The MWP2/7
Buildings and
modules are
dedicated
to common
facilities for
the 3 LNG trains.
The CCB is one of the
most critical modules
of the project, piloting
the entire Yamal plant.
The building is made up
of 73 different rooms
on two levels. It is 103
m long, 44.7 m wide,
21.9 m high, and weighs
over 5,500 tons. It also
includes 340 km of
cables.
challenge
The yard had an extremely tight time schedule for its 21 modules. Production began in 2015
and continued for approximately 20 months in total. That represented a total of 18 million hours
worked, often 24/7. Ensuring good communications among multicultural teams, and mobilising
the teams around a common project was also crucial to the completion of the project.
“When you’re involved on an international
project of this size, the main challenge is a
human one. Without the men and women
who worked on the project, we would not
have achieved anything at all. We obviously
had many moments of stress and tension,
but we never gave up. We all worked as
One Team to support project completion.”
A HUMAN STORY
Yutaka
Matsuzaka,
Senior Project
Manager
50haYard size
60,000t/y Production
capacity
39° 05’ 02” N
117° 12’ 03” E
340KMS OF CABLES
for the CCB, one of
the most critical
modules of the project
21utility modules and buildings
11 Utility modules of 27,000 tonnes for Train 1
10 Modularised buildings for Train 1including
the CCB (Central Control Building) weighing
14,000 tonnes
Team meeting
Welding activities
LĂ©gende
Tianjin chinaBOMESC Yard - MWP2b/2b-7B
 40    41  
2017 JANUARY the arctic adventure one project, one team2017 JANUARY
“My greatest satisfaction relates to the mobil-
isation/demobilisation role. We had a very short
time frame in which to do that and I’m proud
to say we succeeded without any delays. It was
like taking a fast train: you know your destina-
tion and you feel best when you’re going ahead
at high speed, working hard with your team to
solve issues that arise along the way. It was an
exciting and unforgettable time for me.”
Angela Li,
Yard Business Manager
IT WAS LIKE WORKING
ON A HIGH SPEED TRAIN
Paul Bernard,
CCB Construction
Manager
What was your role in the
project?
Paul Bernard: “I was in charge
of the construction of the
CCB module, the linchpin of
the whole Yamal Project. It’s
the biggest module installed
at Sabetta, and the longest
industrial module ever trans-
ported in the world. Ensuring
its safe arrival, on time and on
quality, required very close
coordination between the op-
erating centre, our suppliers,
and our sub-contractor.”
the longest
module ever
transported
in the world
Logistics team in charge of the CCB load-out
Building module loaded
aboard Audax vessel
Utility modules ready
for sail away
BOMESC Yard - MWP2b/2b-7B Tianjin china
one project, one teamthe arctic adventure
 42  
2017 JANUARY the arctic adventure one project, one team
 43  

Weitere ähnliche Inhalte

Ă„hnlich wie Yamal project_BOMESC

CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
Iain Cameron
 
Project Milestones quotes from Project Director
Project Milestones quotes from Project DirectorProject Milestones quotes from Project Director
Project Milestones quotes from Project Director
Fabien Deschamps
 
Contrack Watts Newsletter-Issue 6
Contrack Watts Newsletter-Issue 6Contrack Watts Newsletter-Issue 6
Contrack Watts Newsletter-Issue 6
Peter A. Hanna, CPM
 
Copy of Shutdown TGT 2014 final
Copy of Shutdown TGT 2014 finalCopy of Shutdown TGT 2014 final
Copy of Shutdown TGT 2014 final
Mark Beats
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
Zobed Hossen
 
Team effort wins plate order
Team effort wins plate orderTeam effort wins plate order
Team effort wins plate order
Boulton Richard
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
Kim Barry
 
Cogburn binder no1 project_summary
Cogburn binder no1 project_summaryCogburn binder no1 project_summary
Cogburn binder no1 project_summary
John Chapman
 
Project Defense
Project DefenseProject Defense
Project Defense
Ali Zannah
 

Ă„hnlich wie Yamal project_BOMESC (20)

Fast track projects experiences and overview by Rajesh Prasad
Fast track projects   experiences and overview by Rajesh PrasadFast track projects   experiences and overview by Rajesh Prasad
Fast track projects experiences and overview by Rajesh Prasad
 
CV Presentation May16
CV Presentation May16CV Presentation May16
CV Presentation May16
 
JCCBI 2015 Project Report
JCCBI 2015 Project ReportJCCBI 2015 Project Report
JCCBI 2015 Project Report
 
Project Milestones quotes from Project Director
Project Milestones quotes from Project DirectorProject Milestones quotes from Project Director
Project Milestones quotes from Project Director
 
Contrack Watts Newsletter-Issue 6
Contrack Watts Newsletter-Issue 6Contrack Watts Newsletter-Issue 6
Contrack Watts Newsletter-Issue 6
 
Egypt | Phase IV and Sequoia | Project Data Sheet
Egypt | Phase IV and Sequoia | Project Data SheetEgypt | Phase IV and Sequoia | Project Data Sheet
Egypt | Phase IV and Sequoia | Project Data Sheet
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
Copy of Shutdown TGT 2014 final
Copy of Shutdown TGT 2014 finalCopy of Shutdown TGT 2014 final
Copy of Shutdown TGT 2014 final
 
13.ICON Brochure
13.ICON Brochure13.ICON Brochure
13.ICON Brochure
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Cv presentation jun13
Cv presentation jun13Cv presentation jun13
Cv presentation jun13
 
Team effort wins plate order
Team effort wins plate orderTeam effort wins plate order
Team effort wins plate order
 
Resume
ResumeResume
Resume
 
Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
Cogburn binder no1 project_summary
Cogburn binder no1 project_summaryCogburn binder no1 project_summary
Cogburn binder no1 project_summary
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugo
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric Project
 
Project Defense
Project DefenseProject Defense
Project Defense
 

Yamal project_BOMESC

  • 1. The MWP2/7 Buildings and modules are dedicated to common facilities for the 3 LNG trains. The CCB is one of the most critical modules of the project, piloting the entire Yamal plant. The building is made up of 73 different rooms on two levels. It is 103 m long, 44.7 m wide, 21.9 m high, and weighs over 5,500 tons. It also includes 340 km of cables. challenge The yard had an extremely tight time schedule for its 21 modules. Production began in 2015 and continued for approximately 20 months in total. That represented a total of 18 million hours worked, often 24/7. Ensuring good communications among multicultural teams, and mobilising the teams around a common project was also crucial to the completion of the project. “When you’re involved on an international project of this size, the main challenge is a human one. Without the men and women who worked on the project, we would not have achieved anything at all. We obviously had many moments of stress and tension, but we never gave up. We all worked as One Team to support project completion.” A HUMAN STORY Yutaka Matsuzaka, Senior Project Manager 50haYard size 60,000t/y Production capacity 39° 05’ 02” N 117° 12’ 03” E 340KMS OF CABLES for the CCB, one of the most critical modules of the project 21utility modules and buildings 11 Utility modules of 27,000 tonnes for Train 1 10 Modularised buildings for Train 1including the CCB (Central Control Building) weighing 14,000 tonnes Team meeting Welding activities LĂ©gende Tianjin chinaBOMESC Yard - MWP2b/2b-7B  40    41   2017 JANUARY the arctic adventure one project, one team2017 JANUARY
  • 2. “My greatest satisfaction relates to the mobil- isation/demobilisation role. We had a very short time frame in which to do that and I’m proud to say we succeeded without any delays. It was like taking a fast train: you know your destina- tion and you feel best when you’re going ahead at high speed, working hard with your team to solve issues that arise along the way. It was an exciting and unforgettable time for me.” Angela Li, Yard Business Manager IT WAS LIKE WORKING ON A HIGH SPEED TRAIN Paul Bernard, CCB Construction Manager What was your role in the project? Paul Bernard: “I was in charge of the construction of the CCB module, the linchpin of the whole Yamal Project. It’s the biggest module installed at Sabetta, and the longest industrial module ever trans- ported in the world. Ensuring its safe arrival, on time and on quality, required very close coordination between the op- erating centre, our suppliers, and our sub-contractor.” the longest module ever transported in the world Logistics team in charge of the CCB load-out Building module loaded aboard Audax vessel Utility modules ready for sail away BOMESC Yard - MWP2b/2b-7B Tianjin china one project, one teamthe arctic adventure  42   2017 JANUARY the arctic adventure one project, one team  43