Field Activity Planner is a SaaS SW for timeline visualization of dependencies and cost in work processes for offshore installations and marine operations. Thus allowing you to save time and money and moving into digital oilfield solutions available 24/7 in your browser.
2. TODAY’S Field Planning working environment
Time consuming and highly costly processes
Numerous iterations between a wide variety of
functions to capture the true domain knowledge
Experts today using “old fashioned, time consuming
and unreliable” field development tools – including
text writing, meeting notes, hand-sketches, verbal
descriptions, calculations and explanations
Transferred into a variety of documents for review,
followed by visual presentations and discussions of
the results…and new time consuming iterations to
implement corrective actions
Followed by external document transmittals for
review cycles taking weeks and months by field
partners or key vendors
Complex, costly, resource and time consuming
process – with a real risk of loosing critical
information along the way
TIME CONSUMING & COSTLY PROCESSES
OLD FASHIONED & UNRELIABLE TOOLS
MANUAL & VERBAL ITERATIONS
NO SYNC & COLLABORATION
HIGH RISK FOR LOOSING CRITICAL INFO
7. For a QUANTUM leap in field development EFFICIENCY
The Domain Expert can now directly develop ideas &
solutions in 2D and 3D
Quickly create a plan for realization.
Instant and interactive collaboration across the board
– with any participants involved in the process
The field case can be created, discussed, refined,
add new versions, share selected information real-
time in a meeting, easily use screen sharing and
video-conference – within a project team, with
decision makers, license partners or key vendors. Or
simply export out design and info into a document.
All information digitally stored and available to
anyone, anytime, anywhere with an audit trail.
Instantly get feedback on cost for the various options
INTUITIVE AND INTERACTIVE DESIGN
PROCESS
INSTANT COST IMPLICATIONS INSIGHT
TIME EFFICIENT FIELD PLAN CREATION
SEAMLESS & EASY INFO SHARING
EFFECTIVE COLLABORATION
ACROSS THE BOARD
DYNAMIC UPDATES AND EASY
ACCESSABLE
9. Facts
• Software as a Service (SaaS)
24/7/365 availability!
• Runs in your Browser
Zero Install, No plug-ins!
• Secure & Encrypted
2FA, SSL EV CERTIFICATE!
• Scalable & Reliable
Heroku on Amazon, EU/US
deployed
• Modular Architecture
Expandable, API Integrations
• Continuous Delivery
New functionality added regularly
11. FIELD ACTIVITY PLANNER – OVERVIEW
Users can navigate to a
snapshot of the project.
Activities from multiple
participants and shows
activity and status of
vessels, rigs and
subsea installations
Quickly draw & layout a
field architecture with
drag & drop assets.
Easily connect assets
together and place out
rigs and vessels
Gantt charts from
the project
participants to
visualize activities in
a common graphical
interface
Animate - timeline
Draw – field architecture Plan - tasks
Continuous cost
overview of both
installations and
operations.
Export directly to
MS Excel.
Cost - overview
12. View in 3D for Topside & Subsea
• Switch between 2D and 3D view
• 3D Timeline animation supported
• Topside and Subsea views
• 3D Zoom, Pan, Rotate & Tilt navigation
13. 3D Generic Asset Library
• All generic assets available in 3D
– Subsea & Topside
• Add your own 2D/3D Assets
– Private Asset Library Feature
14. • Manage projects/users
• See reports
• See project Audit Trail/Versioning
• Share/Invite others to specific projects
• Settings/security
Admin Dashboard
15. • Quickly design field layouts
• Drag & drop assets
• Easily connect assets
• Specify connection type/color/width
• Label assets
• Create ports for vessels
Field Layout Module
19. Layout & Activities Visualized!
• Animation support
• Scrubber control
• Speed factor setting
• Press “play” to visualize activities
• Simulate what-if-scenarios!
20. Quick Activity Summary
• ACTIVITY NAME
• SELECT; Activity, Milestone, or Task
• SPECIFY START DATE
• SELECT ANIMATION ACTION
• ANIMATION PLAYBACK
CONTROLS
• SPECIFY END DATE
• SELECT ASSET
• SELECT DESTINATION
• SPECIFY SUPPLIER
• ASSIGN COST
21. Cost Module
• Continuous Cost Summary
• Cost Equipment and Cost Operations
• Multi Currency Support
• Export to Excel!
22. Export
• Field Layout Design to 2D & 3D
• Cost Equipment/Operations to Excel
• GANNT to Excel!
23. Microsoft PowerBI Integration available!
"Forrester estimates that between
60% and 73% of data that enterprises
have access to goes unused for
business intelligence and analytics”
26. TESTIMONIALS!
«The Field Activity Planner is the next
generation visualization tool for project
planning.»
Arnljot Skogvang, Lundin Norway
«Field Activity Planner is incredible easy
to use, and it helps us to become more
productive and create better and more
cost effective solutions for our clients»
Rolf Nordaunet, Chief Engineer
28. BI Dashboard for
Backend & Sensor
Systems
Dismantling &
Reverse Install
Anywhere, anytime
Multi User
Collaboration
Real World Coordinates
and 3D Seabed
Elevation Models
API for integration with 3rd
Party or Back End Systems
(ERP etc.), and Microsoft
PowerBI support
Intergrate with various
Service-/Data- Providers
such as; WellMaster,
WellSpot
Use Field Activity Planner
Dismantling Module to plan
and visualize all the
requiered Field Dismantling
activities/operations for all
stakeholders and operators.
Easily run «What-If»
scenarios
Use Field Activity Planner
during conference calls/web
meetings with live field
layout design participation
regardless of users
geographical location
Support for Real World
Coordinates and projections
for placement of assets and
distance calculations.
Display 3D Seabed elevation
models, and support for
uploading of xyz coordinate
files for on demand creation
of DEMs
Modules in Development
29. Key benefits
• Powerful and easy collaboration
By providing an unified view of the project, Field Activity Planner
simplifies multi-language, cross-disciplinary communications.
This reduces the opportunity for misunderstandings and
scheduling conflicts, and supports knowledge transfer, online
meeting collaboration and creative problem-solving.
• Better decision making
The solution enables activities to be tracked against the project
plan and any deviation is easily measured. The ability to
perform ‘what-if’ analysis including cost parameters allows the
outcome of decisions to be modelled in a risk-free environment
before taking action in the field.
30. Key benefits
• Reduced risk
Increased visibility allows a safety zone to be established
around the installation, to enable compliance with Health &
Safety Executive requirements. Vessels are prohibited from
entering or remaining in the zone at specified points of the
project.
• Future-proof investment
The solution actively encourages joint development between the
customer and Xvision. As a SaaS solution - upgrades and new
releases are included in the license, automatically giving
licensees ongoing value through added functionality.