The Project
Management Role of
Non-Project Managers
(A Secret to
Organizational Growth)




Binod Maliel, PMP
ValYouAdd Consultancy
Contents
   1.1      Abstract                                        4
   1.2      Keywords                                        4
   1.3      Introduction                                    4
   1.3.1    Background                                      4
   1.3.2    Organization of the Paper                       5
   1.4      The Situation                                   5
   1.4.1    Current Situation                               5
   1.4.2    Impact of the Situation                         5
   1.4.3    Project Cost                                    5
   1.4.4    Team Motivation                                 6
   1.4.5    Customer Satisfaction and Quality               7
   1.4.6    Business Opportunities                          7
   1.4.7    Project Manager Utilization                     7
   1.4.8    Organization Capacity                           7
   1.4.9    Country Capacity                                7
   1.5      The Proposed Solution                           7
   1.5.1    The Proposed Solution Approach                  7
   1.5.2    Areas of Project Management Delegation          8
   1.6      Concerns and Responses                          8
   1.7      Concerns                                        8
   1.7.1    Project Manager                                 8
   1.7.2    Project Manager Responsibility                  9
   1.7.3    Project Manager Confidence                      9
   1.7.4    Project Manager Security                        9
   1.7.5    Project Manager Concern                         9
   1.7.6    Team Members                                    9
   1.7.7    Team Member Role                                9
   1.7.8    Team Member Benefits                            9
   1.7.9    The Organization                                9
   1.7.10   Delivery Concern                                9
   1.7.11   Possible Attrition                              10
   1.8      Addressing the Concerns                         10
   1.8.1    The Organization                                10
   1.8.2    Delivery Concern                                10


2|Page
1.8.3    Possible Attrition                             10
   1.8.4    Project Manager                                10
   1.8.5    Project Manager Responsibility                 10
   1.8.6    Project Manager Confidence                     10
   1.8.7    Project Manager Security                       11
   1.8.8    Project Manager Concern                        11
   1.8.9    Team Members                                   11
   1.8.10   Team Member Role                               11
   1.8.11   Team Member Benefits                           11
   1.8.12   The Agile Approach                             11
   1.9      Implementing the Solution                      12
   1.10     The Levels of Implementation                   12
   1.10.1   At the Organization (Top Management) Level     12
   1.10.2   At the Project Manager level                   12
   1.10.3   At the Team Member Level                       12
   1.10.4   Training and Rollout Across the Organization   12
   1.11     Conclusion                                     13
   1.12     References                                     13
   1.13     Author’s Profile                               14
   1.13.1   Certifications and Affiliations                14




3|Page
1.1 Abstract
         It is generally thought that project management is only the project manager’s
         responsibility. However in reality, all the team members have contributions to make
         towards successful project management. In addition to delivering the lowest level
         tasks in the project, team members can play an active role in important project
         management tasks. This paper discusses which project management tasks can be
         delegated to team members.

         This paper explores why it is that project management tasks are normally not
         delegated by project managers to team members? Why team members may be
         reluctant to take on project management tasks? What are the differences in such task
         delegation approaches in agile projects versus waterfall projects?

         This paper proposes an approach to initiate the process of delegating project
         management tasks to the lowest levels in the organization. It is an approach by which
         team members would be motivated to take up and contribute in project management
         tasks. It lays out the benefits this approach will provide to the organization, to the
         project manager, to the team members. It also proposes the benefits this will have to
         the country that embraces this approach.


         1.2 Keywords
         Secret to Organizational Growth, Innovation in Project Management Roles, Keys to
         Project Success, Career Success


         1.3 Introduction
         1.3.1 Background

         I am reminded of that memorable day many years back, when I was promoted to the
         coveted post of ‘Project Manager’. I was promoted because I had delivered a
         technically excellent project, one that was leading edge technology and solution at that
         time, and one that did my organization proud. My promotion did not have much to do
         with any capability I had to relate with and lead the team.

         At that time I felt like a ‘king’, thinking that I knew everything, and that my team
         members did not know much. I thought the indispensible “I” had to do every important
         thing. I thought that the role of my team members was only writing and testing code,
         and other mundane activities.

         Over time in my career, I found out the hard way that many of my team members had
         better ideas than me, had better solutions than me, and had the capacity to do much
         more than just delivering code and doing mundane things. They had the capacity to
         contribute in project management tasks.

         Over even more years, after I moved into the space of training and consulting, I found
         that many of my clients, many of my participants of my programs, had similar
         experiences.




4|Page
1.3.2 Organization of the Paper

         In Section 2, the current situation and problem are summarized, along with the impact
         caused. Section 3 proposes the solution to the problem. Section 4 lists the challenges
         envisaged in implementing the proposed solution and lists out how to respond to these
         challenges. The implementation approach is discussed in Section 5, and Section 6
         provides the conclusion.


         1.4 The Situation
         1.4.1 Current Situation
         Many, if not most of the project managers do most of the project management tasks
         themselves. In Project Management Body of Knowledge (PMBOK) terminology’s
         section about RACI Responsibility Assignment Matrix, project managers feel that they
         are both ‘accountable’ and ‘responsible’ for the project management tasks [1].

         In other words, they feel that they are accountable if something goes wrong in the
         project, and the project management tasks. And they are absolutely correct in feeling
         so.

         However, they also feel that they are responsible to do the actual work of project
         management tasks themselves. The question to think about is whether they are
         correct in this.

         The problem that we are facing today is that organizations may not be delivering as
         much quantity and quality of deliverables as they could, because not many of the
         project management tasks are delegated to the appropriate lowest level of the
         organization where the project management tasks could be effectively done.

         It is possible that in some instances, some project managers could be delegating
         project management tasks to the lowest level. But by and large this is not the practice
         across organizations.


         1.4.2 Impact of the Situation
         The impact of not delegating project management tasks to team members is multifold.

         1.4.3 Project Cost
         Project manager resources are not optimally utilized since project management tasks
         are not delegated to the lowest level possible. Hence the cost of the project goes up.

         How so? Let us take a simple example. Consider the case of a project with one project
         manager (PM) and three team members (TMs). Let us say that the cost to company
         (CTC) per month for a team member is X. Let us also say for the purpose of
         calculation that the cost of a project manager is 50% more than the average team
         member, viz., 1.5*X. Let us say that the project manager spends an average 50% time
         on this project, and that the project has a duration of 4 months. Table-1 shows the
         cost of this project.



5|Page
If in this same case, some project management tasks are delegated effectively to a
         team member, let us see the cost implications. Let us say that the project manager
         now needs to spend only 25% time on this project, and as a result the number of team
         members required for this project is 3.25 instead of the original 3. Table-2 shows the
         cost in this changed scenario.

         We see a benefit of cost reduction of Rs. 0.5*X when tasks are delegated to a lower
         level.

           Reso       No. of     Resourc        %         Duratio       Resource          Resourc
           urce      Resourc        e        Utilizati       n            Cost             e Cost
           Type        es         CTC /         on        (month       Computation          (Rs.)
                                  month                     s)            (Rs.)
                                  (Rs.)
            PM          1         1.5*X        50%           4        1*(1.5*X)*50%*4     = 3.0*X
           TM’s         3         1.0*X       100%           4       3*(1.0*X)*100%*4     =12.0*X

                                                                     Total Resource         =
                                                                          Cost            15.0*X

          Table-1 Total Resource Cost Without Delegation of Project Management Tasks


          Resource     No. of    Resource        %        Duration       Resource         Resource
           Type      Resources    CTC /     Utilization   (months)         Cost             Cost
                                  month                                 Computation         (Rs.)
                                                                           (Rs.)
                                  (Rs.)

            PM           1        1.5*X        25%           4        1*(1.5*X)*25%*4      =1.5*X
            TM’s       3.25       1.0*X       100%           4       3.25*(1.0*X)*100%*    =13.0*
                                                                              4              X
                                                                      Total Resource         =
                                                                           Cost            14.5*X


           Table-2 Total Resource Cost With Delegation of Project Management Tasks


         It is important that this cost benefit may not be seen from the very first project that
         team members take up project management tasks. Like any delegated activity, this
         cost benefit will definitely be achieved over a period of time by when the delegate .

         1.4.4 Team Motivation
         The team members mainly react to tasks assigned to them. They are given
         specifications for pieces of work, and their job is only to deliver those pieces. They are
         not aware of the project management challenges the project faces, they are not
         involved in the estimation, in the risk identification, and other project management
         tasks. They don’t contribute in solving project management challenges. In many cases
         they are not aware of the big picture of why this project is required, and are not aware
         of what benefits the customer, and also what benefits the customers of the customer
         will get when this project is implemented.


6|Page
As a result, motivation levels of team members are not the best. Very often they feel
         that they are just putting a brick in place, and don’t see the beautiful building they are
         building.

         1.4.5 Customer Satisfaction and Quality
         Since the team members are not fully engaged with the project, and also since they
         don’t see the big picture, they are not able to catch defects in requirements early, and
         are not able to deliver the best solution to the customer.

         This results in customer satisfaction and quality of the deliverables not being the best
         that they can be.

         1.4.6 Business Opportunities
         By the same token, team members are not able to spot business opportunities since
         they are not fully engaged with the project. They are not able to propose new projects
         and solutions that will help the customer, and that will bring more business
         opportunities to the team members’ organization.

         1.4.7 Project Manager Utilization
         Since the project manager is spending expensive time doing what other team
         members could do, the project manager utilization is not optimum. The project
         manager is limited in the number of projects that can be handled at any time.

         1.4.8 Organization Capacity
         The impact to the organization is that the organization is not able to deliver the
         quantity, quality and level of value it could otherwise deliver if team members were
         contributing in project management tasks.

         1.4.9 Country Capacity
         The cascading effect at the country level is that the country’s project delivery capacity
         in terms of quantity, quality and value is also not optimum. A country such as India
         could deliver more number of projects with the same number of resources, and with
         better quality, and most importantly add much greater value in terms of solutions to
         customers.


         1.5 The Proposed Solution

         1.5.1 The Proposed Solution Approach
         The proposed solution is simple, yet if implemented, can be extremely powerful.

         The proposed solution is this – project managers across the organization should
         delegate project management tasks to the lowest level of the organization at which
         these tasks can be successfully done, and they should do this with a clear conscience
         knowing that they are doing this in the best interest of the organization, the team
         members, the customers and also themselves.



7|Page
1.5.2 Areas of Project Management Delegation
         The question that arises is whether all project management tasks can be delegated to
         team members. Delegation does depend to a great extent on the capability of the
         delegatee. All the same portions of the following project management tasks can be
         delegated. Some of the project management tasks that can be delegated are given
         below. You may creatively come up with many more.

            Helping in identifying risks of a project
            Helping in identifying responses to risk of a project
            Helping in spotting risk triggers, and in executing the risk response
            Helping in coming up with project estimates and project timelines
            Helping in tracking progress of the project and contributing in status reporting
            Helping in solving project challenges
            Helping in proposing corrective actions to issues faced
            Helping in proposing preventive actions to avoid similar problems in future
            Coming up with innovative ideas to improve the process, the project or product
            Improving quality control so that defects are caught before they go for
            independent testing
            Very importantly, not accepting informal changes customers try to introduce into
            the scope


         1.6 Concerns and Responses
         If the solution is so simple, why then is this solution not happening? Why is it that
         project management tasks are not delegated to the lowest level possible?

         I have come across genuine concerns that three types of stakeholders could have with
         this proposed solution. And these stakeholders are the project manager, the team
         member and the organization. Let us look at their concerns and how we can address
         them. We will also look at how the Agile approach to project delivery attempts to
         address these concerns.


         1.7 Concerns
         Let us first look at the concerns these stakeholders could have with the proposed
         solution.

         1.7.1 Project Manager
         Why don’t project managers delegate project management tasks? I have found
         several reasons. Here are some of the reasons I personally faced, due to which I
         found it difficult to delegate project management tasks when I was a new project
         manager. I have found over the years that many of my colleagues and also my
         training participants and audience feel similarly.

8|Page
1.7.2 Project Manager Responsibility
         Project managers feel that they are the owners of their projects. They feel that it is
         primarily their responsibility to make the project successful, and not the responsibility
         of team members. So they don’t delegate any project management tasks.

         1.7.3 Project Manager Confidence
         Project managers feel that only they have the ability and capacity to do project
         management tasks right, and the project team members cannot do these tasks as well
         as required. As a result they don’t delegate project management tasks.

         1.7.4 Project Manager Security
         There also does exist the feeling that if others do project management tasks, the
         project manager role would become redundant. And because of job security fears,
         project management tasks don’t get delegated.

         1.7.5 Project Manager Concern
         Project managers have a genuine concern for team members. They feel that if team
         members are doing project management tasks, then they would not be able to
         complete the other regular tasks assigned to them. And so they don’t delegate project
         management tasks.

         Now, each of these reasons is a genuine reason. We will see in the next section how
         we can overcome these reasons.

         1.7.6 Team Members
         Why don’t team members want to take on project management tasks? .

         1.7.7 Team Member Role
         Team members feel that it is not their role to do project management tasks. Doing
         these tasks will be an additional burden, and they will need to work longer hours to
         complete these in addition to their regular tasks.

         1.7.8 Team Member Benefits
         Team members don’t see any benefits to them, other than the longer hours they will
         need to work, if they take up project management tasks.

         1.7.9 The Organization
         Why is it that organizations, represented by the top management, may not be keen on
         team members taking on project management tasks?

         1.7.10 Delivery Concern
         Firstly the organization could have a major concern of whether with this approach,
         projects can be delivered on time, within budget and with quality.


9|Page
1.7.11 Possible Attrition
               A second concern some organizations may have is the possibility of attrition. If team
               members gain experience in project management tasks, would there be a greater
               attrition of these resources?


               1.8 Addressing the Concerns
               1.8.1 The Organization
               Let us start with the concerns of the organization.

               1.8.2 Delivery Concern
               Project managers should still be held accountable for the delivery of the project on
               time, within budget and with quality. The balance would be allotting more team
               member resources to projects to the extent the project manager delegates project
               management tasks on one side, with moving project managers to take on more
               number of projects to compensate for the tasks delegated.

               In effect the organization is moving project management tasks to lesser expensive
               resources, while at the same time ensuring project delivery standards are met.

               1.8.3 Possible Attrition
               There is a possibility of attrition of team member resources who have gained
               experience in project management tasks. But on the other hand, because of adopting
               this solution, the resources who continue in the organization and new resources that
               come on board would be high capability resources. Additionally, because of this job
               experience, training and empowerment provided, the organization will become an
               employer of choice over a period of time.

               1.8.4 Project Manager
               How can we address concerns of the project manager?

               1.8.5 Project Manager Responsibility
               Once project managers understand the benefits of delegating project management to
               team members such as developing them for faster growth, they can now freely, and
               without guilt, share their responsibility to make the project successful with the team
               members.

               1.8.6 Project Manager Confidence
               As with any delegation, when project managers start delegating, the project manager
               will develop increasing confidence that the team members can also do these tasks as
               well as required, and in many times can do them even much better.




10 | P a g e
1.8.7 Project Manager Security
               Organizations value leaders who develop other leaders. Delegating project tasks
               helps in developing others who can replace the project manager. So such leaders
               need have no job security fears, because they are greatly in demand by the
               organization.

               1.8.8 Project Manager Concern
               Having a genuine concern for team members that because of additional project
               management tasks, they would not be able to complete the other regular tasks
               assigned to them is good. So like the example discussed in tables 1 and 2, project
               managers should try to negotiate and get additional number of resources for the
               project, and at the same time be willing to take on more projects. In addition, if the
               team members are recognized for their work and encouraged, they will be happy to
               take on project management tasks.

               1.8.9 Team Members
               And how about the concerns that team members have?

               1.8.10 Team Member Role
               Team members should, if possible, negotiate for reducing other tasks when taking on
               project management tasks. If it is not possible, team members should realize the
               benefits such experience can bring to their career. They should volunteer to take on
               project management tasks, and try to lighten the project manager’s load as much as
               possible. Doing this increases your chances of growth financially and in rank in the
               organization.

               1.8.11 Team Member Benefits
               Team members should understand the indirect benefits that they can get by taking up
               project management tasks, such as becoming more visible to management, and
               increased changes of financial and positional growth. Keeping these in mind, it is
               worth investing in yourself by taking up project management tasks.

               1.8.12 The Agile Approach
               Being a Certified Scrum Master I have been intrigued in the way Agile handles some
               of these challenges. A lot of the project management tasks are automatically pushed
               down to team members. For example:

                   Team members (workers) are largely allowed to choose the tasks of the project
                   they prefer to take
                   Workers come up with estimates, and are involved in sprint and release planning
                   Workers track progress – through burndown charts
                   Workers are exposed to the customer, especially during the sprint demo, where
                   they could get the praise of the customer or the wrath of the customer
                   Workers raise risks during daily stand-up meetings



11 | P a g e
1.9 Implementing the Solution
               Implementing the solution should ideally be done top-down. This means that the
               organization, which refers to the top management of the organization should set the
               direction of implementing this solution. Then the project managers and then the team
               members can embrace the implementation by doing their roles of delegating more and
               accepting more delegated tasks respectively.


               1.10 The Levels of Implementation
               1.10.1 At the Organization (Top Management) Level

                   Allow project managers to delegate responsibilities of project managers, but still
                   be held accountable for the project success.
                   Reward project managers according to the value they bring to the organization in
                   terms of the number of projects they handle, and the high value solutions they
                   offer to customers. Project managers who embrace this approach would therefore
                   have a greater chance at greater responsibilities and recognition, and faster
                   career growth.


               1.10.2 At the Project Manager level

                   Delegate more project management tasks to the lowest level at which these tasks
                   can be successfully done.
                   Offer to, and take up more number of projects, at the same time ensuring that
                   because of the empowerment and inclusion of team members, the value added to
                   projects increase and you also get more business opportunities from your clients.
                   You would need however, to negotiate for increased number of team members or
                   longer timelines to be able to delegate project management tasks.
                   Although you offer to take up more projects, at certain times, there may not be
                   more projects to take up. But your offer will make you visible to your management,
                   and when future opportunities come, you will be on their radar for fast growth.


               1.10.3 At the Team Member Level

                   Look out for opportunities to take up project management tasks
                   If they don’t seem to be available, offer your services to your project manager to
                   help in project management tasks. This will make you more visible to your
                   management and will help you in attaining fast growth.


               1.10.4 Training and Rollout Across the Organization
               The approach this paper proposes requires a mindset change.

               Short 2 to 4 hour training programs can be arranged for project managers and team
               members. Use the Snowballing methodology [2] to roll this out across the organization.
               Each participant who undergoes the training would be required to do the following two
               tasks within ten days of the training:

12 | P a g e
1. Submit three real-life case studies or illustrations of how this training was
                  implemented. This should be signed off by the participant’s supervisor.
               2. Dissiminate the learning from the training to 3 other colleagues of his choice. These
                  three are required to complete these same two tasks within ten days of being
                  trained.


               1.11 Conclusion
               If organizations, project managers and team members embrace this approach of
               delegating more project management tasks to the lowest level of the organization at
               which these tasks can be successfully done, the benefits that can be derived are
               astounding. The benefits to the five main stakeholders are below:

               1. Benefits to team members: Team members who take up project management tasks
                  would also grow faster since they are growing in capability faster, and are adding
                  greater value to their projects.
               2. Benefits to project managers: Project managers who delegate project management
                  tasks in this way would also grow faster since they will be able to be responsible for
                  more projects, and would be delivering high quality, high value projects.
               3. Benefits to customers: Customers get better value solutions of high quality because
                  the team tried to solve the customer’s problem, and not just deliver to requirements
                  without understanding the need of the project.
               4. Benefits to organizations: The profits of the organization will improve since a
                  greater number of successful and higher value projects can be delivered with the
                  same number of resources. Customer satisfaction will increase, and so will
                  employee satisfaction.
               5. Benefits to the country: With organizations adopting this approach, the country will
                  also be able to deliver higher quality projects with higher customer value and
                  satisfaction, all with the same number of resources. The country can move up the
                  value chain in terms of the solutions it can provide, and so get projects of greater
                  profitability.

               Ultimately, this simple yet powerful approach could be a win-win-win-win-win for the
               five stakeholders listed.


               1.12 References

               [1] A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fourth
               Edition, PMI Publications, 2008, pp 221

               [2] Rao, Madhavan S., Steering Project Success – Simple Innovations in Execution,
               Tata McGraw-Hill Publishing Company Limited, 2007, pp 3




13 | P a g e
1.13 Author’s Profile




               Binod Maliel has nearly two decades experience in the IT industry, and has
               held senior management positions both in India and overseas. He has worked
               with iFlex, ABN Amro, Citibank, and Mphasis BFL. Binod has led large teams
               and delivery operations across multiple countries, being responsible for
               multiple clients, for end-to-end project delivery, for managed services and
               delivery centers. He has successfully implemented solutions in diverse
               technical and business environments using project management and business
               analysis processes, including practices found in the Project Management
               Body of Knowledge (PMBOK® Guide).

               E-mail: binod.maliel@valyouadd.com



               1.13.1 Certifications and Affiliations
               Binod is a member of the Project Management Institute (PMI®), and is a certified
               Project Management Professional (PMP®) by PMI. He is a Certified Scrum Master
               (CSM). He has a Certificate of Achievement in Leadership from the American
               Management Association* (AMA), USA. He has been trained to train in accelerated
               adult learning techniques by AMA. He is a life member of the Computer Society of
               India (CSI), life member of the National Human Resource Development Network
               (NHRD), and life member of Bangalore Management Association (BMA). He is a
               member of Toastmasters International. He has also received the “Gold Star
               Contributor” recognition from PMI Bangalore chapter for his contribution to them in
               Project Management training.




14 | P a g e

Weitere ähnliche Inhalte

Was ist angesagt?

Where Process Improvements Go Wrong
Where Process Improvements Go WrongWhere Process Improvements Go Wrong
Where Process Improvements Go Wrongdutoitds
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aimRussell Pannone
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)rujbennett
 
Software Project Organisation
Software Project OrganisationSoftware Project Organisation
Software Project OrganisationSavaş Şakar
 
White Paper : Why Outsourcing Fails
White Paper : Why Outsourcing FailsWhite Paper : Why Outsourcing Fails
White Paper : Why Outsourcing FailsISHIR
 
ISHIR: Why Outsourcing Fails
ISHIR: Why Outsourcing FailsISHIR: Why Outsourcing Fails
ISHIR: Why Outsourcing FailsISHIR
 
Tips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery ProjectTips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery Projecticu812
 
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Christine Troianello
 
Evalution Feedback of the Project Partners
Evalution Feedback of the Project PartnersEvalution Feedback of the Project Partners
Evalution Feedback of the Project PartnersImede
 
About us groupaccelerators_ase
About us groupaccelerators_aseAbout us groupaccelerators_ase
About us groupaccelerators_aseCapIpad
 

Was ist angesagt? (20)

Where Process Improvements Go Wrong
Where Process Improvements Go WrongWhere Process Improvements Go Wrong
Where Process Improvements Go Wrong
 
E136
E136E136
E136
 
Normalizing agile and lean product development and aim
Normalizing agile and lean product development and aimNormalizing agile and lean product development and aim
Normalizing agile and lean product development and aim
 
Creatively Reduce Risk
Creatively  Reduce  RiskCreatively  Reduce  Risk
Creatively Reduce Risk
 
Gate Gourmet Case Study
Gate Gourmet Case StudyGate Gourmet Case Study
Gate Gourmet Case Study
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)
 
Software Project Organisation
Software Project OrganisationSoftware Project Organisation
Software Project Organisation
 
Sft 04
Sft 04Sft 04
Sft 04
 
B318 web
B318 webB318 web
B318 web
 
T375 pi
T375 piT375 pi
T375 pi
 
White Paper : Why Outsourcing Fails
White Paper : Why Outsourcing FailsWhite Paper : Why Outsourcing Fails
White Paper : Why Outsourcing Fails
 
Team structure
Team structureTeam structure
Team structure
 
ISHIR: Why Outsourcing Fails
ISHIR: Why Outsourcing FailsISHIR: Why Outsourcing Fails
ISHIR: Why Outsourcing Fails
 
Tips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery ProjectTips for Managing a Mainframe Internal Recovery Project
Tips for Managing a Mainframe Internal Recovery Project
 
Leading Teams in Healthcare
Leading Teams in HealthcareLeading Teams in Healthcare
Leading Teams in Healthcare
 
Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007Measurement Mandate Corp Univ Summit May 2007
Measurement Mandate Corp Univ Summit May 2007
 
E136
E136E136
E136
 
Evalution Feedback of the Project Partners
Evalution Feedback of the Project PartnersEvalution Feedback of the Project Partners
Evalution Feedback of the Project Partners
 
About us groupaccelerators_ase
About us groupaccelerators_aseAbout us groupaccelerators_ase
About us groupaccelerators_ase
 
T352 Asmi
T352 AsmiT352 Asmi
T352 Asmi
 

Ähnlich wie Trn 04

PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter TemplateDemand Metric
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Projectarjencornelisse
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Chetan Pandharinath Padme
 
Communicator’s Pivotal Role in Project Management
Communicator’s Pivotal Role in Project ManagementCommunicator’s Pivotal Role in Project Management
Communicator’s Pivotal Role in Project ManagementGreg Trexler
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project ManagementUday Sharma
 
Project Management
Project ManagementProject Management
Project ManagementScott Gibb
 
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)May Wong, PMP
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train WrecksPete Luan
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Renee Jones
 

Ähnlich wie Trn 04 (20)

Trn 05
Trn 05Trn 05
Trn 05
 
Pmt 02
Pmt 02Pmt 02
Pmt 02
 
Pmt 01
Pmt 01Pmt 01
Pmt 01
 
Iss 06
Iss 06Iss 06
Iss 06
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Project
 
Trn 01
Trn 01Trn 01
Trn 01
 
Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3Project Management Tools & Techniques Assignment 3
Project Management Tools & Techniques Assignment 3
 
Communicator’s Pivotal Role in Project Management
Communicator’s Pivotal Role in Project ManagementCommunicator’s Pivotal Role in Project Management
Communicator’s Pivotal Role in Project Management
 
Excel Project Management
Excel Project ManagementExcel Project Management
Excel Project Management
 
Chap04 project integration management
Chap04 project integration managementChap04 project integration management
Chap04 project integration management
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project Management
 
Rsc 07
Rsc 07Rsc 07
Rsc 07
 
Project Management
Project ManagementProject Management
Project Management
 
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)
Taking smaller bites with PMP-Bite series - PMP Chapter 1 (the 4Ps)
 
How to Avoid Project Train Wrecks
How to Avoid Project Train WrecksHow to Avoid Project Train Wrecks
How to Avoid Project Train Wrecks
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 
ETPM2
ETPM2ETPM2
ETPM2
 

Mehr von PMInstituteIndia (20)

Piyush govil archana_sharma
Piyush govil  archana_sharmaPiyush govil  archana_sharma
Piyush govil archana_sharma
 
D john peter
D john peterD john peter
D john peter
 
Trn 10
Trn 10Trn 10
Trn 10
 
Trn 11
Trn 11Trn 11
Trn 11
 
Trn 09
Trn 09Trn 09
Trn 09
 
Trn 08
Trn 08Trn 08
Trn 08
 
Trn 07
Trn 07Trn 07
Trn 07
 
Trn 06
Trn 06Trn 06
Trn 06
 
Trn 03
Trn 03Trn 03
Trn 03
 
Trn 02
Trn 02Trn 02
Trn 02
 
Trn 12
Trn 12Trn 12
Trn 12
 
Sps 01
Sps 01Sps 01
Sps 01
 
Sft 03
Sft 03Sft 03
Sft 03
 
Sft 02
Sft 02Sft 02
Sft 02
 
Sft 01
Sft 01Sft 01
Sft 01
 
Rsc 06
Rsc 06Rsc 06
Rsc 06
 
Rsc 05
Rsc 05Rsc 05
Rsc 05
 
Rsc 04
Rsc 04Rsc 04
Rsc 04
 
Rsc 03
Rsc 03Rsc 03
Rsc 03
 
Rsc 02
Rsc 02Rsc 02
Rsc 02
 

Kürzlich hochgeladen

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 

Kürzlich hochgeladen (20)

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 

Trn 04

  • 1. Aum gam ganapataye namya. The Project Management Role of Non-Project Managers (A Secret to Organizational Growth) Binod Maliel, PMP ValYouAdd Consultancy
  • 2. Contents 1.1 Abstract 4 1.2 Keywords 4 1.3 Introduction 4 1.3.1 Background 4 1.3.2 Organization of the Paper 5 1.4 The Situation 5 1.4.1 Current Situation 5 1.4.2 Impact of the Situation 5 1.4.3 Project Cost 5 1.4.4 Team Motivation 6 1.4.5 Customer Satisfaction and Quality 7 1.4.6 Business Opportunities 7 1.4.7 Project Manager Utilization 7 1.4.8 Organization Capacity 7 1.4.9 Country Capacity 7 1.5 The Proposed Solution 7 1.5.1 The Proposed Solution Approach 7 1.5.2 Areas of Project Management Delegation 8 1.6 Concerns and Responses 8 1.7 Concerns 8 1.7.1 Project Manager 8 1.7.2 Project Manager Responsibility 9 1.7.3 Project Manager Confidence 9 1.7.4 Project Manager Security 9 1.7.5 Project Manager Concern 9 1.7.6 Team Members 9 1.7.7 Team Member Role 9 1.7.8 Team Member Benefits 9 1.7.9 The Organization 9 1.7.10 Delivery Concern 9 1.7.11 Possible Attrition 10 1.8 Addressing the Concerns 10 1.8.1 The Organization 10 1.8.2 Delivery Concern 10 2|Page
  • 3. 1.8.3 Possible Attrition 10 1.8.4 Project Manager 10 1.8.5 Project Manager Responsibility 10 1.8.6 Project Manager Confidence 10 1.8.7 Project Manager Security 11 1.8.8 Project Manager Concern 11 1.8.9 Team Members 11 1.8.10 Team Member Role 11 1.8.11 Team Member Benefits 11 1.8.12 The Agile Approach 11 1.9 Implementing the Solution 12 1.10 The Levels of Implementation 12 1.10.1 At the Organization (Top Management) Level 12 1.10.2 At the Project Manager level 12 1.10.3 At the Team Member Level 12 1.10.4 Training and Rollout Across the Organization 12 1.11 Conclusion 13 1.12 References 13 1.13 Author’s Profile 14 1.13.1 Certifications and Affiliations 14 3|Page
  • 4. 1.1 Abstract It is generally thought that project management is only the project manager’s responsibility. However in reality, all the team members have contributions to make towards successful project management. In addition to delivering the lowest level tasks in the project, team members can play an active role in important project management tasks. This paper discusses which project management tasks can be delegated to team members. This paper explores why it is that project management tasks are normally not delegated by project managers to team members? Why team members may be reluctant to take on project management tasks? What are the differences in such task delegation approaches in agile projects versus waterfall projects? This paper proposes an approach to initiate the process of delegating project management tasks to the lowest levels in the organization. It is an approach by which team members would be motivated to take up and contribute in project management tasks. It lays out the benefits this approach will provide to the organization, to the project manager, to the team members. It also proposes the benefits this will have to the country that embraces this approach. 1.2 Keywords Secret to Organizational Growth, Innovation in Project Management Roles, Keys to Project Success, Career Success 1.3 Introduction 1.3.1 Background I am reminded of that memorable day many years back, when I was promoted to the coveted post of ‘Project Manager’. I was promoted because I had delivered a technically excellent project, one that was leading edge technology and solution at that time, and one that did my organization proud. My promotion did not have much to do with any capability I had to relate with and lead the team. At that time I felt like a ‘king’, thinking that I knew everything, and that my team members did not know much. I thought the indispensible “I” had to do every important thing. I thought that the role of my team members was only writing and testing code, and other mundane activities. Over time in my career, I found out the hard way that many of my team members had better ideas than me, had better solutions than me, and had the capacity to do much more than just delivering code and doing mundane things. They had the capacity to contribute in project management tasks. Over even more years, after I moved into the space of training and consulting, I found that many of my clients, many of my participants of my programs, had similar experiences. 4|Page
  • 5. 1.3.2 Organization of the Paper In Section 2, the current situation and problem are summarized, along with the impact caused. Section 3 proposes the solution to the problem. Section 4 lists the challenges envisaged in implementing the proposed solution and lists out how to respond to these challenges. The implementation approach is discussed in Section 5, and Section 6 provides the conclusion. 1.4 The Situation 1.4.1 Current Situation Many, if not most of the project managers do most of the project management tasks themselves. In Project Management Body of Knowledge (PMBOK) terminology’s section about RACI Responsibility Assignment Matrix, project managers feel that they are both ‘accountable’ and ‘responsible’ for the project management tasks [1]. In other words, they feel that they are accountable if something goes wrong in the project, and the project management tasks. And they are absolutely correct in feeling so. However, they also feel that they are responsible to do the actual work of project management tasks themselves. The question to think about is whether they are correct in this. The problem that we are facing today is that organizations may not be delivering as much quantity and quality of deliverables as they could, because not many of the project management tasks are delegated to the appropriate lowest level of the organization where the project management tasks could be effectively done. It is possible that in some instances, some project managers could be delegating project management tasks to the lowest level. But by and large this is not the practice across organizations. 1.4.2 Impact of the Situation The impact of not delegating project management tasks to team members is multifold. 1.4.3 Project Cost Project manager resources are not optimally utilized since project management tasks are not delegated to the lowest level possible. Hence the cost of the project goes up. How so? Let us take a simple example. Consider the case of a project with one project manager (PM) and three team members (TMs). Let us say that the cost to company (CTC) per month for a team member is X. Let us also say for the purpose of calculation that the cost of a project manager is 50% more than the average team member, viz., 1.5*X. Let us say that the project manager spends an average 50% time on this project, and that the project has a duration of 4 months. Table-1 shows the cost of this project. 5|Page
  • 6. If in this same case, some project management tasks are delegated effectively to a team member, let us see the cost implications. Let us say that the project manager now needs to spend only 25% time on this project, and as a result the number of team members required for this project is 3.25 instead of the original 3. Table-2 shows the cost in this changed scenario. We see a benefit of cost reduction of Rs. 0.5*X when tasks are delegated to a lower level. Reso No. of Resourc % Duratio Resource Resourc urce Resourc e Utilizati n Cost e Cost Type es CTC / on (month Computation (Rs.) month s) (Rs.) (Rs.) PM 1 1.5*X 50% 4 1*(1.5*X)*50%*4 = 3.0*X TM’s 3 1.0*X 100% 4 3*(1.0*X)*100%*4 =12.0*X Total Resource = Cost 15.0*X Table-1 Total Resource Cost Without Delegation of Project Management Tasks Resource No. of Resource % Duration Resource Resource Type Resources CTC / Utilization (months) Cost Cost month Computation (Rs.) (Rs.) (Rs.) PM 1 1.5*X 25% 4 1*(1.5*X)*25%*4 =1.5*X TM’s 3.25 1.0*X 100% 4 3.25*(1.0*X)*100%* =13.0* 4 X Total Resource = Cost 14.5*X Table-2 Total Resource Cost With Delegation of Project Management Tasks It is important that this cost benefit may not be seen from the very first project that team members take up project management tasks. Like any delegated activity, this cost benefit will definitely be achieved over a period of time by when the delegate . 1.4.4 Team Motivation The team members mainly react to tasks assigned to them. They are given specifications for pieces of work, and their job is only to deliver those pieces. They are not aware of the project management challenges the project faces, they are not involved in the estimation, in the risk identification, and other project management tasks. They don’t contribute in solving project management challenges. In many cases they are not aware of the big picture of why this project is required, and are not aware of what benefits the customer, and also what benefits the customers of the customer will get when this project is implemented. 6|Page
  • 7. As a result, motivation levels of team members are not the best. Very often they feel that they are just putting a brick in place, and don’t see the beautiful building they are building. 1.4.5 Customer Satisfaction and Quality Since the team members are not fully engaged with the project, and also since they don’t see the big picture, they are not able to catch defects in requirements early, and are not able to deliver the best solution to the customer. This results in customer satisfaction and quality of the deliverables not being the best that they can be. 1.4.6 Business Opportunities By the same token, team members are not able to spot business opportunities since they are not fully engaged with the project. They are not able to propose new projects and solutions that will help the customer, and that will bring more business opportunities to the team members’ organization. 1.4.7 Project Manager Utilization Since the project manager is spending expensive time doing what other team members could do, the project manager utilization is not optimum. The project manager is limited in the number of projects that can be handled at any time. 1.4.8 Organization Capacity The impact to the organization is that the organization is not able to deliver the quantity, quality and level of value it could otherwise deliver if team members were contributing in project management tasks. 1.4.9 Country Capacity The cascading effect at the country level is that the country’s project delivery capacity in terms of quantity, quality and value is also not optimum. A country such as India could deliver more number of projects with the same number of resources, and with better quality, and most importantly add much greater value in terms of solutions to customers. 1.5 The Proposed Solution 1.5.1 The Proposed Solution Approach The proposed solution is simple, yet if implemented, can be extremely powerful. The proposed solution is this – project managers across the organization should delegate project management tasks to the lowest level of the organization at which these tasks can be successfully done, and they should do this with a clear conscience knowing that they are doing this in the best interest of the organization, the team members, the customers and also themselves. 7|Page
  • 8. 1.5.2 Areas of Project Management Delegation The question that arises is whether all project management tasks can be delegated to team members. Delegation does depend to a great extent on the capability of the delegatee. All the same portions of the following project management tasks can be delegated. Some of the project management tasks that can be delegated are given below. You may creatively come up with many more. Helping in identifying risks of a project Helping in identifying responses to risk of a project Helping in spotting risk triggers, and in executing the risk response Helping in coming up with project estimates and project timelines Helping in tracking progress of the project and contributing in status reporting Helping in solving project challenges Helping in proposing corrective actions to issues faced Helping in proposing preventive actions to avoid similar problems in future Coming up with innovative ideas to improve the process, the project or product Improving quality control so that defects are caught before they go for independent testing Very importantly, not accepting informal changes customers try to introduce into the scope 1.6 Concerns and Responses If the solution is so simple, why then is this solution not happening? Why is it that project management tasks are not delegated to the lowest level possible? I have come across genuine concerns that three types of stakeholders could have with this proposed solution. And these stakeholders are the project manager, the team member and the organization. Let us look at their concerns and how we can address them. We will also look at how the Agile approach to project delivery attempts to address these concerns. 1.7 Concerns Let us first look at the concerns these stakeholders could have with the proposed solution. 1.7.1 Project Manager Why don’t project managers delegate project management tasks? I have found several reasons. Here are some of the reasons I personally faced, due to which I found it difficult to delegate project management tasks when I was a new project manager. I have found over the years that many of my colleagues and also my training participants and audience feel similarly. 8|Page
  • 9. 1.7.2 Project Manager Responsibility Project managers feel that they are the owners of their projects. They feel that it is primarily their responsibility to make the project successful, and not the responsibility of team members. So they don’t delegate any project management tasks. 1.7.3 Project Manager Confidence Project managers feel that only they have the ability and capacity to do project management tasks right, and the project team members cannot do these tasks as well as required. As a result they don’t delegate project management tasks. 1.7.4 Project Manager Security There also does exist the feeling that if others do project management tasks, the project manager role would become redundant. And because of job security fears, project management tasks don’t get delegated. 1.7.5 Project Manager Concern Project managers have a genuine concern for team members. They feel that if team members are doing project management tasks, then they would not be able to complete the other regular tasks assigned to them. And so they don’t delegate project management tasks. Now, each of these reasons is a genuine reason. We will see in the next section how we can overcome these reasons. 1.7.6 Team Members Why don’t team members want to take on project management tasks? . 1.7.7 Team Member Role Team members feel that it is not their role to do project management tasks. Doing these tasks will be an additional burden, and they will need to work longer hours to complete these in addition to their regular tasks. 1.7.8 Team Member Benefits Team members don’t see any benefits to them, other than the longer hours they will need to work, if they take up project management tasks. 1.7.9 The Organization Why is it that organizations, represented by the top management, may not be keen on team members taking on project management tasks? 1.7.10 Delivery Concern Firstly the organization could have a major concern of whether with this approach, projects can be delivered on time, within budget and with quality. 9|Page
  • 10. 1.7.11 Possible Attrition A second concern some organizations may have is the possibility of attrition. If team members gain experience in project management tasks, would there be a greater attrition of these resources? 1.8 Addressing the Concerns 1.8.1 The Organization Let us start with the concerns of the organization. 1.8.2 Delivery Concern Project managers should still be held accountable for the delivery of the project on time, within budget and with quality. The balance would be allotting more team member resources to projects to the extent the project manager delegates project management tasks on one side, with moving project managers to take on more number of projects to compensate for the tasks delegated. In effect the organization is moving project management tasks to lesser expensive resources, while at the same time ensuring project delivery standards are met. 1.8.3 Possible Attrition There is a possibility of attrition of team member resources who have gained experience in project management tasks. But on the other hand, because of adopting this solution, the resources who continue in the organization and new resources that come on board would be high capability resources. Additionally, because of this job experience, training and empowerment provided, the organization will become an employer of choice over a period of time. 1.8.4 Project Manager How can we address concerns of the project manager? 1.8.5 Project Manager Responsibility Once project managers understand the benefits of delegating project management to team members such as developing them for faster growth, they can now freely, and without guilt, share their responsibility to make the project successful with the team members. 1.8.6 Project Manager Confidence As with any delegation, when project managers start delegating, the project manager will develop increasing confidence that the team members can also do these tasks as well as required, and in many times can do them even much better. 10 | P a g e
  • 11. 1.8.7 Project Manager Security Organizations value leaders who develop other leaders. Delegating project tasks helps in developing others who can replace the project manager. So such leaders need have no job security fears, because they are greatly in demand by the organization. 1.8.8 Project Manager Concern Having a genuine concern for team members that because of additional project management tasks, they would not be able to complete the other regular tasks assigned to them is good. So like the example discussed in tables 1 and 2, project managers should try to negotiate and get additional number of resources for the project, and at the same time be willing to take on more projects. In addition, if the team members are recognized for their work and encouraged, they will be happy to take on project management tasks. 1.8.9 Team Members And how about the concerns that team members have? 1.8.10 Team Member Role Team members should, if possible, negotiate for reducing other tasks when taking on project management tasks. If it is not possible, team members should realize the benefits such experience can bring to their career. They should volunteer to take on project management tasks, and try to lighten the project manager’s load as much as possible. Doing this increases your chances of growth financially and in rank in the organization. 1.8.11 Team Member Benefits Team members should understand the indirect benefits that they can get by taking up project management tasks, such as becoming more visible to management, and increased changes of financial and positional growth. Keeping these in mind, it is worth investing in yourself by taking up project management tasks. 1.8.12 The Agile Approach Being a Certified Scrum Master I have been intrigued in the way Agile handles some of these challenges. A lot of the project management tasks are automatically pushed down to team members. For example: Team members (workers) are largely allowed to choose the tasks of the project they prefer to take Workers come up with estimates, and are involved in sprint and release planning Workers track progress – through burndown charts Workers are exposed to the customer, especially during the sprint demo, where they could get the praise of the customer or the wrath of the customer Workers raise risks during daily stand-up meetings 11 | P a g e
  • 12. 1.9 Implementing the Solution Implementing the solution should ideally be done top-down. This means that the organization, which refers to the top management of the organization should set the direction of implementing this solution. Then the project managers and then the team members can embrace the implementation by doing their roles of delegating more and accepting more delegated tasks respectively. 1.10 The Levels of Implementation 1.10.1 At the Organization (Top Management) Level Allow project managers to delegate responsibilities of project managers, but still be held accountable for the project success. Reward project managers according to the value they bring to the organization in terms of the number of projects they handle, and the high value solutions they offer to customers. Project managers who embrace this approach would therefore have a greater chance at greater responsibilities and recognition, and faster career growth. 1.10.2 At the Project Manager level Delegate more project management tasks to the lowest level at which these tasks can be successfully done. Offer to, and take up more number of projects, at the same time ensuring that because of the empowerment and inclusion of team members, the value added to projects increase and you also get more business opportunities from your clients. You would need however, to negotiate for increased number of team members or longer timelines to be able to delegate project management tasks. Although you offer to take up more projects, at certain times, there may not be more projects to take up. But your offer will make you visible to your management, and when future opportunities come, you will be on their radar for fast growth. 1.10.3 At the Team Member Level Look out for opportunities to take up project management tasks If they don’t seem to be available, offer your services to your project manager to help in project management tasks. This will make you more visible to your management and will help you in attaining fast growth. 1.10.4 Training and Rollout Across the Organization The approach this paper proposes requires a mindset change. Short 2 to 4 hour training programs can be arranged for project managers and team members. Use the Snowballing methodology [2] to roll this out across the organization. Each participant who undergoes the training would be required to do the following two tasks within ten days of the training: 12 | P a g e
  • 13. 1. Submit three real-life case studies or illustrations of how this training was implemented. This should be signed off by the participant’s supervisor. 2. Dissiminate the learning from the training to 3 other colleagues of his choice. These three are required to complete these same two tasks within ten days of being trained. 1.11 Conclusion If organizations, project managers and team members embrace this approach of delegating more project management tasks to the lowest level of the organization at which these tasks can be successfully done, the benefits that can be derived are astounding. The benefits to the five main stakeholders are below: 1. Benefits to team members: Team members who take up project management tasks would also grow faster since they are growing in capability faster, and are adding greater value to their projects. 2. Benefits to project managers: Project managers who delegate project management tasks in this way would also grow faster since they will be able to be responsible for more projects, and would be delivering high quality, high value projects. 3. Benefits to customers: Customers get better value solutions of high quality because the team tried to solve the customer’s problem, and not just deliver to requirements without understanding the need of the project. 4. Benefits to organizations: The profits of the organization will improve since a greater number of successful and higher value projects can be delivered with the same number of resources. Customer satisfaction will increase, and so will employee satisfaction. 5. Benefits to the country: With organizations adopting this approach, the country will also be able to deliver higher quality projects with higher customer value and satisfaction, all with the same number of resources. The country can move up the value chain in terms of the solutions it can provide, and so get projects of greater profitability. Ultimately, this simple yet powerful approach could be a win-win-win-win-win for the five stakeholders listed. 1.12 References [1] A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fourth Edition, PMI Publications, 2008, pp 221 [2] Rao, Madhavan S., Steering Project Success – Simple Innovations in Execution, Tata McGraw-Hill Publishing Company Limited, 2007, pp 3 13 | P a g e
  • 14. 1.13 Author’s Profile Binod Maliel has nearly two decades experience in the IT industry, and has held senior management positions both in India and overseas. He has worked with iFlex, ABN Amro, Citibank, and Mphasis BFL. Binod has led large teams and delivery operations across multiple countries, being responsible for multiple clients, for end-to-end project delivery, for managed services and delivery centers. He has successfully implemented solutions in diverse technical and business environments using project management and business analysis processes, including practices found in the Project Management Body of Knowledge (PMBOK® Guide). E-mail: binod.maliel@valyouadd.com 1.13.1 Certifications and Affiliations Binod is a member of the Project Management Institute (PMI®), and is a certified Project Management Professional (PMP®) by PMI. He is a Certified Scrum Master (CSM). He has a Certificate of Achievement in Leadership from the American Management Association* (AMA), USA. He has been trained to train in accelerated adult learning techniques by AMA. He is a life member of the Computer Society of India (CSI), life member of the National Human Resource Development Network (NHRD), and life member of Bangalore Management Association (BMA). He is a member of Toastmasters International. He has also received the “Gold Star Contributor” recognition from PMI Bangalore chapter for his contribution to them in Project Management training. 14 | P a g e