1. Resume of Paul Christian Pugh Page 1 of 6
C U R R I C U L U M V I TA E
PRIVATE AND CONFIDENTIAL
PAUL CHRISTIAN PUGH
44 Palomino Promenade
THE VINES WA 6069
Tel : + 61 8 6296 7429
Mobile : +(61) 0417 964 311
Email : paul.pugh11@icloud.com
2. Resume of Paul Christian Pugh Page 2 of 6
December 2015
C AR E E R S UM M AR Y
3. Resume of Paul Christian Pugh Page 3 of 6
Profile
Completed contract as Senior Quality SMP Engineer on Roy Hill Project November
2015,Structural,Mechanical & Piping construction inspection and documentation
verification,MDR Compilation.. An experienced Welding / Dimensional Inspector/Manager
in metals manufacturing for large-scale construction projects. Experienced in HR and IR
management as part of career development.
Areas of Expertise
Organisation and planning of workshops and projects
OH&S regulations and requirements – knowledge and experience
Ability to perform to client requirements and specifications
Sound knowledge of quality systems
Good interpretation of detail drawings
Construction verification and MDR Compilation.
Technical Experience
Structural steelfabrication
Pressure vesselplate and tank work
Pipe spooling (carbon steel, stainless steels, titanium, chrome molly, etc.)
Stainless steeltanks and chutes, bisalloy components, inconel, zeron, etc.
Projects for petrochemical, oil and gas industries
Projects for mines and minerals industries
Skills
Man management, motivation and work allocation – to get the best out of individuals
Strong supervisory skills
Knowledge and experience of computerised steel cutting machinery (CNC machines)
Time-served skilled Boilermaker/Welder (Fabricator)
Computer literate
Education & Qualifications
O-Level Standard Secondary School; Liverpool UK
City at Guilds with credits in Heavy Fabrications
E.R.S. British Gas Approved Welding Inspector (Pipelines)
Computer Aided Drawing (C.A.D.); City & Guilds
4 year apprenticeship time served
BHP Supervisors certificate
4. Resume of Paul Christian Pugh Page 4 of 6
D E T AILE D HIS T O R Y
Samsung CT (Roy Hill Project)
February 2015 to November 2015
Senior SMP Quality Engineer
Responsibilities
Management of Project Quality Documentation overseeing construction
compliance, structural mechanical & piping.
Fremantle Steel/Park Engineering
September 2013 – February 2015
Project Quality coordinator/Inspector
Responsibilities
Management in overseeing Quality in both facilities and all Sub-contractors
i.e. Surface Treatment & Machine Shops.
Liasing with Client Inspections
Fastjv PHIHP Project.
November 2011 – September 2013
Senior Project Quality Inspector
Responsibilities
BHP Representative for PHIHP project in Perth
Fastjv RGP5/6 Project
September 2009 – November 2011
Senior Project Quality Inspector
Responsibilities
BHP Representative for RGP5/6 Ship Loaders China
Sandvik Mining and Construction
July 2008 – September 2009
QA/QC Inspector Yandi, Brockman 4 Stackers
Eastman Fort
September 2007 – July 2008
Design Drafting Checker
Fremantle Steel Fabrication
May 1996 – September 2007
QC Dimensional Inspector/Manager
Responsibilities
Overall responsibility for the fabrication inspection and delivery for installation.
Managing and organising of multi discipline engineering team (80-100 people).
Met all milestone dates for projects such as;
5. Resume of Paul Christian Pugh Page 5 of 6
Stacker Cawse Nickel Krupp Engineer’s
Cawse Nickel Expansion Minproc Engineers
Worsley Expansion Project United Group
Dampier Port Upgrade Clough Sandwell
Redbank Power Station ABB Construction
BHP Billiton Area-C Reclaimer Voest Alpine
Shiploader at Esperance S.M.F.W
Shiploader at Albany S.M.F.W
Shiploader at Finucane Island Voist Alpine
Shiploader at Finucane Island Krupp
Shiploader Worsley Alumina Krupp
Maintaining and controlling of operations on various projects, supervision of foreman,
QA, QC Coordinators.
Wood Watts and Associates
July 1995 – May 1996
Responsibilities
10 month contract as a Detailed Drafter Checker for various clients in the Mining
Petrochemical Industries.
Monadelphous Engineering and Associates
April 1994 – June 1995
Responsibilities
Site Supervisor at Gove Northern Territory for the construction and installation of new power
station, installation of tank farms, associated pipe work ensuring a safe working environment
at all times and meeting client deadlines.
6. Resume of Paul Christian Pugh Page 6 of 6
S HO R T T E R M C O N T R AC T S
After immigrating from U.K. in January 1993
Steeltech
Workshop/Site Supervisor
Fabrication and installation of stainless steelvessels for Alcoa Australia
Transfield
Site Supervisor
Fabrication and installation of new components for Kalgoorlie Nickel Smelter
Drake Industrial
Welding Instructor
3 month contract assessing and accrediting welders to AS 1554
Sapeng Liquid Gas Hismelt Pilot Plant
Fabrication Supervisor
Shop fabrication and site installation of pressure vessels,associated pipe work, chutes,
hoppers, general maintenance and co-ordinating shutdowns.
7. Resume of Paul Christian Pugh Page 7 of 6
U. K. E M P LO YM E N T
Simon Handling Systems
February 1988 – 1993
Workshop/Site Superintendent
Responsibilities
Overall responsibility for the fabrication, installation and commissioning activities of all
major process handling projects across UK and Europe.
General duties included not limited to
Sub-contract selection and management
Set up cost control procedures for engineering construction
Set up planning modules based on project timeline estimates per discipline
Initiate and participate in setting up project specific processes and procedures for QA/QC,
Occ/Health Safety and safe work methods and practises
Management of multi discipline engineering team
C.M.L Engineering, U.K.
April 1985 – February 1988
Supervisor
Shop fabrication, installation of stainless steelwater towers,pressure vessels, heat exchangers
for British nuclear fuels.
September 1980 – March 1985
Resided in Holland
Working across Holland as a sub-contractor for companies such as;
Shell – Rotterdam
N.D.S.H. Off Shore – Amsterdam
Schippers Construction – Amsterdam
Santa Fe Off Shore Services – Amsterdam
E.I.S.B. Construction – Weeringerverf
1976 – 1980
Braby’s Construction – Apprentice Boilermaker/Welder
8. Resume of Paul Christian Pugh Page 8 of 6
R E F E R E E S
1) ROYHILL
Steve Hynes – QA/QC Co-ordinator
0427 920 800
2) FLUOR
Paul Edwards – Quality Manager
Office : 6104 4541 Mobile: 0467 802386