PMI Lebanon Chapter Session Title
Another Project Hit The Wall,
Engineer Hisham Zeinoun,
Dec. 27th, 2018
Session Outline
• The Construction Project Life Cycle Overview
• PMBOK concept & processes implemented in the
construction industry
• Impact of financial crisis on project delivery &
completion
• Handling the crisis & challenges through best
practices
• Lessons learned
• Q/A
Construction Project Life Cycle
Product
INITIAL
INTERMEDIATE
Ongoing Operations
Business
Plan
Idea
Retirement
Upgrade
?
BusinessNeed
Project Life-cycle
Construction Life Cycle – 4 phases
Phase Name (s) Major Deliverables Decision @ end of phase
1 Feasibility
Phase
Project Formulation
Feasibility Studies
Strategy Design &
Approval
Project “GO” Decision
2 Planning and
Design
Base Design - Permit
Cost and schedule
Contract Terms and
conditions
Detailed Planning
Major Contracts Let
3 Construction Excavation
Civil Works
Electrical
Mechanical
Testing
Installation Substantially
Complete
4 Turnover
and
Startup
Final Testing
Maintenance
Full Operations
Carrying
out the
work
Closing the
Project
Starting the
Project
Organizing
&
Preparing
4
Characteristics of the Project Life Cycle
- Most project life cycles share a number of common
characteristics:
- Cost and staffing levels are low at the start, peak as
the work is carried out, and drop rapidly as the project
draws to a close.
- Stakeholder influences, risk, and uncertainty are
greatest at the start of the project. These factors
decrease over the life of the project.
- Ability to influence the final characteristics of the
project’s product, without significantly impacting cost,
is highest at the start of the project and decreases as
the project progresses towards completion.
Stakeholders’ Influence and Cost of
Change Over TimeHigh
Low
Influence of stakeholders
Cost of changes
Project Time
Types of Life Cycles
- Predictive Life Cycles (also known as fully plan-
driven or waterfall)
- Iterative and Incremental Life Cycles (also called
iterations)
- Adaptive Life Cycles (also known as change-driven
or agile methods)
Existing
Design
After execution
Agile vs Waterfall
Existing
Design
After execution
Agile vs Waterfall
PMBOK Knowledge Areas
Project Management Processes (1)
Knowledge
Areas
Project Management Process Groups
Initiating
Process
Group
Planning
Process Group
Executing
Process
Group
Monitoring
& Controlling
Process Group
Closing
Process Group
4. Project
Integration
Management
4.1 Develop
Project
Charter
4.2 Develop Project
Management Plan
4.3 Direct and
Manage
Project Work
4.4 Monitor and
Control Project
Work
4.5 Perform
Integrated
Change Control
4.6 Close Project
or Phase
5. Project
Scope
Management
5.1 Plan Scope
Management
5.2 Collect
Requirements
5.3 Define Scope
5.4 Create WBS
5.5 Validate
Scope
5.6 Control
Scope
Project Management Processes (2)
Knowledge
Areas
Project Management Process Groups
Initiating
Process
Group
Planning
Process Group
Executing
Process
Group
Monitoring
& Controlling
Process Group
Closing
Process Group
6. Project
Time
Management
6.1 Plan Schedule
Management
6.2 Define Activities
6.3 Sequence
Activities
6.4 Estimate Activity
Resources
6.5 Estimate Activity
Durations
6.6 Develop Schedule
6.7 Control
Schedule
7. Project
Cost
Management
7.1 Plan Cost
Management
7.2 Estimate Costs
7.3 Determine
Budget
7.4 Control
Costs
Project Management Processes (3)
Knowledge
Areas
Project Management Process Groups
Initiating
Process
Group
Planning
Process
Group
Executing
Process
Group
Monitoring
& Controlling
Process Group
Closing
Process
Group
8. Project
Quality
Management
8.1 Plan Quality
Management
8.2 Perform
Quality
Assurance
8.3 Control
Quality
9. Project
Human
Resource
Management
9.1 Plan Human
Resource
Management
9.2 Acquire
Project Team
9.3 Develop
Project Team
9.4 Manage
Project Team
10. Project
Communicati
ons
Management
10.1 Plan
Communications
Management
10.2 Manage
Communication
s
10.3 Control
Communications
Project Management Processes (4)
Knowledge
Areas
Project Management Process Groups
Initiating
Process
Group
Planning
Process
Group
Executing
Process
Group
Monitoring
& Controlling
Process Group
Closing
Process
Group
11. Project
Risk
Management
11.1 Plan Risk
Management
11.2 Identify Risks
11.3 Perform
Qualitative Risk
Analysis
11.4 Perform
Quantitative Risk
Analysis
11.5 Plan Risk
Responses
11.6 Control
Risks
Project Management Processes (5)
Knowledge
Areas
Project Management Process Groups
Initiating
Process
Group
Planning
Process
Group
Executing
Process
Group
Monitoring
& Controlling
Process Group
Closing
Process
Group
12. Project
Procurement
Management
12.1 Plan
Procurement
Management
12.2 Conduct
Procurements
12.3 Control
Procurements
12.4 Close
Procurements
13. Project
Stakeholder
Management
13.1 Identify
Stakeholders
13.2 Plan
Stakeholder
Management
13.3 Manage
Stakeholder
Engagement
13.4 Control
Stakeholder
Engagement
Stakeholders
Lessons Learn
Lessons Learn
Lessons Learn
Thank You!

Weitere ähnliche Inhalte

Was ist angesagt?

Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
Adam Edwards
 
Project termination lec
Project termination lecProject termination lec
Project termination lec
Cris Orpilla
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
reddvise
 

Was ist angesagt? (20)

Integrating project life cycle with process groups
Integrating project life cycle with process groupsIntegrating project life cycle with process groups
Integrating project life cycle with process groups
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Project closing and methods
Project closing and methodsProject closing and methods
Project closing and methods
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
An Introduction to Agile
An Introduction to AgileAn Introduction to Agile
An Introduction to Agile
 
6.5 Develop Schedule
6.5 Develop Schedule6.5 Develop Schedule
6.5 Develop Schedule
 
Brief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational StructuresBrief Introduction to Project Life Cycle And Organizational Structures
Brief Introduction to Project Life Cycle And Organizational Structures
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
11.7 Monitor Risks
11.7 Monitor Risks11.7 Monitor Risks
11.7 Monitor Risks
 
Project termination lec
Project termination lecProject termination lec
Project termination lec
 
QualiHM: A Requirement Engineering Toolkit for Efficient User Interface Design
QualiHM: A Requirement Engineering Toolkit for Efficient User Interface DesignQualiHM: A Requirement Engineering Toolkit for Efficient User Interface Design
QualiHM: A Requirement Engineering Toolkit for Efficient User Interface Design
 
1 project management framework
1  project management framework1  project management framework
1 project management framework
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
4.0 The Agile Core Practices
4.0 The Agile Core Practices4.0 The Agile Core Practices
4.0 The Agile Core Practices
 
CAPM Week 2 Chapter 4
CAPM Week 2 Chapter 4CAPM Week 2 Chapter 4
CAPM Week 2 Chapter 4
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 

Ähnlich wie Another Project hit the wall by Eng. Hisham Zeinoun

2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6
Jayne Edwards
 

Ähnlich wie Another Project hit the wall by Eng. Hisham Zeinoun (20)

Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Pmp slide share
Pmp slide sharePmp slide share
Pmp slide share
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL4-0 PROJECT EXECUTION AND CONTROL
4-0 PROJECT EXECUTION AND CONTROL
 
A presentation on project life cycle ...
A presentation on project life cycle ...A presentation on project life cycle ...
A presentation on project life cycle ...
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Pl Pr3
Pl Pr3Pl Pr3
Pl Pr3
 
T-N_PM_ProjLifeCycle.ppt
T-N_PM_ProjLifeCycle.pptT-N_PM_ProjLifeCycle.ppt
T-N_PM_ProjLifeCycle.ppt
 
T-N_PM_ProjLifeCycle.ppt
T-N_PM_ProjLifeCycle.pptT-N_PM_ProjLifeCycle.ppt
T-N_PM_ProjLifeCycle.ppt
 
04. Project Management
04. Project Management04. Project Management
04. Project Management
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
 
PMI Vs SDLC
PMI Vs SDLCPMI Vs SDLC
PMI Vs SDLC
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
Lecture 05:Advanced Project Management PM Processes and Framework
Lecture 05:Advanced Project Management   PM Processes and FrameworkLecture 05:Advanced Project Management   PM Processes and Framework
Lecture 05:Advanced Project Management PM Processes and Framework
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Chapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptxChapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptx
 
2014 sdlc project and gate process rollout published v6
2014 sdlc project and gate process rollout   published v62014 sdlc project and gate process rollout   published v6
2014 sdlc project and gate process rollout published v6
 

Mehr von PMILebanonChapter

Mehr von PMILebanonChapter (20)

PMILC Newsletter Q3 2021
PMILC Newsletter Q3 2021PMILC Newsletter Q3 2021
PMILC Newsletter Q3 2021
 
PMI LC newsletter Q4 2020
PMI LC newsletter Q4 2020PMI LC newsletter Q4 2020
PMI LC newsletter Q4 2020
 
PMI LC Q3 2020
PMI LC Q3 2020PMI LC Q3 2020
PMI LC Q3 2020
 
PMI LC Newsletter Q2 2020
PMI LC Newsletter Q2 2020PMI LC Newsletter Q2 2020
PMI LC Newsletter Q2 2020
 
PMI LC Newsletter Q1 2020
PMI LC Newsletter Q1 2020PMI LC Newsletter Q1 2020
PMI LC Newsletter Q1 2020
 
PMI Lebanon Chapter Newsletter Q4 2019
PMI Lebanon Chapter Newsletter Q4 2019PMI Lebanon Chapter Newsletter Q4 2019
PMI Lebanon Chapter Newsletter Q4 2019
 
I, project manager, The rise of artificial intelligence in the world of proje...
I, project manager, The rise of artificial intelligence in the world of proje...I, project manager, The rise of artificial intelligence in the world of proje...
I, project manager, The rise of artificial intelligence in the world of proje...
 
insurance policies in projects
 insurance policies in projects insurance policies in projects
insurance policies in projects
 
PMI LC Newsletter 2019
PMI LC Newsletter 2019PMI LC Newsletter 2019
PMI LC Newsletter 2019
 
2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim2019 August - Jad Abou Ibrahim
2019 August - Jad Abou Ibrahim
 
2019 july pmi coaching and soft skills
2019 july pmi coaching and soft skills2019 july pmi coaching and soft skills
2019 july pmi coaching and soft skills
 
PMI Lebanon chapter newsletter Q219
PMI Lebanon chapter newsletter Q219PMI Lebanon chapter newsletter Q219
PMI Lebanon chapter newsletter Q219
 
Crypto currencies presentation by Dr. Andre Gholam
Crypto currencies presentation by Dr. Andre GholamCrypto currencies presentation by Dr. Andre Gholam
Crypto currencies presentation by Dr. Andre Gholam
 
Leading Millennials in a project context by Mr Charbel Azar
Leading Millennials in a project context by Mr Charbel AzarLeading Millennials in a project context by Mr Charbel Azar
Leading Millennials in a project context by Mr Charbel Azar
 
The Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
The Known Unknown - Importance of Project Risk Management by Mr Wissam YaacoubThe Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
The Known Unknown - Importance of Project Risk Management by Mr Wissam Yaacoub
 
PMI Lebanon chapter newsletter Q1 2019
PMI Lebanon chapter newsletter Q1 2019PMI Lebanon chapter newsletter Q1 2019
PMI Lebanon chapter newsletter Q1 2019
 
Values - Applying Emotional Intelligence Concepts in a Project Environment by...
Values - Applying Emotional Intelligence Concepts in a Project Environment by...Values - Applying Emotional Intelligence Concepts in a Project Environment by...
Values - Applying Emotional Intelligence Concepts in a Project Environment by...
 
Behavioral styles 2019 - Applying Emotional Intelligence Concepts in a Proj...
Behavioral styles   2019 - Applying Emotional Intelligence Concepts in a Proj...Behavioral styles   2019 - Applying Emotional Intelligence Concepts in a Proj...
Behavioral styles 2019 - Applying Emotional Intelligence Concepts in a Proj...
 
"so you think you know the code" by Mrs. Gretta Kelzi
"so you think you know the code" by Mrs. Gretta Kelzi"so you think you know the code" by Mrs. Gretta Kelzi
"so you think you know the code" by Mrs. Gretta Kelzi
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham Zeinoun
 

Kürzlich hochgeladen

Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
amilabibi1
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
Kayode Fayemi
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
Sheetaleventcompany
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
raffaeleoman
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
Kayode Fayemi
 

Kürzlich hochgeladen (20)

lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
Bring back lost lover in USA, Canada ,Uk ,Australia ,London Lost Love Spell C...
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
ICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdfICT role in 21st century education and it's challenges.pdf
ICT role in 21st century education and it's challenges.pdf
 
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Noida Escorts | 100% verified
 
If this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New NigeriaIf this Giant Must Walk: A Manifesto for a New Nigeria
If this Giant Must Walk: A Manifesto for a New Nigeria
 
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
Aesthetic Colaba Mumbai Cst Call girls 📞 7738631006 Grant road Call Girls ❤️-...
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Presentation on Engagement in Book Clubs
Presentation on Engagement in Book ClubsPresentation on Engagement in Book Clubs
Presentation on Engagement in Book Clubs
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
Busty Desi⚡Call Girls in Sector 51 Noida Escorts >༒8448380779 Escort Service-...
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Uncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac FolorunsoUncommon Grace The Autobiography of Isaac Folorunso
Uncommon Grace The Autobiography of Isaac Folorunso
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
Dreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio IIIDreaming Music Video Treatment _ Project & Portfolio III
Dreaming Music Video Treatment _ Project & Portfolio III
 

Another Project hit the wall by Eng. Hisham Zeinoun

  • 1. PMI Lebanon Chapter Session Title Another Project Hit The Wall, Engineer Hisham Zeinoun, Dec. 27th, 2018
  • 2. Session Outline • The Construction Project Life Cycle Overview • PMBOK concept & processes implemented in the construction industry • Impact of financial crisis on project delivery & completion • Handling the crisis & challenges through best practices • Lessons learned • Q/A
  • 3. Construction Project Life Cycle Product INITIAL INTERMEDIATE Ongoing Operations Business Plan Idea Retirement Upgrade ? BusinessNeed Project Life-cycle
  • 4. Construction Life Cycle – 4 phases Phase Name (s) Major Deliverables Decision @ end of phase 1 Feasibility Phase Project Formulation Feasibility Studies Strategy Design & Approval Project “GO” Decision 2 Planning and Design Base Design - Permit Cost and schedule Contract Terms and conditions Detailed Planning Major Contracts Let 3 Construction Excavation Civil Works Electrical Mechanical Testing Installation Substantially Complete 4 Turnover and Startup Final Testing Maintenance Full Operations Carrying out the work Closing the Project Starting the Project Organizing & Preparing 4
  • 5. Characteristics of the Project Life Cycle - Most project life cycles share a number of common characteristics: - Cost and staffing levels are low at the start, peak as the work is carried out, and drop rapidly as the project draws to a close. - Stakeholder influences, risk, and uncertainty are greatest at the start of the project. These factors decrease over the life of the project. - Ability to influence the final characteristics of the project’s product, without significantly impacting cost, is highest at the start of the project and decreases as the project progresses towards completion.
  • 6. Stakeholders’ Influence and Cost of Change Over TimeHigh Low Influence of stakeholders Cost of changes Project Time
  • 7. Types of Life Cycles - Predictive Life Cycles (also known as fully plan- driven or waterfall) - Iterative and Incremental Life Cycles (also called iterations) - Adaptive Life Cycles (also known as change-driven or agile methods)
  • 17. Project Management Processes (1) Knowledge Areas Project Management Process Groups Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 4. Project Integration Management 4.1 Develop Project Charter 4.2 Develop Project Management Plan 4.3 Direct and Manage Project Work 4.4 Monitor and Control Project Work 4.5 Perform Integrated Change Control 4.6 Close Project or Phase 5. Project Scope Management 5.1 Plan Scope Management 5.2 Collect Requirements 5.3 Define Scope 5.4 Create WBS 5.5 Validate Scope 5.6 Control Scope
  • 18. Project Management Processes (2) Knowledge Areas Project Management Process Groups Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 6. Project Time Management 6.1 Plan Schedule Management 6.2 Define Activities 6.3 Sequence Activities 6.4 Estimate Activity Resources 6.5 Estimate Activity Durations 6.6 Develop Schedule 6.7 Control Schedule 7. Project Cost Management 7.1 Plan Cost Management 7.2 Estimate Costs 7.3 Determine Budget 7.4 Control Costs
  • 19. Project Management Processes (3) Knowledge Areas Project Management Process Groups Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 8. Project Quality Management 8.1 Plan Quality Management 8.2 Perform Quality Assurance 8.3 Control Quality 9. Project Human Resource Management 9.1 Plan Human Resource Management 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 10. Project Communicati ons Management 10.1 Plan Communications Management 10.2 Manage Communication s 10.3 Control Communications
  • 20. Project Management Processes (4) Knowledge Areas Project Management Process Groups Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 11. Project Risk Management 11.1 Plan Risk Management 11.2 Identify Risks 11.3 Perform Qualitative Risk Analysis 11.4 Perform Quantitative Risk Analysis 11.5 Plan Risk Responses 11.6 Control Risks
  • 21. Project Management Processes (5) Knowledge Areas Project Management Process Groups Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 12. Project Procurement Management 12.1 Plan Procurement Management 12.2 Conduct Procurements 12.3 Control Procurements 12.4 Close Procurements 13. Project Stakeholder Management 13.1 Identify Stakeholders 13.2 Plan Stakeholder Management 13.3 Manage Stakeholder Engagement 13.4 Control Stakeholder Engagement