Defined below are Engineering terms for comprehensive and professional
digestion;
-Operator: The qualified man (Engineer) that closes and opens feeders in a Control
Room.
- Injection Substation: A structure or building from which Control Room is created.
- Control Room: The room housing the Feeders and the Operator.
-Feeder: Electricity source of the Substation (Transformer) on your street from the
Control Room.
-Substation: Transformer on your street.
-Line: The path (Wire) along which Electricity travels from the feeder to your
Substation (Transformer).
-Relay: A part of the feeder that serves as eyes. It gives/shows reason(s) of trip
when there is/are fault(s).
-Trip: Feeder opening due to normal or abnormal situation as a result of either external
or internet fault(s)
- Power Transformer: This is the transformer at the Injection Substation from which
Feeders feeding Transformers (Substations) receive supply.
-Opening: Switching off
-Closing: Switching on
-Load shedding: Sharing of Electricity among consumers on 2 or more Feeders with a
common Power Transformer.
-Local load shedding: Sharing of Electricity among consumers on 1 Feeder.
Please, you should know that no Operator derives pleasure in Closing and Opening of
Feeder. Operators do not have time and supposed energy for that. So, stop cursing and
abusing when your light keeps going on and off within minutes. The Operator is only
making effort you have light.
Besides, it is against the code of conduct of an Operator to close a Feeder
after tripping if he hasn't informed the linesmen to patrol and locate area of
fault and make amend.
Constant operation of Feeder is said to wear out the spring thereby resulting to
replacing or repairing or managing (this also takes efforts in operating).
Here are few main reasons why you might not have been having light.
1. Load Shedding And Local Load Shedding:
(Note: Among reasons, this is the most important you need to understand clearly. I'm
going to take my time explaining this)
Load Shedding (L/S) happens when power needs to be shared among consumers on
a Building, Street, Neigbourhood, Local Government, State or Country as the case may
be in order to relief the related Transformer from overloading. We can simply call Load
Shedding “Damage Control” operation.
Case study:
An Injection Substation (Control Room) with Power Transformer of 15MVA has 4
Feeders. Namely;
Feeder 1 (Lagos)
Feeder (Anambra)
Feeder (Kano)
Feeder (Ogun)
-Lagos has 10 Substations (Transformers) with total sum capacity of 12MVA. And
let's assume Lagos consume about 8MVA on full load (i.e. Lagos consumes less than
the Transformers’ summed capacity)
-Anambra has 15 Substations (Transformers) with the total sum capacity of
17MVA. And let's assume Anambra consumes about 17MVA on full load (i.e. Anambra
consumes equal to the Transformers’ summed capacity)
-Kano has 25 Substations (Transformers) with the total sum capacity of 5MVA.
Let’s assume Kano consumes 5MVA on full load (i.e. Kano consumes equal to the
Transformers’ summed capacity)
-Ogun has 7 Substations (Transformers) with the total sum capacity of 7MVA.
While Ogun consumes only 1MVA on full load (i.e. Ogun consumes far less than
Transformers’ summed capacity)
N.B: A transformer shouldn't be operated on 100%, but 75% capacity as
factor of longevity.
But, let's assume all Transformers here work on 100% full load capacity.
Summary:
-Injection S/station Power Transformer: 15MVA
-Lagos: 12MVA (Consumes 8MVA)
-Anambra: 17MVA (Consumes 17MVA)
-Kano: 5MVA (Consumes 5MVA)
-Ogun: 7MVA (Consumes 1MVA)
Note: The sum of total consumption by States must not exceed 15MVA of the
Injection Sub-station’s Transformer to avoid damage or tripping as a result
of Over-load.
Since Anambra (17MVA) consumes more than Injection Substation Power Transformer
of 15MVA, then LOCAL LOAD SHEDDING is going to be employed on the Feeder to
avoid damage or trip on the Injection Substation Power Transformer due to over-load.
At this point, some Substations (transformers) will be out of service.
This is a major reason you see some parts of your neighbourhood having
light when you have not, and vice versa
This method is also applicable in Area that consumes more than the summed
substations (transformers) supplying the Area.
A case study of an Area consuming 20MVA when the summed capacity of the
substations (transformers) supplying the Area is 10MVA. This means that at least
10MVA load must be dropped so as to balance the grid so as to avoid damage of
substations (transformers)
These are possibilities of operations on per day schedule;
(Giving out 15MVA)
After Anambra has been Locally load-shedded to 10MVA.
-Lagos (8MVA) + Ogun (5MVA) + Kano (1MVA) = 14MVA
-Anambra (10MVA) + Kano (5MVA) = 15MVA
Days Of Enjoyment On Each Feeder.
-Lagos: 3-4 days a week
-Anambra: 3-4 days a week, while local load-shedding goes on. It means some parts
will have supply for 2-3 days a week.
-Ogun: 3-4 days a week
-Kano: 7 days a week
Note: Kano enjoys more supply because it has the lowest consumption rate,
as Anambra suffers more as a result of Load Shedding and Local Load
Shedding it suffers from.
2. Bypassing:
Like the happenings in some states, some Distribution Companies have decided to stop
giving constant power supply due to shortage of revenue. Customers bypassing Pre-
paid meter. Hence, consume more than they pay for.
What is the essence of the Company paying much when profit is not maximized.....they
are still looking into the matter.
Note: Distribution Company pays Transmission Company (TCN), and
Transmission Company (TCN) pays Generation Company.
3. System collapse:
This could be as a result of fault from Injection Substation or from TCN Station or from
Generation Station (e.g. Shiroro)
4. Devil-May-Care Attitude:
Carelessness over the state of supply in your environment by not reporting to a nearby
office if supply deteriorates. The efficiency and togetherness of the landlords and
landladies go a longer way in this regard.
5. Damage:
Cases of Earth Fault, Over Current, Line-cut, dropped J&P, damaged fuse, damaged
transformer, and the likes which could be due to vandalism, weather factor, etc
6. Unit Exhaustion:
Running out of Unit without knowing
7. Disconnection:
Termination of service cable as to non-remittance of bill.
8. Violence:
Fighting the officials on patrol, especially those conducting disconnection and. This
could lead to black-out punishment.
You are free to add yours and ask questions.

Weitere ähnliche Inhalte

Was ist angesagt?

Power factor correction
Power factor correctionPower factor correction
Power factor correction
slmnsvn
 
Impulse-Voltage-Generator-Test-System
Impulse-Voltage-Generator-Test-SystemImpulse-Voltage-Generator-Test-System
Impulse-Voltage-Generator-Test-System
Fang Sam
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
Neehar NLN
 

Was ist angesagt? (20)

Apfc final seminar
Apfc final seminarApfc final seminar
Apfc final seminar
 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
Automatic Power Factor Corrector
Automatic Power Factor CorrectorAutomatic Power Factor Corrector
Automatic Power Factor Corrector
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
Fundamentals of substaion
Fundamentals of substaionFundamentals of substaion
Fundamentals of substaion
 
Analysis of Power Factor Improvement Techniques in case of Non Linear System ...
Analysis of Power Factor Improvement Techniques in case of Non Linear System ...Analysis of Power Factor Improvement Techniques in case of Non Linear System ...
Analysis of Power Factor Improvement Techniques in case of Non Linear System ...
 
An isolated three port bidirectional dc-dc converter for photovoltaic systems...
An isolated three port bidirectional dc-dc converter for photovoltaic systems...An isolated three port bidirectional dc-dc converter for photovoltaic systems...
An isolated three port bidirectional dc-dc converter for photovoltaic systems...
 
Impulse-Voltage-Generator-Test-System
Impulse-Voltage-Generator-Test-SystemImpulse-Voltage-Generator-Test-System
Impulse-Voltage-Generator-Test-System
 
4 Sed2 Harmonics Overview
4 Sed2 Harmonics Overview4 Sed2 Harmonics Overview
4 Sed2 Harmonics Overview
 
Azadar_Training
Azadar_TrainingAzadar_Training
Azadar_Training
 
Ppt projext 1
Ppt projext 1Ppt projext 1
Ppt projext 1
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
 
VSC based HVDC system
VSC based HVDC systemVSC based HVDC system
VSC based HVDC system
 
Automatic power factor correction
Automatic power factor correctionAutomatic power factor correction
Automatic power factor correction
 
HVDC vs HVAC ppt
HVDC vs HVAC pptHVDC vs HVAC ppt
HVDC vs HVAC ppt
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmission
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
60232804 ppt-compensation-techniques-in-ac-transmission-system-using-c
60232804 ppt-compensation-techniques-in-ac-transmission-system-using-c60232804 ppt-compensation-techniques-in-ac-transmission-system-using-c
60232804 ppt-compensation-techniques-in-ac-transmission-system-using-c
 

Andere mochten auch

Clase web 2.0
Clase web 2.0Clase web 2.0
Clase web 2.0
henrypava
 
Historia del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilenaHistoria del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilena
luis carrillo huaiqui
 
Historia del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilenaHistoria del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilena
luis carrillo huaiqui
 
Soveriegnty and Aboriginal Self-Determination
Soveriegnty and Aboriginal Self-DeterminationSoveriegnty and Aboriginal Self-Determination
Soveriegnty and Aboriginal Self-Determination
James Umpherson
 

Andere mochten auch (17)

Simplifile + Zendesk
Simplifile + ZendeskSimplifile + Zendesk
Simplifile + Zendesk
 
John Mitchell Skanska Low Carbon Business Breakfast Investment in the West 19...
John Mitchell Skanska Low Carbon Business Breakfast Investment in the West 19...John Mitchell Skanska Low Carbon Business Breakfast Investment in the West 19...
John Mitchell Skanska Low Carbon Business Breakfast Investment in the West 19...
 
AIA Solutions Brochure
AIA Solutions BrochureAIA Solutions Brochure
AIA Solutions Brochure
 
Clase web 2.0
Clase web 2.0Clase web 2.0
Clase web 2.0
 
AIA Industries Brochure
AIA Industries BrochureAIA Industries Brochure
AIA Industries Brochure
 
Historia del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilenaHistoria del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilena
 
Historia del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilenaHistoria del derecho del trabajo. evolucion chilena
Historia del derecho del trabajo. evolucion chilena
 
Sourabh Resume.2
Sourabh Resume.2Sourabh Resume.2
Sourabh Resume.2
 
Soveriegnty and Aboriginal Self-Determination
Soveriegnty and Aboriginal Self-DeterminationSoveriegnty and Aboriginal Self-Determination
Soveriegnty and Aboriginal Self-Determination
 
WEB 2.0
WEB 2.0WEB 2.0
WEB 2.0
 
Docker1.12イングレスロードバランサ
Docker1.12イングレスロードバランサDocker1.12イングレスロードバランサ
Docker1.12イングレスロードバランサ
 
DeepuKPrasannan-new
DeepuKPrasannan-newDeepuKPrasannan-new
DeepuKPrasannan-new
 
Progressive Discipline
Progressive DisciplineProgressive Discipline
Progressive Discipline
 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
 
runC概要と使い方
runC概要と使い方runC概要と使い方
runC概要と使い方
 
近頃のDockerネットワーク
近頃のDockerネットワーク近頃のDockerネットワーク
近頃のDockerネットワーク
 
Diagnostico situacional eti dr. rafael pg
Diagnostico situacional eti dr. rafael pgDiagnostico situacional eti dr. rafael pg
Diagnostico situacional eti dr. rafael pg
 

Ähnlich wie Reasons you might not be having light

POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
Jeffrey Dorsey
 

Ähnlich wie Reasons you might not be having light (20)

Major faults in an alternator and their protection.
Major faults in an alternator and their protection.Major faults in an alternator and their protection.
Major faults in an alternator and their protection.
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoring
 
Industry electrical team can monitor power instantly & affordably now
Industry electrical team can monitor power instantly & affordably nowIndustry electrical team can monitor power instantly & affordably now
Industry electrical team can monitor power instantly & affordably now
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
 
POWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docxPOWER DISTRIBUTION 2.docx
POWER DISTRIBUTION 2.docx
 
Sks
SksSks
Sks
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training report
 
IRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using MicrocontrollerIRJET- Load Sharing of Transformer using Microcontroller
IRJET- Load Sharing of Transformer using Microcontroller
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Unit-5.pptx
Unit-5.pptxUnit-5.pptx
Unit-5.pptx
 
MPEB, MPPKVVCL Indore 15 days Training Seminar
MPEB, MPPKVVCL Indore 15 days Training SeminarMPEB, MPPKVVCL Indore 15 days Training Seminar
MPEB, MPPKVVCL Indore 15 days Training Seminar
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 
Power
PowerPower
Power
 
INPLANT TRAINING.pptx
INPLANT TRAINING.pptxINPLANT TRAINING.pptx
INPLANT TRAINING.pptx
 
Importance of transformer in power system
Importance of transformer in power systemImportance of transformer in power system
Importance of transformer in power system
 
Presentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpurPresentation on KESCO sub-station, kanpur
Presentation on KESCO sub-station, kanpur
 
Rps plant
Rps plantRps plant
Rps plant
 
Stability test of transformer
Stability test of transformerStability test of transformer
Stability test of transformer
 

Reasons you might not be having light

  • 1. Reasons you might not be having light Defined below are Engineering terms for comprehensive and professional digestion; -Operator: The qualified man (Engineer) that closes and opens feeders in a Control Room. - Injection Substation: A structure or building from which Control Room is created. - Control Room: The room housing the Feeders and the Operator. -Feeder: Electricity source of the Substation (Transformer) on your street from the Control Room. -Substation: Transformer on your street. -Line: The path (Wire) along which Electricity travels from the feeder to your Substation (Transformer). -Relay: A part of the feeder that serves as eyes. It gives/shows reason(s) of trip when there is/are fault(s). -Trip: Feeder opening due to normal or abnormal situation as a result of either external or internet fault(s) - Power Transformer: This is the transformer at the Injection Substation from which Feeders feeding Transformers (Substations) receive supply. -Opening: Switching off -Closing: Switching on -Load shedding: Sharing of Electricity among consumers on 2 or more Feeders with a common Power Transformer. -Local load shedding: Sharing of Electricity among consumers on 1 Feeder. Please, you should know that no Operator derives pleasure in Closing and Opening of Feeder. Operators do not have time and supposed energy for that. So, stop cursing and abusing when your light keeps going on and off within minutes. The Operator is only making effort you have light. Besides, it is against the code of conduct of an Operator to close a Feeder after tripping if he hasn't informed the linesmen to patrol and locate area of fault and make amend. Constant operation of Feeder is said to wear out the spring thereby resulting to replacing or repairing or managing (this also takes efforts in operating). Here are few main reasons why you might not have been having light. 1. Load Shedding And Local Load Shedding:
  • 2. (Note: Among reasons, this is the most important you need to understand clearly. I'm going to take my time explaining this) Load Shedding (L/S) happens when power needs to be shared among consumers on a Building, Street, Neigbourhood, Local Government, State or Country as the case may be in order to relief the related Transformer from overloading. We can simply call Load Shedding “Damage Control” operation. Case study: An Injection Substation (Control Room) with Power Transformer of 15MVA has 4 Feeders. Namely; Feeder 1 (Lagos) Feeder (Anambra) Feeder (Kano) Feeder (Ogun) -Lagos has 10 Substations (Transformers) with total sum capacity of 12MVA. And let's assume Lagos consume about 8MVA on full load (i.e. Lagos consumes less than the Transformers’ summed capacity) -Anambra has 15 Substations (Transformers) with the total sum capacity of 17MVA. And let's assume Anambra consumes about 17MVA on full load (i.e. Anambra consumes equal to the Transformers’ summed capacity) -Kano has 25 Substations (Transformers) with the total sum capacity of 5MVA. Let’s assume Kano consumes 5MVA on full load (i.e. Kano consumes equal to the Transformers’ summed capacity) -Ogun has 7 Substations (Transformers) with the total sum capacity of 7MVA. While Ogun consumes only 1MVA on full load (i.e. Ogun consumes far less than Transformers’ summed capacity) N.B: A transformer shouldn't be operated on 100%, but 75% capacity as factor of longevity. But, let's assume all Transformers here work on 100% full load capacity. Summary: -Injection S/station Power Transformer: 15MVA -Lagos: 12MVA (Consumes 8MVA) -Anambra: 17MVA (Consumes 17MVA) -Kano: 5MVA (Consumes 5MVA)
  • 3. -Ogun: 7MVA (Consumes 1MVA) Note: The sum of total consumption by States must not exceed 15MVA of the Injection Sub-station’s Transformer to avoid damage or tripping as a result of Over-load. Since Anambra (17MVA) consumes more than Injection Substation Power Transformer of 15MVA, then LOCAL LOAD SHEDDING is going to be employed on the Feeder to avoid damage or trip on the Injection Substation Power Transformer due to over-load. At this point, some Substations (transformers) will be out of service. This is a major reason you see some parts of your neighbourhood having light when you have not, and vice versa This method is also applicable in Area that consumes more than the summed substations (transformers) supplying the Area. A case study of an Area consuming 20MVA when the summed capacity of the substations (transformers) supplying the Area is 10MVA. This means that at least 10MVA load must be dropped so as to balance the grid so as to avoid damage of substations (transformers) These are possibilities of operations on per day schedule; (Giving out 15MVA) After Anambra has been Locally load-shedded to 10MVA. -Lagos (8MVA) + Ogun (5MVA) + Kano (1MVA) = 14MVA -Anambra (10MVA) + Kano (5MVA) = 15MVA Days Of Enjoyment On Each Feeder. -Lagos: 3-4 days a week -Anambra: 3-4 days a week, while local load-shedding goes on. It means some parts will have supply for 2-3 days a week. -Ogun: 3-4 days a week -Kano: 7 days a week Note: Kano enjoys more supply because it has the lowest consumption rate, as Anambra suffers more as a result of Load Shedding and Local Load Shedding it suffers from. 2. Bypassing:
  • 4. Like the happenings in some states, some Distribution Companies have decided to stop giving constant power supply due to shortage of revenue. Customers bypassing Pre- paid meter. Hence, consume more than they pay for. What is the essence of the Company paying much when profit is not maximized.....they are still looking into the matter. Note: Distribution Company pays Transmission Company (TCN), and Transmission Company (TCN) pays Generation Company. 3. System collapse: This could be as a result of fault from Injection Substation or from TCN Station or from Generation Station (e.g. Shiroro) 4. Devil-May-Care Attitude: Carelessness over the state of supply in your environment by not reporting to a nearby office if supply deteriorates. The efficiency and togetherness of the landlords and landladies go a longer way in this regard. 5. Damage: Cases of Earth Fault, Over Current, Line-cut, dropped J&P, damaged fuse, damaged transformer, and the likes which could be due to vandalism, weather factor, etc 6. Unit Exhaustion: Running out of Unit without knowing 7. Disconnection: Termination of service cable as to non-remittance of bill. 8. Violence: Fighting the officials on patrol, especially those conducting disconnection and. This could lead to black-out punishment. You are free to add yours and ask questions.