SlideShare ist ein Scribd-Unternehmen logo
1 von 2
a) Title: Instrument/Electrical ControlsEngineer
b) CompanyName: MT. WEST FABRICATION PLANTS&STATIONS,INC
PROCESSENGINEERINGDESIGN,INC.
c) Location: (thisisthe oldaddress-Now partof Willbros)
WilliamsCenterTowerII
2 WestSecondStreet,suite 2220
Tulsa,OK 74103
P: (918) 584-7100
F: (918) 584-7111
E: mtwest@webzone.net
d) Positionrequiredanunderstandingof processresponsesingasandoil processingfacilitiesand
compressorandpumpstationsand an understandingof the electrical powerrequirementsinthose
facilities,Requiredknowledgeof NEC,APIRP500, RP521 and the ISA specificationsandstandards.
 Responsible forthe developmentof the control portionof facilityflowsheetsbasedonface-to-face
meetingswith`the clientinwhichtheyverballycommunicatedtheirrequirements.
 Developedspecificationsforall the devicesandmaterials required.
 SpecifiedPLCs,remote IO,flowcomputers,HMI& PC hardware andsoftware.
 Specifiedanddesignedlayoutfororifice,ultrasonicandturbine flowmeters. AdheringtoAGA
measurementstandards.
 Requiredtoobtainquotes,analyze competitive bids,make recommendationsforpurchase and
discussthe meritsof these recommendationswiththe client.
 Designedtubing,wiringandconduittoproperlyconnectthe instruments.
PROJECT REFERENCES
WilliamsGasProcessingGRAYSHARBOR PROJECT wasa part of the Satsop CombustionTurbineProject
Locatedin: Grays Harbor County,Washington. The SatsopCombustionTurbineProjectconsistsof two
combinedcycle combustionturbine powerplantunitsandanassociatednatural gaspipeline. Process
EngineeringDesign/Mt.WestFabricationwere awardedresponsibilityforthe replacementof the
originallypermittedWestinghouse turbineswithGeneral Electricturbines; modificationof the facility
configuration fromadual "one-on-one"configuration(twoseparate butidentical combustionturbine
generator- steamturbine generatortrains),toasingle "twoonone"configuration(twocombustion
turbine generators - one steamturbine generatorfacility); anincrease of the nominal outputof the
facilityfrom490 MW to 530 MW; an increase of the a maximumoutputof approximately650 MW by
utilizingductfiring; andremoval of the capabilitytouse dieseloil asa backupfuel. Construction
startedon the combustion turbine projectin September2001, but wassuspendedinSeptember2002 at
approximately56%completion.
As the ProjectControlsEngineerIwasresponsible forthe controlsandlow voltage portionof agas
pipelinecompressorinstallationupgrade andinstallationof deliverymeterstation.
DevelopedI/Eportionof the constructionbidpackage indirectpartnershipwithclient. Specifiedall
instrumentation.
Responsible forP&IDdevelopment. Determinedareaclassification. DevelopedControlNarrative,
I/Odiagram,and S.A.F.E.chart forprogrammingtechnician (now calledthe Cause-and-Effectdiagram).
Directeddraftingtoproduce electrical drawingpackage. Providedengineeringsupportto
construction fromthe office byphone on-call andsome site visits.
Scope of workincludedproducingthe wiringschematics,specifyingcontrol valves,automatedblock
valves,electro/pneumaticcontrol systems,flowmeters,RTDs,transmittersandswitches;analyzers,
chromatographs,heattrace,gas and fire detectionsystems.
Developedcontrol systemnarrative,Scope of Work,P&IDs,andI/Ocommunicationsindirect
partnershipwithclient.
Requiredextreme flexibilitythroughmultipleautomatedvalve manifolds.Extensive panel board
designandretrofitintoexistingpowersystem.Upgrade PLCandSCADA systems. EFMinterface toDuke
providedbyinterposingPLCtolimitaccess.
 NORTHWEST NATURAL MIST STORAGE Undergroundstorage facilitywithhighturndownandbi-
directional flow requiringsplit-rangingcontrol valves. OMNIFlow Computer,InstrometUTmetersfor
highflowwithInvensysAuto-Adjustturbine metersforlow flow.
 GNACOLUMBIA METER STATION Developmentof astandardskid-mountedmeteringsystemforuse
ingas deliverytopowerplantsinremote locations. Requiredsolarpowerw/batterybackup,Instromet
UT meter,AutoMATEEFM andRTU. Implementedinterface toWilliamsEFM.
e) Gary Smith,P.E.
WillbrosEngineers,Inc.
2087 E 71st
Street
Tulsa,OK 74136
(918) 499-2753

Weitere ähnliche Inhalte

Andere mochten auch

ResumeDavidBoudreauxOCT2015
ResumeDavidBoudreauxOCT2015ResumeDavidBoudreauxOCT2015
ResumeDavidBoudreauxOCT2015david boudreaux
 
Jorge Ruballos Resume_GA
Jorge Ruballos Resume_GAJorge Ruballos Resume_GA
Jorge Ruballos Resume_GAJorge Ruballos
 
John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John Bishop
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit KumarLALIT KUMAR
 
Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015j phillips
 
Marketing Automation Specialist Resume - Carly Gorka
Marketing Automation Specialist Resume - Carly GorkaMarketing Automation Specialist Resume - Carly Gorka
Marketing Automation Specialist Resume - Carly GorkaCarly (CJ) Gorka
 
Otis osborne resume
Otis osborne resumeOtis osborne resume
Otis osborne resumeOtis Osborne
 
Darrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultzKenneth Michael Shultz
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015Gary Katz
 
official resume pdf
official resume pdfofficial resume pdf
official resume pdfanwar hamed
 
FCC Cook Federal Resume
FCC Cook Federal ResumeFCC Cook Federal Resume
FCC Cook Federal ResumeTravis Cook
 

Andere mochten auch (18)

ResumeDavidBoudreauxOCT2015
ResumeDavidBoudreauxOCT2015ResumeDavidBoudreauxOCT2015
ResumeDavidBoudreauxOCT2015
 
resume_Tomasz_Salamon
resume_Tomasz_Salamonresume_Tomasz_Salamon
resume_Tomasz_Salamon
 
Jorge Ruballos Resume_GA
Jorge Ruballos Resume_GAJorge Ruballos Resume_GA
Jorge Ruballos Resume_GA
 
Resume
ResumeResume
Resume
 
John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)John BishopResume Controls Engineer(6-11-15)
John BishopResume Controls Engineer(6-11-15)
 
SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0SSG_RESUME_DEC2015.R0
SSG_RESUME_DEC2015.R0
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Ww CV 2016
Ww CV 2016Ww CV 2016
Ww CV 2016
 
Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015
 
Marketing Automation Specialist Resume - Carly Gorka
Marketing Automation Specialist Resume - Carly GorkaMarketing Automation Specialist Resume - Carly Gorka
Marketing Automation Specialist Resume - Carly Gorka
 
Mitchell_Resume
Mitchell_ResumeMitchell_Resume
Mitchell_Resume
 
Otis osborne resume
Otis osborne resumeOtis osborne resume
Otis osborne resume
 
Darrell Ketchum Project Controls
Darrell Ketchum Project ControlsDarrell Ketchum Project Controls
Darrell Ketchum Project Controls
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultz
 
gskresume_2015
gskresume_2015gskresume_2015
gskresume_2015
 
official resume pdf
official resume pdfofficial resume pdf
official resume pdf
 
FCC Cook Federal Resume
FCC Cook Federal ResumeFCC Cook Federal Resume
FCC Cook Federal Resume
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 

Ähnlich wie PED - Controls Engineer

Telecommunications[1][1]
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]John Bernhard
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1William Crowley
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
Reda sultan hassan (1)
Reda sultan hassan (1)Reda sultan hassan (1)
Reda sultan hassan (1)reda sultan
 
James Kelly 06-15
James Kelly 06-15James Kelly 06-15
James Kelly 06-15James Kelly
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel Weathers
 
Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul Coulter
 
洛阳市第二中医院网络竣工文档
洛阳市第二中医院网络竣工文档洛阳市第二中医院网络竣工文档
洛阳市第二中医院网络竣工文档zgxworks
 
Explain industrial control system
Explain industrial control systemExplain industrial control system
Explain industrial control systemPoonam Kherde
 

Ähnlich wie PED - Controls Engineer (20)

Telecommunications[1][1]
Telecommunications[1][1]Telecommunications[1][1]
Telecommunications[1][1]
 
RESUME 2015
RESUME 2015RESUME 2015
RESUME 2015
 
dc2026c1-sch.pdf
dc2026c1-sch.pdfdc2026c1-sch.pdf
dc2026c1-sch.pdf
 
DerrickSoldaviniResumeFinal
DerrickSoldaviniResumeFinalDerrickSoldaviniResumeFinal
DerrickSoldaviniResumeFinal
 
RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1RESUME WilliamCrowley Sept 2016-1
RESUME WilliamCrowley Sept 2016-1
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Eze Michael Onyedika CV (1)
Eze Michael Onyedika CV (1)Eze Michael Onyedika CV (1)
Eze Michael Onyedika CV (1)
 
Reda sultan hassan (1)
Reda sultan hassan (1)Reda sultan hassan (1)
Reda sultan hassan (1)
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
James Kelly 06-15
James Kelly 06-15James Kelly 06-15
James Kelly 06-15
 
Resume
ResumeResume
Resume
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
 
Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016
 
KW resume 2015
KW resume 2015KW resume 2015
KW resume 2015
 
New updated eet klf
New updated eet klfNew updated eet klf
New updated eet klf
 
洛阳市第二中医院网络竣工文档
洛阳市第二中医院网络竣工文档洛阳市第二中医院网络竣工文档
洛阳市第二中医院网络竣工文档
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
 
Nadim Siddique CV
Nadim Siddique CVNadim Siddique CV
Nadim Siddique CV
 
Explain industrial control system
Explain industrial control systemExplain industrial control system
Explain industrial control system
 
resume march 8
resume march 8resume march 8
resume march 8
 

PED - Controls Engineer

  • 1. a) Title: Instrument/Electrical ControlsEngineer b) CompanyName: MT. WEST FABRICATION PLANTS&STATIONS,INC PROCESSENGINEERINGDESIGN,INC. c) Location: (thisisthe oldaddress-Now partof Willbros) WilliamsCenterTowerII 2 WestSecondStreet,suite 2220 Tulsa,OK 74103 P: (918) 584-7100 F: (918) 584-7111 E: mtwest@webzone.net d) Positionrequiredanunderstandingof processresponsesingasandoil processingfacilitiesand compressorandpumpstationsand an understandingof the electrical powerrequirementsinthose facilities,Requiredknowledgeof NEC,APIRP500, RP521 and the ISA specificationsandstandards.  Responsible forthe developmentof the control portionof facilityflowsheetsbasedonface-to-face meetingswith`the clientinwhichtheyverballycommunicatedtheirrequirements.  Developedspecificationsforall the devicesandmaterials required.  SpecifiedPLCs,remote IO,flowcomputers,HMI& PC hardware andsoftware.  Specifiedanddesignedlayoutfororifice,ultrasonicandturbine flowmeters. AdheringtoAGA measurementstandards.  Requiredtoobtainquotes,analyze competitive bids,make recommendationsforpurchase and discussthe meritsof these recommendationswiththe client.  Designedtubing,wiringandconduittoproperlyconnectthe instruments. PROJECT REFERENCES WilliamsGasProcessingGRAYSHARBOR PROJECT wasa part of the Satsop CombustionTurbineProject Locatedin: Grays Harbor County,Washington. The SatsopCombustionTurbineProjectconsistsof two combinedcycle combustionturbine powerplantunitsandanassociatednatural gaspipeline. Process EngineeringDesign/Mt.WestFabricationwere awardedresponsibilityforthe replacementof the originallypermittedWestinghouse turbineswithGeneral Electricturbines; modificationof the facility configuration fromadual "one-on-one"configuration(twoseparate butidentical combustionturbine generator- steamturbine generatortrains),toasingle "twoonone"configuration(twocombustion turbine generators - one steamturbine generatorfacility); anincrease of the nominal outputof the facilityfrom490 MW to 530 MW; an increase of the a maximumoutputof approximately650 MW by utilizingductfiring; andremoval of the capabilitytouse dieseloil asa backupfuel. Construction startedon the combustion turbine projectin September2001, but wassuspendedinSeptember2002 at approximately56%completion. As the ProjectControlsEngineerIwasresponsible forthe controlsandlow voltage portionof agas pipelinecompressorinstallationupgrade andinstallationof deliverymeterstation. DevelopedI/Eportionof the constructionbidpackage indirectpartnershipwithclient. Specifiedall instrumentation. Responsible forP&IDdevelopment. Determinedareaclassification. DevelopedControlNarrative, I/Odiagram,and S.A.F.E.chart forprogrammingtechnician (now calledthe Cause-and-Effectdiagram).
  • 2. Directeddraftingtoproduce electrical drawingpackage. Providedengineeringsupportto construction fromthe office byphone on-call andsome site visits. Scope of workincludedproducingthe wiringschematics,specifyingcontrol valves,automatedblock valves,electro/pneumaticcontrol systems,flowmeters,RTDs,transmittersandswitches;analyzers, chromatographs,heattrace,gas and fire detectionsystems. Developedcontrol systemnarrative,Scope of Work,P&IDs,andI/Ocommunicationsindirect partnershipwithclient. Requiredextreme flexibilitythroughmultipleautomatedvalve manifolds.Extensive panel board designandretrofitintoexistingpowersystem.Upgrade PLCandSCADA systems. EFMinterface toDuke providedbyinterposingPLCtolimitaccess.  NORTHWEST NATURAL MIST STORAGE Undergroundstorage facilitywithhighturndownandbi- directional flow requiringsplit-rangingcontrol valves. OMNIFlow Computer,InstrometUTmetersfor highflowwithInvensysAuto-Adjustturbine metersforlow flow.  GNACOLUMBIA METER STATION Developmentof astandardskid-mountedmeteringsystemforuse ingas deliverytopowerplantsinremote locations. Requiredsolarpowerw/batterybackup,Instromet UT meter,AutoMATEEFM andRTU. Implementedinterface toWilliamsEFM. e) Gary Smith,P.E. WillbrosEngineers,Inc. 2087 E 71st Street Tulsa,OK 74136 (918) 499-2753