Implementing a level 5 metrics programme @Capgemini Netherlands”
Selecting The Right Set...
Niteen Kumar - 26/11/2013
MEASUREMENT
OBJECTIVE

SCOPE

LEADING &
LAGGING
INDICATORS

LAGGING
INDICATORS

SPECIFIC

MEASUREABLE

Are the measurement target
oriented?

Can it be measured?

RELEVANT

What story will it tell?

ATTAINABLE

Does it cost too much?

TIME BOUND

By When?

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

2
MEASUREMENT
OBJECTIVE

SCOPE

LEADING &
LAGGING
INDICATORS

REGRESSION
EQUATION

APPLICATION DEVELOPMENT KPI PORTFOLIO

COST

QUALITY

SCHEDULE

APPLICATION MAINTENANCE KPI PORTFOLIO

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

3
MEASUREMENT
OBJECTIVE

SCOPE

LEADING &
LAGGING
INDICATORS

REGRESSION
EQUATION

LIST OF X FACTORS
code complexity, encapsulation, program language & tools, code review checklist, coding skills and experiences with the program
languages and tools used, code review skills and experiences, %

of tickets having existing

solution in KEDB,

quality of reused source code, requirements

volatility, integration test methods and tools, Integration test skills and
experiences with methods and tools used, quality of reused test cases ,domain, requirements volatility, quality attributes,
readability of documents, architecture measures, code complexity, encapsulation, requirements methods and tools, Right

shore Ratio requirements inspection checklist, high-level design methods and tools, high-level design inspection checklist,
detailed design methods and tools, detailed design review/inspection checklist, program language & tools, code review checklist

requirement inspection
skills and experiences, high-level design skills and experiences with the methods and tools used, high-level design
inspection skills and experiences, detailed de-sign skills and experiences with the methods and tools used, detailed design
review/inspection skills and experiences, # of CR’s Rolled Back, coding skills domain, architecture measures, high-level
usage, domain experiences, requirements skills and experiences with methods and tools used,

design methods and tools, high-level design skills and experiences with methods and tools used, quality of reused high-level
design documents, Rework

Effort

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

4
MEASUREMENT
OBJECTIVE

SCOPE

DEVELOPMENT
PROJECT –
INDICATORS

REGRESSION
EQUATION

APPLICATION DEVELOPMENT KPI PORTFOLIO
COST
Y - FACTORS

 % EFFORT VARIANCE

 CONTRIBUTION MARGIN

X - FACTORS
 Requirements Volatility
 Skill Index
 Reusability
 Effort by SDLC Phase
 Review , Rework Effort
 Resource Cost
 Code Complexity / Quality
 Overrun / Underrun
 # of times resource
changed during build

QUALITY
Y - FACTORS
 DEFECT REMOVAL
EFFICIENCY

 DELIVERED DEFECT
DENSITY

 COST OF QUALITY
X - FACTORS

SCHEDULE
Y - FACTORS

 % SCHEDULE VARIANCE

X - FACTORS
 Resource Availability
 Requirements Volatility
 Skill Index
 Reusability
 Rework Effort
 # of times resource
changed during build

The “X” factors
influencing the
outcome of “Y” was
identified during the
workshops.

The identified “X”
factors are logical in
nature and may
change during
statistical validation

 Rework Effort
 Test Coverage
 Testing Rate
 Review Effort
 Skill Level
 Code Complexity / Quality
 Test Preparation Effort

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

5
MEASUREMENT
OBJECTIVE

SCOPE

DEVELOPMENT
PROJECT –
INDICATORS

REGRESSION
EQUATION

APPLICATION DEVELOPMENT KPI PORTFOLIO
SPRINT

SPRINT
NUMBER
i

Total # of
Features /
Use Case
Planned
i

Estimated
Size (SP)
i

COST

Planned
Actual Size Productivity
%
(SP)
Factor
Completion
i
i
i

Total
Planned
Effort
(P.Hrs)
i

TOTAL AT ENGAGEMENT LEVEL g

Total # of
User
Stories
Total
Total
Total Actual MODIFIED Features /
Features / Overall Effort
Effort
During the Use Case
Use Case Variance in
(P.Hrs)
Iteration. COMPLETED ACCEPTED
%
i
i
i
i
i

ACTUAL EFFORT For Below Activities (Person Hours)
P.Hrs
902,00 1985,00 2177,00 1561,00 1153,00 1412,00 1805,00 1089,00 1478,00 1498,00

7935,00

174,00

628,00

534,00

h

h

h

i

MODL

COD

TST-P

TST-E

REFTR

SCRUM
MASTER

REV

REW

h

g

g

g

g

g

38,00

g

g

g

63,00

7,00

56,00

70,00

4,00

2,00

19,00

25,00

10,00

25,00

5,00

223,00

4

7

6

-

67,00

9,00

27,00

48,00

45,00

22,00

27,00

23,00

18,00

22,00

2,00

243,00

0

12

8

263%

120,00

11,00

12,00

19,00

27,00

19,00

16,00

32,00

26,00

21,00

21,00

204,00

5

9

10

70%

i

i

i

i

i

i

h

SCOPE &
REFTR -1

g

g

g

g

g

50,00

25,00

1

8

139

152

7

60

245,00

2

12

200

175

8

100

3

9

150

130

7,5

100

SCOPE DSGN

QUALITY DETAILS

Total Number Of
Planned Test
Cases
i

Total Number Of
Total Number Of
Test Cases
Total Number Of
EXTERNAL
Executed
INTERNAL Defects
Defects
i
i
i

QUALITY

DOD Performed
i

% DOD Steps
Performed
i

Total # Of
Impediments
Reported
i

Total # Of
Impediments
Removed
i

Defect Removal
Effeciency (%)
i

1289

1084

1443

472

46

-

284

163

h

h

h

h

h

h

h

h

i

28

20

17

9

YES

70

4

3

65%

34

30

21

16

NO

100

7

7

50%

12

12

25

12

YES

100

3

3

50%

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

6
MEASUREMENT
OBJECTIVE

SCOPE

MAINTENANCE
ENGAGEMENT
INDICATORS

REGRESSION
EQUATION

APPLICATION MAINTENANCE KPI PORTFOLIO
COST
Y - FACTORS
 % EFFORT VARIANCE FOR
KT and RELEASE
 PRODCTIVITY (AET)
 % BACKLOG OF TICKET

 CONTRIBUTION MARGIN

X - FACTORS
 Idle Time (under discussion)
 Resource Cost
 Right shore Ratio
 Skill Index
 Effort Spent on KT
 % of tickets having existing
solution in KEDB
 # of modules reoccurring
impacted
 System Downtime
 % Additional Work

QUALITY
Y - FACTORS
 % INCIDENT REDUCTION
 % FIRST TIME PASS
 % OF SYSTEM S’FULLY
TRANSITIONED DURING KT
STAGE
 DEFECT REMOVAL
EFFICIENCY FOR RELEASE
 DELIVERED DEFECT
DENSITY FOR RELEASE
 COST OF QUALITY
X - FACTORS
 Rework Effort
 Test Coverage
 Testing Rate
 Test Preparation Effort
 System Downtime
 # of CR’s Rolled Back
 % RCA Compliance
 # of reoccurring modules
impacted

SCHEDULE
Y - FACTORS
 % SCHEDULE VARIANCE
FOR KT PHASE
 % RESPONSE &
RESOLUTION COMPLIANCE
 % SCHEDULE VARIANCE
FOR RELEASE

The “X” factors
influencing the
outcome of “Y” was
identified during the
workshops.

X - FACTORS
 Resource Availability
 Skill Index
 Reusability
 Rework Effort
 % of tickets having existing
solution in KEDB
 Elapsed Time to Assign /
Investigate / Testing /
Implementation Per Ticket
 # of times incident/service
request assigned within and
between teams

Capgemini Leading and Lagging Indicators – NESMA Presentation

The identified “X”
factors are logical in
nature and may
change during
statistical validation

Niteen Kumar

7
MEASUREMENT
OBJECTIVE

SCOPE

INDICATORS
MAINTENANCE
PROJECT

REGRESSION
EQUATION

APPLICATION MAINTENANCE KPI PORTFOLIO
INCIDENT / PROBLEM MANAGEMENT - LEADING & LAGGING INDICATORS

5811

Reporting
Month

Priority

Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13
Jun-13

P0
P1
P2
P3
P4
P5
S0
S1
S2
S3
S4
S5

926

5895

Tickets
Backlog
Number of
Received Tickets of
Tickets
Current
Previous
Resolved
Month
Month

11
13
807
44

1
4
132
35

12
17
845
47

2
10
437
53

1
2
82
46

3
10
475
52

842

20545

3

Number of
Backlog
Tickets

Effort Spent
in Closing
The Ticket
P. Hours

Average
Effort per
Ticket

0
0
94
32
0
2
44
47
-

29,75
40,5
2552
216

4
1134
259

2,48
2,38
3,02
4,60
0,00
0,40
2,39
4,98
-

64

98,91

263

95,54

# of
# of
% SLA
% SLA
Response
Resolution
Compliance
Compliance
Breach
Breach

2
3
5
1

0
6
0
0

83,33
82,35
99,41
97,87
100,00
40,00
100,00
100,00
-

0
0
45
0

0
2
55
0

100,00
100,00
94,67
100,00
100,00
80,00
88,42
100,00
-

Capgemini Leading and Lagging Indicators – NESMA Presentation

0

FTR

0

-

Average
Elapsed Time
To Closure
H:MM:S

1:30:22
0:33:00
0:02:00
0:02:00

4:54:00
11:33:00
30:10:00
149:38:00

0:05:00
43:34:00
0:02:00
0:16:00

%First Time
Right

Average
Elapsed Time
To Assign
Ticket
Hours : Mins:
Sec

10:56:00
52:14:00
24:25:00
169:45:00

Niteen Kumar

8
MEASUREMENT
OBJECTIVE

SCOPE

INDICATORS
MAINTENANCE
PROJECT

REGRESSION
EQUATION

Example: Delivered Defect Density

*DDD = 3.0-0.05*RAE-0.06*TPE – 0.025CRE
RAE = Requirement Analysis Effort
TPE = Test Preperation Effort
CRE = Code Review Effort
* Example

Capgemini Leading and Lagging Indicators – NESMA Presentation

Niteen Kumar

9
About Capgemini
With more than 120,000 people in 40 countries, Capgemini
is one of the world's foremost providers of consulting,
technology and outsourcing services. The Group reported
2011 global revenues of EUR 9.7 billion.
Together with its clients, Capgemini creates and delivers
business and technology solutions that fit their needs and
drive the results they want. A deeply multicultural
organization, Capgemini has developed its own way of
working, the Collaborative Business ExperienceTM, and
draws on Rightshore ®, its worldwide delivery model.
Rightshore® is a trademark belonging to Capgemini

www.capgemini.com

The information contained in this presentation is proprietary.
© 2012 Capgemini. All rights reserved.

Weitere ähnliche Inhalte

Was ist angesagt?

Agile Metrics
Agile MetricsAgile Metrics
Agile Metrics
nick945
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Serdar Temiz
 
Agile metrics what is... riga-version
Agile metrics   what is... riga-versionAgile metrics   what is... riga-version
Agile metrics what is... riga-version
Alex Birke
 

Was ist angesagt? (20)

Estimation of a micro services based estimation application bhawna thakur -...
Estimation of a micro services based estimation application   bhawna thakur -...Estimation of a micro services based estimation application   bhawna thakur -...
Estimation of a micro services based estimation application bhawna thakur -...
 
Governance of agile Software projects by an automated KPI Cockpit in the Cloud
Governance of agile Software projectsby an automated KPI Cockpit in the CloudGovernance of agile Software projectsby an automated KPI Cockpit in the Cloud
Governance of agile Software projects by an automated KPI Cockpit in the Cloud
 
5. agile estimation reconsidered again esteban sanchez
5. agile estimation reconsidered again   esteban sanchez5. agile estimation reconsidered again   esteban sanchez
5. agile estimation reconsidered again esteban sanchez
 
Agile Metrics
Agile MetricsAgile Metrics
Agile Metrics
 
Test Estimation in Practice
Test Estimation in PracticeTest Estimation in Practice
Test Estimation in Practice
 
Ac2017 6. output based contracting
Ac2017   6. output based contractingAc2017   6. output based contracting
Ac2017 6. output based contracting
 
Agile Metrics
Agile MetricsAgile Metrics
Agile Metrics
 
Effective Test Estimation
Effective Test EstimationEffective Test Estimation
Effective Test Estimation
 
Seven Key Metrics to Improve Agile Performance
Seven Key Metrics to Improve Agile PerformanceSeven Key Metrics to Improve Agile Performance
Seven Key Metrics to Improve Agile Performance
 
Anne Mette Hass - I Don't Want To Be A Tester Anymore - EuroSTAR 2010
Anne Mette Hass - I Don't Want To Be A Tester Anymore - EuroSTAR 2010Anne Mette Hass - I Don't Want To Be A Tester Anymore - EuroSTAR 2010
Anne Mette Hass - I Don't Want To Be A Tester Anymore - EuroSTAR 2010
 
The art of project estimation
The art of project estimationThe art of project estimation
The art of project estimation
 
Essam lotffy this project is not in line with organizational strategic plans
Essam lotffy   this project is not in line with organizational strategic plansEssam lotffy   this project is not in line with organizational strategic plans
Essam lotffy this project is not in line with organizational strategic plans
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
 
Rob Baarda - Are Real Test Metrics Predictive for the Future?
Rob Baarda - Are Real Test Metrics Predictive for the Future?Rob Baarda - Are Real Test Metrics Predictive for the Future?
Rob Baarda - Are Real Test Metrics Predictive for the Future?
 
Cost and time estimation methods pros and cons
Cost and time estimation methods pros and consCost and time estimation methods pros and cons
Cost and time estimation methods pros and cons
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Agile metrics what is... riga-version
Agile metrics   what is... riga-versionAgile metrics   what is... riga-version
Agile metrics what is... riga-version
 
Testestimationtechniques
Testestimationtechniques Testestimationtechniques
Testestimationtechniques
 
Agile metrics - Measure and Improve
Agile metrics - Measure and ImproveAgile metrics - Measure and Improve
Agile metrics - Measure and Improve
 
Practical usage of fpa and automatic code review piotr popovski
Practical usage of fpa and automatic code review   piotr popovskiPractical usage of fpa and automatic code review   piotr popovski
Practical usage of fpa and automatic code review piotr popovski
 

Andere mochten auch

Estimation and planning with smart use cases
Estimation and planning with smart use casesEstimation and planning with smart use cases
Estimation and planning with smart use cases
Robert de Wolff
 
Cloud-Migration-Methodology v1.0
Cloud-Migration-Methodology v1.0Cloud-Migration-Methodology v1.0
Cloud-Migration-Methodology v1.0
b3535840
 

Andere mochten auch (20)

Function Point Analysis: Size Matters - No Matter What You Have Been Told!
Function Point Analysis: Size Matters - No Matter What You Have Been Told!Function Point Analysis: Size Matters - No Matter What You Have Been Told!
Function Point Analysis: Size Matters - No Matter What You Have Been Told!
 
Workshop - Estimating Packaged Software - Nesma - Eric van der Vliet - Frank ...
Workshop - Estimating Packaged Software - Nesma - Eric van der Vliet - Frank ...Workshop - Estimating Packaged Software - Nesma - Eric van der Vliet - Frank ...
Workshop - Estimating Packaged Software - Nesma - Eric van der Vliet - Frank ...
 
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der SchaafNesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
Nesma autumn conference - the gains of unit based pricing - Sytse van der Schaaf
 
Capgemini - Oracle Engineered Systems
Capgemini - Oracle Engineered SystemsCapgemini - Oracle Engineered Systems
Capgemini - Oracle Engineered Systems
 
The top 5 issues for CFO's in 2016
The top 5 issues for CFO's in 2016The top 5 issues for CFO's in 2016
The top 5 issues for CFO's in 2016
 
Estimation and planning with smart use cases
Estimation and planning with smart use casesEstimation and planning with smart use cases
Estimation and planning with smart use cases
 
Cg Portfolio Presentation
Cg Portfolio PresentationCg Portfolio Presentation
Cg Portfolio Presentation
 
The Nielsen Company BI COE: A Case Study
The Nielsen Company BI COE: A Case StudyThe Nielsen Company BI COE: A Case Study
The Nielsen Company BI COE: A Case Study
 
Solution deck capgemini cloud assessment
Solution deck capgemini cloud assessmentSolution deck capgemini cloud assessment
Solution deck capgemini cloud assessment
 
Microservices: The Future-Proof Framework for IoT
Microservices: The Future-Proof Framework for IoTMicroservices: The Future-Proof Framework for IoT
Microservices: The Future-Proof Framework for IoT
 
Closing the gap in your cloud ecosystem capgemini mark skilton v1
Closing the gap in your cloud ecosystem capgemini mark skilton v1Closing the gap in your cloud ecosystem capgemini mark skilton v1
Closing the gap in your cloud ecosystem capgemini mark skilton v1
 
Implications of Industry 4.0 for CIOs
Implications of Industry 4.0 for CIOsImplications of Industry 4.0 for CIOs
Implications of Industry 4.0 for CIOs
 
Cloud Computing for Enterprise Architects
Cloud Computing for Enterprise ArchitectsCloud Computing for Enterprise Architects
Cloud Computing for Enterprise Architects
 
A Portfolio Strategy To Execute Digital Transformation
A Portfolio Strategy To Execute Digital TransformationA Portfolio Strategy To Execute Digital Transformation
A Portfolio Strategy To Execute Digital Transformation
 
Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2
 
SAP HANA Transformation: Cloud Advantage
SAP HANA Transformation: Cloud AdvantageSAP HANA Transformation: Cloud Advantage
SAP HANA Transformation: Cloud Advantage
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2
 
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyIT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
 
Cloud-Migration-Methodology v1.0
Cloud-Migration-Methodology v1.0Cloud-Migration-Methodology v1.0
Cloud-Migration-Methodology v1.0
 
The Product Management X-Factor: How to be a Rock Star Product Manager
The Product Management X-Factor: How to be a Rock Star Product ManagerThe Product Management X-Factor: How to be a Rock Star Product Manager
The Product Management X-Factor: How to be a Rock Star Product Manager
 

Ähnlich wie Implementing Level 5 Metrics Programme @ Capgemini Netherlands

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 
Stage Presentation
Stage PresentationStage Presentation
Stage Presentation
Ahmed Elbahy
 

Ähnlich wie Implementing Level 5 Metrics Programme @ Capgemini Netherlands (20)

Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Six Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational StepsSix Sigma Process Improvement Foundational Steps
Six Sigma Process Improvement Foundational Steps
 
Best Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptxBest Business Practice @ Nov 22.pptx
Best Business Practice @ Nov 22.pptx
 
Van heeringen estimate faster, cheaper, better
Van heeringen   estimate faster, cheaper, betterVan heeringen   estimate faster, cheaper, better
Van heeringen estimate faster, cheaper, better
 
Resume sarang C Ghawde
Resume sarang C GhawdeResume sarang C Ghawde
Resume sarang C Ghawde
 
A lecture on CCP Certificate
A lecture on CCP CertificateA lecture on CCP Certificate
A lecture on CCP Certificate
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Stage Presentation
Stage PresentationStage Presentation
Stage Presentation
 
PetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & ControlPetroSync - Successful Project Cost Estimation & Control
PetroSync - Successful Project Cost Estimation & Control
 
Managed Services Using SLAs and KPIs
Managed Services Using SLAs and KPIsManaged Services Using SLAs and KPIs
Managed Services Using SLAs and KPIs
 
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal MaanAgile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
Agile Network India | T Shirt Sizing Model for DevOps COE | Bharti Goyal Maan
 
Dmaic
DmaicDmaic
Dmaic
 
sepg402
sepg402sepg402
sepg402
 
#Demand Forecasting & Inventory Optimization# By SN Panigrahi
#Demand Forecasting & Inventory Optimization# By SN Panigrahi#Demand Forecasting & Inventory Optimization# By SN Panigrahi
#Demand Forecasting & Inventory Optimization# By SN Panigrahi
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Measure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementMeasure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive Improvement
 
Yellow belt
Yellow beltYellow belt
Yellow belt
 

Kürzlich hochgeladen

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Kürzlich hochgeladen (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Implementing Level 5 Metrics Programme @ Capgemini Netherlands

  • 1. Together. Free your energies Implementing a level 5 metrics programme @Capgemini Netherlands” Selecting The Right Set... Niteen Kumar - 26/11/2013
  • 2. MEASUREMENT OBJECTIVE SCOPE LEADING & LAGGING INDICATORS LAGGING INDICATORS SPECIFIC MEASUREABLE Are the measurement target oriented? Can it be measured? RELEVANT What story will it tell? ATTAINABLE Does it cost too much? TIME BOUND By When? Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 2
  • 3. MEASUREMENT OBJECTIVE SCOPE LEADING & LAGGING INDICATORS REGRESSION EQUATION APPLICATION DEVELOPMENT KPI PORTFOLIO COST QUALITY SCHEDULE APPLICATION MAINTENANCE KPI PORTFOLIO Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 3
  • 4. MEASUREMENT OBJECTIVE SCOPE LEADING & LAGGING INDICATORS REGRESSION EQUATION LIST OF X FACTORS code complexity, encapsulation, program language & tools, code review checklist, coding skills and experiences with the program languages and tools used, code review skills and experiences, % of tickets having existing solution in KEDB, quality of reused source code, requirements volatility, integration test methods and tools, Integration test skills and experiences with methods and tools used, quality of reused test cases ,domain, requirements volatility, quality attributes, readability of documents, architecture measures, code complexity, encapsulation, requirements methods and tools, Right shore Ratio requirements inspection checklist, high-level design methods and tools, high-level design inspection checklist, detailed design methods and tools, detailed design review/inspection checklist, program language & tools, code review checklist requirement inspection skills and experiences, high-level design skills and experiences with the methods and tools used, high-level design inspection skills and experiences, detailed de-sign skills and experiences with the methods and tools used, detailed design review/inspection skills and experiences, # of CR’s Rolled Back, coding skills domain, architecture measures, high-level usage, domain experiences, requirements skills and experiences with methods and tools used, design methods and tools, high-level design skills and experiences with methods and tools used, quality of reused high-level design documents, Rework Effort Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 4
  • 5. MEASUREMENT OBJECTIVE SCOPE DEVELOPMENT PROJECT – INDICATORS REGRESSION EQUATION APPLICATION DEVELOPMENT KPI PORTFOLIO COST Y - FACTORS  % EFFORT VARIANCE  CONTRIBUTION MARGIN X - FACTORS  Requirements Volatility  Skill Index  Reusability  Effort by SDLC Phase  Review , Rework Effort  Resource Cost  Code Complexity / Quality  Overrun / Underrun  # of times resource changed during build QUALITY Y - FACTORS  DEFECT REMOVAL EFFICIENCY  DELIVERED DEFECT DENSITY  COST OF QUALITY X - FACTORS SCHEDULE Y - FACTORS  % SCHEDULE VARIANCE X - FACTORS  Resource Availability  Requirements Volatility  Skill Index  Reusability  Rework Effort  # of times resource changed during build The “X” factors influencing the outcome of “Y” was identified during the workshops. The identified “X” factors are logical in nature and may change during statistical validation  Rework Effort  Test Coverage  Testing Rate  Review Effort  Skill Level  Code Complexity / Quality  Test Preparation Effort Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 5
  • 6. MEASUREMENT OBJECTIVE SCOPE DEVELOPMENT PROJECT – INDICATORS REGRESSION EQUATION APPLICATION DEVELOPMENT KPI PORTFOLIO SPRINT SPRINT NUMBER i Total # of Features / Use Case Planned i Estimated Size (SP) i COST Planned Actual Size Productivity % (SP) Factor Completion i i i Total Planned Effort (P.Hrs) i TOTAL AT ENGAGEMENT LEVEL g Total # of User Stories Total Total Total Actual MODIFIED Features / Features / Overall Effort Effort During the Use Case Use Case Variance in (P.Hrs) Iteration. COMPLETED ACCEPTED % i i i i i ACTUAL EFFORT For Below Activities (Person Hours) P.Hrs 902,00 1985,00 2177,00 1561,00 1153,00 1412,00 1805,00 1089,00 1478,00 1498,00 7935,00 174,00 628,00 534,00 h h h i MODL COD TST-P TST-E REFTR SCRUM MASTER REV REW h g g g g g 38,00 g g g 63,00 7,00 56,00 70,00 4,00 2,00 19,00 25,00 10,00 25,00 5,00 223,00 4 7 6 - 67,00 9,00 27,00 48,00 45,00 22,00 27,00 23,00 18,00 22,00 2,00 243,00 0 12 8 263% 120,00 11,00 12,00 19,00 27,00 19,00 16,00 32,00 26,00 21,00 21,00 204,00 5 9 10 70% i i i i i i h SCOPE & REFTR -1 g g g g g 50,00 25,00 1 8 139 152 7 60 245,00 2 12 200 175 8 100 3 9 150 130 7,5 100 SCOPE DSGN QUALITY DETAILS Total Number Of Planned Test Cases i Total Number Of Total Number Of Test Cases Total Number Of EXTERNAL Executed INTERNAL Defects Defects i i i QUALITY DOD Performed i % DOD Steps Performed i Total # Of Impediments Reported i Total # Of Impediments Removed i Defect Removal Effeciency (%) i 1289 1084 1443 472 46 - 284 163 h h h h h h h h i 28 20 17 9 YES 70 4 3 65% 34 30 21 16 NO 100 7 7 50% 12 12 25 12 YES 100 3 3 50% Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 6
  • 7. MEASUREMENT OBJECTIVE SCOPE MAINTENANCE ENGAGEMENT INDICATORS REGRESSION EQUATION APPLICATION MAINTENANCE KPI PORTFOLIO COST Y - FACTORS  % EFFORT VARIANCE FOR KT and RELEASE  PRODCTIVITY (AET)  % BACKLOG OF TICKET  CONTRIBUTION MARGIN X - FACTORS  Idle Time (under discussion)  Resource Cost  Right shore Ratio  Skill Index  Effort Spent on KT  % of tickets having existing solution in KEDB  # of modules reoccurring impacted  System Downtime  % Additional Work QUALITY Y - FACTORS  % INCIDENT REDUCTION  % FIRST TIME PASS  % OF SYSTEM S’FULLY TRANSITIONED DURING KT STAGE  DEFECT REMOVAL EFFICIENCY FOR RELEASE  DELIVERED DEFECT DENSITY FOR RELEASE  COST OF QUALITY X - FACTORS  Rework Effort  Test Coverage  Testing Rate  Test Preparation Effort  System Downtime  # of CR’s Rolled Back  % RCA Compliance  # of reoccurring modules impacted SCHEDULE Y - FACTORS  % SCHEDULE VARIANCE FOR KT PHASE  % RESPONSE & RESOLUTION COMPLIANCE  % SCHEDULE VARIANCE FOR RELEASE The “X” factors influencing the outcome of “Y” was identified during the workshops. X - FACTORS  Resource Availability  Skill Index  Reusability  Rework Effort  % of tickets having existing solution in KEDB  Elapsed Time to Assign / Investigate / Testing / Implementation Per Ticket  # of times incident/service request assigned within and between teams Capgemini Leading and Lagging Indicators – NESMA Presentation The identified “X” factors are logical in nature and may change during statistical validation Niteen Kumar 7
  • 8. MEASUREMENT OBJECTIVE SCOPE INDICATORS MAINTENANCE PROJECT REGRESSION EQUATION APPLICATION MAINTENANCE KPI PORTFOLIO INCIDENT / PROBLEM MANAGEMENT - LEADING & LAGGING INDICATORS 5811 Reporting Month Priority Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 Jun-13 P0 P1 P2 P3 P4 P5 S0 S1 S2 S3 S4 S5 926 5895 Tickets Backlog Number of Received Tickets of Tickets Current Previous Resolved Month Month 11 13 807 44 1 4 132 35 12 17 845 47 2 10 437 53 1 2 82 46 3 10 475 52 842 20545 3 Number of Backlog Tickets Effort Spent in Closing The Ticket P. Hours Average Effort per Ticket 0 0 94 32 0 2 44 47 - 29,75 40,5 2552 216 4 1134 259 2,48 2,38 3,02 4,60 0,00 0,40 2,39 4,98 - 64 98,91 263 95,54 # of # of % SLA % SLA Response Resolution Compliance Compliance Breach Breach 2 3 5 1 0 6 0 0 83,33 82,35 99,41 97,87 100,00 40,00 100,00 100,00 - 0 0 45 0 0 2 55 0 100,00 100,00 94,67 100,00 100,00 80,00 88,42 100,00 - Capgemini Leading and Lagging Indicators – NESMA Presentation 0 FTR 0 - Average Elapsed Time To Closure H:MM:S 1:30:22 0:33:00 0:02:00 0:02:00 4:54:00 11:33:00 30:10:00 149:38:00 0:05:00 43:34:00 0:02:00 0:16:00 %First Time Right Average Elapsed Time To Assign Ticket Hours : Mins: Sec 10:56:00 52:14:00 24:25:00 169:45:00 Niteen Kumar 8
  • 9. MEASUREMENT OBJECTIVE SCOPE INDICATORS MAINTENANCE PROJECT REGRESSION EQUATION Example: Delivered Defect Density *DDD = 3.0-0.05*RAE-0.06*TPE – 0.025CRE RAE = Requirement Analysis Effort TPE = Test Preperation Effort CRE = Code Review Effort * Example Capgemini Leading and Lagging Indicators – NESMA Presentation Niteen Kumar 9
  • 10. About Capgemini With more than 120,000 people in 40 countries, Capgemini is one of the world's foremost providers of consulting, technology and outsourcing services. The Group reported 2011 global revenues of EUR 9.7 billion. Together with its clients, Capgemini creates and delivers business and technology solutions that fit their needs and drive the results they want. A deeply multicultural organization, Capgemini has developed its own way of working, the Collaborative Business ExperienceTM, and draws on Rightshore ®, its worldwide delivery model. Rightshore® is a trademark belonging to Capgemini www.capgemini.com The information contained in this presentation is proprietary. © 2012 Capgemini. All rights reserved.