110623 pgi cv_hospitals_english
1. PGI Engineering, organization certified to ISO 9001¹ and ISO 14001 ², with
registration numbers ER-0339/2007 and GA-2009/0111 respectively, for the
consultancy and project preparation for MEP in buildings, obtaining opening
licenses and permissions from Spanish local authorities and supply companies,
MEP contractor’s tenders , technical assistance and direction of MEP works.
¹ Offices in Barcelona, Madrid and Girona. ² Delegation of Girona
2. INDEX
1. PRESENTATION
2. SERVICES
3. PRIZES AND AWARDS
4. RELATED WORKS
4.1 HOSPITALS AND HEALTHCARE CENTERS
4.2-LABORATORIES AND RESEARCH CENTERS
4.3 NURSING HOMES
5. ENERGETIC EFFICIENCY
5.1 PRESENTATION
5.2 OBJECTIVES
5.3 AREAS AND SERVICES
6. ARCHITECS
7. DEVELOPPERS
Página 2 de 31
3. 1.-PRESENTATION
PGI ENGINEERING is a group of companies of INTEGRATED SERVICES OF
ENGINEERING that since his creation in 1992 has experienced a steady
expansion in the market thanks mainly to the high degree of professionalism
of its human team, facing each project with utmost enthusiasm.
At present the company consists of more than 100 engineers and technicians
distributed in the several work centers located in Spain, North of Africa and
Latin America. In these centers we find the following companies:
• PeGI Engineering, S.L.P.
• PGI Ingenieria Madrid S.L.
• Consultoria de Projectes Girona SL / Consultoria de Projectes Girona SLP
• PGI 2000 Consultoria i Enginyeria Barcelona SL /Consultoria de
Projectes Barcelona SLP
• CIASA / Consultoria Madrid SLP
• URCULO / PGI Ingeniería
• PGI Gest SLP
• PGI Tarragona 2007 SLP
• PGI Energy
• PGI Group Atlas / Casablanca
• PGI Perú (subsidiary in legalization process)
During its career as Business of Engineering, PGI ENGINEERING has
participated in the design and construction of more than 3.000 Projects,
working for all kinds of Clients, national and international.
The company is formed by a wide range of specialized engineers and
technicians with a high level of experience in designing, developing,
monitoring and managing projects as well as in technical studies, related to
the installations engineering in the construction field. The basic criteria PGI
ENGINEERING / PGI GRUP follows to carry out this work are:
• Rationalization of the design of the installations and services of a
building, whether of industrial or services use, to obtain a reasonable
and adjusted price of execution under the specifications of the client.
• Development of the project until the last details, this being one of the
main differentiating factors versus the competition.
• Control of the execution of the works in order to obtain an equal or
superior quality to the one indicated in the project and if possible at a
lower price. That is to say, we will defend the client’s interests, both
technical and economical.
• Advice and assistance to manage more efficiently maintenance and
infrastructure operations, improving design and facility management.
Página 3 de 31
4. Today, PGI ENGINEERING is an important Engineering Company in the
construction industry, responsible for the design and monitoring of installations
in the field of construction and with an approximate total amount of executed
Engineering Installations MEP works over 125 million of €.
Throughout its history, PGI ENGINEERING has provided a broad spectrum of
services to an ever-expanding marketplace and we enjoy working with our
clients on a wide variety of projects. The projects include:
• hospitals and medical buildings
• resort and recreation developments
• data Processing Centers
• office and industrial parks
• retail shopping centers
• mixed-use development projects
• academic and research institutions
• residential developments
• leisure, sport and culture facilities.
PGI ENGINEERING / PGI GRUP belongs to the following associations:
• ASINCA: (Tecniberia-FIDIC) Association of Enterprises of Engineering of
Catalonia (SPAIN).
• ASICMA: (Tecniberia-FIDIC) Association of Enterprises of Engineering,
Consulting, Environment, Architecture and Technological Services of
Madrid.
• ACI: Association of Installations Consultancy of Catalonia (SPAIN).
• AEM: Association of Maintenance Enterprises.
• ATECYR: Spanish Technical Association of Refrigeration and Cooling
Systems.
• CEEC: Cluster of Energetic Efficiency of Catalonia (SPAIN).
2.-SERVICES
PGI ENGINEERING develops his business activity offering the services that
follow:
Main activity:
Engineering and Consulting in Mechanical, Electrical and Plumbing (MEP)
Complementary activities:
• Engineering and consulting in energy saving
• Engineering and consulting in renewable energies
• Engineering in energy infrastructures
• (Generation, Cogeneration, Trigeneration, Distribution, etc.)
• Engineering in acoustic and audiovisual infrastructures
• Engineering in water supply / wastewater infrastructures (wastewater
treatment, purge, purification, etc.)
• Logistical and industrial buildings
Página 4 de 31
5. 3.-PRIZES AND AWARDS
- During the year 2010 several projects where PGI ENGINEERING has
participated have been awarded:
• The Building Espacio Baronda (Barcelona) has won the Award to the
“Most innovative initiative in Architecture”.
• The Headquarters of Layetana -Plaza Europa 31 (Barcelona) – have won
the Award to the “Best Sustainable Building”.
• The Seafront of Benidorm has won the “Prize of Architecture in Public
Spaces and Infrastructures”.
• The Hotel Aire in Bardenas has won the “Prize to the Hotel
Architecture”.
• The Can Framis Museum has been finalist to the “FAD Prize 2010”.
• The Football Staudium RCDE Español has been chosen Worldwide
Sportive Facility of the Year in the Stadium Business Award 2010.
• The Football Stadium RCDE Español has won the “Catalonia Building
Prize”, given by the Technicians in Architecture College of Catalonia.
- The Building of Social Housing for Young People in the neighborhood of Sant
Andreu (Barcelona) won the “FAD Prize 2008”
- 2007 The “Telefonica City of Communications” project in Madrid won the “BEX
Prize” (BUILDING EXCHANGE) Energy Sustainability.
- 2006 PGI ENGINEERING won the “SUSTAINABLE ARCHITECTURE Prize” from
the Junta de Castilla La Mancha for the Project TELEFÓNICA CALL CENTER
- 1999 PGI GIRONA won the "CONSTRUMAT Prize 1999" to the technological
innovation in building with the factory SIMON S.A. in Olot, Girona.
- 1996 PGI MADRID won the “IDAE-CEI ANNUAL Prize 1996” on Electricity
Saving Projects in lighting, for the design of the lighting system developed for
the NCR BUILDING in Madrid.
www.pgiengineering.com
Página 5 de 31
6. 4.-WORKS
4.1 HOSPITALS AND HEALTHCARE CENTERS
PUERTA DEL HIERRO HOSPITAL
Installation
Client Architecture Location
budget
FERROVIAL- Majadahonda 57.250.000
BERNA 10
NECSO (Madrid) €
Date
State Surface
Project
--- 145.250 m2 2004
Observations:
850 Beds.
Performance:
Installations MEP Preliminary Design.
SANT JOAN DE REUS HOSPITAL
Installation
Client Architecture Location
budget
COREA MORAN
Reus 20.131.200
INNOVA – PICH
(Tarragona) €
AGUILERA
Date
State Surface
Project
Completed 106.000 m² 2007
Observations:
460 Beds.
Performance:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Acoustic Design and Works
Supervision.
VALLECAS HOSPITAL
Installation
Client Architecture Location
budget
Vallecas 21.700.000
FERROVIAL BERNA 10
(Madrid) €
Date
State Surface
Project
Completed 85.400 m2 2005
Observations:
324 Beds.
Performance:
Installations Preliminary Design.
Página 6 de 31
7. NORTH HOSPITAL
Installation
Client Architecture Location
budget
S.S. de los Reyes
FERROVIAL BERNA 10 16.010.000 €
(Madrid)
State Surface Date Project
2
Completed 84.300 m 2005
Observations:
349 Beds.
Performance:
Installations MEP Preliminary Design.
PARLA HOSPITAL
Installation
Client Architecture Location
budget
FERROVIAL BERNA 10 Parla (Madrid) 18.815.000 €
State Surface Date Project
Completed 75.200 m2 2005
Observations:
250 Beds.
Performance:
Installations MEP Preliminary Design.
HOSPITAL DEL MAR - EXTENSION
Installation
Client Architecture Location
budget
A.I.A. Arq -
Hospital del
Brullet Pineda Barcelona 4.600.000 €
Mar
Arq
Date
State Surface
Project
In Progress 30.100 m² 2007
Observations:
Refurbishment and extension of the “Hospital de Mar”,
joined to the Faculty of Medicine to UPF.
Performance:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
COSLADA HOSPITAL
Installation
Client Architecture Location
budget
Coslada 16.260.000
FERROVIAL BERNA 10
(Madrid) €
Date
State Surface
Project
Completed 60.160 m2 2005
Observations:
239 Beds.
Performance:
Installations MEP Preliminary Design.
Página 7 de 31
8. HOSPITAL DE ARGANDA
Installation
Client Architecture Location
budget
Arganda 11.950.000
FERROVIAL BERNA 10
(Madrid) €
Date
State Surface
Project
Completed 51.950 m2 2005
Observations:
148 Beds.
Performance:
Installations MEP Preliminary Design.
HOSPITAL DE SANT PAU – MASTER PLAN (PHASE I)
Installation
Client Architecture Location
budget
Javier Asarta – 4.000.000 €
UNESCO Barcelona
XavierGuitart (Fase I)
Date
State Surface
Project
In progress 45.280 m² 2007
Performance:
Installations MEP Master Plan for the refurbishment of 17
pavilions (45.280 m²) and the outside areas general
infrastructures.
HOSPITAL DEL TAJO
Installation
Client Architecture Location
budget
Aranjuez 11.550.000
FERROVIAL BERNA 10
(Madrid) €
Date
State Surface
Project
Completed 42.400 m2 2005
Observations:
116 Beds.
Performance:
Preliminary Installations MEP Design.
REFURBISHMENT AND EXTENSION OF THE HOSPITAL
“LA MANCHA CENTRAL”
Installation
Client Architecture Location
budget
Alcázar de San
SESCAM ARGOLA 7.200.000 €
Juan (C. Real)
Date
State Surface
Project
In progress 25.000 m2 2003
Performance:
Installations MEP Execution Design.
Página 8 de 31
9. HEALTH-CARE CENTER “COCHERAS DE BORBÓN”
Installation
Client Architecture Location
budget
CHC VITRE LA VINYA DE LA 4.236.563,2
Barcelona
S.A. VILLA ARQ 5€
Date
State Surface
Project
Completed 15.120 m2 2006
Performance:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
NURSING HOME AND HEALTH-CARE CENTER ECUADOR
Installation
Client Architecture Location
budget
ALONSO &
REGESA Barcelona 3.000.000 €
BALAGUER
Date
State Surface
Project
Completed 7.900 m² 2007
Performances:
Town-Planning Adequacy Certificate, Final Legalization
Certificate and Project for the MEP Installations, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
HOSPITAL DE MONTECANAL
Installation
Client Architecture Location
budget
MANUEL
VIAMED SALUD Zaragoza 2.700.000 €
BLASCO
Date
State Surface
Project
In execution 6.500 m2 2004
Observations:
48 rooms, 6 surgery rooms, Emergency services, 5 offices
and a unit of diagnosis.
Performance:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
TARAZONA HEALTH-CARE CENTER
Installation
Client Architecture Location
budget
GOBIERNO DE CÓDIGO Tarazona
1.560.000 €
ARAGÓN ARQUITECTURA (Zaragoza)
Date
State Surface
Project
On Project 5.350 m2 2005
Performance:
Installations MEP Preliminary and Execution Design.
Página 9 de 31
10. DAY CENTER, NURSING HOME AND HEALTH-CARE
CENTER
Installation
Client Architecture Location
budget
OLIVERAS BOIX Reus
AYTO. REUS 900.130 €
ARQUITECTES (Tarragona)
Date
State Surface
Project
In progress 4.760 m² 2009
Observations:
Day center, nursing home and health-care center.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
HEALTH PARK CAMP CLAR
Installation
Client Architecture Location
budget
RAHOLA VIDAL Camp Clar
CATSALUT 1.300.000 €
ARQ (Tarragona)
Date
State Surface
Project
In progress 3.500 m² 2009
Performance:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
HOSPITAL SANTA MARIA DE LLEIDA-
REFURBISHMENT OF THE EAST WING
Installation
Client Architecture Location
budget
Hospital Sta.
Intersalus -
Maria de Lleida 1.449.675 €
Albert Vitaller
Lleida
Date
State Surface
Project
On Project 3.411 m² 2006
Observations:
Refurbishment of the East Wing of Santa Maria Hospital de
Lleida
Performance:
Environmental Licence Project, Preliminary and Execution
Design, Installations MEP Works Supervision.
Página 10 de 31
11. REFURBISHMENT AND EXTENSION OF THE
EMERGENCY SERVICES AND THE 7th FLOOR OF THE
HOSPITAL JOAN XXIII OF TARRAGONA
Installation
Client Architecture Location
budget
HOSPITAL
ARQ. QUIÑOA Y
JOAN XXIII
ASOCIADOS, Tarragona 1.775.700€
DE
S.L.
TARRAGONA
Date
State Surface
Project
In progress 3.360 m² 2008
Observations:
Refurbishment and extension of the emergency services and
the 7th floor of the hospital Joan XXIII of Tarragona.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
“LA MILAGROSA” HEALTHCARE CENTER
Installation
Client Architecture Location
budget
MIGUEL
I. N. SALUD Soria 615.000 €
COLMENARES
Date
State Surface
Project
In execution 3.300 m2 2002
Performance:
Installations MEP Execution Design.
DENTAL CLINIC – UNIVERSITAT DE SALAMANCA
Installation
Client Architecture Location
budget
Emilio Sanchez
DRAGADOS Salamanca 700.000 €
Gil
Date
State Surface
Project
Completed 2.500 m² 2003
Performance:
Installations MEP Preliminary and Execution Design,
Installations MEP Works Supervision.
PRIMARY HEALTH-CARE CENTER – SANT FELIU DE
GUÍXOLS
Installation
Client Architecture Location
budget
CROUS, Sant Feliu de
GISA GRABULEDA, Guíxols 1.000.000 €
RIERA ARQ. (Girona)
Data
State Surface
Project
Completed 2.500 m² 2006
Performances:
Environmental Licence Project, Preliminary and Execution
Design, Installations MEP Works Supervision.
Página 11 de 31
12. PRIMARY HEALTH-CARE CENTER - NORD
Installation
Client Architecture Location
budget
GISA BAMMP Arq. Terrassa 820.000 €
Data
State Surface
Project
Completed 2.245 m² 2006
Performances:
Environmental Licence Project and Certificate, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
REFURBISHMENT AND EXTENSION OF THE HOSPITAL
PIUS DE VALLS
Installation
Client Architecture Location
budget
HOSPITAL
DIEGO
PIUS DE Valls 2.198.300 €
NAKAMATSU
VALLS
Data
State Surface
Project
In progress 2.230 m² 2009
Observations:
Refurbishment and extension of the Hospital Pius de Valls.
Performances:
Installations MEP Preliminary and Execution Design,
Installations MEP Works Supervision.
PRIMARY HEALTH-CARE CENTER – CONCÓRDIA
Installation
Client Architecture Location
budget
Sabadell
GISA HAZ ARQ. 600.000 €
(Barcelona)
Data
State Surface
Project
Completed 1.650 m² 2006
Performances:
Environmental Licence Project and Certificate, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
PRIMARY HEALTH-CARE CENTER - PALAU SOLITÀ I
PLEGAMANS
Installation
Client Architecture Location
budget
CASANOVAS, Palau Solità i
GISA GRAUS, PEREZ Plegamans 470.500 €
ARQ (Barcelona)
Data
State Surface
Project
Completed 1.500 m² 2007
Performances:
Environmental Licence Project and Certificate, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
Página 12 de 31
13. PRIMARY HEALTH-CARE CENTER - GRÀCIA
Installation
Client Architecture Location
budget
Sabadell
GISA CC245 ARQ 315.500 €
(Barcelona)
Data
State Surface
Project
In progress 1.000 m² 2006
Performances:
Environmental Licence Project and Certificate, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
HOSPITALIZATION UNIT (BUILDING B, 3th FLOOR)
JOAN XXIII HOSPITAL OF TARRAGONA
Installation
Client Architecture Location
budget
Hospital Joan
ARQ. Quiñoa y
XXIII de Tarragona 510.000 €
Asociados, S.L.
Tarragona
Date
State Surface
Project
Completed 1.100 m² 2005
Observations:
Reform of hospitalization unit (3th Floor, Building B) of
Joan’s XXIII Hospital, in Tarragona.
Performance:
Environmental Licence Project, Preliminary and Execution
Design.
ENDOSCOPY UNIT OF JOSEP TRUETA UNIVERSITY
HOSPITAL
Installation
Client Architecture Location
budget
Hospital
Universitario PGI GRUP Girona 40.000 €
Josep Trueta
Date
State Surface
Project
Completed 600 m² 2005
Observations:
Josep Trueta University Hospital
Performance:
Environmental Licence Project, Preliminary and Execution
Design, Installations MEP Works Supervision.
Página 13 de 31
14. PRIMARY HEALTH-CARE CENTER – CASTELLÓ
D’EMPURIES
Installation
Client Architecture Location
budget
ORDOÑEZ- Castelló
GISA GARCÍA- Empuries 300.000 €
FERRANDO UTE (Girona)
Data
State Surface
Project
Completed 500 m² 2006
Performances:
Environmental Licence Project and Certificate, Installations
MEP Preliminary and Execution Design, Installations MEP
Works Supervision.
Página 14 de 31
15. 4.2- LABORATORIES AND RESEARCH CENTERS
OFFICES AND LABORATORIES GIROC CT
Installation
Client Architecture Location
budget
Mollet del
LABORATORIO JORDI MARCÈ
Vallés 650.000 €
S GIROC ARQ
(Barcelona)
Data
State Surface
Project
In progress 2.000 m2 2009
Performances:
Installations MEP Execution Design for the renovation of the
HVA facilities.
ISDIN HEADQUATERS
Installation
Client Architecture Location
budget
ISDIN GCA Barcelona 650.000 €
Data
State Surface
Project
Completed 4.000 m2 2009
Observations:
Headquarters of the company in Barcelona on the 22@
district, 4.000 m². Building with research laboratories.
Performances:
Installations MEP Preliminary and Execution Design,
Installations MEP Works Supervision.
BARCELONA SUPERCOMPUTING CENTER
Installation
Client Architecture Location
budget
BAAS
UPC Barcelona 3.797.700 €
ARQUITECTES
Data
State Surface
Project
In progress 12.500 m2 2008
Performances:
Environmental Licence Project and Certificate , Town-
Planning Adequacy Certificate , solar collectors
justification, Installations MEP Preliminary and Execution
Design, CTE-SI justification, CTE-HE justification, Final
Legalization Certificate and Project for the MEP
Installations , Telecommunications Certificate,
Emergency plan, Maintenance plan , Installations MEP
Works Supervision .
Página 15 de 31
16. TECNOCAMPUS MATARÓ PARK
Installation
Client Architecture Location
budget
MBM Mataró
PUMSA 11.771.840 €
ARQUITECTES (Barcelona)
State Surface Data Project
In progress 46.940 m² 2007
Observations:
University campus facilities, with office and commercial units,
parking and an auditorium.
Performances:
Environmental Licence Project and Certificate , Town-Planning
Adequacy Certificate , solar collectors justification, Installations
MEP Preliminary and Execution Design, CTE-SI justification, CTE-
HE justification, Final Legalization Certificate and Project for the
MEP Installations , Telecommunications Certificate, Emergency
plan, Maintenance plan ,Installations MEP Works Supervision.
I+D BUILDING OF THE POLYTECHNICAL CATALONIA
UNIVERSITY
Installation
Client Architecture Location
budget
D. SOLDEVILA Castelldefells
U.P.C. 1.100.000 €
ARCHITECTURE (Barcelona)
State Surface Data Project
2
Completed 2.600 m 2006
Observations:
Variable Refrigerant Flow (VRF) condensate for loop water.
Loop supply trough adiabatic cooling tower and condensing
boiler. Reinforced with an alternative system of collector
panels for the heating, and lake superficial waters cooling
for refrigeration.
Performances:
Environmental Licence Project, Installations MEP Execution
Design
AUDITORIUM ROOM CPD OF THE CAMPUS ESADE IN
SANT CUGAT DEL VALLÉS
Installation
Client Architecture Location
budget
St. Cugat del
FUNDACIÓN
Vallés 540.000 €
ESADE
(Barcelona)
Data
State Surface
Project
Completed 600 m² 2005
Observations:
University campus consisting of: University buildings,
Creativity center, Residence Hall, Sportive Areas, Green
Areas, Parking and outdoor infrastructures.
Performances:
Preliminary and Execution Design, Installations MEP Works
Supervision.
Página 16 de 31
17. INNOVATION AND RESEARCH CENTER LA RIOJA
Installation
Client Architecture Location
budget
FUNDACIÓN
INTERSALUS Logroño 5.850.000 €
RIOJA SALUD
Data
State Surface
Project
Completed 20.400 m² 2004
Observations:
Health, care, nursing, administration and research building
belonging to the Health Rioja Foundation.
Performances:
Environmental Licence Project, Preliminary and Execution
Design, Installations MEP Works Supervision.
SCIENCE PARK UDG
Installation
Client Architecture Location
budget
UNIVERSIDAD BOSCH- 2.498.270,0
Girona
GIRONA TARRÚS ARQ. 0€
Data
State Surface
Project
Completed 11.304 m2 2004
Observations:
Business building for renting to research enterprises.
Performances:
Environmental Licence Project, Preliminary and Execution
Design, Installations MEP Works Supervision, Legalization
Project for the MEP Installations and Emergency Plan.
CERECO LABORATORIES
Installation
Client Architecture Location
budget
LABORATORIO
DE
INVESTIGACIÓN Maçanet de la
ACIEROID 595.000 €
Y Selva (Girona)
ASESORAMIENT
O, S.L.
State Surface Data Project
2
Completed 1.800 m 2004
Performances:
Environmental Licence Project, Preliminary and Execution Design,
Installations MEP Works Supervision.
TELEFONICA CALL CENTER BUILDING
Installation
Client Architecture Location
budget
CASTILLA LA PICH
Toledo 1.800.000 €
MANCHA AGUILERA
Data
State Surface
Project
Completed 6.000 m² 2003
Performances:
Preliminary and Execution Design, Installations MEP Works
Supervision.
Página 17 de 31
18. BOTANICAL INSTITUTE
Installation
Client Architecture Location
budget
CARLOS
C.S.I.C. Barcelona 400.000 €
FARRATER
Data
State Surface
Project
Completed 2.800 m2 2000
Observations:
Educational and Research Center
Performances:
Preliminary and Execution Design, Installations MEP Works
Supervision.
MEDITERRANEAN CENTER OF SEA RESEARCH
Installation
Client Architecture Location
budget
CSIC RGA Arq Barcelona ----
Data
State Surface
Project
Completed ---- 1998
Observations:
Filtration and Water treatment Design for the research water
tanks.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
Página 18 de 31
19. 4.5. – NURSING HOMES
MEETING POINT BUILDING IN CAMP CLAR
Installation
Client Architecture Location
budget
AYTO.
Jordi Marcè Tarragona 712.133€
TARRAGONA
State Surface Data Project
In progress 2.031,65m² 2009
Observations:
Meeting Point Building in Camp Clar (Tarragona).
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Energetic Efficiency and Acoustic Design.
CENTER FOR DISABLED PEOPLE
Installation
Client Architecture Location
budget
CÓDIGO
IMSERSO Rabanedo(León 3.900.000 €
ARQUITECTURA
Data
State Surface
Project
Completed 13.400 m2 2005
Observations:
123 rooms, auditorium 135 seats.
Performances:
Installations MEP Execution Design, Installations MEP Works
Supervision.
NURSING HOME COMPLEX
Installation
Client Architecture Location
budget
Villajoyosa
URBIS ANGEL ASENJO 4.500.000 €
(Alicante)
Data
State Surface
Project
Completed 16.500 m2 2004
Observations:
3 buildings with 40 apartments y 150 rooms.
Performances:
Installations MEP Execution Design, Installations MEP Works
Supervision.
Página 19 de 31
20. NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
TYM Coslada
AMMA 2.100.000 €
ASOCIADOS (Madrid)
Data
State Surface
Project
Completed 10.100 m2 2003
Observations:
164 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Emergency Plan.
NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
TYM Vicálvaro
AMMA 2.300.000 €
ASOCIADOS (Madrid)
Data
State Surface
Project
Completed 10.450 m2 2002
Observations:
147 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Emergency Plan.
NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
TYM Colmenar Viejo
AMMA 2.275.000 €
ASOCIADOS (Madrid)
Data
State Surface
Project
Completed 10.400 m2 2002
Observations:
164 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Emergency Plan.
Página 20 de 31
21. NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
Puente de
TYM
AMMA Vallecas 2.250.000 €
ASOCIADOS
(Madrid)
Data
State Surface
Project
Completed 10.400 m2 2002
Observations:
147 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Emergency Plan.
NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
TYM Arganzuela -
AMMA 2.100.000 €
ASOCIADOS Madrid
Data
State Surface
Project
Completed 10.500 m2 2002
Observations:
162 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision
and Emergency Plan.
MENTALLY HANDICAPPED CENTER “SAN JOSE”
Installation
Client Architecture Location
budget
GOBIERNO TYM
Pamplona 1.660.000 €
DE NAVARRA ASOCIADOS
Data
State Surface
Project
Completed 7.700 m2 2001
Observations:
164 rooms.
Performances:
Installations MEP Preliminary and Execution Design,
Installations MEP Works Supervision.
Página 21 de 31
22. NURSING HOME AND DAY CENTER
Installation
Client Architecture Location
budget
JOSE LUIS Poio
URBIS 1.550.000 €
PEREIRO (Pontevedra)
Data
State Surface
Project
Completed 6.250 m2 2003
Observations:
115 rooms.
Performances:
Environmental Licence Project, Installations MEP Preliminary
and Execution Design, Installations MEP Works Supervision.
RESIDÈNCIA CREU DE PALAU EN GIRONA
Installation
Client Architecture Location
budget
Crous
GISA Grabuleda Girona 2.448.573 €
Arq
State Surface Data Project
Completed 9.252 m2 2003
Observations:
Reforma Residencia Creu de Palau en Girona
Performances:
Environmental Licence Project, Installations MEP Preliminary and
Execution Design, Installations MEP Works Supervision.
NURSING HOME AND DAY CENTER EN ST. FELIU DE GUÍXOLS
Client Architecture Location Installation budget
AYTO. ST. FELIU DE Sant Feliu de Guíxols
Jordi Casadevall 500.000 €
GUÍXOLS (Girona)
State Surface Data Project
2
Completed 3380 m 1997
Performances:
Environmental Licence Project, Installations MEP Preliminary and Execution Design.
NURSING HOME AND DAY CENTER EN EMPURIABRAVA
Client Architecture Location Installation budget
AYTO. Palomeras
Empuriabrava (Girona) 1.997.000 €
EMPURIABRAVA Arquitectes
State Surface Data Project
Completed 13.500 m2 2006
Performances:
Environmental Licence Project, Installations MEP Preliminary and Execution Design.
Página 22 de 31
23. NURSING HOME URBIS
Client Architecture Location Installation budget
URBIS Reyal Urbis, S.A. Badalona 2.208.274 €
State Surface Data Project
Completed 8.522 m² 2004
Observations:
Nursing home and Parking in Badalona.
Performances:
Environmental Licence Project, Installations MEP Preliminary and Execution Design, Installations
MEP Works Supervision.
Página 23 de 31
24. 5. - ENERGETIC EFFICIENCY DEPARTMENT
5.1. - PRESENTATION
PGI ENGINEERING created in 2006 the Department of Energy efficiency in
the Building, conscious of the need of a rational use of the energy and also
to give response to a few needs of the market with regard to the new
normative frame in the energetic area.
Understanding that the Building sector is one of the main energetic
consumers, it is important to work from the initial phase of development
of the project aiming to obtain energetic important improvements that will
reverberate positively in the whole building, in the air quality, in his
movement, in the comfort of the persons and likewise in the optimization of
equipments to obtain as final result a better saving.
5.2. - OBJECTIVES
To give technical advice to our clients in order to obtain an optimized
design of the building, the installations and bringing the necessary tools for the
energetic management of the Buildings, in view to improve the savings and the
energetic efficiency during the life of the building.
5.3. - AREAS AND SERVICES
The services that our department is offering are structured in four
strategic areas which let us meet most of the requirements of our clients in
the energetic saving field.
We are provided with a professional human team highly compromised,
qualified and motivated, with a working methodology focused in the
innovation and the continuous improvement of the quality assurance and
to give a high added value services.
ENERGETIC ENERGETIC
SERVICES ENGINEERING
AREA AREAS
BUILDING
I+D+i ENERGETIC
AREA CONSULTING
AREA
Página 24 de 31
25. 5.3. a-ENERGETIC ENGINEERING AREA
Implementation of measures of energy savings and energetic efficiency
referring as well the enclosure design as the installations from the early stage
until the completion of the project. Using powerful software to achieve several
simulation typologies allows us to optimize the final cost of the building.
Compliance with the regulations of the CTE-DB-HE
Energetic Qualification of the Buildings– Project Phase
Energetic study of the building enclosure
Energetic study of the installations MEP
Energetic study of the building (EED)
Energetic Qualification of the Buildings – Completion of the Work Phase.
Justification of the Regulations of Water Saving
Projects of renewable energy sources.
Project of Justification of the Regulations of Thermal and Photovoltaic Solar
Collection.
5.3. b-ENERGETIC SERVICES AREA
Implementation of working methods which will allow to reduce the energy
consumption and to improve the energetic efficiency in a steady way during
the life of the building according the established planning to reach the defined
objectives in the strategic plan of the company.
Feasibility study auditing
Energetic audit. Improvement proposals.
Planning for the verification and measurement of the Savings (IPMVP)
Maintenance Planning
Energy Management
Implementation of the proposals and Commissioning
Training and Warning Technology.
Implementation of the collaborative tools for the managing tasks.
Commissioning
Equipment Investment projects
Assessment to the client
Periodic Check and Follow-up
5.3. c-ENERGETIC CONSULTING AREA
We assess our clients regarding the current and future energetic model in
such a way to provide them with the maximum information to take decisions
regarding several actions in environment and energy topics which can concern
them in the future.
We work on the search of strategies and solutions that will allow our clients
to reduce the energy consumption, the CO2 emissions and to make
environment improvements. All this will have an impact on his activity and will
increase competitiveness.
Página 25 de 31
26. Saving and energetic efficiency guides
Implementation of renewable energy sources analysis
Implementation of high technology and efficiency solutions
Participation in technical days and presentation in the energy field
Knowledge transfer/ Training to companies, associations, technical
colleges.
Knowledge transfer /Training to universities, teaching.
Management and processing of the regional and state grants.
Consulting in the Energy Management of the organization.
Consulting in the Energy Management of the whole building.
Consulting for the development of the Planning for the verification and
measurement of the Energy and Water Savings.
Feasibility study energy auditing
Energetic classification of the building
Certification of the Sustainable Building LEED
Certification of the Sustainable Building “green building”
Certification of Energy Management
Auditing in the energetic management system.
Processing of the Grants
4.3. d- I+D+i AREA
Engagement in research projects, development of research strands with
the universities and the administration with the clear commitment of
improving the systems, the technologies, the materials, the working
methodologies etc…in such a way thay we can be able to minimize the
energetic consumption having a positive impact in the environment.
I+D+i projects
Energy research strands collaborating with the universities.
Research strands with Technology companies.
4.4. - WORKS
CÁMARA DE COMERCIO DE BARCELONA CORPORATE
BUILDING
Date: 2009
Location: Barcelona
Area: 20.500 m2
Energy certification: A
Status: in draft
Energy study for architectural tender
Double-skin facade optimization using simulation software
Design of high performance air conditioning and lighting installation
Client: CÁMARA DE COMERCIO DE BARCELONA.
Página 26 de 31
27. BANCO DE SABADELL OFFICE BUILDING
Date: 2009
Location: Sant Cugat del Vallès
Area: 31.592 m2
Energy certification: B
Status: under construction
Energy study
Critical facades optimization
Air conditioning machinery selection
Heating/Cooling production and lighting optimization
LEED certification in process
Client: BANCO DE SABADELL, S.A.
COMISIÓN DEL MERCADO DE LAS
TELECOMUNICACIONES OFFICE BUILDING
Date: 2009
Location: Barcelona
Area: 18.523 m2
Energy certification: B
Status: Finished
Energy study
Critical facades optimization
Air conditioning machinery selection
Lighting optimization
ICAEN grant management for green buildings
Client: GRUPO INMOBILIARIO CASTELLVÍ
PUERTO VENECIA SHOPPING CENTER
Date: 2008
Location: Zaragoza
Area: 275.000 m2
Status: under construction
Energy study
Critical facades and sunscreen optimization using simulation
software
Sunscreen design: expanded metal rotating facades with solar
tracking system
Client: EUROFUND INVESTMENTS ZARAGOZA, S.L.
BARCELONA SUPERCOMPUTING CENTER BUILDING
Date: 2008
Location: Barcelona
Area: 12.597 m2
Energy certification: B
Status: under construction
Energy study
Critical facades optimization
Air conditioning machinery selection
Lighting optimization
ICAEN grant management for green buildings
Client: CENTRO NACIONAL DE SUPERCOMPUTACÓN – BSC
Página 27 de 31
28. HOSPITAL DEL MAR
Date: 2008
Location: Barcelona
Area: 92.542 m2
Status: under construction
Energy study
Critical facades optimization
Air conditioning machinery and Heating/Cooling production selection
Lighting optimization
Client: CONSORCI SANITARI DE BARCELONA
Estudi 21 juny – solstici d’estiu TORRE ONA BUILDING
Date: 2008
Location: Barcelona
Area: 32.000 m2
Energy certification: A
Status: in draft
Energy study
Critical facades optimization
Sunscreen design: expanded metal facades / natural light
Client: BIMSA – AYUNTAMIENTO DE BARCELONA
RBA EDITORES CORPORATE BUILDING
Date: 2007
Location: Barcelona
Area: 26.755 m2
Energy certification: B
Status: Finished
Energy study
Critical facades optimization
Design of high performance air conditioning and lighting installation
ICAEN grant management for green buildings
Client: RBA DIVISIÓN DE INMUEBLES, S.L.
IGUZZINI ILUMINAZIONE CORPORATE BUILDING
Date: 2007
Location: Sant Cugat del Vallès
Area: 9.000 m2
Status: under de construction
Energy study
Critical facades optimization and sunscreen design using simulation
software
Sunscreen design: expanded metal rotating facades with solar
tracking system
Client: IGUZZINI ILUMINAZIONE ESPAÑA, S.A.
Página 28 de 31
29. MEDIATIC 22@ OFFICE BUILDING
Date: 2006
Location: Barcelona
Area: 23.105 m2
Status: Finished
Energy study
Critical facades, air conditioning machinery and lighting optimization
Control of ETFE skin
30% global energy savings
LEED certification in process
Client: CONSORCIO DE LA ZONA FRANCA
LAYETANA INMOBILIARIA OFFICE BUILDING
Date: 2006
Location: Hospitalet de Llobregat
Area: 12.634 m2
Energy certification: A
Status: Finished
Energy study
LEED Certification obtained
ICAEN grant management for green buildings
Client: LAYETANA DESARROLLOS INMOBILIARIOS, S.L.
UNIVERSITAT DE BARCELONA BUILDINGS ENERGY AUDIT
Date: 2010
Location: Barcelona
Area: 130.000 m2 – 7 buildings
Current consumption: Electricity17 GWh/year; Gas 9.7 GWh/year;
Water 95,000 m3/year
Client: UNIVERSITAT DE BARCELONA
GENERALITAT DE CATALUNYA BUILDINGS ENERGY AUDIT
Date:2008 - 2009
Location: Cataluña
Energy audit in all Generalitat de Catalunya buildings
Design of remote management system in 200 Community Health
Centers and consumption analysis
Client: GENERALITAT DE CATALUNYA
BARCELONA LAW COURTS – CITY OF JUSTICE
COMISSIONING MANAGEMENT
Date: 2006
Location: Barcelona
Area: 233.000 m2
Comissioning Management of all buildings located in Barcelona City
of Justice
Client: Urbs ludex et Causidicus (URBICSA)
Página 29 de 31
30. 6.-ARCHITECTS
These are the architects with we have had the pleasure and
AAAR EMBT (MIRALLES - TAGLIABUE) NICOLAU PARÉS, CARLES
AB-A EMMA OCTAVIO MESTRE
ABALOS & HERREROS ESPIGA-MONEO ARCHITECTURES OVE ARUP PARTNERS
ACP ESTUDIO ARQ. JORGE SALVAT PASCUAL I ARGENTÉ, JOAN
ALIA ESTUDIO LAMELA PICH-AGUILERA ARCHITECTURES
ALLENDE ARCHITECTURES ESTUDIO VILLARROEL POMAR MARIN. ÁNGEL M.
ALONSO & BALAGUER FARGAS ASSOCIATS PRADA I JAÉN, PERE DE
ARQUITECTURA ALTERNATIVA FERRATER, CARLOS PROYECTOS A+U
ARQ-SOCIS FINA, PERE PERÁLVAREZ RUIZ, ANTONIO
ARTEM ARCHITECTURES F.I.V.Z. RAVENTÓS, IGNASI
ARTIGUES & SANABRIA F.O.A. REDONDO I DOMÍNGUEZ, ERNEST
ARQUITECTURA OSCAR TUSQUETS FONT – VIÑOLAS ARCHITECTURES REID FENWICK.
ARREMENTERIA, IÑAKI G.V. ARQUITECTES ASSOCIATS RELIMAC
RGA (RIERA-GUTIÉRREZ &
ARROYO, EDUARDO GOAR
ASSOCIATS)
AURREKOETXEA, IÑAKI GASULLA ARQUITECTURA ROBUFFO, ROBERTO
B.S.T. (BONET, STEGMAN, GIBAULT-LAGACHE,
ROMEU, ENRIQUE
TIANA) ARCHITECTURES
BADOSA/DOÑATE,
GIMENO I GONZÁLEZ, PILAR ROS I BALLESTEROS, JORDI
ARCHITECTURES
BLANC-CONCA ARCHITECTURES GUALLART FURIÓ, VICENTE RUBIO&ALVAREZ-SALA
BORO, J. GUIBERNAU, JOAN RUIZ, ELENA
BORRELL ARCHITECTURES INDYA SALAZAR, JAVIER
BRU, EDUARD JUNQUERA, JERÓNIMO SÁNCHEZ GIL, EMILIO
BRULLET I ASSOCIATS, S.L. JUVANTENY I REIXACH, F. XAVIER SANS GIRONELLA, CÉSAR
BRINGAS & BELLOD KATSURA, ARQUIT. Y URBANISMO SANTOS, JOSÉ ANGEL
CALAFELL I LAFUENTE, EDUARD KM+P (KAUFMAN, MEEKS) SANZ RUEDA, ÁNGEL
CALVO ONTORIA, ELADIO L35 SGA ESTUDIOS (VITORIA)
CAPELLA I SAMPER, JULI LARROSA I PADRÓ, MANEL SISTERNAS I SURIS, JOSEP LLUIS
CASADEVALL I DALMAU, JORDI LÁZARO, CARLOS SMITH, JOSÉ
S.O.B. ARQUITECTES
CHAPMAN TAYLOR LÓPEZ, FERNANDO
(SOLER/BATALLA)
CHURTICHAGA+CUADRA SALCEDO LÓPEZ, VÍCTOR SOLÀ I BUSQUETS, PERE
CLOTET.PARICIO & ASSOCIATS LOSADA, RAMÓN SOLID ARQUITECTURA
CÓDIGO ARQUITECTURA MARTÍN MIRANDA, JOSÉ MANUEL SUÁREZ, JUAN JOSÉ
COLLADO, ÁNGEL MARTORELL BOHIGAS MACKAY SURÍS I SALA, JOAN S.
COLMENARES, MIGUEL MATEO I MARTÍNEZ, JOSEP-LLUIS SUTRÍAS I FIGUERAS, JORDI
COOT ARQUITECTURA MATEU POMAR, ELENA T.A.C.
CROUS-GRABULEDA-RIERA METRICA TIP TDB ARQUITECTURA,
CRUZ Y ORTIZ, ARCHITECTURES MESTRE ARAMENDIA, OCTAVIO T.D.A. TÉCNICA
DAVID CHIPPERFIELD ARCHITECTS MINGO & ARCHITECTURES TYM ASOCIADOS
DÍAZ, JOSÉ LUÍS MONEO, RAFAEL ÚBEDA, PASCUAL
DOMÍNGUEZ, HORACIO MXC (MONSÓ, CONCEJAL)
ECHEVARRÍA SAINZ, FEDERICO NADAL MARCÈ, ARCHITECTURES
Página 30 de 31
31. 7.-DEVELOPPERS
ACCOR FORUM 2004 PRESTIGE HOTELS-HOTEL ROSINCS
ACIEROID FUNDACIÓ PROMEDIC PRIMA INMOBILIARIA
ADFINSA GALERIES TARRAGONA, S.A. PROCOM DESARROLLOS URBANOS
AGBAR GAS NATURAL PROCREU, S.L.
AGUIRRE NEWMAN
GERENS PROINOSA
ARQUITECTURA
AIG LINCOLN ESPAÑA GENERALITAT DE CATALUNYA PROMODEICO
AMENA GINKOPLANET CLIENTA TORMA
APEX GIVAUDAN ROURE, S.A. PUNT DIARI
ARQUITÈCNICS G.M.P. RAFAEL HOTELES
ASEPEYO GOLF EMPORDÀ RED ELÉCTRICA DE ESPAÑA
RESIDENCIAL PEDRALBES - CARRERAS,
AUTOLICA-QUADIS GRUP FERRAN
S.L.
BLUENET GRUP TÈCNIC RETEVISIÓN MÓVILES, S.A.
BOVIS LEND LEASE GRUPO PALOMO RETEVISIÓN S.A.
BOUYGUES INMOBILIARIA GRUPO REYAL REYAL HOTELES
BUY BUSINESS GRUPO V. MUÑOZ-POMER RIOFISA
CAMPS MOTOR, S.A. HABITAT ROCKAL PROPERTIES
CANDESA HEWLETT PACKARD RODAMCO
CASER HINES S B GRUP – SUBIRATS BERENGUER, S.A.
CENTRO INSULAR DE DEPORTES HOTUSA SAT-SUIS
CHAMPION – GRUPO
IDEA SEAT
CONTINENTE
CIMEX ING REAL STATE SEGURFONDO DE INVERSIÓN
COBEGA INMOBILIARIA COLONIAL SELENIUM CONSTRUCT
CODECSA, S.A. INMOBILIARIA PUIGSACALM SERVIHABITAT
CONDEMINAS INMOBILIARIA URBIS SFERA JOVEN
CONSTRUCTORA ÁVALOS JAIME MASCARÓ, S.A. SIMON, S.A.
CONSTRUCTORA SAN JOSÉ JOYERÍA SUÁREZ TASINSA
COPCISA LANDSCAPE TELEFÓNICA
COPERFIL LAYETANA TERRASSA, S.L. TESTA INMUEBLES
CORSAN - CORVIAM LAR GROSVENOR TIFSA
COYMAR M & S MODE TORRA, S.A.
DIAGONAL MAR RESIDENCIAL MANGO TORRE BONANOVA GRUP INMOBILIARI
EDICSA MAXOR TRADE CENTER HOTEL, S.L.
EL CORTE INGLÉS MERKAMUEBLE TRANSPORTES AZKAR
ELECNOR MIGDIA PROMOCIÓ TRAVEL LODGE HOTELES
E.M.V. MADRID MIQUEL ALIMENTACIÓ UGC CINE CITÉ ESPAÑA
ENRESA M.J.C.M. INMOBILIARIA UNIVERSAL STUDIOS PORT AVENTURA
ERALAN NATUR HOTEL CATALUNYA, S.L. UNIVERSIDAD DE DEUSTO
ESPAIS NECSO UNIVERSITAT DE GIRONA
FALGÀS NEXITY ESPAÑA VALLEHERMOSO
FERROVIAL-AGROMAN NIKE VIAMED SALUD
FERROVIAL INMOBILIARIA PANINI ESPAÑA, S.A. VILA-SABARICH, S.L.
FINCAS PEDRALBES-STELGROC PERFUMERÍA GAL ZUMOS PAGO
FIRA 2.000 PITNEY BOWNES