Wellfield Road site
 0.9 hectare factory site
 Makes cosmetics applicators for high-end
companies
 Identified as deliverable/developable in SHLAA
 Promoted for about 90 dwellings
 Lack of land use or environmental designations
 Subject to positive pre-application discussions
 Mix of local architectural styles = scope for
range of masterplan, landscape, design
approaches
Council mentality
 New Director and Head of Planning in summer
2014
 Strong emphasis on pre-application advice and
PPAs
 Local Plan raising challenging green belt issues
 Desire to bring forward brownfield sites
 Hatfield seen as bridesmaid to Welwyn Garden
City
 Chance to explore new development
mechanism
Caressa Kahn / Wakelin
Associates
 Caressa Kahn in Hatfield for 50+ years
 Specialist manufacturing, complicated to relocate
 Ambition to grow but constrained by site size
 Want to leave legacy on site once gone
 Want to maximise value to cover relocation costs
 Most evidence already exists to support plan app
 Wakelin keen to explore new ways of working
 But hesitant about working with others, particularly
in respect of masterplanning/design issues
LDO Objectives
 Quality – to deliver exemplar scheme and at
least as good as through conventional plan app
process
 Speed – to adopt LDO within timescales and
deliver scheme earlier than 2018, to
demonstrate that LDOs can boost delivery and
free-up officer time
 Ease of replication – to gain experience of how
best to prepare an LDO and establish standard
structure
Governance
 Political leadership = Executive Member for
Planning
 Project manager = Head of Planning
 Project officers = from Policy and Dev
Management
 Input from Wakelin Associates
 Input from URS on behalf of PAS
 Regular updates to Cabinet Planning Panel, with
expectation that LDO will be approved by DM
Cmte in same way as normal planning
application
Process
 Sept 14 = Agreement with landowners and
agents to submit nomination. Wakelin
Associates enthusiastic.
 Oct 2014 = Early preparation of clear project
plan with agreed milestones
 Nov 2014 = Initiation meeting and site
visit between Council, PAS, URS,
landowner, agents and ward cllrs.
First time all parties had met.
Process
 Dec 2014 = Landowner/agent worried that LDO
will be slower than plan app and ultimately less
profit.
 Jan 2015 = Council, PAS, landowner/agent
meeting to offer reassurance.
Agreement that indicative
masterplan and LDO will be
prepared in parallel to reassure
landowner of
most profitable scheme.
Process
 Feb 2015 = Finalisation of clear project plan,
agreed milestones and use of project funding
 Feb 2015 = Council advise that LDO is far
cheaper than plan app route, which would cost
circa £3,000 pre-app advice plus £24,000 plan
fee
 Feb 2015 = Funding received from
CLG and project gets properly
underway
Next steps
 Complete technical contamination evidence (Feb)
 Commission joint viability appraisal (Feb)
 Jointly prepare indicative masterplan &LDO
(March)
- Absolutes such as building heights, overlooking
distances
- Parameters such as number of units, density
- Palettes such as design styles, construction
materials
 Informal local consultation (March)
 Prepare and consult on draft LDO (April)
 Agree final LDO at DM Cmte (June)
Timetable
8th
15th
22nd
29th
5th
12th
19th
26th
2nd
9th
16th
23rd
2nd
9th
16th
23rd
30th
6th
13th
20th
27th
4th
11th
18th
25th
1st
8th
15th
22nd
29th
6th
13th
20th
27th
Project Plan
Scoping of LDO and Project Plan
Project partner agreement to Project Plan
Preparatory work
Prepare brief for viability work
Appoint viability consultant
Viability work carried out
Stakeholder meetings
Contamination Assessment
Site survey work
Graphic design work
Preparation of the LDO
Drafting the core LDO wording
Producing the design aspects of the LDO
Revisions to the LDO
Communication and consultation
Prepare consultation materials
Mailouts and publish advert
Consultation period
Consultation events
Press releases
Post to PASHousing LDOs website
Formal LDO milestones
Draft reports
DMC - Approval for consultation
DMC - Report back consultation amendments
Cabinet - Adoption of LDO
Notify Secratary of State of adoption
June 2015 July 2015Dec 2014 Jan 2015 Feb 2015 Mar 2015 Apr 2015 May 2015
Scheme
Flatted blocks of 2,
3, 4 storeys
Modern
architecture and
flat roofs
Parking courtyards
Landscaping
LDO Costs
 £12,000 for joint viability appraisal
 £1,500 for desktop contamination survey
 £650 for newspaper adverts
 £500 for letters to surrounding residents
 £250 for consultation boards / material
 £7,500 for graphic design work and more
detailed contamination evidence if needed
 Total £24,640 inc 10% contingency
Ambitions
 Learning experience
 Looking for transferable principles
 Template format with standardised headings
and text, so can be easily copied and re-applied
to other brownfield and potentially green belt
sites
 Scope to be cheaper third alternative:
1) straight plan app = plan app fee
2) pre-app advice = pre-app fee + plan
app fee
3) prepare LDO = joint work fee but
free plan app
Risks
 LDO results in inappropriate development
 Difficult for supporters/objectors to comment on
all aspects of scheme if LDO enables flexibility
 LDO contains loopholes that are exploited
 LDO is incorrect or ineffective
 LDO preparation is delayed
 LDO is not seen as giving residents a voice
 Viability appraisal concludes that scheme does
not deliver sufficient returns

Weitere ähnliche Inhalte

Ähnlich wie Colin Haigh, Welwyn Hatfield BC - Local Development Order Wellfield Road, Hatfield

Document 1
Document 1Document 1
Document 1
Erik Ong
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa Tsemtsidis
Costa Tsemtsidis
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
Richard B. Petch
 
CV Vincent Lasseaux December 2015
CV Vincent Lasseaux December 2015CV Vincent Lasseaux December 2015
CV Vincent Lasseaux December 2015
Vincent Lasseaux
 
IAN HERBERT 2016 NZ - General
IAN HERBERT 2016 NZ - GeneralIAN HERBERT 2016 NZ - General
IAN HERBERT 2016 NZ - General
Ian Herbert
 

Ähnlich wie Colin Haigh, Welwyn Hatfield BC - Local Development Order Wellfield Road, Hatfield (20)

Downtown Improvement Project 1/20/2010
Downtown Improvement Project 1/20/2010Downtown Improvement Project 1/20/2010
Downtown Improvement Project 1/20/2010
 
Document 1
Document 1Document 1
Document 1
 
Pre-application good practice
Pre-application good practicePre-application good practice
Pre-application good practice
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa Tsemtsidis
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
 
Single Conversation Slides 15th June 2010
Single Conversation Slides   15th June 2010Single Conversation Slides   15th June 2010
Single Conversation Slides 15th June 2010
 
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New ParadigmFERC Order 1000: Understanding Transmission Planning in a New Paradigm
FERC Order 1000: Understanding Transmission Planning in a New Paradigm
 
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bria...
 
Planning
PlanningPlanning
Planning
 
CV Vincent Lasseaux December 2015
CV Vincent Lasseaux December 2015CV Vincent Lasseaux December 2015
CV Vincent Lasseaux December 2015
 
SmartKlub master slide deck Leeds April 15
SmartKlub master slide deck Leeds April 15SmartKlub master slide deck Leeds April 15
SmartKlub master slide deck Leeds April 15
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
 
Our pre application offer at Croydon Council
Our pre application offer at Croydon CouncilOur pre application offer at Croydon Council
Our pre application offer at Croydon Council
 
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP) HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
HOW TO PREPARE YOUR STANDARD OPERATING PROCEDURES (SOP)
 
IAN HERBERT 2016 NZ - General
IAN HERBERT 2016 NZ - GeneralIAN HERBERT 2016 NZ - General
IAN HERBERT 2016 NZ - General
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
 
Building a Resilient Environment - Afternoon Session
Building a Resilient Environment - Afternoon SessionBuilding a Resilient Environment - Afternoon Session
Building a Resilient Environment - Afternoon Session
 
Coo projects operations
Coo projects  operationsCoo projects  operations
Coo projects operations
 
World FM Day 2015: VELUX Facility Success Story
World FM Day 2015: VELUX Facility Success StoryWorld FM Day 2015: VELUX Facility Success Story
World FM Day 2015: VELUX Facility Success Story
 

Mehr von PAS_Team

PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS_Team
 

Mehr von PAS_Team (20)

231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf231121 SP slides - PAS workshop November 2023.pdf
231121 SP slides - PAS workshop November 2023.pdf
 
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
So you want to apply for the Planning Skills Delivery Fund PAS Events August ...
 
PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023PAS BNG in Local Plans slides June 2023
PAS BNG in Local Plans slides June 2023
 
Guildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdfGuildford BC BNG Policy June 2023.pdf
Guildford BC BNG Policy June 2023.pdf
 
BNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdfBNG at Salford City Council_June 2023.pdf
BNG at Salford City Council_June 2023.pdf
 
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptxPAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
PAS LNRS and role of Supporting Authorities_23_05_23_PAS slides.pptx
 
Leeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptxLeeds Beckett Lecture Career Advice.pptx
Leeds Beckett Lecture Career Advice.pptx
 
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
Infrastructure Levy Technical Consultation (Workshop 3 Delivering Affordable ...
 
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
Infrastructure Levy Technical Consultation (Workshop 2 Spending the levy and ...
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23PAS Natural England Biodiversity Net Gain update 18_04_23
PAS Natural England Biodiversity Net Gain update 18_04_23
 
EOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptxEOR Webinar PAS presentation slidesFINAL.pptx
EOR Webinar PAS presentation slidesFINAL.pptx
 
230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx230329 IL Technical Consultation - launch event.pptx
230329 IL Technical Consultation - launch event.pptx
 
PAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdfPAS Pre-App March 2023.pdf
PAS Pre-App March 2023.pdf
 
CBC Monitoring Review.pptx
CBC Monitoring  Review.pptxCBC Monitoring  Review.pptx
CBC Monitoring Review.pptx
 
PAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptxPAS Salford Pre App Journey March 2023 JC.pptx
PAS Salford Pre App Journey March 2023 JC.pptx
 
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdfPAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
PAS BNG and Nature Recovery Autumn 2022 Events Evaluation.pdf
 
PAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptxPAS NERC guidance events Nov 22 web.pptx
PAS NERC guidance events Nov 22 web.pptx
 
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptxPAS Nature Recovery for LAs 8 Dec Post Event.pptx
PAS Nature Recovery for LAs 8 Dec Post Event.pptx
 
PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy PAS BNG and NR policy and strategy
PAS BNG and NR policy and strategy
 

Kürzlich hochgeladen

VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
CedZabala
 

Kürzlich hochgeladen (20)

Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 

Colin Haigh, Welwyn Hatfield BC - Local Development Order Wellfield Road, Hatfield

  • 1. Local Development Order Wellfield Road, Hatfield Colin Haigh - Head of Planning
  • 2. Town centre University Business Park Railway station Hatfield New Town Good range of services but needs a bit of regeneration Galleria Hatfield House
  • 3.
  • 4. Wellfield Road site  0.9 hectare factory site  Makes cosmetics applicators for high-end companies  Identified as deliverable/developable in SHLAA  Promoted for about 90 dwellings  Lack of land use or environmental designations  Subject to positive pre-application discussions  Mix of local architectural styles = scope for range of masterplan, landscape, design approaches
  • 5. Council mentality  New Director and Head of Planning in summer 2014  Strong emphasis on pre-application advice and PPAs  Local Plan raising challenging green belt issues  Desire to bring forward brownfield sites  Hatfield seen as bridesmaid to Welwyn Garden City  Chance to explore new development mechanism
  • 6. Caressa Kahn / Wakelin Associates  Caressa Kahn in Hatfield for 50+ years  Specialist manufacturing, complicated to relocate  Ambition to grow but constrained by site size  Want to leave legacy on site once gone  Want to maximise value to cover relocation costs  Most evidence already exists to support plan app  Wakelin keen to explore new ways of working  But hesitant about working with others, particularly in respect of masterplanning/design issues
  • 7. LDO Objectives  Quality – to deliver exemplar scheme and at least as good as through conventional plan app process  Speed – to adopt LDO within timescales and deliver scheme earlier than 2018, to demonstrate that LDOs can boost delivery and free-up officer time  Ease of replication – to gain experience of how best to prepare an LDO and establish standard structure
  • 8. Governance  Political leadership = Executive Member for Planning  Project manager = Head of Planning  Project officers = from Policy and Dev Management  Input from Wakelin Associates  Input from URS on behalf of PAS  Regular updates to Cabinet Planning Panel, with expectation that LDO will be approved by DM Cmte in same way as normal planning application
  • 9. Process  Sept 14 = Agreement with landowners and agents to submit nomination. Wakelin Associates enthusiastic.  Oct 2014 = Early preparation of clear project plan with agreed milestones  Nov 2014 = Initiation meeting and site visit between Council, PAS, URS, landowner, agents and ward cllrs. First time all parties had met.
  • 10. Process  Dec 2014 = Landowner/agent worried that LDO will be slower than plan app and ultimately less profit.  Jan 2015 = Council, PAS, landowner/agent meeting to offer reassurance. Agreement that indicative masterplan and LDO will be prepared in parallel to reassure landowner of most profitable scheme.
  • 11. Process  Feb 2015 = Finalisation of clear project plan, agreed milestones and use of project funding  Feb 2015 = Council advise that LDO is far cheaper than plan app route, which would cost circa £3,000 pre-app advice plus £24,000 plan fee  Feb 2015 = Funding received from CLG and project gets properly underway
  • 12. Next steps  Complete technical contamination evidence (Feb)  Commission joint viability appraisal (Feb)  Jointly prepare indicative masterplan &LDO (March) - Absolutes such as building heights, overlooking distances - Parameters such as number of units, density - Palettes such as design styles, construction materials  Informal local consultation (March)  Prepare and consult on draft LDO (April)  Agree final LDO at DM Cmte (June)
  • 13. Timetable 8th 15th 22nd 29th 5th 12th 19th 26th 2nd 9th 16th 23rd 2nd 9th 16th 23rd 30th 6th 13th 20th 27th 4th 11th 18th 25th 1st 8th 15th 22nd 29th 6th 13th 20th 27th Project Plan Scoping of LDO and Project Plan Project partner agreement to Project Plan Preparatory work Prepare brief for viability work Appoint viability consultant Viability work carried out Stakeholder meetings Contamination Assessment Site survey work Graphic design work Preparation of the LDO Drafting the core LDO wording Producing the design aspects of the LDO Revisions to the LDO Communication and consultation Prepare consultation materials Mailouts and publish advert Consultation period Consultation events Press releases Post to PASHousing LDOs website Formal LDO milestones Draft reports DMC - Approval for consultation DMC - Report back consultation amendments Cabinet - Adoption of LDO Notify Secratary of State of adoption June 2015 July 2015Dec 2014 Jan 2015 Feb 2015 Mar 2015 Apr 2015 May 2015
  • 14. Scheme Flatted blocks of 2, 3, 4 storeys Modern architecture and flat roofs Parking courtyards Landscaping
  • 15.
  • 16. LDO Costs  £12,000 for joint viability appraisal  £1,500 for desktop contamination survey  £650 for newspaper adverts  £500 for letters to surrounding residents  £250 for consultation boards / material  £7,500 for graphic design work and more detailed contamination evidence if needed  Total £24,640 inc 10% contingency
  • 17. Ambitions  Learning experience  Looking for transferable principles  Template format with standardised headings and text, so can be easily copied and re-applied to other brownfield and potentially green belt sites  Scope to be cheaper third alternative: 1) straight plan app = plan app fee 2) pre-app advice = pre-app fee + plan app fee 3) prepare LDO = joint work fee but free plan app
  • 18. Risks  LDO results in inappropriate development  Difficult for supporters/objectors to comment on all aspects of scheme if LDO enables flexibility  LDO contains loopholes that are exploited  LDO is incorrect or ineffective  LDO preparation is delayed  LDO is not seen as giving residents a voice  Viability appraisal concludes that scheme does not deliver sufficient returns