SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
0!
5!
10!
15!
20!
25!
30!
35!
40!
2010! 2011! 2012! 2013! 2014! 2015! 2016! 2017! 2018! 2019! 2020!
Gigafactory!
Others!
Lishen!
BYD!
BAK!
ATL!
Maxell!
Sony!
Panasonic!
LGC!
SDI!
Source: IIT Takeshita 2013	

	

500,000
Vehicles	

Global cell supply
growing, but almost
entirely in Asia	

Planned 2020 Gigafactory Production Exceeds 2013 Global Production	

Battery pack cost/kWh reduced >30% by Gen III volume ramp in 2017	

	

35,000
Vehicles	

	

GWh/YearProduction
Module	

	

	

	

	

	

	

	

	

	

Cathode
Manufacturing	

Aluminum Foil	

Cathode	

Electrode	

Anode	

Electrode	

Separator	

Manufacturing	

Separator	

 Winding	

Cell
Assembly	

Anode
Manufacturing	

Copper	

Foil	

RawMaterials	

Cell	

Cell	

Cell	

Cell	

…
Pack	

	

	

	

	

	

	

	

	

	

Module	

Module	

Module	

Module	

…
Pack	

Enclosure	

Vehicle Assembly	

(Fremont, CA)	

Can &
Cap	

Battery Pack
Lifetime Usage	

Battery Pack	

Recycling	

Raw Steel/
Aluminum	

Gigafactory Process Flow	

	

	

Electrolyte
Manufacturing
Gigafactory Projected Figures
2020TeslaVehicleVolume 500,000/yr
2020 Gigafactory Cell Output 35 GWh/yr	

2020 Gigafactory Pack Output 50 GWh/yr	

Space Requirement
Up to 10M ft2	

w/ 1-2 levels	

Total Land Area (acres) 500-1000
Employees 6,500
New Local
Renewables 	

Solar and Wind	

Tesla Gigafactory	

	

	

Rendering
Gigafactory Location Finalists	

	

	

Finished battery packs from the Gigafactory to Fremont, CA for vehicle assembly.	

Final site selection activities are underway.
ACTIVE	

TODAY	

2014	

 2015	

 2016	

 2017	

Site 	

Selection	

Zoning & 	

Design / Build	

Partner	

Discussions	

Initial Project
Design	

2020	

(500kVeh/Yr)	

Facility Construction	

 Equipment Installation	

Production Launch and
Ramp	

Tesla and its partners will invest ≈$4-5 billion in the Gigafactory through 2020.
CapEx will be shared by Gigafactory partners.
Tesla will directly invest ≈$2 billion.	

Gigafactory Projected Timeline
Forward Looking Statements	

	

	

Certain statements in this communication, including statements regarding the Tesla
Gigafactory and its development plans, production capacity, cost savings, costs, timeline and
vehicle production estimates, are “forward-looking statements” that are subject to risks
and uncertainties. These forward-looking statements are based on management’s current
expectations, and as a result of certain risks and uncertainties, actual events or results may
differ materially from those contained in the forward-looking statements. Various
important factors could cause actual results to differ materially from those in the forward-
looking statements, including potential difficulties in finding a suitable Tesla Gigafactory site,
obtaining required permits, negotiating terms with technology and other partners,
maintaining implementation schedules, output and cost estimates and vehicle demand.
Please refer to Tesla’s most recent Annual Report on Form 10-K and its other filings with
the Securities and Exchange Commission. These filings contain and identify important
factors that could cause actual results to differ materially from those contained in Tesla’s
forward-looking statements.Tesla disclaims any obligation to update information contained
in these forward-looking statements.

Weitere ähnliche Inhalte

Was ist angesagt?

PDF Tesla FINAL Complete
PDF Tesla FINAL CompletePDF Tesla FINAL Complete
PDF Tesla FINAL Complete
Chris Washburn
 
GonzalezAnthonyTeslaAnalysis
GonzalezAnthonyTeslaAnalysisGonzalezAnthonyTeslaAnalysis
GonzalezAnthonyTeslaAnalysis
Anthony Gonzalez
 
SunDevil6_WrittenCase_Final
SunDevil6_WrittenCase_FinalSunDevil6_WrittenCase_Final
SunDevil6_WrittenCase_Final
James Gillis
 

Was ist angesagt? (20)

Class Presentation - Tesla Motors
Class Presentation - Tesla MotorsClass Presentation - Tesla Motors
Class Presentation - Tesla Motors
 
Tesla Lithium Battery Gigafactory Presentation
Tesla Lithium Battery Gigafactory PresentationTesla Lithium Battery Gigafactory Presentation
Tesla Lithium Battery Gigafactory Presentation
 
Tesla
TeslaTesla
Tesla
 
Darden School of Business Tesla Strategic Analysis
Darden School of Business   Tesla Strategic AnalysisDarden School of Business   Tesla Strategic Analysis
Darden School of Business Tesla Strategic Analysis
 
PDF Tesla FINAL Complete
PDF Tesla FINAL CompletePDF Tesla FINAL Complete
PDF Tesla FINAL Complete
 
Tesla vision and mission
Tesla vision and mission Tesla vision and mission
Tesla vision and mission
 
TESLA.pptx
TESLA.pptxTESLA.pptx
TESLA.pptx
 
Tesla Motors, Panasonic J-V for Gigafactory - Simon Moores Research Note
Tesla Motors, Panasonic J-V for Gigafactory - Simon Moores Research NoteTesla Motors, Panasonic J-V for Gigafactory - Simon Moores Research Note
Tesla Motors, Panasonic J-V for Gigafactory - Simon Moores Research Note
 
GonzalezAnthonyTeslaAnalysis
GonzalezAnthonyTeslaAnalysisGonzalezAnthonyTeslaAnalysis
GonzalezAnthonyTeslaAnalysis
 
Tesla Case Study Strategy
Tesla Case Study StrategyTesla Case Study Strategy
Tesla Case Study Strategy
 
Tesla
TeslaTesla
Tesla
 
TESLA FINAL REPORT
TESLA FINAL REPORTTESLA FINAL REPORT
TESLA FINAL REPORT
 
TESLA REPORT PDF
TESLA REPORT PDFTESLA REPORT PDF
TESLA REPORT PDF
 
Tesla motors Strategic Analysis
Tesla motors Strategic AnalysisTesla motors Strategic Analysis
Tesla motors Strategic Analysis
 
TESLA MOTORS
TESLA MOTORSTESLA MOTORS
TESLA MOTORS
 
Tesla Company Presentation
Tesla Company PresentationTesla Company Presentation
Tesla Company Presentation
 
Tesla Motors
Tesla MotorsTesla Motors
Tesla Motors
 
SunDevil6_WrittenCase_Final
SunDevil6_WrittenCase_FinalSunDevil6_WrittenCase_Final
SunDevil6_WrittenCase_Final
 
Tesla
TeslaTesla
Tesla
 
Tesla project PPT
Tesla project PPTTesla project PPT
Tesla project PPT
 

Andere mochten auch

4 growing and thriving online communities
4 growing and thriving online communities4 growing and thriving online communities
4 growing and thriving online communities
COMP 113
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
Center for Sustainable Energy
 
Samsung SDI Plant Project
Samsung SDI Plant ProjectSamsung SDI Plant Project
Samsung SDI Plant Project
Edmond Kwok
 
Motorolas Global Strategy
Motorolas Global StrategyMotorolas Global Strategy
Motorolas Global Strategy
Sally Dhina
 
NEC's Lithium Ion battery for EVs to TelecomTower
NEC's Lithium Ion battery for EVs to TelecomTowerNEC's Lithium Ion battery for EVs to TelecomTower
NEC's Lithium Ion battery for EVs to TelecomTower
Prernasinghrawat
 

Andere mochten auch (17)

Abridged #DallaraBrookesStoryBook
Abridged #DallaraBrookesStoryBookAbridged #DallaraBrookesStoryBook
Abridged #DallaraBrookesStoryBook
 
4 growing and thriving online communities
4 growing and thriving online communities4 growing and thriving online communities
4 growing and thriving online communities
 
Battery Choices April 2011
Battery Choices April 2011Battery Choices April 2011
Battery Choices April 2011
 
BMW i3 vs Tesla Battery Discussion
BMW i3 vs Tesla Battery DiscussionBMW i3 vs Tesla Battery Discussion
BMW i3 vs Tesla Battery Discussion
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
 
Ultra Battery Presentation
Ultra Battery PresentationUltra Battery Presentation
Ultra Battery Presentation
 
International Battery: Applying Lean Manufacturing Processes In The Productio...
International Battery: Applying Lean Manufacturing Processes In The Productio...International Battery: Applying Lean Manufacturing Processes In The Productio...
International Battery: Applying Lean Manufacturing Processes In The Productio...
 
Battery Experience
Battery ExperienceBattery Experience
Battery Experience
 
Electric car
Electric carElectric car
Electric car
 
London Electric Vehicles Plan
London  Electric Vehicles PlanLondon  Electric Vehicles Plan
London Electric Vehicles Plan
 
Samsung SDI Plant Project
Samsung SDI Plant ProjectSamsung SDI Plant Project
Samsung SDI Plant Project
 
Electric Vehicle Enterprises Prospective Business Plan
Electric Vehicle Enterprises Prospective Business PlanElectric Vehicle Enterprises Prospective Business Plan
Electric Vehicle Enterprises Prospective Business Plan
 
Resume functional automotive
Resume functional   automotiveResume functional   automotive
Resume functional automotive
 
Motorolas Global Strategy
Motorolas Global StrategyMotorolas Global Strategy
Motorolas Global Strategy
 
NEC's Lithium Ion battery for EVs to TelecomTower
NEC's Lithium Ion battery for EVs to TelecomTowerNEC's Lithium Ion battery for EVs to TelecomTower
NEC's Lithium Ion battery for EVs to TelecomTower
 
Marketing Plan
Marketing Plan Marketing Plan
Marketing Plan
 
Project Report On Electric Vehicles
Project Report On Electric VehiclesProject Report On Electric Vehicles
Project Report On Electric Vehicles
 

Ähnlich wie Tesla Giga-Factory Project

Tesla presentation
Tesla presentationTesla presentation
Tesla presentation
Tim Bradshaw
 
CYT_SlideDeck_Final
CYT_SlideDeck_FinalCYT_SlideDeck_Final
CYT_SlideDeck_Final
Tyler Smith
 
An Introduction to PowerCo.pdf
An Introduction to PowerCo.pdfAn Introduction to PowerCo.pdf
An Introduction to PowerCo.pdf
joetyson3
 
Explosion Proof Batteries.pdf
Explosion Proof Batteries.pdfExplosion Proof Batteries.pdf
Explosion Proof Batteries.pdf
Boolean IP Consulting
 
Lead Battery Recycling
Lead Battery RecyclingLead Battery Recycling
Lead Battery Recycling
Ajjay Kumar Gupta
 
AIP Chicago Bridge & Iron Research Report (1)
AIP Chicago Bridge & Iron Research Report (1)AIP Chicago Bridge & Iron Research Report (1)
AIP Chicago Bridge & Iron Research Report (1)
Ryan Sopinski
 
caterpillar • 2007 Annual Report
caterpillar  • 2007 Annual Report caterpillar  • 2007 Annual Report
caterpillar • 2007 Annual Report
finance5
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
Ajjay Kumar Gupta
 
[GE Innovation Forum 2015] The GE Store for Technology (English)
[GE Innovation Forum 2015] The GE Store for Technology (English)[GE Innovation Forum 2015] The GE Store for Technology (English)
[GE Innovation Forum 2015] The GE Store for Technology (English)
GE코리아
 

Ähnlich wie Tesla Giga-Factory Project (20)

Tesla presentation
Tesla presentationTesla presentation
Tesla presentation
 
CYT_SlideDeck_Final
CYT_SlideDeck_FinalCYT_SlideDeck_Final
CYT_SlideDeck_Final
 
2015 - Cleveland Research Company Stock Pitch Competition Runner Up
2015 - Cleveland Research Company Stock Pitch Competition Runner Up2015 - Cleveland Research Company Stock Pitch Competition Runner Up
2015 - Cleveland Research Company Stock Pitch Competition Runner Up
 
Jared Kearby - Power Technology Research
Jared Kearby - Power Technology Research Jared Kearby - Power Technology Research
Jared Kearby - Power Technology Research
 
An Introduction to PowerCo.pdf
An Introduction to PowerCo.pdfAn Introduction to PowerCo.pdf
An Introduction to PowerCo.pdf
 
Explosion Proof Batteries.pdf
Explosion Proof Batteries.pdfExplosion Proof Batteries.pdf
Explosion Proof Batteries.pdf
 
Lead Battery Recycling
Lead Battery RecyclingLead Battery Recycling
Lead Battery Recycling
 
2014 tmc spring future truck
2014 tmc spring future truck2014 tmc spring future truck
2014 tmc spring future truck
 
Tesla Investor Day 2023: Master Plan 3
Tesla Investor Day 2023:  Master Plan 3Tesla Investor Day 2023:  Master Plan 3
Tesla Investor Day 2023: Master Plan 3
 
Investor-Day-2023-Keynote.pdf
Investor-Day-2023-Keynote.pdfInvestor-Day-2023-Keynote.pdf
Investor-Day-2023-Keynote.pdf
 
Tesla
TeslaTesla
Tesla
 
AIP Chicago Bridge & Iron Research Report (1)
AIP Chicago Bridge & Iron Research Report (1)AIP Chicago Bridge & Iron Research Report (1)
AIP Chicago Bridge & Iron Research Report (1)
 
Cowen Nikola Initiation Report
Cowen Nikola Initiation ReportCowen Nikola Initiation Report
Cowen Nikola Initiation Report
 
Dlg key bank 9 13
Dlg key bank 9 13Dlg key bank 9 13
Dlg key bank 9 13
 
caterpillar • 2007 Annual Report
caterpillar  • 2007 Annual Report caterpillar  • 2007 Annual Report
caterpillar • 2007 Annual Report
 
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
PVC Wires and Cables - Manufacturing Plant, Detailed Project Report, Profile,...
 
ADRO ADMR May 2023.pdf
ADRO ADMR May 2023.pdfADRO ADMR May 2023.pdf
ADRO ADMR May 2023.pdf
 
Pgt future of_batteries
Pgt future of_batteriesPgt future of_batteries
Pgt future of_batteries
 
Electric Motor Manufacturing Plant Project Report PPT 2021-2026
Electric Motor Manufacturing Plant Project Report PPT 2021-2026Electric Motor Manufacturing Plant Project Report PPT 2021-2026
Electric Motor Manufacturing Plant Project Report PPT 2021-2026
 
[GE Innovation Forum 2015] The GE Store for Technology (English)
[GE Innovation Forum 2015] The GE Store for Technology (English)[GE Innovation Forum 2015] The GE Store for Technology (English)
[GE Innovation Forum 2015] The GE Store for Technology (English)
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Tesla Giga-Factory Project

  • 1. 0! 5! 10! 15! 20! 25! 30! 35! 40! 2010! 2011! 2012! 2013! 2014! 2015! 2016! 2017! 2018! 2019! 2020! Gigafactory! Others! Lishen! BYD! BAK! ATL! Maxell! Sony! Panasonic! LGC! SDI! Source: IIT Takeshita 2013 500,000 Vehicles Global cell supply growing, but almost entirely in Asia Planned 2020 Gigafactory Production Exceeds 2013 Global Production Battery pack cost/kWh reduced >30% by Gen III volume ramp in 2017 35,000 Vehicles GWh/YearProduction
  • 3. Gigafactory Projected Figures 2020TeslaVehicleVolume 500,000/yr 2020 Gigafactory Cell Output 35 GWh/yr 2020 Gigafactory Pack Output 50 GWh/yr Space Requirement Up to 10M ft2 w/ 1-2 levels Total Land Area (acres) 500-1000 Employees 6,500 New Local Renewables Solar and Wind Tesla Gigafactory Rendering
  • 4. Gigafactory Location Finalists Finished battery packs from the Gigafactory to Fremont, CA for vehicle assembly. Final site selection activities are underway.
  • 5. ACTIVE TODAY 2014 2015 2016 2017 Site Selection Zoning & Design / Build Partner Discussions Initial Project Design 2020 (500kVeh/Yr) Facility Construction Equipment Installation Production Launch and Ramp Tesla and its partners will invest ≈$4-5 billion in the Gigafactory through 2020. CapEx will be shared by Gigafactory partners. Tesla will directly invest ≈$2 billion. Gigafactory Projected Timeline
  • 6. Forward Looking Statements Certain statements in this communication, including statements regarding the Tesla Gigafactory and its development plans, production capacity, cost savings, costs, timeline and vehicle production estimates, are “forward-looking statements” that are subject to risks and uncertainties. These forward-looking statements are based on management’s current expectations, and as a result of certain risks and uncertainties, actual events or results may differ materially from those contained in the forward-looking statements. Various important factors could cause actual results to differ materially from those in the forward- looking statements, including potential difficulties in finding a suitable Tesla Gigafactory site, obtaining required permits, negotiating terms with technology and other partners, maintaining implementation schedules, output and cost estimates and vehicle demand. Please refer to Tesla’s most recent Annual Report on Form 10-K and its other filings with the Securities and Exchange Commission. These filings contain and identify important factors that could cause actual results to differ materially from those contained in Tesla’s forward-looking statements.Tesla disclaims any obligation to update information contained in these forward-looking statements.