SlideShare ist ein Scribd-Unternehmen logo
1 von 14
CurriculumVitae
PERSONAL PARTICULARS Contact No (0167544023)
Nationality : Indonesia Email: ongkybme8@gmail.com
Marital Status : Married
Date Of Birth : 08 aug 1974
Gender : Male
Religion : Muslim
IC No/passport : A 7901475
Language : English, Malay / Bahasa
Education
DEGREE IN CIVIL AND INVIRONMENTAL ENGINEERING
FACULTY OF ENGINEERING UNIVERSITY GADJA MADA
INDONESIA
UGM UNIVERSITY GADJA MADA: JAWA TENGAH
SEKOLAH TECHNIC MENENGAH (STM)
SECONDARY SCHOOL TECHNOLOGY (STM)
JURUSAN BANGUNAN OF CIVIL, BEST SCHOOL STM 1
SURABAYA, EAST JAVA
Computer Knowledge
Window application Microsoft Excel,
Microsoft office Visio 2003, Microsoft word.
Building and Piping Structure engineering design,
AutoCAD application. AutoCAD
COURSE BACKGROUND
Training Design structure
Training of engineering pipelines under water and Gas Plant.
Three months,
Fabrication and design calculation module,
KEYS EXPERIENCE
EIGHTEEN(18) YEARS OF EXPERIENCED AS PROJECT ENGINEER &
SUPERINTENDENT IN ONSHORE AND OFFSHORE CONSTRUCTION,
SHIPBUILDING AND FABRICATION FIELD IN OIL & GAS INDUSTRIES ,
PETROCHEMICAL AND ALSO PROVIDED LEADERSHIP SKILLS IN THE FIELD
OF DESIGN, CONSTRUCTION AND PLANT MAINTENANCE TO UTILIZE MY
TRAINING AND MY 18 YEARS EXPERIENCES TO IMPROVE THE FIRM’S LONG
TERM VIABILITY
CORE QUALIFICATIONS
 Excellent written documentations and modification design skills
 Extensive knowledge of best practice workmanship in Oil & Gas industry
 Good interpersonal and oral communication skills
 Effective at monitoring site projects and establishing piping works
 Good monitoring of contractors and subcontractors to ensure quality work
 Above-average knowledge of safety guidelines and regulations
 Able to submit reports to company and clients as required
Oct 2014- Present
Company Name: Mencast Offshore & Engineering
Position : Superintendent
Project list : Drilling Rig Keppel Singapore
Client : Keppel Pte Ltd Singapore
Duties & Responsibilities :
 Work under client Keppel Singapore to settle engineering drawinggo through to
millimeter.
 To handle all meetings with clientsto discussed about progress and the quality
of one set Rig Fabrication.
 To Control material speculation following as per drawing.
 Completed fabrication and installation one set Rig
 To Control 6 crews,6 supervisors, 12 foremen as per work site activity every
day.
 Checking one section or per detail drawing after finished workshopfabrication
with client QC.
 Control all documents report progress and also checking QC report before
submission with client.
 Meeting every 15:00 pm with supervisor to discuss about the progress
At project manager office.
Job Description
 Fabrication Anchor rack fort & STBD 2 set finished
 Fabrication accommodations1 set
 Fabrication engine room 1 set
 Fabrication changing room 1 set
 Fabrication heli deck 1 set
 Fabrication control room 1 set
 Fabrication Anchor winch 1 set
 Cement tank 1 set
 Fabrication pontoon 2 set
 Fabrication deck floor 1 set
 Fabrication tank columns 4 set
 Fabrication electrical room
April 2013 ~ December 2013
Company Name: Integrity Engineering Services Sdn Bhd
Position : Superintendent
Project list : Down Stream and Up Stream PETRONAS Carigali
Client : PETRONAS
Duties & Responsibilities:
 Work as controls piping and structure, design any site modification and
field instruction.
 To control 3 Contractor the complete erection of pipe, hanger and support for
critical and piping system.
 The duties are to ensure that pipe systems are stored,
minted, installed and tested in accordance
tested in accordance with the applicable codes,
Specifications, drawing & design documents.
 Control overall, piping line, structure, civil, mechanical,
until completed system, prepare equipment material until
tools.
 To control modification claim and additional job and
drawing error.
 To handle 3 contractors 700 manpower 3 engineer
contractor, 3 engineer main contractor.
 Coordinate every 15:00 to meeting about progress report
with engineer supervisor and QC
Jul 2011- Nov 2012
Company Name: PEC (M) Sdn Bhd/Singapore
Position : Superintendent
Project list : Poly Silicon Plan Project Tokohama in Bintulu Sarawak
Client : Tokohama
Duties & Responsibilities:
 Served as the piping superintendent for installation of gas
and oil pipelines.
 As a piping specialist, check points and planning before
Constructions, start installed
 Ensured personnel compliance with all safety regulations and guidelines.
 Monitored contractors and subcontractors to ensure work met quality
standards.
 Fired personnel when needed.
 Kept and maintained daily logs and ensured workers met deadlines.
 Meeting progress and schedule or duration every afternoon 15:30 in the
area of Superintendent
 Attend and participate in weekly coordinate meetings with other
subcontractor and area manager
 Perform regular briefing for everyday activities to all manpower to avoid
site problems.
 Communicate with subcontractors, and oversee manpower activities.
 Prepared documentations reports before construction action.

Sep 2010-Jul 2011
Company Name: Bersatu Marine & Engineering Sdn Bhd
Position : Superintendent
Project list : Drilling Rig/Ship Repair
Client : Diamond Offshore
Duties/responsibilities:
 As a Superintendent the duties are to ensure that pipe systems are
stored, minted, installed and tested in accordance with the applicable
codes, specifications, drawing & design documents
 Daily reporting and inspections on work in progress.
 Coordinate with manager during the erection.
 Develop, maintain and distribute procedures, work practices, standards
and specifications.
 Review and oversee the storage, preventive maintenance and cleaning of
piping spool prior to commissioning Review piping and structure drawing
and hanger design drawing
 Coordinate the required inspection and testing with start-up manager
and client.
 Attend and participate in weekly coordinate meetings with other
subcontractor In
area manager.
Mar 2010-Jun 2010
Company Name: Aida Japan
Position : Specialist Hydraulics System Engineer
Project list : Manufacturing / Machine Banding and Robotics Car PT
EPP/Astra Mobil Indonesia
Client : Aida Japan
Duties & Responsibilities
 Installation and setting until running, machine jack
 Robots process system to banding cover car.
 New capital equipment installations and upgrades
 Process optimization - cycle time and scrap reduction
 Tooling / Dies / Hydraulics
 Robotics / Pick and place - programming and troubleshooting
 Installation mechanical machine jacking car until system, capacity 1000
ton 3 unit at PT EPP/Astra Indonesia
 Setting machine robotics 4 unit
 Install piping and hydraulics hose to coordinate with contractor.
 Checking pipe line and connection after contractor install pipe line and
pipe hose. Following as per ISO drawing speculation.
 Minimum pressure 3000 PSI, maximum 6000 PSI. Calculation following
as per standard Engineering software.
 Installation Machine jacking car duration 3 month 17 days completed
running.
Jan 2010 - Mar 2010
 Company Name : Bersatu Management Engineering Sdn Bhd
 Position : Superintendent/Engineer
 Project list : Molly Brown
 Client : Compass Offshore Hotel Ltd
Duties/responsibilities:
 Review Steel Structure engineering drawings, specifications and other
documents.
 Review construction equipment requirements and validate contractors
plans area Superintendent.
 Review and finalize the installation duration, sequencing and
coordination with the Contractor.
 Coordinate material deliveries, requisitions and releases to contractors.
 Maintained quality control reports and inspections.
 Coordination with other Construction supervisors on site.
 Coordinate necessary interfaces to maintain schedule (ie. Cranes,
scaffolding, etc.)
Working with the Area Construction Manager and interfacing with the
Field Engineer and Document control for drawing change and change
control management queries.
Feb 2009- Dec 2009
Company Name: Willtec Pt Ltd Singapore
Position : Project engineer
Project list : Transocean actinia
Client : Transocean
Duties/responsibilities:
 Work under project manager and direction of the OIM, Transocean
actinia during the construction and testing of the critical and piping
systems required for the construction
 Oversee the complete erection of pipe, hanger and support for critical
and piping system
 The duties are to ensure that pipe systems are stored, minted, installed
and tested in accordance with the applicable codes, specifications,
drawing & design documents. in accordance with the applicable codes,
specifications, drawing & design documents.
 Daily reporting and inspections on work in progress.
 Coordinate with superintendents during the erection.
 Coordinate problem & solution between site, craft labour, and the design
field client engineer.
 Review and oversee the storage, preventive maintenance and cleaning of
piping spool prior to commissioning Review piping and structure drawing
and hanger design drawing
 Coordinate the required inspection and testing with start-up manager
and client.
 Attend and participate in weekly coordinate meetings with other
subcontractor in area manager.

Jun 2008 -Jan 2009
Company Name: ORM / Offshore Resource Management Pt Ltd Singapore
Position : Engineer
Project list : Transocean Nordic/Drilling Rig Project
Client : Transocean
Duties/responsibilities:
 Control overall ship repair Deep Water drilling Rig at oversea/offshore.
 Design one set heli deck safety next until install complete.
 Fabrication pipe line height pressure/jetting line sch xxs and propose
radiography testing
 Required inspection with IBS before welding activity start.
 Review and oversee the storage, preventive maintenance and cleaning of
piping spool prior to commissioning Review piping and structure drawing
and hanger design drawing.
 Meeting every 3 o’clock PM with Rig Supervisor, Rig superintendent and
Rig manager in area meeting room.
 Update progress report every day to submit with client.
 Coordinate with main contractor supervisor and crew QC for the
submission report before 3 o’clock meeting with client.
September 2007 - August 2007
Company Name: Bersatu Management and Engineering Sdn Bhd
Position : Design Engineer
Project list : Bunga Raya
Client : Sime Darby Sdn Bhd
Duties/responsibilities:
 Researching and developing ideas for new products and production
systems using.
 Computer-aided design to create detailed designs and specifications.
Liaising with customers and support agencies on file transfer issues.
Control and maintain the design standard of the products.
 Providing design support at all stages of the design process.
 Develop and maintain project plans using MS Project for allocated tasks.
 Involved in creating and planning new production processes.
 Advising the purchasing department on tooling & product purchase &
Cost control.
 Visiting clients to conduct trial installations & offer technical expertise /
solutions.
 Being a first line answering service for all customer technical questions
improving the design.
 Performance and efficiency of existing products.
 Writing professional progress reports for project managers and clients.
 Compile test qualification schedules and reports when required.
 Undertaking simple draft stress calculations, weight calculations.
 Considering issues such as cost, safety and time constraints.
 Communicating with customers and suppliers to resolve design issues.
 Checking drawings for accuracy and errors.
Jan 2007 - August 2007
Company Name: RAHARTA CORPORATION SDN BHD
Position : Senior supervisor
Project list : EPCC of Oil Terminal at Tanjung Langsat Port
Client : DIALOG E&C SDN BHD
Duties/responsibilities:
 As senior supervisor of the plant sites directing 6 crew leaders, 1
planner/scheduler and as many as 4 contractors during peak periods.
 Key focus was to maintain the site facilities, services, and to provide
resources to meet department’s long and short term goals.
 Accountabilities included service factor, control and reduction of repair
cost and Environmental compliance, employee performance and
satisfaction as well as labour cost and productivity.
 Responsibilities included the planning and scheduling of all maintenance
activities while supervising and evaluating and contractors.
 Checks that the same is in line with construction schedules and
contractual commitments.
 To check that the said schedule is kept to and to promote action to
recover any delay.
 To monitor the workmanship do the work is follow the procedure.
 To detect any design error and where possible rectify the same or request
the project engineer to make the necessary changes.
 Dedicated to maintaining high quality standards.
 Fully conversant in all aspects of my discipline at a trade, supervisory
and the majority of system and all aspects of pipe sizes, material,
isometric drawing, site running and various types of work packs, punch
list and QA/QC and test package.
January 2006 - December 2006
 Company Name : Sapura Kencana Sdn Bhd
 Position : Superintendent
 Project list : BCP Jacket India
 Client : BCP India
Duties/responsibilities:
 Review Steel Structure engineering drawings, specifications and other
documents.
 Review construction equipment requirements and validate contractors
plans Area Superintendent.
 Review and finalize the installation duration, sequencing and
coordination with the Contractor.
 Coordinate material deliveries, requisitions and releases to contractors.
 Maintained quality control reports and inspections.
 Coordination with other Construction supervisors on site.
 Coordinate necessary interfaces to maintain schedule (i.e. Cranes,
scaffolding, etc.)
 Working with the Area Construction Manager and interfacing with the
Field Engineer and Documentcontrol for drawing change and change
control management queries.
March 1998-November 2000
 Company Name : PT GANESIS JAKARTA
 Position : QC ENGINEER
 Project list : Work Clover - 2 LTD
 Client : Puchang Ship Korea
Duties/responsibilities:
 Key focus was to maintain the site facilities, services, and to provide
resources to meet department’s long and short term goals.
 Accountabilities included service factor, control and reduction of repair
cost and environmental compliance, employee performance and
satisfaction as well as labour cost and productivity.
 Responsibilities included the planning and scheduling of all maintenance
activities while supervising and evaluating and contractors.
 Coordinate with the site QC for the completion of as-built turnover
documentation commitments.
 To check that the said schedule is kept to and to promote action to
recover any delay.
 Resolve any discrepancies between the completed milestone and quality
documentation.
 To detect any design error and where possible rectify the same or request
the project manager to make the necessary changes.
 Dedicated to maintaining high quality standards.
 Fully conversant in all aspects of my discipline at a trade, supervisory
and the majority of system and all aspects of pipe sizes, material,
isometric drawing, site running and various types of work packs, punch
list and Client QC Engineer and test package.
 Monitor and control the status of punch list and exception lists relevant
to quality dossiers.
April 1997-december 1997
 Company Name : PT PERTAMINA
 Position : Trainee/ Engineer
 Project list : Gas Pipe line & Hydrogen PERTAMINA, Indonesia
 Client : PT. PERTAMINA
Duties/responsibilities:
 Monitor & controlling hydrogen & faker’s plant in daily basis.
 Manpower planning.
 Daily & monthly production report generation
 Plant chemical and petrol, utilities & stock monitoring, controlling &
records.
 Plant drawing update & generation of drawing for modification & project
through AutoCAD application.
 Plant equipment history & details data compilation.
REFERENCE
Piping,Tank,Structure,Overall Job
Company : Bersatu Management Engineering S/B
Name : Mr Chong
Position : CEO
Structure Job
Company : TTJ Engineering S/B
Name : Mr Leo
Position : Project Manager
Structure & Piping Job
Company : Compass Offshore Hotel LTD
Name : Mr Saukat Ali
Position : Project Manager
Piping, Structure Mechanical Job
Company : Integrity engineering services
Name : Mr Resman
Position : Director
Structure & Tank Job
Company : Raharta Corporation S/B
Name : Mr Somadran
Position : Project Manager
Ship Repair RIG
Company : Offshore Resource Management Pte Ltd
Name : Mr Simen
Position : CEO
Ship Repair RIG
Company : Willtec Asia Pacific Pte Ltd
Name : Mr William
Position : Director Manager
Ship Repair RIG
Company : Global One Pte Ltd
Name : Mr Reward
Position : Director Manager
Piping & Structure Job
Company : PEC (M) /PEC Pte Ltd
Name : Mr Tanggo
Position : Project Manager
Piping & Structure Job
Company : KTS S/B
Name : Mr Khen
Position : Director Manager
Piping Structure Job
Company : Poratha Corporation
Name : Mr Narish
Position : Project Manager
Mechanical Job
Company : Aida Pte Ltd
Name : Mr Lim
Position : Project Manager
Sincerely,
Ongky Basori

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (6)

Rezume imaevartur
Rezume imaevarturRezume imaevartur
Rezume imaevartur
 
Contoh Resume Bahasa Melayu
Contoh Resume Bahasa MelayuContoh Resume Bahasa Melayu
Contoh Resume Bahasa Melayu
 
rezyume
rezyumerezyume
rezyume
 
2015 резюме анучин
2015 резюме анучин2015 резюме анучин
2015 резюме анучин
 
DanielStefanescu_ro_
DanielStefanescu_ro_DanielStefanescu_ro_
DanielStefanescu_ro_
 
Contoh resume
Contoh resumeContoh resume
Contoh resume
 

Ähnlich wie Rezume ongky (20)

cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129
 
Mr Jassadaporn CV apply for UAE
Mr Jassadaporn  CV  apply for UAEMr Jassadaporn  CV  apply for UAE
Mr Jassadaporn CV apply for UAE
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Resume 08--Earl Victor -
Resume 08--Earl Victor -Resume 08--Earl Victor -
Resume 08--Earl Victor -
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Cv project manager
Cv project managerCv project manager
Cv project manager
 
aditi
aditiaditi
aditi
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
Resume 2016 PH Updated
Resume 2016  PH UpdatedResume 2016  PH Updated
Resume 2016 PH Updated
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.mechanical_engineer-raman-cv.
mechanical_engineer-raman-cv.
 
SULU TOLANI cv
SULU TOLANI cvSULU TOLANI cv
SULU TOLANI cv
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 

Rezume ongky

  • 1. CurriculumVitae PERSONAL PARTICULARS Contact No (0167544023) Nationality : Indonesia Email: ongkybme8@gmail.com Marital Status : Married Date Of Birth : 08 aug 1974 Gender : Male Religion : Muslim IC No/passport : A 7901475 Language : English, Malay / Bahasa Education DEGREE IN CIVIL AND INVIRONMENTAL ENGINEERING FACULTY OF ENGINEERING UNIVERSITY GADJA MADA INDONESIA UGM UNIVERSITY GADJA MADA: JAWA TENGAH SEKOLAH TECHNIC MENENGAH (STM) SECONDARY SCHOOL TECHNOLOGY (STM) JURUSAN BANGUNAN OF CIVIL, BEST SCHOOL STM 1 SURABAYA, EAST JAVA Computer Knowledge Window application Microsoft Excel, Microsoft office Visio 2003, Microsoft word. Building and Piping Structure engineering design, AutoCAD application. AutoCAD
  • 2. COURSE BACKGROUND Training Design structure Training of engineering pipelines under water and Gas Plant. Three months, Fabrication and design calculation module, KEYS EXPERIENCE EIGHTEEN(18) YEARS OF EXPERIENCED AS PROJECT ENGINEER & SUPERINTENDENT IN ONSHORE AND OFFSHORE CONSTRUCTION, SHIPBUILDING AND FABRICATION FIELD IN OIL & GAS INDUSTRIES , PETROCHEMICAL AND ALSO PROVIDED LEADERSHIP SKILLS IN THE FIELD OF DESIGN, CONSTRUCTION AND PLANT MAINTENANCE TO UTILIZE MY TRAINING AND MY 18 YEARS EXPERIENCES TO IMPROVE THE FIRM’S LONG TERM VIABILITY CORE QUALIFICATIONS  Excellent written documentations and modification design skills  Extensive knowledge of best practice workmanship in Oil & Gas industry  Good interpersonal and oral communication skills  Effective at monitoring site projects and establishing piping works  Good monitoring of contractors and subcontractors to ensure quality work  Above-average knowledge of safety guidelines and regulations  Able to submit reports to company and clients as required Oct 2014- Present Company Name: Mencast Offshore & Engineering Position : Superintendent Project list : Drilling Rig Keppel Singapore Client : Keppel Pte Ltd Singapore
  • 3. Duties & Responsibilities :  Work under client Keppel Singapore to settle engineering drawinggo through to millimeter.  To handle all meetings with clientsto discussed about progress and the quality of one set Rig Fabrication.  To Control material speculation following as per drawing.  Completed fabrication and installation one set Rig  To Control 6 crews,6 supervisors, 12 foremen as per work site activity every day.  Checking one section or per detail drawing after finished workshopfabrication with client QC.  Control all documents report progress and also checking QC report before submission with client.  Meeting every 15:00 pm with supervisor to discuss about the progress At project manager office. Job Description  Fabrication Anchor rack fort & STBD 2 set finished  Fabrication accommodations1 set  Fabrication engine room 1 set  Fabrication changing room 1 set  Fabrication heli deck 1 set  Fabrication control room 1 set  Fabrication Anchor winch 1 set  Cement tank 1 set  Fabrication pontoon 2 set  Fabrication deck floor 1 set  Fabrication tank columns 4 set  Fabrication electrical room April 2013 ~ December 2013 Company Name: Integrity Engineering Services Sdn Bhd Position : Superintendent Project list : Down Stream and Up Stream PETRONAS Carigali Client : PETRONAS
  • 4. Duties & Responsibilities:  Work as controls piping and structure, design any site modification and field instruction.  To control 3 Contractor the complete erection of pipe, hanger and support for critical and piping system.  The duties are to ensure that pipe systems are stored, minted, installed and tested in accordance tested in accordance with the applicable codes, Specifications, drawing & design documents.  Control overall, piping line, structure, civil, mechanical, until completed system, prepare equipment material until tools.  To control modification claim and additional job and drawing error.  To handle 3 contractors 700 manpower 3 engineer contractor, 3 engineer main contractor.  Coordinate every 15:00 to meeting about progress report with engineer supervisor and QC Jul 2011- Nov 2012 Company Name: PEC (M) Sdn Bhd/Singapore Position : Superintendent Project list : Poly Silicon Plan Project Tokohama in Bintulu Sarawak Client : Tokohama Duties & Responsibilities:  Served as the piping superintendent for installation of gas and oil pipelines.  As a piping specialist, check points and planning before Constructions, start installed  Ensured personnel compliance with all safety regulations and guidelines.  Monitored contractors and subcontractors to ensure work met quality standards.  Fired personnel when needed.  Kept and maintained daily logs and ensured workers met deadlines.  Meeting progress and schedule or duration every afternoon 15:30 in the area of Superintendent
  • 5.  Attend and participate in weekly coordinate meetings with other subcontractor and area manager  Perform regular briefing for everyday activities to all manpower to avoid site problems.  Communicate with subcontractors, and oversee manpower activities.  Prepared documentations reports before construction action.  Sep 2010-Jul 2011 Company Name: Bersatu Marine & Engineering Sdn Bhd Position : Superintendent Project list : Drilling Rig/Ship Repair Client : Diamond Offshore Duties/responsibilities:  As a Superintendent the duties are to ensure that pipe systems are stored, minted, installed and tested in accordance with the applicable codes, specifications, drawing & design documents  Daily reporting and inspections on work in progress.  Coordinate with manager during the erection.  Develop, maintain and distribute procedures, work practices, standards and specifications.  Review and oversee the storage, preventive maintenance and cleaning of piping spool prior to commissioning Review piping and structure drawing and hanger design drawing  Coordinate the required inspection and testing with start-up manager and client.  Attend and participate in weekly coordinate meetings with other subcontractor In area manager. Mar 2010-Jun 2010 Company Name: Aida Japan Position : Specialist Hydraulics System Engineer Project list : Manufacturing / Machine Banding and Robotics Car PT
  • 6. EPP/Astra Mobil Indonesia Client : Aida Japan Duties & Responsibilities  Installation and setting until running, machine jack  Robots process system to banding cover car.  New capital equipment installations and upgrades  Process optimization - cycle time and scrap reduction  Tooling / Dies / Hydraulics  Robotics / Pick and place - programming and troubleshooting  Installation mechanical machine jacking car until system, capacity 1000 ton 3 unit at PT EPP/Astra Indonesia  Setting machine robotics 4 unit  Install piping and hydraulics hose to coordinate with contractor.  Checking pipe line and connection after contractor install pipe line and pipe hose. Following as per ISO drawing speculation.  Minimum pressure 3000 PSI, maximum 6000 PSI. Calculation following as per standard Engineering software.  Installation Machine jacking car duration 3 month 17 days completed running. Jan 2010 - Mar 2010  Company Name : Bersatu Management Engineering Sdn Bhd  Position : Superintendent/Engineer  Project list : Molly Brown  Client : Compass Offshore Hotel Ltd Duties/responsibilities:  Review Steel Structure engineering drawings, specifications and other documents.  Review construction equipment requirements and validate contractors plans area Superintendent.  Review and finalize the installation duration, sequencing and coordination with the Contractor.
  • 7.  Coordinate material deliveries, requisitions and releases to contractors.  Maintained quality control reports and inspections.  Coordination with other Construction supervisors on site.  Coordinate necessary interfaces to maintain schedule (ie. Cranes, scaffolding, etc.) Working with the Area Construction Manager and interfacing with the Field Engineer and Document control for drawing change and change control management queries. Feb 2009- Dec 2009 Company Name: Willtec Pt Ltd Singapore Position : Project engineer Project list : Transocean actinia Client : Transocean Duties/responsibilities:  Work under project manager and direction of the OIM, Transocean actinia during the construction and testing of the critical and piping systems required for the construction  Oversee the complete erection of pipe, hanger and support for critical and piping system  The duties are to ensure that pipe systems are stored, minted, installed and tested in accordance with the applicable codes, specifications, drawing & design documents. in accordance with the applicable codes, specifications, drawing & design documents.  Daily reporting and inspections on work in progress.  Coordinate with superintendents during the erection.  Coordinate problem & solution between site, craft labour, and the design field client engineer.  Review and oversee the storage, preventive maintenance and cleaning of piping spool prior to commissioning Review piping and structure drawing and hanger design drawing  Coordinate the required inspection and testing with start-up manager and client.  Attend and participate in weekly coordinate meetings with other subcontractor in area manager. 
  • 8. Jun 2008 -Jan 2009 Company Name: ORM / Offshore Resource Management Pt Ltd Singapore Position : Engineer Project list : Transocean Nordic/Drilling Rig Project Client : Transocean Duties/responsibilities:  Control overall ship repair Deep Water drilling Rig at oversea/offshore.  Design one set heli deck safety next until install complete.  Fabrication pipe line height pressure/jetting line sch xxs and propose radiography testing  Required inspection with IBS before welding activity start.  Review and oversee the storage, preventive maintenance and cleaning of piping spool prior to commissioning Review piping and structure drawing and hanger design drawing.  Meeting every 3 o’clock PM with Rig Supervisor, Rig superintendent and Rig manager in area meeting room.  Update progress report every day to submit with client.  Coordinate with main contractor supervisor and crew QC for the submission report before 3 o’clock meeting with client. September 2007 - August 2007 Company Name: Bersatu Management and Engineering Sdn Bhd Position : Design Engineer Project list : Bunga Raya Client : Sime Darby Sdn Bhd Duties/responsibilities:  Researching and developing ideas for new products and production systems using.  Computer-aided design to create detailed designs and specifications. Liaising with customers and support agencies on file transfer issues. Control and maintain the design standard of the products.
  • 9.  Providing design support at all stages of the design process.  Develop and maintain project plans using MS Project for allocated tasks.  Involved in creating and planning new production processes.  Advising the purchasing department on tooling & product purchase & Cost control.  Visiting clients to conduct trial installations & offer technical expertise / solutions.  Being a first line answering service for all customer technical questions improving the design.  Performance and efficiency of existing products.  Writing professional progress reports for project managers and clients.  Compile test qualification schedules and reports when required.  Undertaking simple draft stress calculations, weight calculations.  Considering issues such as cost, safety and time constraints.  Communicating with customers and suppliers to resolve design issues.  Checking drawings for accuracy and errors. Jan 2007 - August 2007 Company Name: RAHARTA CORPORATION SDN BHD Position : Senior supervisor Project list : EPCC of Oil Terminal at Tanjung Langsat Port Client : DIALOG E&C SDN BHD Duties/responsibilities:  As senior supervisor of the plant sites directing 6 crew leaders, 1 planner/scheduler and as many as 4 contractors during peak periods.  Key focus was to maintain the site facilities, services, and to provide resources to meet department’s long and short term goals.  Accountabilities included service factor, control and reduction of repair cost and Environmental compliance, employee performance and satisfaction as well as labour cost and productivity.  Responsibilities included the planning and scheduling of all maintenance activities while supervising and evaluating and contractors.
  • 10.  Checks that the same is in line with construction schedules and contractual commitments.  To check that the said schedule is kept to and to promote action to recover any delay.  To monitor the workmanship do the work is follow the procedure.  To detect any design error and where possible rectify the same or request the project engineer to make the necessary changes.  Dedicated to maintaining high quality standards.  Fully conversant in all aspects of my discipline at a trade, supervisory and the majority of system and all aspects of pipe sizes, material, isometric drawing, site running and various types of work packs, punch list and QA/QC and test package. January 2006 - December 2006  Company Name : Sapura Kencana Sdn Bhd  Position : Superintendent  Project list : BCP Jacket India  Client : BCP India Duties/responsibilities:  Review Steel Structure engineering drawings, specifications and other documents.  Review construction equipment requirements and validate contractors plans Area Superintendent.  Review and finalize the installation duration, sequencing and coordination with the Contractor.  Coordinate material deliveries, requisitions and releases to contractors.  Maintained quality control reports and inspections.  Coordination with other Construction supervisors on site.  Coordinate necessary interfaces to maintain schedule (i.e. Cranes, scaffolding, etc.)  Working with the Area Construction Manager and interfacing with the Field Engineer and Documentcontrol for drawing change and change control management queries.
  • 11. March 1998-November 2000  Company Name : PT GANESIS JAKARTA  Position : QC ENGINEER  Project list : Work Clover - 2 LTD  Client : Puchang Ship Korea Duties/responsibilities:  Key focus was to maintain the site facilities, services, and to provide resources to meet department’s long and short term goals.  Accountabilities included service factor, control and reduction of repair cost and environmental compliance, employee performance and satisfaction as well as labour cost and productivity.  Responsibilities included the planning and scheduling of all maintenance activities while supervising and evaluating and contractors.  Coordinate with the site QC for the completion of as-built turnover documentation commitments.  To check that the said schedule is kept to and to promote action to recover any delay.  Resolve any discrepancies between the completed milestone and quality documentation.  To detect any design error and where possible rectify the same or request the project manager to make the necessary changes.  Dedicated to maintaining high quality standards.  Fully conversant in all aspects of my discipline at a trade, supervisory and the majority of system and all aspects of pipe sizes, material, isometric drawing, site running and various types of work packs, punch list and Client QC Engineer and test package.  Monitor and control the status of punch list and exception lists relevant to quality dossiers. April 1997-december 1997  Company Name : PT PERTAMINA  Position : Trainee/ Engineer  Project list : Gas Pipe line & Hydrogen PERTAMINA, Indonesia  Client : PT. PERTAMINA
  • 12. Duties/responsibilities:  Monitor & controlling hydrogen & faker’s plant in daily basis.  Manpower planning.  Daily & monthly production report generation  Plant chemical and petrol, utilities & stock monitoring, controlling & records.  Plant drawing update & generation of drawing for modification & project through AutoCAD application.  Plant equipment history & details data compilation. REFERENCE Piping,Tank,Structure,Overall Job Company : Bersatu Management Engineering S/B Name : Mr Chong Position : CEO Structure Job Company : TTJ Engineering S/B Name : Mr Leo Position : Project Manager Structure & Piping Job Company : Compass Offshore Hotel LTD Name : Mr Saukat Ali Position : Project Manager Piping, Structure Mechanical Job
  • 13. Company : Integrity engineering services Name : Mr Resman Position : Director Structure & Tank Job Company : Raharta Corporation S/B Name : Mr Somadran Position : Project Manager Ship Repair RIG Company : Offshore Resource Management Pte Ltd Name : Mr Simen Position : CEO Ship Repair RIG Company : Willtec Asia Pacific Pte Ltd Name : Mr William Position : Director Manager Ship Repair RIG Company : Global One Pte Ltd Name : Mr Reward Position : Director Manager Piping & Structure Job Company : PEC (M) /PEC Pte Ltd Name : Mr Tanggo
  • 14. Position : Project Manager Piping & Structure Job Company : KTS S/B Name : Mr Khen Position : Director Manager Piping Structure Job Company : Poratha Corporation Name : Mr Narish Position : Project Manager Mechanical Job Company : Aida Pte Ltd Name : Mr Lim Position : Project Manager Sincerely, Ongky Basori