton (8 mm x 6 m) BH 16,000 Rp 108.000 Rp 1.728.000
7. 2 Kawat Bendrat Kg 2,720 Rp 21.400 Rp 58.208
3 Kayu Papan Cor (2 cm x 18 cm x 4m) m² 13,600 Rp 233.400 Rp 933.600
5 Pasir Cor m³ 2,720 Rp 315.000 Rp 856.800
6 Portland Cement (Merk I 50 Kg) Kg 2,720 Rp 54.600 Rp 148.512
7 Koral Beton m³ 2,720 Rp 346.500 Rp 942.480
8 Kayu Usuk Glugu (4 x 6 cm x 2 m) BH 27,200 Rp 66.200 Rp 1.800.640
9 Bambu AE 6-8/600 cm BH 24,000 Rp 15.500 Rp 62.000
10 Paku (5-10 cm) Kg 10,000 Rp 15.000 Rp 150.000
11 Tukang OH 0,250 Rp 77.000 Rp 19.250
12 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
K Pekerjaan Tulisan Rp 225.604
1 Pasir Pasang Lokal m³ 0,4332 Rp 346.500 Rp 150.104
2 Portland Cement (Merk I 50 Kg) Kg 0,4332 Rp 54.600 Rp 54.600
3 Tukang OH 0,250 Rp 77.000 Rp 19.250
4 Jasa Tukang Ahli OH 0,020 Rp 82.500 Rp 1.650
L Finishing Pengacian Dinding Rp 54.600
1 Portland Cement (Merk I 50 Kg) Kg 1,828 Rp 54.600 Rp 54.600
M Final Finishing Rp 363.825
1 Cat (5 Kg) Kg 15,000 Rp 24.255 Rp 363.825
Sub Total Rp 32.761.364
8. D. REKAPITULASI RAB GAPURA KAWASAN WISATA SEBORO
No Jenis Pekerjaan Harga (Rp)
Dinding Sebelah Kiri
A Pekerjaan Pondasi Rp 760.786
B Pekerjaan Besi Rp 69.650
C Pekerjaan Dinding Rp 2.773.654
D Pekerjaan Plester Dinding Rp 109.284
E Pekerjaan Besi Tulang Cor Rp 5.604.213
Dinding Sebelah Kanan
F Pekerjaan Pondasi Rp 1.267.064
G Pekerjaan Dinding Rp 2.850.673
H Pekerjaan Plester Dinding Rp 132.673
I Pekerjaan Penempelan Batu Alam Rp 11.848.200
J Plang Nama Rp 6.701.140
K Pekerjaan Tulisan Rp 225.604
L Finishing Pengacian Dinding Rp 54.600
M Final Finishing Rp 363.825
Jumlah Total Rp 32.761.366
dibulatkan Rp 32.761.000
9. E. RENCANA ANGGARAN BIAYA KAWASAN WISATA SELO ASRI
No Jenis Pekerjaan Satuan Volume
Harga Satuan
(Rp)
Jumlah Harga
(Rp)
Total Harga
(Rp)
A Pekerjaan Pondasi Rp 2.057.898
1 Batu Bata (5 x 11 x 22 cm) m³ 3,600 Rp 500.000 Rp 1.800.000
2 Besi Beton (8 mm x 6 m) Bh 8,000 Rp 108.000 Rp 144.000
3 Portland Cement (Merk I 50 Kg) Kg 0,540 Rp 54.600 Rp 29.484
4 Pasir Pasang Lokal m³ 0,180 Rp 346.500 Rp 62.370
5 Tukang OH 0,250 Rp 77.000 Rp 19.250
6 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
7 Mandor OH 0,013 Rp 88.000 Rp 1.144
B Pekerjaan Besi Rp 1.182.610
1 Plat Besi (2,90 mm x 4' x 8') m² 1,250 Rp 471.200 Rp 589.000
2
Besi Hollow Bar (50 x 50 x 3 mm
x 6 m)
m 23,500 Rp 25.260 Rp 593.610
3 Tukang OH 0,250 Rp 77.000 Rp 19.250
4 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
5 Mandor OH 0,013 Rp 88.000 Rp 1.144
C Pekerjaan Tulisan Rp 5.025.000
1
Huruf Timbul Acrylic, belakang
Stainless (tebal: 3mm x 0.8mm;
tinggi: 19 cm)
Bh 21,000 Rp 237.500 Rp 4.987.500
2 Jasa Tukang Ahli OH 0,250 Rp 150.000 Rp 37.500
D Pekerjaan Finishing Rp 12.031.872
1
Batu Andesit Susun Sirih Polos (5
x 30 cm)
m² 6,000 Rp 2.000.000 Rp 12.000.000
2 Portland Cement (Merk I 50 Kg) Kg 0,180 Rp 54.600 Rp 9.828
3 Tukang OH 0,250 Rp 77.000 Rp 19.250
4 Kepala Tukang OH 0,020 Rp 82.500 Rp 1.650
5 Mandor OH 0,013 Rp 88.000 Rp 1.144
Sub Total Rp 20.297.380
10. F. REKAPITULASI RAB GAPURA KAWASAN WISATA SELO ASRI
No Jenis Pekerjaan Harga (Rp)
A Pekerjaan Pondasi Rp 2.057.898
B Pekerjaan Besi Rp 1.182.610,00
C Pekerjaan Tulisan Rp 5.025.000,00
D Pekerjaan Finishing Rp 12.031.872,00
Total Jumlah Rp 20.297.380,00