1. PAUL LEATHAM C.V.
29 NEW ROAD
HOOK
HAVERFORDWEST
PEMBROKESHIRE
SA62 4LJ
D.O.B 30/07/1974
Tel: 01437890103
Mobile: 07793614534
PRLEATHAM@HOTMAIL.CO.UK
QUALIFICATIONS (ACADEMIC)
IOSH MANAGING SAFELY.
APPOINTED PERSON LIFTING OPERATIONS (336581) (00880122).
INSPECTION OF LIFTING EQUIPMENT INCLUDING SAFETY HARNESSES.
SAFETY PASSPORT (1917493).
MEWP BOOM/SCISSOR.
SLINGER/SIGNALLER.
CONFINED SPACE ENTRY.
STEEL ERECTOR INDUSTRY ACCREDITATION B.
NAECI TWO DAY INDUSTRIAL RELATIONS COURSE.
SIPP PART 1 HSE TRAINING FOR SUPERVISION.
SIPP PART 2 CONSTRUCTION SAFETY.
CB@I FIVE DAY RIGGING COURSE.
Employment history.
Jan 2015 _ present _ Rigging supervisor
Coordinating all crane works on a waste to energy project in port Clarence.
Overseeing lifting operations in accordance with BS: 7121, LOLER.
Supervising the installation of the pipe line and conveyors, silos and overseeing
The erection of all the steelwork.
Inspection of all lifting equipment including harnesses.
2. Assisting the H&S department when required.
May 2014 _ Jan 2015 _ rigging supervisor/appointed person
Carrington power station project, Coordinating all crane works. Overseeing the erection of the boiler
panels/stack sections/condenser unit/air intake.
Inspection of all lifting equipment.
Assisting the H&S department when required.
July 2013_May 2014 _ Rigging supervisor. CB&I
Tv1 Tees valley Energy from waste project.
Supervising the erection of the silo structure, transfer tower and dozing tower.
Supervising the installation of all conveyors.
Inspection of lifting equipment.
Sept 2012_July 2013 _ Erection supervisor. Shaw group
Sleaford REP.
Supervising the erection of the boiler steelwork and installation of boiler panels.
April 2012_Sept 2012 _ Charge hand/Rigger. Unit Birwelco
Pembroke power station.
Finishing Erection of steelwork to the 5 boilers.
Feb 2010_April 2012 _ Charge hand/rigger/erector. Shaw group
Pembroke power station HRSG.
Installation of the boiler steelwork and platforms around the boiler. Installing the feed water modules on all
five boilers up to 90 tonnes.
Nov 2009_Feb 2010_Erection supervisor for Cardiff steel.
Pembroke power station.
Erection of the turbine steelwork.
Jan 2009_Nov 2009_Rigger for Rhyal Engineering.
Bp Northampton.
Installation of pipework.
May 08_Nov 08_rigger for power units.
LNG Milford Haven.
Installing steelwork and pipework.
References. Derek Shipley manager cb&i. Tel:07885166500.