SlideShare ist ein Scribd-Unternehmen logo
1 von 37
ODOTECHNIKI LTD
CONSULTING ENGINEERS                                                 www.odotechniki.gr


                       UNDERGROUND WORKS




 DESIGN            MODELLING                ANALYSIS            CONSTRUCTION
                                                                 FOLLOW UP

                                 Address: 59, 3 rd September Str. GR 10433, Athens, Greece
                              e-mails: info@odotechniki.gr , odotechniki@odotechniki.gr
                       Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003
ODOTECHNIKI LTD
CONSULTING ENGINEERS                                                         www.odotechniki.gr

                               Geotechnical & Structural experts

    Design, Consulting, Construction Follow Up and Subcontracting Services on:
   • State-of-the-art modelling and analysis;
   • Value Engineering solutions;
   • Design reviews and independent checks;
   • Design of tunnels and underground works;
   • Design of bridges and steel structures;
   • Design of buildings;
   • Design of retaining structures;
   • Design of foundations, embankments, reinforced soil structures, cuts, deep excavations;
   • Analysis and stabilization design of landslides and failures;
   • Analysis of rock fall and rock fall barriers design;
   • Programming and evaluation of geotechnical investigations and monitoring;
   • Geological & geotechnical interpretation reports;
   • Risk analysis in geotechnical and structural projects;
   • CAD services, providing drawings preparation, reinforcement tables and detailing .


                                         Address: 59, 3 rd September Str. GR 10433, Athens, Greece
                                    e-mails: info@odotechniki.gr , odotechniki@odotechniki.gr
                             Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003
UNDERGROUND WORKS




   DESIGN OF
MAJOR PROJECTS




                      STATE OF THE ART DESIGN,
                        MODELLING, ANALYSIS



                                                     CONSTRUCTION FOLLOW-
                                                       UP AND CONSULTING

                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE




              DESIGN OF MAJOR PROJECTS




          ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

• ATTIKO METRO (Athens metro), Geotechnical Consulting for lines 2 & 3, (constructed).
• ATTIKI ODOS (Athens ring road), geotechnical-structural design of bridges, retaining structures, cut
  & covers, tunnels, foundations, buildings, urban development projects, (constructed).
• EGNATIA ODOS, 700km major highway in northern Greece, geotechnical-structural design of
  tunnels, bridges, cut & covers, tunnels, special retaining structures, foundations, high embankments,
  cuts, landslide rehabilitation, (constructed).
• ANCIENT OLYMPIA RING ROAD , geotechnical-structural design, bridges, cut & covers, tunnels,
  special retaining structures, foundations, high embankments, (constructed).
• KORINTHOS-TRIPOLI-KALAMATA Highway,  geotechnical-structural design of bridges, cut &
  covers, tunnels, special retaining structures, foundations, high embankments, cuts, landslide
  rehabilitation, (under construction).
• High speed RAILWAY KORINTHOS-PATRAS,  geotechnical-structural design of bridges, cut &
  covers, tunnels, special retaining structures, foundations, (under construction).
• ATHENS-THESSALONIKI Highway (STYLIDA ring road), geotechnical-structural design of
  bridges, tunnels, special retaining structures, (under construction).
• North Highway of Crete island,  geotechnical-structural design of bridges, cut & covers, tunnels,
  special retaining structures, foundations, (design in progress).
• THESSALONIKI external peripheral highway,  geotechnical-structural design of tunnels, cut &
  covers, special retaining structures, (design in progress).


• Construction follow up consulting for EGNATIA TUNNELS: Veria - Polymilos section, (constructed).
• Construction follow up consulting fro ANCIENT OLYMPIA RING ROAD, (constructed).
• Construction follow up consulting for TRIPOLI-KALAMATA Highway, (constructed).

                          ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

ATTIKO METRO – ATHENS, GREECE – GEOTECHNICAL CONSULTING SERVICES




               ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

             ATTIKI ODOS – ATHENS, GREECE




          ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

          EGNATIA ODOS – NORTHERN GREECE




          ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

   ANCIENT OLYMPIA RING ROAD – PELOPONNESE, GREECE




          ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

KORINTHOS-TRIPOLI-KALAMATA HIGHWAY – PELOPONNESE, GREECE




            ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

KORINTHOS-PATRAS HIGH SPEED RAILWAY – PELOPONNESE, GREECE




            ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE

         STYLIDA RING ROAD – CENTRAL GREECE




          ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS




            STATE OF THE ART DESIGN, MODELLING, ANALYSIS




                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

                                                  TUNNEL DESIGN




                                         3.74 %                       4.62 %
                  3.74 %                                     4.62 %




                           ×È:6+900.20
                           310.82




                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

               2D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION



                                                  Angle 60 o




                                                               Simulation of the discontinuities
   Back analysis of twin tunnel excavation                        in a stratified rock mass




      Simulation of slope tunnels (SRF                 The influence of competent rock mass layer
                 procedure)
                          ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

    3D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION WITH ANCHORS




                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

      3D MODELLING AND INVESTIGATION OF TWIN TUNNEL EXCAVATION




    vertical displacements                                    plastic strain




    vertical displacements                                    plastic strain


                     ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

3D ANALYSIS AND INVESTIGATION OF TUNNEL FACE TREATMENT IN SHALLOW TUNNELS




                                                                                                                          0.000



                                                                                                                          -0.005


Evaluation of different tunnel face treatment
  schemes based on the resulting surface                                                                                  -0.010
                                                uz (m)




  settlements for a shallow urban tunnel
                                                          Unsupported Face
                                                                                                                          -0.015
                                                          Forepoles Φ114/101
                                                          Forepoles Φ159/139
                                                          0.25nails/sqm
                                                          0.40nails/sqm                                                   -0.020
                                                          Forepoles Φ114/101 & 0.25nails/sqm
                                                          Forepoles Φ159/139 & 0.40nails/sqm
                                                                                                                           -0.025
                                                  -4.00   -3.50   -3.00    -2.50   -2.00       -1.50   -1.00   -0.50   0.00
                                                                                   x/D


                               ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

   3D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION WITH FOREPOLING




                                     Bending moment distribution of the forepole umbrella
                                    and influence of the tube length on the bending moment




                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

         3D MODELLING AND ANALYSIS OF TUNNEL’S FINAL LINING




      SIMULATION OF THE GEOMATERIAL TIME-DEPENDENT BEHAVIOUR



                                               εε c r
                                                cr

                                                          Γ ι α σ υ γ κ ε κ ρlevel ο q/q/f q f
                                                                Stress ι μ έ ν q
                                             ε cr,tdt d
                                             ε c r,


                                      0.50ε cr,tdt d
                                       0 .5 ε c r,


                                                          t 5t 0 %                      t
                                                                                        td       tt
                                                             50%                          d

             Creep strains

                   ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

                                                                                                                                                                             PROBABILISTIC ANALYSIS IN TUNNELLING
                                                                                                              Variation of tunnel loads                                                                                                                                                                Reliability analysis of reinforced and unreinforced
                                                                                                                                                                                                                                                                                                       FL
Load coefficient ε τofβ λvariation p Vp) (%)




                                                     1 0 0 .0                                                                                                                                                                                                                                                               4 .0
                                                                                                                                                          Convergence - Confinement Method




                                                                                                                                                                                                                                                              Ε π ι μ Tunnelν τloadsς partial φ factor γ p , r e q
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          EC
                                                                                                                                                                                                                                                                                                                                                                                                        Reinforced final lining                                           β = 5 .6 1   (p f   = 1 0 -8 )
                                                                                                                                                              Monte - Carlo Simulation
     Σ υ ν τε λ ε σ τ ή ς μ α η τό τη τ α ς , V (%




                                                                                                                                                                                                                                                                                                                                                                                                                                                                          β = 5 .2 0   (p f   = 1 0 -7 )




                                                                                                                                                                                                                                                                      έ ρ ο υ ς σ υ ε λ ε σ τ ή μ ό ν ιμ ω ν ο ρ τ ίω ν ,
                                                      8 0 .0                                                                                                                                                                                                                                                                3 .5
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          β = 4 .7 5   (p f   = 1 0 -6 )
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          β = 4 .2 6   (p f   = 1 0 -5 )
                                                                                                                                                                                                                                                                                                                            3 .0
                                                      6 0 .0


                                                                                                                                                                                                                                                                                                                            2 .5
                                                      4 0 .0


                                                                                                                                                                                                                                                                                                                            2 .0
                                                      2 0 .0

                                                                                                                                                                                                                                                                                                                            1 .5
                                                        0 .0                                                                                                                                                                                                                                                                       γ g ,E C = 1 .3 5
                                                           0 .0 0                                    0 .1 0                                      0 .2 0                 0 .3 0                   0 .4 0                   0 .5 0            0 .6 0
                                                                                                                                                   Μ έ σ ο α ν η γ μ έ ν ο φ ο ρ τ ίο , m p /p                                                                                                                              1 .0
                                                                                                                                            Mean tunnel load m p /p o,m
                                                                                                                                                                  o
                                                                                                                                                                                                                                                                                                                               0 .0 0                                          0 .2 5                 0 .5 0                  0 .7 5                 1 .0 0               1 .2 5                       1 .5 0
                                                                                                                                                                                                                                                                                                                                                                                        Α ν η γ μ έ ν η α ξ ο ν ικ ή δ ύ ν α μ η ν d (Γ ια V p = 1 0 % & γ p = 1 .3 5 )
                                                                                                                                                                                                                                                                                                                                                                                         Normalized final lining axial force
                                                                                       6 5 0 .0                                                   8 .0 0                                                                                                                                                                                                              8 .0 0
                                                                                                         Point Estimation Method                                                                                                                              (a )                                                                                                                                            Unreinforced final lining                                            (b )
                                                                                       6 0 0 .0                                                                                                                      m a x im u m
                                                                                                                                                  7 .5 0                                                                                                                                                                                                              7 .0 0
                                                                                       5 5 0 .0
                                                            tunnell load ((kPa)
                                                             tu n n e lo a d k P a )




                                                                                                                                                                                                                                                                                                                                                                                                      e /h
                                                                                                                                                  7 .0 0                                                                                                                                                                                                              6 .0 0




                                                                                                                                                                                                                                                                                                                                        r eReliability i index ββ )
                                                                                                               r e lia b ilit y in d e x ( β )




                                                                                       5 0 0 .0




                                                                                                                                                                                                                                                                                                                                           lia b ility n d e x (




                                                                                                                                                                                                                                                                                                                                                                                                        UC
                                                                                                                                                                          average




                                                                                                                                                                                                                                                                                                                                                                                                            =0
                                                                                       4 5 0 .0                                                   6 .5 0                                                                                                                                                                                                              5 .0 0




                                                                                                                                                                                                                                                                                                                                                                                                               .1 0
                                                                                       4 0 0 .0                                                   6 .0 0                                                                                                                                                                                                              4 .0 0
                                                                                                                                                                                                                                            γ C = 1 .8 0




                                                                                                                                                                                                                                                                                                                                                                                                     e/
                                                                                                              m in im u m




                                                                                                                                                                                                                                                                                                                                                                                                      h
                                                                                       3 5 0 .0                                                   5 .5 0                                                                                                                                                                                                              3 .0 0




                                                                                                                                                                                                                                                                                                                                                                                                       UC
                                                                                                                                                                                                                                                                                                                                                                                                           =0
                                                                                       3 0 0 .0




                                                                                                                                                                                                                                                                                                                                                                                                                .2
                                                                                                                                                  5 .0 0                                                                                                                                                                                                              2 .0 0




                                                                                                                                                                                                                                                                                                                                                                                                                  0
                                                                                                                                                                                                                                            γ C = 1 .5 0                                                                                                                                 e /h
                                                                                       2 5 0 .0
                                                                                                  0 .0                                           9 40 . .50 0               1 8 0 .0                      2 7 0 .0                   3 6 0 .0                                                                                                                                                   UC   = 0 .3 0
                                                                                                                                                                                                                                                                                                                                                                      1 .0 0
                                                                                                                                                                       aAngle ( (o )
                                                                                                                                                                         n g le )
                                                                                                                                                  4 .0 0                                                                                                                                                                                                              0 .0 0
                                                                                                                                                       0 .0 0              0 .1 0            0 .2 0             0 .3 0             0 .4 0            0 .5 0                                                0 .6 0                                                          0 .0 0           0 .1 0             0 .2 0            0 .3 0            0 .4 0             0 .5 0            0 .6 0
                                                                                                                                                                                                                 V    P
                                                                                                                                                                                                                                                                                                                                                                                                                    V
                                                                                                                                                                                                                                                                                                                                                                                                        Coefficient of Pvariation V p


                                                                                                                                                                                  ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

     EXPERIENCE ON GEOTECHNICAL AND TUNNEL DATA BASE DEVELOPMENT




Associates,    Prountzopoulos,     G. &   Fortsakis,  P.,
Participated in the Research on the behaviour of
geomaterials during the construction of the Egnatia Odos
tunnels and on the factors defining the final cost of
construction (Egnatia Odos S.A.) .

Marinos, V., Prountzopoulos, G., Fortsakis, P., Koumoutsakos, D. & Papouli, D. (2012) ,
Tunnel Information and Analysis System: A geotechnical database for tunnels .
Geotechnical and Geological Engineering . doi: 10.1007/s10706-012-9570.


                       ODOTECHNIKI LTD – CONSULTING ENGINEERS
DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS

                TUNNEL AND CULVERT REHABILITATION




                 ODOTECHNIKI LTD – CONSULTING ENGINEERS
ON SITE FOLLOW UP ENHANCES COMPANY’S RELIABILITY & EXPERIENCE




            CONSTRUCTION FOLLOW-UP AND CONSULTING




               ODOTECHNIKI LTD – CONSULTING ENGINEERS
CONSTRUCTION FOLLOW-UP AND CONSULTING

     DETAILED CONSTRUCTION DESIGN




   ODOTECHNIKI LTD – CONSULTING ENGINEERS
CONSTRUCTION FOLLOW-UP AND CONSULTING

DETAILED CONSTRUCTION DESIGN AND ON-SITE SUPPORT




        ODOTECHNIKI LTD – CONSULTING ENGINEERS
CONSTRUCTION FOLLOW-UP AND CONSULTING

                                                                                                                                                                                          DETAILED CONSTRUCTION DESIGN AND ON-SITE SUPPORT
                                                                                                                                                                                                                         125 14 10        4.67

                                                                                                                                                                                                                            125 16 10           12.00

                                                                                                                                                                                                                             4 14        12.00




                                                                                                                                                                                                                                                   +7.80




                                                                                                                                                                                                                                                                                                                                                                                   2.
                                                                                                 04                                                                                                                                                                                                                                                                                     04
                                                                                            2.
                                                                                                                                                                                                          0.15
                                                                                                                                                                                                   0.46

                                                                                                                                                                                            0.15
                                                                                                                                                                                             2821 12 30/40       0.76
    14.00
       10




                                                                                                                                                                                                                                                                                                                                                                                                                                                                        125 14
125 14
7.21




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            7.21
                                                                                 Ü
                                                                       óôçí ð áñåé




                                                                                                                                                                                                                                                                                                                                                                                                     (2x2)




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                10
                                                                               5
                                                                    10.65-10.2
                           10




                                                                                                                                                                                                                                                                                                                                                                                                    7.56-7.1
                                                                            6




                                                                                                                                                                                                                                                                                                                                                                                                                                                    125 14
                                                                                                                                                                                                                                                                                                                                                                                                      4 14
                   125 14




                                                                   7.56-7.1
                      9.50




                                                                                                                                                                                                                                                                                                                                                                                                                                                                               14.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 7.46
            7.46




                                                                                                                                                                                                                                                                                                                                                                                                                                                       9.50
                                                                                                                                                                                                                                                                                                                                                                                                         10.65-1
                                                           (2x2) 4 14




                                                                                                                                                                                                                                                                                                                                                                                                            óôçí ð
                                                                                                                                                                                                                                                                                                                                                                                                             6




                                                                                                                                                                                                                                                                                                                                                                                                                                                            10
                                                                                                                                                                                                                                                                                                                                                                                                                 0.25
                                                                                                                                                                                                                                                                                                                                                                                                                   áñåé
                                                                                                                                                                                                                                                                                                                                                                                                                      Ü
                                                                                                                                                                                                                                                 +0.98




                                                                                                                                                                                                                                                              +0.40




                                                                                                                                                                                                                               ± 0.00




                                                                                                                                                 0.15
                                                                                                                        0.46-0.20

                                                                                                                0.15
                                                                                                                 124 12 30/40 (62x2)
                                                                                                                    0.76-0.50




             0.60




                                                                                                                                                                                                                                                                                                                                                                                                                                             1.15
                                1.15




                                                                                                                                                                                                                                                                                                                                                                                                                                                             0.60
                   1.00




                                                                                                                                                                                                                                                                                                                                                                                                                                                      1.00
                                                                                                                                                                                 -1.83                                                                                       -1.83                                                                                                                                                                        125 14 10
                                                                                     1.25                                                                                                                                                                                                                                                                                                    1.25                                                            2.40
                                  0.25      125 14 10                 2.40                                                                                                                                                                                                                                                                                                                                                                 0.25




                                                                                                                                                                                                                                                                                                                                                                                                                                    2.00
                                         2.00




                                                 250 28 10
                                                    2.40
                                                                                                                                                                                                                                                     -2.81                                                                                                                                                   250 28 10
                                                                                                                                                                                                                                                                                                                                                                                                                2.40


                                                 0.4                                                                                                                                                                                                                                                                                                                                                                            0
                                                       0                                                                                                                                                                                                                                                                                                                                                                  0.4




                                                                                                             125 18 10                    6.00                                                                                                     -3.41                                                                       125 18 10                 6.00
                                                                                                                 1.74                                                                                                                                                                                                                  1.74
                                                                                                                                                            1.04




                                                                                                                                                                                                                                                                                                     1.04




                                                                                                                                                                                                                                                                                                                                                                       535   16    1.75
                                                                                                                                                                                                                                                                                                                                                                         0.35
                                                                                                                                                                   1.04




                                                                                                                                                                                                                                                                                              1.04




                                                                                                      1.85                                                                                                                                                                                                                                             1.85
                                                                                                                                                                                                                                                                                                                                                                0.49              0.49



                                                                                                                                                         0.33                                                                                                                                          0.33                                                     0.21              0.21



                                                                                                                   1.26                                                                                                                                                                                                        1.26




                                                                                                                                                                                                                              êÜô 125 20 10
                                                                                                                                                                                                                                 ù                         14.00
                                                                                                                                                                                                                                         11.48




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       0.02           0.05     0.02




                                                                                                                                                                                                                         åóù ô êÜ 130 14 10
                                                                                                                                                                                                                              åñé                          12.00

                                                                                                                                                                                                                         åóù ô êÜ 150 12 10 (2x75)
                                                                                                                                                                                                                              åñé                                  12.00

                                                                                                                                                                          1.77
                                                                                                                                                                                                                                                                                            1.77
                                                                                                                                                                                                                                                                                                                               0.46-0.20




                                                                                                                                                        532 12 10 (266x2)          4.00
                                                                                                                                0.46




                                                                                                                                                                                                                                                                                     28 12 10 [(7x2)x2]            4.00-3.74

                                                                                                                                                                          1.77                                                                                                               1.77



                                                                                                                                                                                                                        åî ù ôåñé 300 12 10 (9x2+282)
                                                                                                                                                                                                                                êÜ                                   12.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       0.015




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      0.02
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               0.02          0.02
                                                                                                                                                                                                                                                                                                            1.20
                                                                                                                                                                                                                                                                                                                                           1.65-0.80




                                                                                                                                                           1.20                                                                                                                                             36 12 10 (9x2)x2
                                                                                                                                                                                                                                                                                                               4.05-3.20
                                                                                                                              1.04-0.20




                                                                                                                                                 68 12 10 (17x2)x2
                                                                                                                                                   3.44-2.60

                                                                                                                                                           1.20                                                                                                                                             1.20
                                                                                                                                                                                                                                Üí ù 54 12 10 (27x2)                 12.00




                                                                                                                                                                                                                               Üí ù 108 12 10              13.30
                                                                                                                                                                                                                                        12.40
                                                                                                                                                                                                                                                                                                                               0.45
                                                                                                                       0.45




                                                                                                                                                                                                                                                                                                                                           0.45
                                                                                                                                0.45




                                                                                                                                                                                                                                 êÜô 152 12 10
                                                                                                                                                                                                                                    ù                         13.30
                                                                                                                                                                                                                                        12.40




                                                                                                                                                                                                                                 Üí ù 125 18 10              12.80

                                                                                                                                                                                                                                    4   14 (2x2)         12.00




                                                                                                                                                                                                                                        ODOTECHNIKI LTD – CONSULTING ENGINEERS
CONSTRUCTION FOLLOW-UP AND CONSULTING

             ON-SITE SUPPORT




   ODOTECHNIKI LTD – CONSULTING ENGINEERS
HUMAN RESOURSES OF ODOTECHNIKI LTD




  ODOTECHNIKI LTD – CONSULTING ENGINEERS
PARTNER AND DIRECTOR OF ODOTECHNIKI LTD

                 KONSTANTINOS SEFEROGLOU, Geotechnical Engineer, M.Sc.




                          www.linkedin.com/pub/konstantinos-seferoglou/2b/286/a

Areas of expertise:
•Extensive conceptual design experience on civil engineering, mainly infrastructure projects;
•Extensive experience in team leadership and support of multidiscipline groups;
•Geotechnical investigation, monitoring programming and evaluation;
•Tunnelling, tunnel portal analysis & design, cut & cover design;
•Slope stabilization, retaining structures, rock fall protection design;
•Assessment of slide stabilization and design of remedial measures;
•Embankment design, earthworks reconstruction and upgrade;
•Bridge foundation and deep foundation design;
•Construction follow up consulting & value engineering;
•Client and authorities communication skills;
•Total design management and coordination.
                              ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                        PETROS FORTSAKIS, Geotechnical Engineer, Ph.D.




                              www.linkedin.com/pub/petros-fortsakis/24/a7a/368

Areas of expertise:
•Geotechnical analysis and design with emphasis on infrastructure projects, mainly focused on evaluation of
geotechnical investigation data, tunnel design, foundation design, landslide rehabilitation, slope stability;
•Non-linear numerical analyses (2D & 3D) for the simulation of complex geotechnical environment and
construction procedures;
•Development of geotechnical database for the storage and evaluation of geotechnical, design, construction
and monitoring data;
•Risk analysis in geotechnical projects (sensitivity analysis, probabilistic analysis, reliability based design);
•Structural design of conventional structures.




                              ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                GEORGIOS PROUNTZOPOULOS, Geotechnical Engineer, Ph.D.




                                    www.linkedin.com/in/prountzopoulos

Areas of expertise:
•Design of tunnels with focus on the specific engineering geological and geotechnical behaviour of rock and
soil formations;
•Tunnel face stability, tunnel face reinforcement and protection design, using rational methods, with focus on
face nailing and steel tube umbrella in shallow tunnels;
•Numerical analyses with the use of finite element codes;
•Evaluation of geotechnical investigation data for rocks and soils;
•Design of geotextile reinforced soil structures, for use in road and rail embankments, retaining structures,
bridge foundations;
•Landslide rehabilitation;
•Stability of big scale slope cuts in large open mines;
•Risk assessment associated with civil engineering works due to rock falls and landslides in highways and
secondary roads.
                             ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                  FRAGISKOS CHRYSOHOIDIS, Engineering Geologist, M.Sc.




                         www.linkedin.com/pub/fragiskos-chrysohoidis/48/808/a59

Areas of expertise:
•Geotechnical Investigation | Planning, Supervision & Evaluation;
•Geological and Geotechnical Design (field and desk work);
•Geotechnical Monitoring | Scheduling and Assessment.




                             ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                    ISABELLA VASSILOPOULOU, Structural Engineer, Ph.D.




                         www.linkedin.com/pub/isabella-vassilopoulou/46/871/304

Areas of expertise:
•Structural analysis and design with emphasis on infrastructure design;
•Resistance of the structural system, the elements and the cross-sections;
•Investigation and solution proposal for earthquake-resistant design with real life experience in the local
industry planning and execution;
•Involvement in analysis and design of structures under extreme loading conditions, including both seismic
and wind settings;
•Inspection and assessment of nonlinear static and dynamic structural behaviour. Concentration on tension
structures with the engagement of finite element method;
•Preparation or supervision of construction drawings.




                             ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                                EVA XENOU, Structural Engineer, M.Sc.




                                 www.linkedin.com/pub/eva-xenou/46/3bb/b00

Areas of expertise:
Structural analysis and design of structures (mainly infrastructure related civil engineering projects) including:
•3D modelling and linear/non-linear numerical analyses;
•Resistance of the structural system, the elements and the cross-sections;
•Static analysis of structures under permanent, live, accidental, thermal and ground-settlement loads;
•Dynamic analysis of structures under seismic combinations;
•Foundation bearing capacity;
•Preparation or supervision of construction drawings.




                               ODOTECHNIKI LTD – CONSULTING ENGINEERS
ASSOCIATES OF ODOTECHNIKI LTD

                              LEFTERIS CHRISOS, Structural Engineer




                              www.linkedin.com/pub/lefteris-chrisos/53/26/353

Areas of expertise:
•Structural analysis and design of structures;
•3D modelling and linear/non-linear numerical analyses;
•Extensive experience on structural analysis and design of metro stations, buildings and bridges;
•Dynamic analysis of structures under seismic combinations;
•Preparation or supervision of construction drawings.




                             ODOTECHNIKI LTD – CONSULTING ENGINEERS
ODOTECHNIKI LTD
CONSULTING ENGINEERS                                                      www.odotechniki.gr




                 CONTACT US FOR MORE INFORMATION

              Address: 59, 3 rd September Str. GR 10433, Athens, Greece
             e-mails: info@odotechniki.gr, odotechniki@odotechniki.gr
          Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003

Weitere ähnliche Inhalte

Ähnlich wie Odotechniki ltd underground works

Ähnlich wie Odotechniki ltd underground works (14)

Odotechniki Ltd - Geotechnical & Structural Consulting
Odotechniki Ltd - Geotechnical & Structural ConsultingOdotechniki Ltd - Geotechnical & Structural Consulting
Odotechniki Ltd - Geotechnical & Structural Consulting
 
Odotechniki Ltd - Geotechnical and Structural Consulting Engineers
Odotechniki Ltd  - Geotechnical and Structural Consulting EngineersOdotechniki Ltd  - Geotechnical and Structural Consulting Engineers
Odotechniki Ltd - Geotechnical and Structural Consulting Engineers
 
KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016KONSTANTINOS SEFEROGLOU CV_2016
KONSTANTINOS SEFEROGLOU CV_2016
 
2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf2022_03_PRESENTAZIONE L.L.F..pdf
2022_03_PRESENTAZIONE L.L.F..pdf
 
ultrasonic in endodontic
ultrasonic in endodonticultrasonic in endodontic
ultrasonic in endodontic
 
Syntosis vasileios.
Syntosis vasileios.Syntosis vasileios.
Syntosis vasileios.
 
Syntosis Vasileios.
Syntosis Vasileios.Syntosis Vasileios.
Syntosis Vasileios.
 
IRJET- Harmonic Analysis of Cantilever Beam with and without Cracks
IRJET- Harmonic Analysis of Cantilever Beam with and without CracksIRJET- Harmonic Analysis of Cantilever Beam with and without Cracks
IRJET- Harmonic Analysis of Cantilever Beam with and without Cracks
 
State of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical DesignState of the Art and Practice Geotechnical Design
State of the Art and Practice Geotechnical Design
 
pipe line inspection robot ppt
pipe line inspection robot pptpipe line inspection robot ppt
pipe line inspection robot ppt
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
intro. civil_engineering(1).ppt
intro. civil_engineering(1).pptintro. civil_engineering(1).ppt
intro. civil_engineering(1).ppt
 
Capitulo 02 grupo 01
Capitulo 02 grupo 01Capitulo 02 grupo 01
Capitulo 02 grupo 01
 
Resume Principal Consultant Soilsrock
Resume Principal Consultant SoilsrockResume Principal Consultant Soilsrock
Resume Principal Consultant Soilsrock
 

Kürzlich hochgeladen

Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...ZurliaSoop
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样yhavx
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024Ilham Brata
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...Amil baba
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipNitya salvi
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Websitemark11275
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement 210303105569
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...HyderabadDolls
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...gajnagarg
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxNikhil Raut
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...gargpaaro
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证eqaqen
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样awasv46j
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...drmarathore
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证ehyxf
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKMarekMitek1
 

Kürzlich hochgeladen (20)

Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
Jual Obat Aborsi Bandung ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan ...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
Madhyamgram \ (Genuine) Escort Service Kolkata | Service-oriented sexy call g...
 
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In fatehgarh [ 7014168258 ] Call Me For Genuine Models...
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
Mohanlalganj ! Call Girls in Lucknow - 450+ Call Girl Cash Payment 9548273370...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
Abortion pills in Kuwait 🚚+966505195917 but home delivery available in Kuwait...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 

Odotechniki ltd underground works

  • 1. ODOTECHNIKI LTD CONSULTING ENGINEERS www.odotechniki.gr UNDERGROUND WORKS DESIGN MODELLING ANALYSIS CONSTRUCTION FOLLOW UP Address: 59, 3 rd September Str. GR 10433, Athens, Greece e-mails: info@odotechniki.gr , odotechniki@odotechniki.gr Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003
  • 2. ODOTECHNIKI LTD CONSULTING ENGINEERS www.odotechniki.gr Geotechnical & Structural experts Design, Consulting, Construction Follow Up and Subcontracting Services on: • State-of-the-art modelling and analysis; • Value Engineering solutions; • Design reviews and independent checks; • Design of tunnels and underground works; • Design of bridges and steel structures; • Design of buildings; • Design of retaining structures; • Design of foundations, embankments, reinforced soil structures, cuts, deep excavations; • Analysis and stabilization design of landslides and failures; • Analysis of rock fall and rock fall barriers design; • Programming and evaluation of geotechnical investigations and monitoring; • Geological & geotechnical interpretation reports; • Risk analysis in geotechnical and structural projects; • CAD services, providing drawings preparation, reinforcement tables and detailing . Address: 59, 3 rd September Str. GR 10433, Athens, Greece e-mails: info@odotechniki.gr , odotechniki@odotechniki.gr Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003
  • 3. UNDERGROUND WORKS DESIGN OF MAJOR PROJECTS STATE OF THE ART DESIGN, MODELLING, ANALYSIS CONSTRUCTION FOLLOW- UP AND CONSULTING ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 4. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE DESIGN OF MAJOR PROJECTS ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 5. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE • ATTIKO METRO (Athens metro), Geotechnical Consulting for lines 2 & 3, (constructed). • ATTIKI ODOS (Athens ring road), geotechnical-structural design of bridges, retaining structures, cut & covers, tunnels, foundations, buildings, urban development projects, (constructed). • EGNATIA ODOS, 700km major highway in northern Greece, geotechnical-structural design of tunnels, bridges, cut & covers, tunnels, special retaining structures, foundations, high embankments, cuts, landslide rehabilitation, (constructed). • ANCIENT OLYMPIA RING ROAD , geotechnical-structural design, bridges, cut & covers, tunnels, special retaining structures, foundations, high embankments, (constructed). • KORINTHOS-TRIPOLI-KALAMATA Highway,  geotechnical-structural design of bridges, cut & covers, tunnels, special retaining structures, foundations, high embankments, cuts, landslide rehabilitation, (under construction). • High speed RAILWAY KORINTHOS-PATRAS,  geotechnical-structural design of bridges, cut & covers, tunnels, special retaining structures, foundations, (under construction). • ATHENS-THESSALONIKI Highway (STYLIDA ring road), geotechnical-structural design of bridges, tunnels, special retaining structures, (under construction). • North Highway of Crete island,  geotechnical-structural design of bridges, cut & covers, tunnels, special retaining structures, foundations, (design in progress). • THESSALONIKI external peripheral highway,  geotechnical-structural design of tunnels, cut & covers, special retaining structures, (design in progress). • Construction follow up consulting for EGNATIA TUNNELS: Veria - Polymilos section, (constructed). • Construction follow up consulting fro ANCIENT OLYMPIA RING ROAD, (constructed). • Construction follow up consulting for TRIPOLI-KALAMATA Highway, (constructed). ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 6. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE ATTIKO METRO – ATHENS, GREECE – GEOTECHNICAL CONSULTING SERVICES ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 7. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE ATTIKI ODOS – ATHENS, GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 8. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE EGNATIA ODOS – NORTHERN GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 9. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE ANCIENT OLYMPIA RING ROAD – PELOPONNESE, GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 10. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE KORINTHOS-TRIPOLI-KALAMATA HIGHWAY – PELOPONNESE, GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 11. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE KORINTHOS-PATRAS HIGH SPEED RAILWAY – PELOPONNESE, GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 12. PARTICIPATION IN MAJOR UNDERGROUND WORKS IN GREECE STYLIDA RING ROAD – CENTRAL GREECE ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 13. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS STATE OF THE ART DESIGN, MODELLING, ANALYSIS ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 14. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS TUNNEL DESIGN 3.74 % 4.62 % 3.74 % 4.62 % ×È:6+900.20 310.82 ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 15. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 2D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION Angle 60 o Simulation of the discontinuities Back analysis of twin tunnel excavation in a stratified rock mass Simulation of slope tunnels (SRF The influence of competent rock mass layer procedure) ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 16. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 3D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION WITH ANCHORS ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 17. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 3D MODELLING AND INVESTIGATION OF TWIN TUNNEL EXCAVATION vertical displacements plastic strain vertical displacements plastic strain ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 18. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 3D ANALYSIS AND INVESTIGATION OF TUNNEL FACE TREATMENT IN SHALLOW TUNNELS 0.000 -0.005 Evaluation of different tunnel face treatment schemes based on the resulting surface -0.010 uz (m) settlements for a shallow urban tunnel Unsupported Face -0.015 Forepoles Φ114/101 Forepoles Φ159/139 0.25nails/sqm 0.40nails/sqm -0.020 Forepoles Φ114/101 & 0.25nails/sqm Forepoles Φ159/139 & 0.40nails/sqm -0.025 -4.00 -3.50 -3.00 -2.50 -2.00 -1.50 -1.00 -0.50 0.00 x/D ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 19. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 3D MODELLING AND ANALYSIS OF TUNNEL EXCAVATION WITH FOREPOLING Bending moment distribution of the forepole umbrella and influence of the tube length on the bending moment ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 20. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS 3D MODELLING AND ANALYSIS OF TUNNEL’S FINAL LINING SIMULATION OF THE GEOMATERIAL TIME-DEPENDENT BEHAVIOUR εε c r cr Γ ι α σ υ γ κ ε κ ρlevel ο q/q/f q f Stress ι μ έ ν q ε cr,tdt d ε c r, 0.50ε cr,tdt d 0 .5 ε c r, t 5t 0 % t td tt 50% d Creep strains ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 21. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS PROBABILISTIC ANALYSIS IN TUNNELLING Variation of tunnel loads Reliability analysis of reinforced and unreinforced FL Load coefficient ε τofβ λvariation p Vp) (%) 1 0 0 .0 4 .0 Convergence - Confinement Method Ε π ι μ Tunnelν τloadsς partial φ factor γ p , r e q EC Reinforced final lining β = 5 .6 1 (p f = 1 0 -8 ) Monte - Carlo Simulation Σ υ ν τε λ ε σ τ ή ς μ α η τό τη τ α ς , V (% β = 5 .2 0 (p f = 1 0 -7 ) έ ρ ο υ ς σ υ ε λ ε σ τ ή μ ό ν ιμ ω ν ο ρ τ ίω ν , 8 0 .0 3 .5 β = 4 .7 5 (p f = 1 0 -6 ) β = 4 .2 6 (p f = 1 0 -5 ) 3 .0 6 0 .0 2 .5 4 0 .0 2 .0 2 0 .0 1 .5 0 .0 γ g ,E C = 1 .3 5 0 .0 0 0 .1 0 0 .2 0 0 .3 0 0 .4 0 0 .5 0 0 .6 0 Μ έ σ ο α ν η γ μ έ ν ο φ ο ρ τ ίο , m p /p 1 .0 Mean tunnel load m p /p o,m o 0 .0 0 0 .2 5 0 .5 0 0 .7 5 1 .0 0 1 .2 5 1 .5 0 Α ν η γ μ έ ν η α ξ ο ν ικ ή δ ύ ν α μ η ν d (Γ ια V p = 1 0 % & γ p = 1 .3 5 ) Normalized final lining axial force 6 5 0 .0 8 .0 0 8 .0 0 Point Estimation Method (a ) Unreinforced final lining (b ) 6 0 0 .0 m a x im u m 7 .5 0 7 .0 0 5 5 0 .0 tunnell load ((kPa) tu n n e lo a d k P a ) e /h 7 .0 0 6 .0 0 r eReliability i index ββ ) r e lia b ilit y in d e x ( β ) 5 0 0 .0 lia b ility n d e x ( UC average =0 4 5 0 .0 6 .5 0 5 .0 0 .1 0 4 0 0 .0 6 .0 0 4 .0 0 γ C = 1 .8 0 e/ m in im u m h 3 5 0 .0 5 .5 0 3 .0 0 UC =0 3 0 0 .0 .2 5 .0 0 2 .0 0 0 γ C = 1 .5 0 e /h 2 5 0 .0 0 .0 9 40 . .50 0 1 8 0 .0 2 7 0 .0 3 6 0 .0 UC = 0 .3 0 1 .0 0 aAngle ( (o ) n g le ) 4 .0 0 0 .0 0 0 .0 0 0 .1 0 0 .2 0 0 .3 0 0 .4 0 0 .5 0 0 .6 0 0 .0 0 0 .1 0 0 .2 0 0 .3 0 0 .4 0 0 .5 0 0 .6 0 V P V Coefficient of Pvariation V p ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 22. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS EXPERIENCE ON GEOTECHNICAL AND TUNNEL DATA BASE DEVELOPMENT Associates, Prountzopoulos, G. & Fortsakis, P., Participated in the Research on the behaviour of geomaterials during the construction of the Egnatia Odos tunnels and on the factors defining the final cost of construction (Egnatia Odos S.A.) . Marinos, V., Prountzopoulos, G., Fortsakis, P., Koumoutsakos, D. & Papouli, D. (2012) , Tunnel Information and Analysis System: A geotechnical database for tunnels . Geotechnical and Geological Engineering . doi: 10.1007/s10706-012-9570. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 23. DESIGN, MODELLING, ANALYSIS AND CONSULTING FOR UNDERGROUND WORKS TUNNEL AND CULVERT REHABILITATION ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 24. ON SITE FOLLOW UP ENHANCES COMPANY’S RELIABILITY & EXPERIENCE CONSTRUCTION FOLLOW-UP AND CONSULTING ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 25. CONSTRUCTION FOLLOW-UP AND CONSULTING DETAILED CONSTRUCTION DESIGN ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 26. CONSTRUCTION FOLLOW-UP AND CONSULTING DETAILED CONSTRUCTION DESIGN AND ON-SITE SUPPORT ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 27. CONSTRUCTION FOLLOW-UP AND CONSULTING DETAILED CONSTRUCTION DESIGN AND ON-SITE SUPPORT 125 14 10 4.67 125 16 10 12.00 4 14 12.00 +7.80 2. 04 04 2. 0.15 0.46 0.15 2821 12 30/40 0.76 14.00 10 125 14 125 14 7.21 7.21 Ü óôçí ð áñåé (2x2) 10 5 10.65-10.2 10 7.56-7.1 6 125 14 4 14 125 14 7.56-7.1 9.50 14.00 7.46 7.46 9.50 10.65-1 (2x2) 4 14 óôçí ð 6 10 0.25 áñåé Ü +0.98 +0.40 ± 0.00 0.15 0.46-0.20 0.15 124 12 30/40 (62x2) 0.76-0.50 0.60 1.15 1.15 0.60 1.00 1.00 -1.83 -1.83 125 14 10 1.25 1.25 2.40 0.25 125 14 10 2.40 0.25 2.00 2.00 250 28 10 2.40 -2.81 250 28 10 2.40 0.4 0 0 0.4 125 18 10 6.00 -3.41 125 18 10 6.00 1.74 1.74 1.04 1.04 535 16 1.75 0.35 1.04 1.04 1.85 1.85 0.49 0.49 0.33 0.33 0.21 0.21 1.26 1.26 êÜô 125 20 10 ù 14.00 11.48 0.02 0.05 0.02 åóù ô êÜ 130 14 10 åñé 12.00 åóù ô êÜ 150 12 10 (2x75) åñé 12.00 1.77 1.77 0.46-0.20 532 12 10 (266x2) 4.00 0.46 28 12 10 [(7x2)x2] 4.00-3.74 1.77 1.77 åî ù ôåñé 300 12 10 (9x2+282) êÜ 12.00 0.015 0.02 0.02 0.02 1.20 1.65-0.80 1.20 36 12 10 (9x2)x2 4.05-3.20 1.04-0.20 68 12 10 (17x2)x2 3.44-2.60 1.20 1.20 Üí ù 54 12 10 (27x2) 12.00 Üí ù 108 12 10 13.30 12.40 0.45 0.45 0.45 0.45 êÜô 152 12 10 ù 13.30 12.40 Üí ù 125 18 10 12.80 4 14 (2x2) 12.00 ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 28. CONSTRUCTION FOLLOW-UP AND CONSULTING ON-SITE SUPPORT ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 29. HUMAN RESOURSES OF ODOTECHNIKI LTD ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 30. PARTNER AND DIRECTOR OF ODOTECHNIKI LTD KONSTANTINOS SEFEROGLOU, Geotechnical Engineer, M.Sc. www.linkedin.com/pub/konstantinos-seferoglou/2b/286/a Areas of expertise: •Extensive conceptual design experience on civil engineering, mainly infrastructure projects; •Extensive experience in team leadership and support of multidiscipline groups; •Geotechnical investigation, monitoring programming and evaluation; •Tunnelling, tunnel portal analysis & design, cut & cover design; •Slope stabilization, retaining structures, rock fall protection design; •Assessment of slide stabilization and design of remedial measures; •Embankment design, earthworks reconstruction and upgrade; •Bridge foundation and deep foundation design; •Construction follow up consulting & value engineering; •Client and authorities communication skills; •Total design management and coordination. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 31. ASSOCIATES OF ODOTECHNIKI LTD PETROS FORTSAKIS, Geotechnical Engineer, Ph.D. www.linkedin.com/pub/petros-fortsakis/24/a7a/368 Areas of expertise: •Geotechnical analysis and design with emphasis on infrastructure projects, mainly focused on evaluation of geotechnical investigation data, tunnel design, foundation design, landslide rehabilitation, slope stability; •Non-linear numerical analyses (2D & 3D) for the simulation of complex geotechnical environment and construction procedures; •Development of geotechnical database for the storage and evaluation of geotechnical, design, construction and monitoring data; •Risk analysis in geotechnical projects (sensitivity analysis, probabilistic analysis, reliability based design); •Structural design of conventional structures. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 32. ASSOCIATES OF ODOTECHNIKI LTD GEORGIOS PROUNTZOPOULOS, Geotechnical Engineer, Ph.D. www.linkedin.com/in/prountzopoulos Areas of expertise: •Design of tunnels with focus on the specific engineering geological and geotechnical behaviour of rock and soil formations; •Tunnel face stability, tunnel face reinforcement and protection design, using rational methods, with focus on face nailing and steel tube umbrella in shallow tunnels; •Numerical analyses with the use of finite element codes; •Evaluation of geotechnical investigation data for rocks and soils; •Design of geotextile reinforced soil structures, for use in road and rail embankments, retaining structures, bridge foundations; •Landslide rehabilitation; •Stability of big scale slope cuts in large open mines; •Risk assessment associated with civil engineering works due to rock falls and landslides in highways and secondary roads. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 33. ASSOCIATES OF ODOTECHNIKI LTD FRAGISKOS CHRYSOHOIDIS, Engineering Geologist, M.Sc. www.linkedin.com/pub/fragiskos-chrysohoidis/48/808/a59 Areas of expertise: •Geotechnical Investigation | Planning, Supervision & Evaluation; •Geological and Geotechnical Design (field and desk work); •Geotechnical Monitoring | Scheduling and Assessment. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 34. ASSOCIATES OF ODOTECHNIKI LTD ISABELLA VASSILOPOULOU, Structural Engineer, Ph.D. www.linkedin.com/pub/isabella-vassilopoulou/46/871/304 Areas of expertise: •Structural analysis and design with emphasis on infrastructure design; •Resistance of the structural system, the elements and the cross-sections; •Investigation and solution proposal for earthquake-resistant design with real life experience in the local industry planning and execution; •Involvement in analysis and design of structures under extreme loading conditions, including both seismic and wind settings; •Inspection and assessment of nonlinear static and dynamic structural behaviour. Concentration on tension structures with the engagement of finite element method; •Preparation or supervision of construction drawings. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 35. ASSOCIATES OF ODOTECHNIKI LTD EVA XENOU, Structural Engineer, M.Sc. www.linkedin.com/pub/eva-xenou/46/3bb/b00 Areas of expertise: Structural analysis and design of structures (mainly infrastructure related civil engineering projects) including: •3D modelling and linear/non-linear numerical analyses; •Resistance of the structural system, the elements and the cross-sections; •Static analysis of structures under permanent, live, accidental, thermal and ground-settlement loads; •Dynamic analysis of structures under seismic combinations; •Foundation bearing capacity; •Preparation or supervision of construction drawings. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 36. ASSOCIATES OF ODOTECHNIKI LTD LEFTERIS CHRISOS, Structural Engineer www.linkedin.com/pub/lefteris-chrisos/53/26/353 Areas of expertise: •Structural analysis and design of structures; •3D modelling and linear/non-linear numerical analyses; •Extensive experience on structural analysis and design of metro stations, buildings and bridges; •Dynamic analysis of structures under seismic combinations; •Preparation or supervision of construction drawings. ODOTECHNIKI LTD – CONSULTING ENGINEERS
  • 37. ODOTECHNIKI LTD CONSULTING ENGINEERS www.odotechniki.gr CONTACT US FOR MORE INFORMATION Address: 59, 3 rd September Str. GR 10433, Athens, Greece e-mails: info@odotechniki.gr, odotechniki@odotechniki.gr Tel. +30 210 8228052, +30 210 8222127, Fax. +30 210 8233003

Hinweis der Redaktion

  1. *
  2. *
  3. *