SlideShare ist ein Scribd-Unternehmen logo
1 von 42
Downloaden Sie, um offline zu lesen
Engineers India Limited
July 04
14 July 2016 2
SECURE SOCKET LAYER
NAME :NIKHIL JAIWAL
ROLL NO :1502914909
BRANCH :M.C.A
SEMESTER :V
SESSION :2016-2017
(AT)
Under the Guidance Of Mr. Niranjan Behera
(Assistant General Manager)
(BY)
14 July 2016 3
Contents
1. About Organization 07
2. Introduction 13
1. FEATURES 14
2. SYSTEM REQUIREMENT 14
3. BRIEF SYSTEM DETAILS 14
4. OPERATING DETAILS 15
3. VDM Implementation 16
4. Conclusion 38
5. Scope Of Improvement 39
6. Bibliography 34
14 July 2016 4
Certificate
This is to certify that Industrial training report entitled "VENDOR DOCUMENT
MANAGEMENT SYSTEM" made by NIKHIL JAIWAL, student of KIET
GHAZIABAD MCA-5t h Semester, at “ENGINEERS INDIA LIMITED” is an
original work and the same has not been submitted to any other institute for the
award of any other degree. A Presentation of the Industrial Training report was
made on “VENDOR DOCUMENT MANAGEMENT SYSTEM” and the
suggestions as approved by the faculty were duly incorporated.
Mr. Niranjan Behera
(Assistant General Manager)
(Engineers India Limited)
14 July 2016 5
Declaration
I NIKHIL JAISWAL, hereby declare that the project work entitled
“VENDOR DOCUMENT MANAGEMENT SYSTEM” is an authenticated
work carried out by me at Engineers India Limited (EIL) for the partial
fulfillment of the award of the degree of Masters of Computer Application
submitted at, Krishna Institute of Engineering And Technology (Ghaziabad).
This work has not been submitted for similar purpose anywhere else.
NIKHIL JAIWAL
(Masters Of Computer Application )
Krishna Institute of Engineering and Technology
14 July 2016 6
ACKNOWLEDGEMENT
I am highly grateful HOD , DEPT. OF COMPUTER APPLICATION, KIET ,GHAZIABAD,
U.P for providing this opportunity to carry out the industrial training at EIL
I would like express my gratitude to other faculty members of MCA dept. for providing
academic inputs , guidance and encouragement throughout the training period
I am grateful to MR .M .Y ALI, AGM (training dept.) EIL for giving me an opportunity to
undertake the vocational training in EIL , NEW DELHI
I express my sincere thanks and gratitude to MR. NIRANJAN BEHERA (AGM , ITS) , my
guide
MR.BALVINDER SINGH NAGI (ENGINEER , ITS ) for giving me an opportunity and
supporting me throughout .
The valuable guidance , keen interest and kind supervision of my work help me to
complete my training successfully .
14 July 2016 7
About the Organization
Overview:
Engineers India Limited (EIL), a Public Sector Undertaking was set up on
March 15th, 1965 to provide engineering and related technical services for
petroleum refineries and other industrial projects. EIL is working under the
administrative control of Ministry of Petroleum and Natural Gas,
Government of India. In addition to Petroleum Refineries, with which EIL
started initially, over the years it has diversified and excelled in various
other fields. EIL today has emerged as Asia’s leading design, engineering
and turnkey contracting company providing a complete range of project
services needed to conceptualize, plan, design, engineer and construct
projects to meet the specific requirements of its clients in the following
fields:
14 July 2016 8
‱Petroleum Refining
‱Petrochemicals
‱Pipelines
‱Offshore Oil & Gas
‱Onshore Oil & Gas
‱Terminals & Storages
‱Mining & Metallurgy
‱Infrastructure
Today, EIL is a ‘Total Solution’ engineering consultancy company providing
design, engineering, procurement, construction and integrated project
management services from ‘Concept to Commissioning’ with highest quality
and safety standards. It also provides specialist services such as heat and
mass transfer equipment design, environmental engineering, specialist
materials and maintenance and plant operations and safety services.
14 July 2016 9
With corporate office in New Delhi, EIL also operates from its four regional
engineering offices in Mumbai, Kolkata, Chennai and Vadodara and has inspection
offices at all major manufacturing locations of the country. The company’s overseas
presence is marked by an engineering office in Abu Dhabi, which caters to the
business needs in UAE/Middle-East region. Additionally, there are offices in
London, Milan and Shanghai to coordinate the activities of international
procurement and marketing.
EIL’s technological excellence is driven by 2950 engineers in a competent employee
base of over 3370 employees. The availability of technical resources per annum is
about 5.4 million man-hours in EIL’s design offices along with 7200 Man-months of
construction management services.
14 July 2016 10
About the Department (ITS)
Information and Technology Services has shaped into a channel of authentic and
reliable information flow throughout the company. In other words, it has become the
backbone of information management in the organization.
ITS is at the forefront in applying advanced IT tools to define, design and deliver
technology-enabled business solutions to our Internal business departments as well as
External Clients . It has built up the networking infrastructure and hardware set up for
creating, storing, processing and communication of information throughout the
company. Connectivity of HO to ROs & Site Offices (through VPN) has bridged the gap
of distance and time of information flow. It provides 24X7 availability of IT
Infrastructure in terms of Hardware & Software. Information Security is also ensured at
EIL through various means like Perimeter Security, Network Security, LAN Server
Security and Anti-virus measures.
14 July 2016 11
In house development of various functions of almost all departments of Company has led
to automation of the workflows. Starting from planning of the project with project
management and execution to commissioning of the project has been computerized.
Integrated systems are in place for HR as well as F&A departments. In-house Knowledge
Management System as well as world class Documented customized for EIL as EDMS are
being supported successfully.
Progress of ITS can be gauged through the facilities provided to reduce the time spent by
the employees in querying personal information regarding P&A claims/ payments/
status, Salary, PF, Earning using a single window interface, EILPORTAL, lodging of their
Hardware & Software complaints through ITS Helpdesk. Facility has been provided for
giving suggestions and feedback related to company's technical/ financial/ projects/
diversification issues through C&MD Portal. Concise and summarized management
information is available through a single window interface, Management Dashboard.
Online system for departmental information, Intranet and ready information on mobile,
Mobile Application Portal (MAP) also add value to IT services.
14 July 2016 12
These systems have been developed and implemented on platforms such as
UNIX, NetWare & NT using Microsoft .Net Framework, Spring Framework, J2EE,
RDBMS like ORACLE & Access. D2K, VB, C, C++, Java are being used for
development of front end modules. Furthermore the portals being web based are
accessible even at home. The customer centric approach of the dedicated team of
Information Technology and Services aims at maximizing customer-satisfaction.
ITS has executed a number of assignments involving OR techniques for the
Ministry of Petroleum, Govt. of India. Major investment decisions have been
taken by the clients based on these optimization studies.
14 July 2016 13
1. INTRODUCTION
Engineers India Limited (EIL), being a consultancy company depends heavily on
the services of its suppliers, contractors, licensors etc. for various materials and
equipments. The interaction between EIL and its vendors is critical to the
successful completion of its projects. The traditional way of interaction where
we make requests, exchange and approve documents offline as hard copies
tends to consume a lot of unwarranted time and contributes a little to the
standardization of the process. A step towards improvement, thus, was taken
when the Vendor Document requirements (VDR) module was released which
lets EIL personnel prepare a standardized VDR document online. To further
enhance and streamline the essential interaction process the Document Control
Index (DCI) module has been developed, which in tandem with VDR module,
will completely put this process online.
Document Control Index Module (DCIM) is a web application that lets a
vendor manage its orders online through a clean interface and via an intuitive
workflow.
14 July 2016 14
2. FEATURE
During a project, potentially thousands of documents from hundreds of vendors need to be
managed efficiently. For the contractor, processing, tracking and reporting on these items has
traditionally been a manual, resource-intensive process – involving various spreadsheets, email and
internal systems. A system that reduces complexity, improves data capture and increases control can
help address these challenges. And getting it right can help meet deadlines, drive down cost and
control risk.
3. SYSTEM REQUIREMENT
Hardware:
Minimum CPU: Pentium IV
Minimum RAM: 512 MB
Broadband Internet Connection
Software:
All the modern browsers with JavaScript enabled (Recommended).
Internet Explorer 7.0 or above with JavaScript enabled.
4. BRIEF SYSTEM DETAILS
Document Control Index Module (DCIM) is a web application that lets a vendor manage its
orders online through a clean interface and via an intuitive workflow.
14 July 2016 15
5. OPERATING DETAILS
To use the application, the user has to visit the following URL through its browser:
http://edocx.eil.co.in/vdm/
14 July 2016 16
To use the application, the user has to visit the following URL through its browser:
http://edocx.eil.co.in/vdm/. On doing that, a login screen will appear on which the user can
enter its credentials.
14 July 2016 17July 14, 2016
Home Screen
Where users can see their Respective index which consist list of Job No: , FOA
No: , Suppliers/ Contractors, Submitted on Date, View , and Approval Status.
14 July 2016 18July 14, 2016
Complete VDR
We can create new VDR by Selecting Job No: Unit No: MR/Tender document No:. After
selection an standard VDR number is generated which can be seen on screen after generation
of VDR No a user can allocate an Revision No: to it. After Allocating the revision number , an
appropriate VDR title will be generated. In this window we can copy existing VDR too by
providing the details of it.
14 July 2016 19July 14, 2016
Edit VDR
By selection Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No: ,
the selected VDR can be editable by clicking on GET VDR.
14 July 2016 20July 14, 2016
Submit VDR for Approval
.For filing VDR for approval one can submit it by selecting Job No:, Unit No: ,
MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can be send request
for approval by clicking on GET VDR
14 July 2016 21July 14, 2016
Approve VDR
For Approving the requested VDR, one can submit it by selecting Job No:, Unit
No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can
be approve by clicking on GET VDR
14 July 2016 22July 14, 2016
Revise VDR
For Revising the requested VDR, one can submit it by selecting Job No:, Unit
No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can
be rewise by clicking on Revise VDR
14 July 2016 23July 14, 2016
Print VDR
For Printing VDR, one can submit it by selecting Job No:, Unit No: , MR/Tender Document
No:, MR/Tender Revision No:. For printing the VDR several format is specified further over
the window and pressing Print VDR after it.
14 July 2016 24July 14, 2016
Approve DCI
For Approving the Document Control Index one has to select Job No.
and FOA No. form the window and click on Get DCI. After clicking
one can see various
14 July 2016 25July 14, 2016
Approve DCI
For Approving the Document Control Index one has to select Job No.
and FOA No. form the window and click on Get DCI. After clicking
one can see various DCI‟s for approving any DCI on has to select an
DCI and click on Approve Selected Document and send to Supplier Tab
or Lock DCI to prevent future editing tab.
14 July 2016 26July 14, 2016
Unlock DCI
To unlock DCI one has to send request to the manager of the department. Then the unlock
DCI will be displaced on the window. This is an confidential request one has to submit it with an proper
reason .
14 July 2016 27July 14, 2016
Pending Concession / Deviation
If the manager may wish to raise a Concession or Deviation request with EIL, he or she
may do so by going to the „Submit Concessions/Deviations Request‟ link in the „C&D‟
dropdown menu, filling the laid out form and submitting the same.
14 July 2016 28July 14, 2016
Resolved Concessions / Deviation
If the manager may wish to raise a Concession or Deviation request with EIL, he or
she may do so by going to the „Submit Concessions/Deviations Request‟ link in the
„C&D‟ dropdown menu, filling the laid out form and submitting the same.
14 July 2016 29July 14, 2016
Concessions / Deviation Conveyed to Originators
14 July 2016 30July 14, 2016
Concessions / Deviation Reports
14 July 2016 31July 14, 2016
VDR/DCI Reports
14 July 2016 32July 14, 2016
Job Wise Vendor Document Report
14 July 2016 33July 14, 2016
Job Wise Contractor Document Status
14 July 2016 34July 14, 2016
Bulk Import
14 July 2016 35July 14, 2016
Reorder Documents
14 July 2016 36July 14, 2016
Approved MSD
14 July 2016 37July 14, 2016
Edit Standard VDR’s
14 July 2016 38July 14, 2016
Help Desk
Form the „Help‟ dropdown menu, the manger may download the user manual, add emails
for notifications, raise a ticket on the helpdesk and change his or her password.
14 July 2016 39
Thank You
Conclusion
Web sites are unfortunately prone to security risks. And so are any
networks to which web servers are connected, thus in today‟s world
there is a dire need for a secured network on which the data can travel.
In this project a secured connection has been established between the
client and server through SSL, and tested. Now sensitive information
such as credit card numbers, social security numbers, and login
credentials can be transmitted securely over this network.
A vender can update their status and check there current status of the
document which it was provided .
14 July 2016 40
Thank You
Scope of Improvement
This project is not the end of our path for our career. This is the first project
designed by us as we think this is the learning experience for us. We have put our
best effort to design a website with the implementation of “Vendor Document
Management System” in six weeks. Time is the major problem as we have to
deliver the project in a particular time period. In the project we have used Spring
Framework
Technique to develop web application for a web organization
In future the following features can be added to enhance the project.
‱Bootstrap technology for enhanced Appearance.
‱Tools other then Wireshark may be used to test the level of security offered by
Secure Socket Layer.
14 July 2016 41
Thank You
Bibliography
References:
http://en.wikipedia.org/wiki/spring
http://en.wikipedia.org/wiki/springframework
http://www.openssl.org/docs/fips/tutorialpoint
http://www.youtube.com/javabrains/spring
14 July 2016 42
Thank You
THANK YOU

Weitere Àhnliche Inhalte

Was ist angesagt?

Strategic Human Resource Management - AIB (MBA) 2015
Strategic Human Resource Management - AIB (MBA) 2015Strategic Human Resource Management - AIB (MBA) 2015
Strategic Human Resource Management - AIB (MBA) 2015Rohana K Amarakoon
 
ALBA Presentation
ALBA PresentationALBA Presentation
ALBA PresentationPeoplecert
 
Introduction to BEACON SOLIDWORKS
Introduction to BEACON SOLIDWORKSIntroduction to BEACON SOLIDWORKS
Introduction to BEACON SOLIDWORKSBEACON SolidWorks
 
IRJET- Enhanced Mobile Application for Training and Placement Cell
IRJET- Enhanced Mobile Application for Training and Placement CellIRJET- Enhanced Mobile Application for Training and Placement Cell
IRJET- Enhanced Mobile Application for Training and Placement CellIRJET Journal
 
Microsoft exchange server report final3
Microsoft exchange server report final3Microsoft exchange server report final3
Microsoft exchange server report final3Manshant Singh
 
Automation Training+Job Assistance Training+industrial training+automation tr...
Automation Training+Job Assistance Training+industrial training+automation tr...Automation Training+Job Assistance Training+industrial training+automation tr...
Automation Training+Job Assistance Training+industrial training+automation tr...eratif1
 
Iris volume I
Iris volume IIris volume I
Iris volume IBPalmer13
 
Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Gopalakrishnan P
 
Resume_Sanjay1
Resume_Sanjay1Resume_Sanjay1
Resume_Sanjay1Sanjay Borude
 
Website documents
Website documentsWebsite documents
Website documentsjayam19
 
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Rahul D Sharma
 

Was ist angesagt? (13)

Strategic Human Resource Management - AIB (MBA) 2015
Strategic Human Resource Management - AIB (MBA) 2015Strategic Human Resource Management - AIB (MBA) 2015
Strategic Human Resource Management - AIB (MBA) 2015
 
KTCV2016July
KTCV2016JulyKTCV2016July
KTCV2016July
 
ALBA Presentation
ALBA PresentationALBA Presentation
ALBA Presentation
 
Introduction to BEACON SOLIDWORKS
Introduction to BEACON SOLIDWORKSIntroduction to BEACON SOLIDWORKS
Introduction to BEACON SOLIDWORKS
 
IRJET- Enhanced Mobile Application for Training and Placement Cell
IRJET- Enhanced Mobile Application for Training and Placement CellIRJET- Enhanced Mobile Application for Training and Placement Cell
IRJET- Enhanced Mobile Application for Training and Placement Cell
 
Microsoft exchange server report final3
Microsoft exchange server report final3Microsoft exchange server report final3
Microsoft exchange server report final3
 
Automation Training+Job Assistance Training+industrial training+automation tr...
Automation Training+Job Assistance Training+industrial training+automation tr...Automation Training+Job Assistance Training+industrial training+automation tr...
Automation Training+Job Assistance Training+industrial training+automation tr...
 
Iris volume I
Iris volume IIris volume I
Iris volume I
 
Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)Brochure ifs shipbuilding (1)
Brochure ifs shipbuilding (1)
 
Resume_Sanjay1
Resume_Sanjay1Resume_Sanjay1
Resume_Sanjay1
 
Content
ContentContent
Content
 
Website documents
Website documentsWebsite documents
Website documents
 
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
 

Ähnlich wie VDM Reprot By Nikhil Jaiswal

White paper-iop tech1
White paper-iop tech1White paper-iop tech1
White paper-iop tech1ali tajalli
 
REport Fle.pdf
REport Fle.pdfREport Fle.pdf
REport Fle.pdfTarunPreet4
 
NCI School of Computing Project Showcase 2014
NCI School of Computing Project Showcase 2014NCI School of Computing Project Showcase 2014
NCI School of Computing Project Showcase 2014ckennedynci
 
eWIDEPLUS Company Profile 2014
eWIDEPLUS Company Profile 2014eWIDEPLUS Company Profile 2014
eWIDEPLUS Company Profile 2014eWIDEPLUS
 
Company - Presentation
Company - PresentationCompany - Presentation
Company - PresentationAmit Joshi
 
Taxation project new
Taxation project newTaxation project new
Taxation project newIT
 
inventeron.pptx
inventeron.pptxinventeron.pptx
inventeron.pptxChinnaSwamy8
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubroShray Jali
 
Training Report (2)
Training Report (2)Training Report (2)
Training Report (2)Rahul Dubey
 
Senior on full stack web develpoment .pptx
Senior on full stack web develpoment .pptxSenior on full stack web develpoment .pptx
Senior on full stack web develpoment .pptxShravanaK1
 
Resume - Nitin Nagrale
Resume - Nitin NagraleResume - Nitin Nagrale
Resume - Nitin NagraleNitin Nagrale
 
rip 1.pdf
rip 1.pdfrip 1.pdf
rip 1.pdfHarryKkc1
 
Internship-Report-sample-6.pdf
Internship-Report-sample-6.pdfInternship-Report-sample-6.pdf
Internship-Report-sample-6.pdfAbhiAry
 

Ähnlich wie VDM Reprot By Nikhil Jaiswal (20)

White paper-iop tech1
White paper-iop tech1White paper-iop tech1
White paper-iop tech1
 
Rushindra-CV
Rushindra-CVRushindra-CV
Rushindra-CV
 
Rushindra-CV
Rushindra-CVRushindra-CV
Rushindra-CV
 
REport Fle.pdf
REport Fle.pdfREport Fle.pdf
REport Fle.pdf
 
Resume
ResumeResume
Resume
 
Gaurav resume
Gaurav resumeGaurav resume
Gaurav resume
 
NCI School of Computing Project Showcase 2014
NCI School of Computing Project Showcase 2014NCI School of Computing Project Showcase 2014
NCI School of Computing Project Showcase 2014
 
eWIDEPLUS Company Profile 2014
eWIDEPLUS Company Profile 2014eWIDEPLUS Company Profile 2014
eWIDEPLUS Company Profile 2014
 
Company - Presentation
Company - PresentationCompany - Presentation
Company - Presentation
 
Taxation project new
Taxation project newTaxation project new
Taxation project new
 
Resume_Shyamalendu
Resume_ShyamalenduResume_Shyamalendu
Resume_Shyamalendu
 
inventeron.pptx
inventeron.pptxinventeron.pptx
inventeron.pptx
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubro
 
Training Report (2)
Training Report (2)Training Report (2)
Training Report (2)
 
Sanjay CV
Sanjay CVSanjay CV
Sanjay CV
 
Sanjay cv
Sanjay cvSanjay cv
Sanjay cv
 
Senior on full stack web develpoment .pptx
Senior on full stack web develpoment .pptxSenior on full stack web develpoment .pptx
Senior on full stack web develpoment .pptx
 
Resume - Nitin Nagrale
Resume - Nitin NagraleResume - Nitin Nagrale
Resume - Nitin Nagrale
 
rip 1.pdf
rip 1.pdfrip 1.pdf
rip 1.pdf
 
Internship-Report-sample-6.pdf
Internship-Report-sample-6.pdfInternship-Report-sample-6.pdf
Internship-Report-sample-6.pdf
 

VDM Reprot By Nikhil Jaiswal

  • 2. 14 July 2016 2 SECURE SOCKET LAYER NAME :NIKHIL JAIWAL ROLL NO :1502914909 BRANCH :M.C.A SEMESTER :V SESSION :2016-2017 (AT) Under the Guidance Of Mr. Niranjan Behera (Assistant General Manager) (BY)
  • 3. 14 July 2016 3 Contents 1. About Organization 07 2. Introduction 13 1. FEATURES 14 2. SYSTEM REQUIREMENT 14 3. BRIEF SYSTEM DETAILS 14 4. OPERATING DETAILS 15 3. VDM Implementation 16 4. Conclusion 38 5. Scope Of Improvement 39 6. Bibliography 34
  • 4. 14 July 2016 4 Certificate This is to certify that Industrial training report entitled "VENDOR DOCUMENT MANAGEMENT SYSTEM" made by NIKHIL JAIWAL, student of KIET GHAZIABAD MCA-5t h Semester, at “ENGINEERS INDIA LIMITED” is an original work and the same has not been submitted to any other institute for the award of any other degree. A Presentation of the Industrial Training report was made on “VENDOR DOCUMENT MANAGEMENT SYSTEM” and the suggestions as approved by the faculty were duly incorporated. Mr. Niranjan Behera (Assistant General Manager) (Engineers India Limited)
  • 5. 14 July 2016 5 Declaration I NIKHIL JAISWAL, hereby declare that the project work entitled “VENDOR DOCUMENT MANAGEMENT SYSTEM” is an authenticated work carried out by me at Engineers India Limited (EIL) for the partial fulfillment of the award of the degree of Masters of Computer Application submitted at, Krishna Institute of Engineering And Technology (Ghaziabad). This work has not been submitted for similar purpose anywhere else. NIKHIL JAIWAL (Masters Of Computer Application ) Krishna Institute of Engineering and Technology
  • 6. 14 July 2016 6 ACKNOWLEDGEMENT I am highly grateful HOD , DEPT. OF COMPUTER APPLICATION, KIET ,GHAZIABAD, U.P for providing this opportunity to carry out the industrial training at EIL I would like express my gratitude to other faculty members of MCA dept. for providing academic inputs , guidance and encouragement throughout the training period I am grateful to MR .M .Y ALI, AGM (training dept.) EIL for giving me an opportunity to undertake the vocational training in EIL , NEW DELHI I express my sincere thanks and gratitude to MR. NIRANJAN BEHERA (AGM , ITS) , my guide MR.BALVINDER SINGH NAGI (ENGINEER , ITS ) for giving me an opportunity and supporting me throughout . The valuable guidance , keen interest and kind supervision of my work help me to complete my training successfully .
  • 7. 14 July 2016 7 About the Organization Overview: Engineers India Limited (EIL), a Public Sector Undertaking was set up on March 15th, 1965 to provide engineering and related technical services for petroleum refineries and other industrial projects. EIL is working under the administrative control of Ministry of Petroleum and Natural Gas, Government of India. In addition to Petroleum Refineries, with which EIL started initially, over the years it has diversified and excelled in various other fields. EIL today has emerged as Asia’s leading design, engineering and turnkey contracting company providing a complete range of project services needed to conceptualize, plan, design, engineer and construct projects to meet the specific requirements of its clients in the following fields:
  • 8. 14 July 2016 8 ‱Petroleum Refining ‱Petrochemicals ‱Pipelines ‱Offshore Oil & Gas ‱Onshore Oil & Gas ‱Terminals & Storages ‱Mining & Metallurgy ‱Infrastructure Today, EIL is a ‘Total Solution’ engineering consultancy company providing design, engineering, procurement, construction and integrated project management services from ‘Concept to Commissioning’ with highest quality and safety standards. It also provides specialist services such as heat and mass transfer equipment design, environmental engineering, specialist materials and maintenance and plant operations and safety services.
  • 9. 14 July 2016 9 With corporate office in New Delhi, EIL also operates from its four regional engineering offices in Mumbai, Kolkata, Chennai and Vadodara and has inspection offices at all major manufacturing locations of the country. The company’s overseas presence is marked by an engineering office in Abu Dhabi, which caters to the business needs in UAE/Middle-East region. Additionally, there are offices in London, Milan and Shanghai to coordinate the activities of international procurement and marketing. EIL’s technological excellence is driven by 2950 engineers in a competent employee base of over 3370 employees. The availability of technical resources per annum is about 5.4 million man-hours in EIL’s design offices along with 7200 Man-months of construction management services.
  • 10. 14 July 2016 10 About the Department (ITS) Information and Technology Services has shaped into a channel of authentic and reliable information flow throughout the company. In other words, it has become the backbone of information management in the organization. ITS is at the forefront in applying advanced IT tools to define, design and deliver technology-enabled business solutions to our Internal business departments as well as External Clients . It has built up the networking infrastructure and hardware set up for creating, storing, processing and communication of information throughout the company. Connectivity of HO to ROs & Site Offices (through VPN) has bridged the gap of distance and time of information flow. It provides 24X7 availability of IT Infrastructure in terms of Hardware & Software. Information Security is also ensured at EIL through various means like Perimeter Security, Network Security, LAN Server Security and Anti-virus measures.
  • 11. 14 July 2016 11 In house development of various functions of almost all departments of Company has led to automation of the workflows. Starting from planning of the project with project management and execution to commissioning of the project has been computerized. Integrated systems are in place for HR as well as F&A departments. In-house Knowledge Management System as well as world class Documented customized for EIL as EDMS are being supported successfully. Progress of ITS can be gauged through the facilities provided to reduce the time spent by the employees in querying personal information regarding P&A claims/ payments/ status, Salary, PF, Earning using a single window interface, EILPORTAL, lodging of their Hardware & Software complaints through ITS Helpdesk. Facility has been provided for giving suggestions and feedback related to company's technical/ financial/ projects/ diversification issues through C&MD Portal. Concise and summarized management information is available through a single window interface, Management Dashboard. Online system for departmental information, Intranet and ready information on mobile, Mobile Application Portal (MAP) also add value to IT services.
  • 12. 14 July 2016 12 These systems have been developed and implemented on platforms such as UNIX, NetWare & NT using Microsoft .Net Framework, Spring Framework, J2EE, RDBMS like ORACLE & Access. D2K, VB, C, C++, Java are being used for development of front end modules. Furthermore the portals being web based are accessible even at home. The customer centric approach of the dedicated team of Information Technology and Services aims at maximizing customer-satisfaction. ITS has executed a number of assignments involving OR techniques for the Ministry of Petroleum, Govt. of India. Major investment decisions have been taken by the clients based on these optimization studies.
  • 13. 14 July 2016 13 1. INTRODUCTION Engineers India Limited (EIL), being a consultancy company depends heavily on the services of its suppliers, contractors, licensors etc. for various materials and equipments. The interaction between EIL and its vendors is critical to the successful completion of its projects. The traditional way of interaction where we make requests, exchange and approve documents offline as hard copies tends to consume a lot of unwarranted time and contributes a little to the standardization of the process. A step towards improvement, thus, was taken when the Vendor Document requirements (VDR) module was released which lets EIL personnel prepare a standardized VDR document online. To further enhance and streamline the essential interaction process the Document Control Index (DCI) module has been developed, which in tandem with VDR module, will completely put this process online. Document Control Index Module (DCIM) is a web application that lets a vendor manage its orders online through a clean interface and via an intuitive workflow.
  • 14. 14 July 2016 14 2. FEATURE During a project, potentially thousands of documents from hundreds of vendors need to be managed efficiently. For the contractor, processing, tracking and reporting on these items has traditionally been a manual, resource-intensive process – involving various spreadsheets, email and internal systems. A system that reduces complexity, improves data capture and increases control can help address these challenges. And getting it right can help meet deadlines, drive down cost and control risk. 3. SYSTEM REQUIREMENT Hardware: Minimum CPU: Pentium IV Minimum RAM: 512 MB Broadband Internet Connection Software: All the modern browsers with JavaScript enabled (Recommended). Internet Explorer 7.0 or above with JavaScript enabled. 4. BRIEF SYSTEM DETAILS Document Control Index Module (DCIM) is a web application that lets a vendor manage its orders online through a clean interface and via an intuitive workflow.
  • 15. 14 July 2016 15 5. OPERATING DETAILS To use the application, the user has to visit the following URL through its browser: http://edocx.eil.co.in/vdm/
  • 16. 14 July 2016 16 To use the application, the user has to visit the following URL through its browser: http://edocx.eil.co.in/vdm/. On doing that, a login screen will appear on which the user can enter its credentials.
  • 17. 14 July 2016 17July 14, 2016 Home Screen Where users can see their Respective index which consist list of Job No: , FOA No: , Suppliers/ Contractors, Submitted on Date, View , and Approval Status.
  • 18. 14 July 2016 18July 14, 2016 Complete VDR We can create new VDR by Selecting Job No: Unit No: MR/Tender document No:. After selection an standard VDR number is generated which can be seen on screen after generation of VDR No a user can allocate an Revision No: to it. After Allocating the revision number , an appropriate VDR title will be generated. In this window we can copy existing VDR too by providing the details of it.
  • 19. 14 July 2016 19July 14, 2016 Edit VDR By selection Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can be editable by clicking on GET VDR.
  • 20. 14 July 2016 20July 14, 2016 Submit VDR for Approval .For filing VDR for approval one can submit it by selecting Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can be send request for approval by clicking on GET VDR
  • 21. 14 July 2016 21July 14, 2016 Approve VDR For Approving the requested VDR, one can submit it by selecting Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can be approve by clicking on GET VDR
  • 22. 14 July 2016 22July 14, 2016 Revise VDR For Revising the requested VDR, one can submit it by selecting Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No: , the selected VDR can be rewise by clicking on Revise VDR
  • 23. 14 July 2016 23July 14, 2016 Print VDR For Printing VDR, one can submit it by selecting Job No:, Unit No: , MR/Tender Document No:, MR/Tender Revision No:. For printing the VDR several format is specified further over the window and pressing Print VDR after it.
  • 24. 14 July 2016 24July 14, 2016 Approve DCI For Approving the Document Control Index one has to select Job No. and FOA No. form the window and click on Get DCI. After clicking one can see various
  • 25. 14 July 2016 25July 14, 2016 Approve DCI For Approving the Document Control Index one has to select Job No. and FOA No. form the window and click on Get DCI. After clicking one can see various DCI‟s for approving any DCI on has to select an DCI and click on Approve Selected Document and send to Supplier Tab or Lock DCI to prevent future editing tab.
  • 26. 14 July 2016 26July 14, 2016 Unlock DCI To unlock DCI one has to send request to the manager of the department. Then the unlock DCI will be displaced on the window. This is an confidential request one has to submit it with an proper reason .
  • 27. 14 July 2016 27July 14, 2016 Pending Concession / Deviation If the manager may wish to raise a Concession or Deviation request with EIL, he or she may do so by going to the „Submit Concessions/Deviations Request‟ link in the „C&D‟ dropdown menu, filling the laid out form and submitting the same.
  • 28. 14 July 2016 28July 14, 2016 Resolved Concessions / Deviation If the manager may wish to raise a Concession or Deviation request with EIL, he or she may do so by going to the „Submit Concessions/Deviations Request‟ link in the „C&D‟ dropdown menu, filling the laid out form and submitting the same.
  • 29. 14 July 2016 29July 14, 2016 Concessions / Deviation Conveyed to Originators
  • 30. 14 July 2016 30July 14, 2016 Concessions / Deviation Reports
  • 31. 14 July 2016 31July 14, 2016 VDR/DCI Reports
  • 32. 14 July 2016 32July 14, 2016 Job Wise Vendor Document Report
  • 33. 14 July 2016 33July 14, 2016 Job Wise Contractor Document Status
  • 34. 14 July 2016 34July 14, 2016 Bulk Import
  • 35. 14 July 2016 35July 14, 2016 Reorder Documents
  • 36. 14 July 2016 36July 14, 2016 Approved MSD
  • 37. 14 July 2016 37July 14, 2016 Edit Standard VDR’s
  • 38. 14 July 2016 38July 14, 2016 Help Desk Form the „Help‟ dropdown menu, the manger may download the user manual, add emails for notifications, raise a ticket on the helpdesk and change his or her password.
  • 39. 14 July 2016 39 Thank You Conclusion Web sites are unfortunately prone to security risks. And so are any networks to which web servers are connected, thus in today‟s world there is a dire need for a secured network on which the data can travel. In this project a secured connection has been established between the client and server through SSL, and tested. Now sensitive information such as credit card numbers, social security numbers, and login credentials can be transmitted securely over this network. A vender can update their status and check there current status of the document which it was provided .
  • 40. 14 July 2016 40 Thank You Scope of Improvement This project is not the end of our path for our career. This is the first project designed by us as we think this is the learning experience for us. We have put our best effort to design a website with the implementation of “Vendor Document Management System” in six weeks. Time is the major problem as we have to deliver the project in a particular time period. In the project we have used Spring Framework Technique to develop web application for a web organization In future the following features can be added to enhance the project. ‱Bootstrap technology for enhanced Appearance. ‱Tools other then Wireshark may be used to test the level of security offered by Secure Socket Layer.
  • 41. 14 July 2016 41 Thank You Bibliography References: http://en.wikipedia.org/wiki/spring http://en.wikipedia.org/wiki/springframework http://www.openssl.org/docs/fips/tutorialpoint http://www.youtube.com/javabrains/spring
  • 42. 14 July 2016 42 Thank You THANK YOU