2. “My greatest satisfaction relates to the mobil-
isation/demobilisation role. We had a very short
time frame in which to do that and I’m proud
to say we succeeded without any delays. It was
like taking a fast train: you know your destina-
tion and you feel best when you’re going ahead
at high speed, working hard with your team to
solve issues that arise along the way. It was an
exciting and unforgettable time for me.”
Angela Li,
Yard Business Manager
IT WAS LIKE WORKING
ON A HIGH SPEED TRAIN
Paul Bernard,
CCB Construction
Manager
What was your role in the
project?
Paul Bernard: “I was in charge
of the construction of the
CCB module, the linchpin of
the whole Yamal Project. It’s
the biggest module installed
at Sabetta, and the longest
industrial module ever trans-
ported in the world. Ensuring
its safe arrival, on time and on
quality, required very close
coordination between the op-
erating centre, our suppliers,
and our sub-contractor.”
the longest
module ever
transported
in the world
Logistics team in charge of the CCB load-out
Building module loaded
aboard Audax vessel
Utility modules ready
for sail away
BOMESC Yard - MWP2b/2b-7B Tianjin china
one project, one teamthe arctic adventure
 42  
2017 JANUARY the arctic adventure one project, one team