SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Downloaden Sie, um offline zu lesen
MARKETING OFFICE
WISMA YAKYF – 2ND FLOOR, JALAN WARUNG BUNCIT RAYA NO.99, JAKARTA 12740 – INDONESIA
OPERATIONAL OFFICE
JALAN CEMPAKA XI NO.56B, BANJARMASIN, SOUTH KALIMANTAN - INDONESIA
PT. RAJA AL AZHAR is a company that has been established as Coal Mining, Exporter and Finance.
As Coal Mining, we are backup with some location areas of coal mining in varieties calories. Its
spreading at Binuang, Asam-Asam and Sungai Danau in south Kalimantan, Indonesia.
As Exporter, we are focused on selling to foreign consumers, especially asian countries. We want to
satisfy our consumers by guaranteeing the supply with the level of quality maintained, timely and
sustainable.
As Finance, we have a credit line in UOB Bank Indonesia to handle export transaction such non
TRANSFERABLE USANCE and SKBDN. All transactions based on collection, negotiation and discount.
Our expectations are very high in pursuit of the dream of making it into great company.
With our competence employee in team to run the operation which here our professionalism are
demanded and dedicated to guarantee.
INTRODUCTION
THE POWER OF COMMITMENT
COMPANY NAME
ESTABLISHED MAIN
OFFICE
OPERATIONAL
OFFICE
COMPANY REGISTER
SIUP REGISTER
TAX REGISTER
NOTARIAL NUMBER
NOTARY NAME
: PT. RAJA AL AZHAR
: JUNE 05TH, 2013
: WISMA YAKYF – 2ND FLOOR, JALAN WARUNG BUNCIT RAYA
NO.99 JAKARTA 12740 – INDONESIA
: JALAN CEMPAKA XI NO.56B, BANJARMASIN,
SOUTH KALIMANTAN - INDONESIA
: 657324993
: 470/418.104.05/2013
: 31.794.375.1-655.000
: AKTA NO.02, JUNE 05TH, 2013
: SISCA UTAMI DAMAYANTI, SH, M.KN
COMPANY
THE POWER OF COMMITMENT
NAME : MINE SITE
BROAD AREA : 5,353 HA
LOCATION : KEC. KELUMPANG HILIR, KAB. KOTABARU,
SOUTH KALIMANTAN – INDONESIA
MINING METHOD : OPEN PIT
CALORIE : GCV (ADB) 5,600 - 6700
PERMITS : IUP OP No. 545/69/IUPOP/D.PE/2010
AREA CODE : KTB.1005/IUPOP0092
START PRODUCTION: JULY
PRODUCTION CAPACITY/MONTH : 300.000 MT/MONTH : -
MEASURABLE RESERVES : 199.5 HA = 27,368,000 MT
INDICATED RESOURCES : 5,353 HA = 340,000,000 MT
STRIPING : 1 : 4
SEAM : 8 UP 50 METER
HAULING TO JETTY : 30 KM
STOCKPILE : ASAM-ASAM AND BINUANG KM 97
MINESUMMARY
THE POWER OF COMMITMENT
LOADING PORT
JETTY PORT : JETTY KPP - SUNGAI PUTING
JETTY HASNUR - SUNGAI SALAI
LOADING RATE : 7,500 - 10,000 MT / DAY
HAULING TO JETTY : 22 KM
BARGE : 300 - 330 FT
ANCHORAGE : TABONEO, and MUARA SATUI SOUTH KALIMANTAN
LOADING RATE : 10,000 - 15,000 MT / DAY
LAND TRANSPORTATION
TRUCKING : TRUCK 10 tires @30 MT - 100 UNITS AVAILABLE
HAULING ROAD : MINING ROAD , WIDE : 30 MTRS
MINESUMMARY
THE POWER OF COMMITMENT
STOCKPILE FACILITY MACHINE CAP : 300-500 MT/HOUR
BROAD AREA ANOTHER MINE : 6,038 HA
LOCATION : KEC. PENGARON, SAMBUNG MAKMUR, KAB. BANJAR
SOUTH KALIMANTAN – INDONESIA
MINING METHOD : OPEN PIT
CALORIE : GCV (ADB) 6,400 - 7,300
PERMITS : PKP2B No.206.K/40.00/DJB/06
AREA CODE : PKP2B00PB0139
PRESIDENT
DIRECTOR
FINANCE/BANKING
SITE MANAGER
EXECUTIVE
DIRECTOR
FINANCE MANAGER
ACCOUNTING
TAX AND BANKING
MARKETING MANAGER
OPERATIONAL
ASSOCIATE
MARKETING
ORGANIZATION
STRUCTURE
THE POWER OF COMMITMENT
MANAGEMENT & MARKETING
BOD
MASTER LOADING
COORDINATOR
LOADING BARGE
COORDINATOR LOADING
VESSEL
COORDINATOR
JETTY
COORDINATOR
CRUSHING
COORDINATOR
STOCKPILE
COORDINATOR
MINING
SITE
ORGANIZATION
THE POWER OF COMMITMENT
PARTNERSHIP
PRESIDENT DIRECTOR
MANAGEMENT & MARKETING
FINANCE/BANKING
BOD
SITE MANAGER
CUSTOMS
MINING
INFORMATION
PARTNERSHIPTAJ
THE POWER OF COMMITMENT
PARTNERSHIPGRB
THE POWER OF COMMITMENT
PARTNERSHIP BMB
THE POWER OF COMMITMENT
PARTNERSHIP
BAJ
CONFIDENTIAL
CONFIDENTIAL
DISTANCE TO JETTY BARGE
SIZE
JETTY PORT LOADING
RATE
: 33 KM
: 270 - 300 - 330 FT
: KPP - MANDIRI - HASNUR
: 1,200 MT PER HOURS
DISTANCE TO ANCHORAGE
VESSEL SIZE ANCHORAGE
PORT LOADING RATE
: 4 HOURS
: SUPRAMAX - PANAMAX
: TABONEO - MUARA ASAM-ASAM
: 10,000 - 15,000 MT PER DAY
COORDINATE OPEN SEA TABONEO, SOUTH KALIMANTAN SUPRAMAX VESSEL
03-40-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 12-13M, DEPTH ABT 13M)
PANAMAX VESSEL
03-41-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 14-15M, DEPTH ABT 17M) CAPSIZE VESSEL
03-42-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 18-19M, DEPTH ABT 20 - 22M)
LOADING ACTIVITYINFO
THE POWER OF COMMITMENT
STOCKPILE
THE POWER OF COMMITMENT
STOCKPILE
THE POWER OF COMMITMENT
THE POWER OF COMMITMENT
JETTY
HAULING
MINE
&
THE POWER OF COMMITMENT
LOADING BARGES
VESSEL
TRANSSHIPMENT
THE POWER OF COMMITMENT
DOCUMENTS
LEGAL&
COMPANYLEGALITY
THE POWER OF COMMITMENT
THE POWER OF COMMITMENT
THE POWER OF COMMITMENT
THE POWER OF COMMITMENT
Financesupport
Copyright@2015 - All Reserved by PT. RAJA AL AZHAR
THE POWER OF COMMITMENT
Mr. KP.H.Kesoemo,SE,MBA
Mr. Gandung Perono
Mr. Ishwara Danurdara,MBA
Mr. Teten Puri Dewa
Mr. Paul Tan
ASSOCIATE EMAIL :
rajaalazharmining@gmail.com
ishwara@hakersen.id
gandung@harkesen.id
wattubara@gmail.com
paul.cendrawasih@gmail.com
Mr. Chaidir Azhar.MD

Weitere ähnliche Inhalte

Was ist angesagt?

Materi 6 persiapan pbj - versi 4
Materi 6   persiapan pbj - versi 4Materi 6   persiapan pbj - versi 4
Materi 6 persiapan pbj - versi 4Nurul Angreliany
 
Prakualifikasi dan Proses Pengadaan
Prakualifikasi dan Proses PengadaanPrakualifikasi dan Proses Pengadaan
Prakualifikasi dan Proses PengadaanOswar Mungkasa
 
Tata Cara Revisi Anggaran Kewenangan Ditjen Perbendaharaan
Tata Cara Revisi Anggaran Kewenangan Ditjen PerbendaharaanTata Cara Revisi Anggaran Kewenangan Ditjen Perbendaharaan
Tata Cara Revisi Anggaran Kewenangan Ditjen PerbendaharaanAhmad Abdul Haq
 
Perpres 12 tahun 2021 mei 2021 khusus pemda
Perpres 12 tahun 2021 mei 2021 khusus pemdaPerpres 12 tahun 2021 mei 2021 khusus pemda
Perpres 12 tahun 2021 mei 2021 khusus pemdaAtit Damay
 
Surat Pernyataan Backdate
Surat Pernyataan Backdate Surat Pernyataan Backdate
Surat Pernyataan Backdate BellaYohana1
 
Perpajakan dalam PBJ melalui Swakelola.pdf
Perpajakan dalam PBJ melalui Swakelola.pdfPerpajakan dalam PBJ melalui Swakelola.pdf
Perpajakan dalam PBJ melalui Swakelola.pdfkppnbandaaceh
 
Data pengalaman perusahaan
Data pengalaman perusahaanData pengalaman perusahaan
Data pengalaman perusahaanLaode Sultani
 
Materi 03 Persiapan Pengadaan Barang/Jasa 2
Materi 03 Persiapan Pengadaan Barang/Jasa 2Materi 03 Persiapan Pengadaan Barang/Jasa 2
Materi 03 Persiapan Pengadaan Barang/Jasa 2Massaputro Delly TP
 
Tata Cara Pembuatan TOR /KAK sebagai data dukung Usulan Anggaran tahun 2015
Tata Cara Pembuatan TOR /KAK sebagai data dukung  Usulan Anggaran tahun 2015Tata Cara Pembuatan TOR /KAK sebagai data dukung  Usulan Anggaran tahun 2015
Tata Cara Pembuatan TOR /KAK sebagai data dukung Usulan Anggaran tahun 2015Joko Riswanto
 
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...Krisnä Nurzämän
 
Kerangka acuan kerja pagar kantor
Kerangka acuan kerja pagar kantorKerangka acuan kerja pagar kantor
Kerangka acuan kerja pagar kantorKHRISTIAN MAUKO
 
Contoh jadwal pelaksanaan pengadaan langsung
Contoh jadwal pelaksanaan pengadaan langsungContoh jadwal pelaksanaan pengadaan langsung
Contoh jadwal pelaksanaan pengadaan langsungbh4ja
 
Laporan Pendahuluan Konsep Perencanaan Bangunan
Laporan Pendahuluan Konsep Perencanaan Bangunan Laporan Pendahuluan Konsep Perencanaan Bangunan
Laporan Pendahuluan Konsep Perencanaan Bangunan Gremons
 
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)Menyusun Dokumen Rencana Anggaran Biaya (PR 03)
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)Khalid Mustafa
 
Surat pernyataan-kesanggupan
Surat pernyataan-kesanggupanSurat pernyataan-kesanggupan
Surat pernyataan-kesanggupanUmmi Zulfa
 
233160387 struktur-organisasi-dan-personil-perusahaan-tambang
233160387 struktur-organisasi-dan-personil-perusahaan-tambang233160387 struktur-organisasi-dan-personil-perusahaan-tambang
233160387 struktur-organisasi-dan-personil-perusahaan-tambangFatimah Syarifuddin
 
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...Ahmad Abdul Haq
 
Mengapa Perlu SOP Pengadaan
Mengapa Perlu SOP PengadaanMengapa Perlu SOP Pengadaan
Mengapa Perlu SOP PengadaanKhalid Mustafa
 

Was ist angesagt? (20)

Materi 6 persiapan pbj - versi 4
Materi 6   persiapan pbj - versi 4Materi 6   persiapan pbj - versi 4
Materi 6 persiapan pbj - versi 4
 
Prakualifikasi dan Proses Pengadaan
Prakualifikasi dan Proses PengadaanPrakualifikasi dan Proses Pengadaan
Prakualifikasi dan Proses Pengadaan
 
Tata Cara Revisi Anggaran Kewenangan Ditjen Perbendaharaan
Tata Cara Revisi Anggaran Kewenangan Ditjen PerbendaharaanTata Cara Revisi Anggaran Kewenangan Ditjen Perbendaharaan
Tata Cara Revisi Anggaran Kewenangan Ditjen Perbendaharaan
 
Exp imp-bab-05
Exp imp-bab-05Exp imp-bab-05
Exp imp-bab-05
 
Perpres 12 tahun 2021 mei 2021 khusus pemda
Perpres 12 tahun 2021 mei 2021 khusus pemdaPerpres 12 tahun 2021 mei 2021 khusus pemda
Perpres 12 tahun 2021 mei 2021 khusus pemda
 
Surat Pernyataan Backdate
Surat Pernyataan Backdate Surat Pernyataan Backdate
Surat Pernyataan Backdate
 
Perpajakan dalam PBJ melalui Swakelola.pdf
Perpajakan dalam PBJ melalui Swakelola.pdfPerpajakan dalam PBJ melalui Swakelola.pdf
Perpajakan dalam PBJ melalui Swakelola.pdf
 
Data pengalaman perusahaan
Data pengalaman perusahaanData pengalaman perusahaan
Data pengalaman perusahaan
 
Materi 03 Persiapan Pengadaan Barang/Jasa 2
Materi 03 Persiapan Pengadaan Barang/Jasa 2Materi 03 Persiapan Pengadaan Barang/Jasa 2
Materi 03 Persiapan Pengadaan Barang/Jasa 2
 
Tata Cara Pembuatan TOR /KAK sebagai data dukung Usulan Anggaran tahun 2015
Tata Cara Pembuatan TOR /KAK sebagai data dukung  Usulan Anggaran tahun 2015Tata Cara Pembuatan TOR /KAK sebagai data dukung  Usulan Anggaran tahun 2015
Tata Cara Pembuatan TOR /KAK sebagai data dukung Usulan Anggaran tahun 2015
 
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...
ANALISIS OPINI BADAN PEMERIKSA KEUANGAN ATAS LAPORAN KEUANGAN PEMERINTAH DAER...
 
Kerangka acuan kerja pagar kantor
Kerangka acuan kerja pagar kantorKerangka acuan kerja pagar kantor
Kerangka acuan kerja pagar kantor
 
Contoh jadwal pelaksanaan pengadaan langsung
Contoh jadwal pelaksanaan pengadaan langsungContoh jadwal pelaksanaan pengadaan langsung
Contoh jadwal pelaksanaan pengadaan langsung
 
Laporan Pendahuluan Konsep Perencanaan Bangunan
Laporan Pendahuluan Konsep Perencanaan Bangunan Laporan Pendahuluan Konsep Perencanaan Bangunan
Laporan Pendahuluan Konsep Perencanaan Bangunan
 
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)Menyusun Dokumen Rencana Anggaran Biaya (PR 03)
Menyusun Dokumen Rencana Anggaran Biaya (PR 03)
 
Kurva s jasa konsultansi
Kurva s jasa konsultansiKurva s jasa konsultansi
Kurva s jasa konsultansi
 
Surat pernyataan-kesanggupan
Surat pernyataan-kesanggupanSurat pernyataan-kesanggupan
Surat pernyataan-kesanggupan
 
233160387 struktur-organisasi-dan-personil-perusahaan-tambang
233160387 struktur-organisasi-dan-personil-perusahaan-tambang233160387 struktur-organisasi-dan-personil-perusahaan-tambang
233160387 struktur-organisasi-dan-personil-perusahaan-tambang
 
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...
Slide Peraturan Pemerintah Nomor 45 Tahun 2013 tentang Tata Cara Pelaksanaan ...
 
Mengapa Perlu SOP Pengadaan
Mengapa Perlu SOP PengadaanMengapa Perlu SOP Pengadaan
Mengapa Perlu SOP Pengadaan
 

Ähnlich wie COMPANY PROFILE PT. RAJA AL AZHAR 2015 NEW

Company profile anugerah wicaksono
Company profile anugerah wicaksonoCompany profile anugerah wicaksono
Company profile anugerah wicaksonoyannick99
 
BBA final year internship project report
BBA final year internship project reportBBA final year internship project report
BBA final year internship project reportJaimin Patel
 
Blackstone Synergy - Small Businesses concept note
Blackstone Synergy - Small Businesses concept noteBlackstone Synergy - Small Businesses concept note
Blackstone Synergy - Small Businesses concept noteDebashish Banerjee
 
Mdlj chew jun hui_3S4_7
Mdlj chew jun hui_3S4_7Mdlj chew jun hui_3S4_7
Mdlj chew jun hui_3S4_7Projectsss
 
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDER
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDERICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDER
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDERMD. FAZLA RABBE SARDER
 
Osiris Infotech Profile
Osiris Infotech Profile Osiris Infotech Profile
Osiris Infotech Profile Jugal Garg
 
Pb604 – bussiness finance
Pb604 – bussiness financePb604 – bussiness finance
Pb604 – bussiness financeNur Dalila Zamri
 
M P S B Presentation New2
M P S B Presentation New2M P S B Presentation New2
M P S B Presentation New2neceolite
 
M P S B Presentation New
M P S B Presentation NewM P S B Presentation New
M P S B Presentation Newneceolite
 
Mpsb Pp New
Mpsb Pp NewMpsb Pp New
Mpsb Pp Newlengkuas
 
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...Jo Balucanag - Bitonio
 
Bhavin khunt business plan
Bhavin khunt business planBhavin khunt business plan
Bhavin khunt business planRajesh Patel
 
Company profile master for buyer
Company profile master for buyerCompany profile master for buyer
Company profile master for buyerFaisal Riza
 

Ähnlich wie COMPANY PROFILE PT. RAJA AL AZHAR 2015 NEW (20)

Company profile anugerah wicaksono
Company profile anugerah wicaksonoCompany profile anugerah wicaksono
Company profile anugerah wicaksono
 
BBA final year internship project report
BBA final year internship project reportBBA final year internship project report
BBA final year internship project report
 
HAFIZUR LATEST CV
HAFIZUR  LATEST CVHAFIZUR  LATEST CV
HAFIZUR LATEST CV
 
mauric
mauricmauric
mauric
 
Blackstone Synergy - Small Businesses concept note
Blackstone Synergy - Small Businesses concept noteBlackstone Synergy - Small Businesses concept note
Blackstone Synergy - Small Businesses concept note
 
Mdlj chew jun hui_3S4_7
Mdlj chew jun hui_3S4_7Mdlj chew jun hui_3S4_7
Mdlj chew jun hui_3S4_7
 
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDER
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDERICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDER
ICB Islamic Bank Limited Foreign Exchange Procedure | MD. FAZLA RABBE SARDER
 
VITAE 1
VITAE  1VITAE  1
VITAE 1
 
Osiris Infotech Profile
Osiris Infotech Profile Osiris Infotech Profile
Osiris Infotech Profile
 
Pb604 – bussiness finance
Pb604 – bussiness financePb604 – bussiness finance
Pb604 – bussiness finance
 
SSGC Complete Report
SSGC Complete ReportSSGC Complete Report
SSGC Complete Report
 
M P S B Presentation New2
M P S B Presentation New2M P S B Presentation New2
M P S B Presentation New2
 
M P S B Presentation New
M P S B Presentation NewM P S B Presentation New
M P S B Presentation New
 
Mpsb Pp New
Mpsb Pp NewMpsb Pp New
Mpsb Pp New
 
Honey ppr
Honey pprHoney ppr
Honey ppr
 
SKS MICROFINANCE
SKS MICROFINANCESKS MICROFINANCE
SKS MICROFINANCE
 
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...
Productivity & Entrepreneurship: The Story of Nueva Segovia Consortium of Coo...
 
Bhavin khunt business plan
Bhavin khunt business planBhavin khunt business plan
Bhavin khunt business plan
 
Company profile master for buyer
Company profile master for buyerCompany profile master for buyer
Company profile master for buyer
 
Buteermilk
ButeermilkButeermilk
Buteermilk
 

COMPANY PROFILE PT. RAJA AL AZHAR 2015 NEW

  • 1. MARKETING OFFICE WISMA YAKYF – 2ND FLOOR, JALAN WARUNG BUNCIT RAYA NO.99, JAKARTA 12740 – INDONESIA OPERATIONAL OFFICE JALAN CEMPAKA XI NO.56B, BANJARMASIN, SOUTH KALIMANTAN - INDONESIA
  • 2. PT. RAJA AL AZHAR is a company that has been established as Coal Mining, Exporter and Finance. As Coal Mining, we are backup with some location areas of coal mining in varieties calories. Its spreading at Binuang, Asam-Asam and Sungai Danau in south Kalimantan, Indonesia. As Exporter, we are focused on selling to foreign consumers, especially asian countries. We want to satisfy our consumers by guaranteeing the supply with the level of quality maintained, timely and sustainable. As Finance, we have a credit line in UOB Bank Indonesia to handle export transaction such non TRANSFERABLE USANCE and SKBDN. All transactions based on collection, negotiation and discount. Our expectations are very high in pursuit of the dream of making it into great company. With our competence employee in team to run the operation which here our professionalism are demanded and dedicated to guarantee. INTRODUCTION THE POWER OF COMMITMENT
  • 3. COMPANY NAME ESTABLISHED MAIN OFFICE OPERATIONAL OFFICE COMPANY REGISTER SIUP REGISTER TAX REGISTER NOTARIAL NUMBER NOTARY NAME : PT. RAJA AL AZHAR : JUNE 05TH, 2013 : WISMA YAKYF – 2ND FLOOR, JALAN WARUNG BUNCIT RAYA NO.99 JAKARTA 12740 – INDONESIA : JALAN CEMPAKA XI NO.56B, BANJARMASIN, SOUTH KALIMANTAN - INDONESIA : 657324993 : 470/418.104.05/2013 : 31.794.375.1-655.000 : AKTA NO.02, JUNE 05TH, 2013 : SISCA UTAMI DAMAYANTI, SH, M.KN COMPANY THE POWER OF COMMITMENT
  • 4. NAME : MINE SITE BROAD AREA : 5,353 HA LOCATION : KEC. KELUMPANG HILIR, KAB. KOTABARU, SOUTH KALIMANTAN – INDONESIA MINING METHOD : OPEN PIT CALORIE : GCV (ADB) 5,600 - 6700 PERMITS : IUP OP No. 545/69/IUPOP/D.PE/2010 AREA CODE : KTB.1005/IUPOP0092 START PRODUCTION: JULY PRODUCTION CAPACITY/MONTH : 300.000 MT/MONTH : - MEASURABLE RESERVES : 199.5 HA = 27,368,000 MT INDICATED RESOURCES : 5,353 HA = 340,000,000 MT STRIPING : 1 : 4 SEAM : 8 UP 50 METER HAULING TO JETTY : 30 KM STOCKPILE : ASAM-ASAM AND BINUANG KM 97 MINESUMMARY THE POWER OF COMMITMENT
  • 5. LOADING PORT JETTY PORT : JETTY KPP - SUNGAI PUTING JETTY HASNUR - SUNGAI SALAI LOADING RATE : 7,500 - 10,000 MT / DAY HAULING TO JETTY : 22 KM BARGE : 300 - 330 FT ANCHORAGE : TABONEO, and MUARA SATUI SOUTH KALIMANTAN LOADING RATE : 10,000 - 15,000 MT / DAY LAND TRANSPORTATION TRUCKING : TRUCK 10 tires @30 MT - 100 UNITS AVAILABLE HAULING ROAD : MINING ROAD , WIDE : 30 MTRS MINESUMMARY THE POWER OF COMMITMENT STOCKPILE FACILITY MACHINE CAP : 300-500 MT/HOUR BROAD AREA ANOTHER MINE : 6,038 HA LOCATION : KEC. PENGARON, SAMBUNG MAKMUR, KAB. BANJAR SOUTH KALIMANTAN – INDONESIA MINING METHOD : OPEN PIT CALORIE : GCV (ADB) 6,400 - 7,300 PERMITS : PKP2B No.206.K/40.00/DJB/06 AREA CODE : PKP2B00PB0139
  • 6. PRESIDENT DIRECTOR FINANCE/BANKING SITE MANAGER EXECUTIVE DIRECTOR FINANCE MANAGER ACCOUNTING TAX AND BANKING MARKETING MANAGER OPERATIONAL ASSOCIATE MARKETING ORGANIZATION STRUCTURE THE POWER OF COMMITMENT MANAGEMENT & MARKETING BOD
  • 7. MASTER LOADING COORDINATOR LOADING BARGE COORDINATOR LOADING VESSEL COORDINATOR JETTY COORDINATOR CRUSHING COORDINATOR STOCKPILE COORDINATOR MINING SITE ORGANIZATION THE POWER OF COMMITMENT PARTNERSHIP PRESIDENT DIRECTOR MANAGEMENT & MARKETING FINANCE/BANKING BOD SITE MANAGER CUSTOMS
  • 11. PARTNERSHIP BMB THE POWER OF COMMITMENT
  • 13. DISTANCE TO JETTY BARGE SIZE JETTY PORT LOADING RATE : 33 KM : 270 - 300 - 330 FT : KPP - MANDIRI - HASNUR : 1,200 MT PER HOURS DISTANCE TO ANCHORAGE VESSEL SIZE ANCHORAGE PORT LOADING RATE : 4 HOURS : SUPRAMAX - PANAMAX : TABONEO - MUARA ASAM-ASAM : 10,000 - 15,000 MT PER DAY COORDINATE OPEN SEA TABONEO, SOUTH KALIMANTAN SUPRAMAX VESSEL 03-40-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 12-13M, DEPTH ABT 13M) PANAMAX VESSEL 03-41-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 14-15M, DEPTH ABT 17M) CAPSIZE VESSEL 03-42-00 SOUTH/114-26.5-00 EAST (MAX DRAFT ABT 18-19M, DEPTH ABT 20 - 22M) LOADING ACTIVITYINFO THE POWER OF COMMITMENT
  • 16. THE POWER OF COMMITMENT JETTY
  • 21. THE POWER OF COMMITMENT
  • 22. THE POWER OF COMMITMENT
  • 23. THE POWER OF COMMITMENT Financesupport
  • 24. Copyright@2015 - All Reserved by PT. RAJA AL AZHAR THE POWER OF COMMITMENT Mr. KP.H.Kesoemo,SE,MBA Mr. Gandung Perono Mr. Ishwara Danurdara,MBA Mr. Teten Puri Dewa Mr. Paul Tan ASSOCIATE EMAIL : rajaalazharmining@gmail.com ishwara@hakersen.id gandung@harkesen.id wattubara@gmail.com paul.cendrawasih@gmail.com Mr. Chaidir Azhar.MD