GOLDEN GATE BRIDGE
BY: NOUMAN TAHIR
14-CE-128
LOCATION
The golden gate bridge is constructed on channel between san-
francisco bay and pacific ocean. This peninsula is 3 miles long
and 1mile wide. The structure links the U.S. city of San Francisco,
on the northern tip of the San Francisco Peninsula, to Marin
County, bridging both san-francisco and California State across
the strait.
Satellite view
GENERAL INFORMATION OF BRIDGE
Chief engineer
Joseph Strauss
Architecture
Irving Foster Morrow
Beginning of project
5 January 1933
Completion
28 May 1937
Cost
$ 35 million
Status
in use
Project type
 Structure
suspension bridge
It opened in 1937 and was, until 1964, the longest suspension main
bridge span in the world.
 function/usage
motorway bridge/ freeway bridge
 Material
steel bridge
 Color of bridge
international orange
Dimensions of bridge
main span 1 280 m
length of side spans 345 m
total length 2 737 m
Cables
number of cables 2
strands per cable 92
wires per strand 27 572
deck
deck depth 7.6 m
deck width 27 m
clearance/elevation 67 m
Tower
height 230 m
Dimensions
elevation
67m
Purpose of elevation
An elevation/clearance of 67m was given to allow the passage of massive and huge
ships under the bridge.
Material used in construction
cables
Cables are entirely made
up of steel.
Deck truss
Made up of steel using
rivets.
pylons
Made up of steels and sections are
joined together by using rivets.
Joining of sections by rivets
CONSTRUCTION OF BRIDGE
COMPONENTS
 The north pier, which supports the tower, was built easily on a bedrock ledge 6m
below the water.
 But on the southern San Francisco side, Strauss had to build his pier in the open
ocean, 30m below the surface.
 Steel frame and steel cables.
 weight-blocks which ballast the cable anchorage.
Provided for stabilization.
 Pier:
The pier, made up of 147,600 tons of concrete, was built in 37m of
open water. This was achieved by the concrete fender that in itself is a
marvel of construction; it is 108m long and 56m wide at the center line
of the bridge.
 Suspended cantilever construction.
Suspended cantilever construction
Construction challenges
 The bridge in this location should withstand brutal winds, tide, and fog.
 It is also located less than 13km from the epicenter of the most
catastrophic earthquake in history.
 There was high speed moving water at spot where south tower had to
be constructed. The construction of south side pier started from 30 m
below hard rock bed.
 Cable anchorage was a challenging task for engineers.
Fog and cable anchorage challenges
Loading on bridge
The most important types of loadings considered on the bridge construction are:
 Dead load,
 Super-imposed dead load,
 Live Traffic,
 Wind,
 Temperature
This bridge is designed constructed in a way that it can bear:
 90 mph of wind.
 8.0 intensity earthquake.
 Wage of workers
Every worker earned $4 to $11 per day.
 Workers died during construction
11 workers died during construction.
 Safety
A safety net was tied below elevations to avoid any loss of life. 19 lives were
saved by this net.
Visiting the bridge
The bridge is popular with
pedestrians and bicyclists, and was
built with walkways on either side of
the six vehicle traffic lanes. Initially,
they were separated from the traffic
lanes by only a metal curb, but
railings between the walkways and
the traffic lanes were added in 2003,
primarily as a measure to prevent
bicyclists from falling into the
roadway.
Suicides
The Golden Gate Bridge is the
second most used suicide
site/suicide bridge in the
world.
Brief glimpse of all aspects
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Tacoma Narrows Bridge Presentation
Tacoma Narrows Bridge PresentationTacoma Narrows Bridge Presentation
Tacoma Narrows Bridge PresentationTaylor Leszczynski
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptxKvmRaju
 
Leaning Tower of Pisa
Leaning Tower of PisaLeaning Tower of Pisa
Leaning Tower of PisaDheeraj Kumar
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridgeDhruv Seth
 
AKASHI KAIKYO BRIDGE
AKASHI KAIKYO BRIDGEAKASHI KAIKYO BRIDGE
AKASHI KAIKYO BRIDGEgomathi gowda
 
Tacoma Narrows Bridge - 1940
Tacoma Narrows Bridge - 1940Tacoma Narrows Bridge - 1940
Tacoma Narrows Bridge - 1940Nicole Grubb
 
Earthquake resistant building in mexico
Earthquake resistant building in  mexicoEarthquake resistant building in  mexico
Earthquake resistant building in mexicoVeera Veer
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Tacoma Narrows Suspension Bridge
Tacoma Narrows Suspension BridgeTacoma Narrows Suspension Bridge
Tacoma Narrows Suspension BridgeMuhammad Warraich
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldADARSH _
 
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONINDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONBhavek Sharma
 

Was ist angesagt? (20)

Tacoma Narrows Bridge Presentation
Tacoma Narrows Bridge PresentationTacoma Narrows Bridge Presentation
Tacoma Narrows Bridge Presentation
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
 
Leaning Tower of Pisa
Leaning Tower of PisaLeaning Tower of Pisa
Leaning Tower of Pisa
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Sydney harbour bridge
Sydney harbour bridgeSydney harbour bridge
Sydney harbour bridge
 
AKASHI KAIKYO BRIDGE
AKASHI KAIKYO BRIDGEAKASHI KAIKYO BRIDGE
AKASHI KAIKYO BRIDGE
 
Tacoma bridge
Tacoma bridge  Tacoma bridge
Tacoma bridge
 
the millau viaduct
the millau viaductthe millau viaduct
the millau viaduct
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Tacoma Narrows Bridge - 1940
Tacoma Narrows Bridge - 1940Tacoma Narrows Bridge - 1940
Tacoma Narrows Bridge - 1940
 
Earthquake resistant building in mexico
Earthquake resistant building in  mexicoEarthquake resistant building in  mexico
Earthquake resistant building in mexico
 
Gateway Arch
Gateway ArchGateway Arch
Gateway Arch
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Millau viaduct
Millau viaductMillau viaduct
Millau viaduct
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
Tacoma Narrows Suspension Bridge
Tacoma Narrows Suspension BridgeTacoma Narrows Suspension Bridge
Tacoma Narrows Suspension Bridge
 
The Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the worldThe Akashi Kaikyo bridge - longest suspension bridge in the world
The Akashi Kaikyo bridge - longest suspension bridge in the world
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTIONINDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
INDUSTRIAL TRAINING OF FLYOVER CONSTRUCTION
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 

Andere mochten auch

Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its TypesZakaria Yahya
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)suraj kumar
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges David Collings
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge ConstructionMAHAVIR MEENA
 
Precast Bridges slides
Precast Bridges slidesPrecast Bridges slides
Precast Bridges slidesWaqas Javaid
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Bridge
Bridge Bridge
Bridge illpa
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpointguested929b
 

Andere mochten auch (13)

Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its Types
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Steel concrete composite bridges
Steel concrete composite bridges Steel concrete composite bridges
Steel concrete composite bridges
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 
Fundamentals of-psc-bridge
Fundamentals of-psc-bridgeFundamentals of-psc-bridge
Fundamentals of-psc-bridge
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Precast Bridges slides
Precast Bridges slidesPrecast Bridges slides
Precast Bridges slides
 
Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Bridge
Bridge Bridge
Bridge
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Slideshare.Com Powerpoint
Slideshare.Com PowerpointSlideshare.Com Powerpoint
Slideshare.Com Powerpoint
 

Ähnlich wie Golden gate bridge construction

Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Seven modern wonders of the world
Seven modern wonders of the worldSeven modern wonders of the world
Seven modern wonders of the worldvvelasco
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationAmir Amdani
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setuRatulDas36
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the worldAsifKhan17884
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the worldAnishaJalathota
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuVishweshwar Rao Narla
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfPramodLimbore
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxsimonithomas47935
 
2009 civil engineering modern date
2009 civil engineering modern date2009 civil engineering modern date
2009 civil engineering modern date信瑜 單信瑜
 
Presentation
PresentationPresentation
PresentationMZaheeb
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 

Ähnlich wie Golden gate bridge construction (20)

Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Golden gate.pdf
Golden gate.pdfGolden gate.pdf
Golden gate.pdf
 
Seven modern wonders of the world
Seven modern wonders of the worldSeven modern wonders of the world
Seven modern wonders of the world
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
Truss bridges around the world
Truss bridges around the worldTruss bridges around the world
Truss bridges around the world
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the world
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Bridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara SetuBridge Construction Kalia Bhomara Setu
Bridge Construction Kalia Bhomara Setu
 
Tunnel boring machines123
Tunnel boring machines123Tunnel boring machines123
Tunnel boring machines123
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
Detailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docxDetailed outlineResearch question What happened to th.docx
Detailed outlineResearch question What happened to th.docx
 
2009 civil engineering modern date
2009 civil engineering modern date2009 civil engineering modern date
2009 civil engineering modern date
 
Presentation
PresentationPresentation
Presentation
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Howrah bridge
Howrah bridgeHowrah bridge
Howrah bridge
 

Kürzlich hochgeladen

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 

Kürzlich hochgeladen (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Golden gate bridge construction

  • 1. GOLDEN GATE BRIDGE BY: NOUMAN TAHIR 14-CE-128
  • 2. LOCATION The golden gate bridge is constructed on channel between san- francisco bay and pacific ocean. This peninsula is 3 miles long and 1mile wide. The structure links the U.S. city of San Francisco, on the northern tip of the San Francisco Peninsula, to Marin County, bridging both san-francisco and California State across the strait.
  • 4. GENERAL INFORMATION OF BRIDGE Chief engineer Joseph Strauss Architecture Irving Foster Morrow Beginning of project 5 January 1933 Completion 28 May 1937 Cost $ 35 million Status in use
  • 5. Project type  Structure suspension bridge It opened in 1937 and was, until 1964, the longest suspension main bridge span in the world.  function/usage motorway bridge/ freeway bridge  Material steel bridge  Color of bridge international orange
  • 6. Dimensions of bridge main span 1 280 m length of side spans 345 m total length 2 737 m Cables number of cables 2 strands per cable 92 wires per strand 27 572 deck deck depth 7.6 m deck width 27 m clearance/elevation 67 m Tower height 230 m
  • 8. Purpose of elevation An elevation/clearance of 67m was given to allow the passage of massive and huge ships under the bridge.
  • 9. Material used in construction cables Cables are entirely made up of steel. Deck truss Made up of steel using rivets. pylons Made up of steels and sections are joined together by using rivets.
  • 10. Joining of sections by rivets
  • 12. COMPONENTS  The north pier, which supports the tower, was built easily on a bedrock ledge 6m below the water.  But on the southern San Francisco side, Strauss had to build his pier in the open ocean, 30m below the surface.
  • 13.  Steel frame and steel cables.  weight-blocks which ballast the cable anchorage. Provided for stabilization.  Pier: The pier, made up of 147,600 tons of concrete, was built in 37m of open water. This was achieved by the concrete fender that in itself is a marvel of construction; it is 108m long and 56m wide at the center line of the bridge.  Suspended cantilever construction.
  • 15. Construction challenges  The bridge in this location should withstand brutal winds, tide, and fog.  It is also located less than 13km from the epicenter of the most catastrophic earthquake in history.  There was high speed moving water at spot where south tower had to be constructed. The construction of south side pier started from 30 m below hard rock bed.  Cable anchorage was a challenging task for engineers.
  • 16. Fog and cable anchorage challenges
  • 17. Loading on bridge The most important types of loadings considered on the bridge construction are:  Dead load,  Super-imposed dead load,  Live Traffic,  Wind,  Temperature This bridge is designed constructed in a way that it can bear:  90 mph of wind.  8.0 intensity earthquake.
  • 18.  Wage of workers Every worker earned $4 to $11 per day.  Workers died during construction 11 workers died during construction.  Safety A safety net was tied below elevations to avoid any loss of life. 19 lives were saved by this net.
  • 19. Visiting the bridge The bridge is popular with pedestrians and bicyclists, and was built with walkways on either side of the six vehicle traffic lanes. Initially, they were separated from the traffic lanes by only a metal curb, but railings between the walkways and the traffic lanes were added in 2003, primarily as a measure to prevent bicyclists from falling into the roadway.
  • 20. Suicides The Golden Gate Bridge is the second most used suicide site/suicide bridge in the world.
  • 21. Brief glimpse of all aspects