The document discusses how building information modeling (BIM) can be used to improve project controls strategies in construction projects. It explains that BIM allows for a single coordinated source of structured information to support all parties involved in a project from design through construction and facility operation. This reduces information loss and improves productivity. BIM models can also be used to simulate the entire building lifecycle from construction through operation. When integrated with decision support systems, BIM can help optimize the selection of sustainable building components and measures through multi-criteria decision making.
11. Innovation of Building Processes
in Syria by Using BIM
Intelligent design information in 3D – ‘model-based
process’; building will be built virtually before
physical building is constructed
New technology and new way of working,
beginning to make an impact to construction
industry (has been used for a while in
manufacturing & engineering industries)
At a strategic level, BIM addresses
many of the industries failures:
waste reduction, value creation
while improving productivity.
Provides a common single and coordinated
source of structured information to support all
parties involved in the delivery process -design,
construct, operation – reducing loss of
information
BIM can be used to demonstrate
the entire building lifecycle from
construction through to facility
operation.
Contains representations of the actual parts
and pieces - includes building shape, design
and construction time, costs, physical
performance, logistics and more
WHAT IS
BIM?
What is BIM ?
11
12. What is BIM?
“a digital representation of physical and functional characteristics of
a facility. As such it serves as a shared knowledge resource for
information about a facility forming a reliable basis for decisions
during its lifecycle from inception onward.”
Building Information ModelingBuilding Information Management
Better Information For Management.
12
13. What is BIM? …Embedded
information (the i in BIM)
13
14. CAD vs. BIM
Task CAD
(hours)
BIM
(hours)
Hours saved Time savings
Schematic 190 90 100 53%
Design development 436 220 216 50%
Construction
documents
1023 815 208 20%
Checking and
coordination
175 16 159 91%
Totals: 1824 1141 683
(Rick Rundel (7),2007)14
15. WHAT IS BIM?
BUILDING INFORMATION MODELING
(BIM)
What is BIM ,, Building Information Modeling,,
15
16. WHAT IS BIM?
B
The “Building” is unhelpful as people start to think of a
“building”. For people working in infrastructure they may
wonder whether “BIM” is relevant
BIM is as relevant to “Infrastructure” and Oil & Gas” as “ Buildings”.
What is BIM ,, Building Information Modeling,,
16
18. WHAT IS BIM?
I
“Information” is a fundamental to BIM. In fact it is the flow and
sharing of structured information that is the central philosophy
of BIM.
What is BIM ,, Building Information Modeling,,
18
19. WHAT IS BIM?
M
There is even a debate as to whether “M” should be for
“Modeling” or for “Management”
The danger with using “Modeling” is that people start to
think purely in terms of a (CAD) model.
BIMarabia
What is BIM ,, Building Information Modeling,,
19
20. 3D: PARAMETRIC AND GEOMETRY INFORMATION
4D: ADDING TIME/SCHEDULE INFORMATION
5D: ADDING COST/BUDGET INFORMATION
6D: ADDING SUSTAINABILITY INFORMATION
7D: ADDING FACILITIES MANAGEMENT INFORMATION
WHAT IS BIM? 4D, 5D, 6D, 7D
6D4D3D 5D 7D
What is BIM ,, Building Information Modeling,,
20
24. - Management
The Human role ,
making sure everybody
collaborates
for the benefits of the project
without any
conflicts of interest.
Right information,
in the right form,
from the right person,
at the right time
BIM
32. ▶ BIM elements are fully parametric
Lego blocks
▶ Lego blocks are [PLACEHOLDERS] for
real-world product data
▶ All Lego blocks must be accounted
for - otherwise model is incomplete
Think of BIM as intelligent Lego
32
33. ▶ Model is complete (No blocks missing)
All Lego blocks accounted for?
33
34. Select the BIM element to access its associated:
• that can store ‘unlimited’ building lifecycle data
● BIM = Document Management System for Buildings
● BIM elements can be used as Smart Folders for “unlimited” data storage
Imagine Lego blocks
✓Real-world products
✓Construction methods
Estimated Costs
✓Actual Costs
✓Manufacturer Info
✓Warranties
✓Maintenance records
✓Specifications
✓Documents
✓Photos
✓Radio Frequency IDs
34
38. Design
team
Rest of your project
team
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Authoring tools Coordination tools
“Traditional BIM” leaves project teams,
information & processes disconnected
How do
I…• View models without special software?
• Link RFIs with objects for resolution of clashes
and issues
How do
I…• Link information into my model for a
complete BIM handover?
• Get an audit trail of decisions made?
How do
I…• Distribute huge BIM files?
• Reduce cycle times on clash
resolution?
• Version control to avoid errors on
out-of-date models?
How do
I…• Access models on my mobile
device?
38
39. Rest of your project
team
Coordination tools
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning
Packages &
Deliverables
Field
Inspections
Handover
Document
Control
RFIs &
change
orders
Bidding &
Tenders
Workflows &
approvals
Commissioning Submittals Field
Inspections
Handover
Native model data
Open BIM, IFC, COBie
The Solution: Aconex “Connected BIM”…
Driving everyone project-wide to participate in BIM
Open
BIM
Handover
Design
team
BIM Collaboration
39
41. Finds issue
on site, checks
BIM model
Resolves issue
on site
Responds with instruction
Receives RFI,
clicks through
to BIM model
Reviews linked
information for
full context
Raises RFI
Informed and connected review cycle
▶ Project-wide access to the model
Contractor Designer /
Engineer
BIM Collaboration
41
52. BIM : RETURN ON INVESTMENT
▶ Dodge Data & Analytics
Five Top-Rated Positive
Impacts of BIM
Respondent
Type
% Rating High
or Very High
Improved Constructability
of Final Design
Contractors 74%
Increased Owner’s
Understanding of
Proposed Design Solutions
Owners 73%
Improved Quality /
Function of Final Design
Engineers 71%
Generated Better
Construction Documents
Owners 70%
Improved Ability to Plan
Construction Phasing and
Logistics
Owners 70%
53. 53
BIM BAM BOOM savings
Time
Benefit
Design Build Manage
1$ 20$ 60$
BIM
Building
Information
Model
BAM
Building
Assembly Model
BOOM!
Building
Operation & Optimisation
Model
Up to 30% saving Cost benefits over 50 years
53
54. ▶ is a mix of science and art that is
used particularly in the process
and infrastructure sectors as a
standalone discipline to control
what are often large and complex
projects with the aim of bringing
the project to a successful
conclusion from the aspect of time,
cost, and quality.
Project Controls
56. Decision making with incomplete information
• in BIM Right information, in the right form, from the right person, at the right time
56
Multiple Criteria Decision Making (MCDM)
59. 59
Integrating Decision Support System
(DSS) and Building Information Modeling
(BIM) to Optimize the Selection of
Sustainable Building Components
Farzad Jalaei, Ahmad Jrade, Mahtab Nassiri
71. 3D Printing
Source: Foster +Partners, UK – NBK Project
Different design options and alternatives
may be easily modeled and changed in
real-time during design based on end users
and/or owner feedback
OPTIONEERING (investigation of alternative designs)
Why BIM ,,Benefits of BIM,,