Case Study
Glassworks, Student
Accommodation, Newcastle
STUDENT ACCOMMODATION PROJECT CASE STUDY
www.deesidetimberframe.com
“Deeside Timberframe were pleased
to work with Brimms Construction on
this high profile project in Newcastle
and will look forward to working with
them on the next development.”
DAVID JAMIESON
NATIONAL SALES MANAGER
DEESIDE TIMBERFRAME
BRIMMS CONSTRUCTION AWARDED DEESIDE TIMBERFRAME TO DESIGN, SUPPLY
AND ERECT THE TIMBER FRAME FOR THE STUDENT ACCOMMODATION PROJECT AT
COQUET ST IN NEWCASTLE.
•	 Onsite for 6 week period, followed by 8 week period for project completion
•	 Wall and roof cassettes erected on site
•	 CAT C2 build, under the STA’s Site Safety Policy due to site being surrounded by
	 industrial buildings, offices, housing and other existing student accommodation
To discover more please contact David Jamieson on 07501466575 or
email david.jamieson@deesidetimberframe.com
Unique Project Facts
ONSITE STORY
CRM Student Accommodation acquired the former Glassworks
site in Newcastle for redevelopment and to provide much needed
accommodation in this part of the city.
Due to the nature and scale of the project, fire mitigation measures
were required during construction. Deeside, as members of the STA,
were awarded the project as we were best placed to advise our clients
on this specification. It is a requirement that STA Site Safe Procedures
are followed on any new building with a floor area of more than 600m2,
and on site additional fire protection with the use of Fire Retardant
sheathing boards, studs and floor decking as fire mitigation measures
were adopted by Deeside Timberframe.
SCALE OF DELIVERY
Three student accommodation blocks were erected, with each block
5 storeys high. The development comprised of 165 rooms in total plus
reception areas and management centre. The project was successfully
completed within agreed timescales and budgets.
WHAT WE DELIVERED
From initial engagement with the client in January 2015, Deeside’s
dedicated project management and design team worked alongside
the architects, client and contractor to create a build solution and build
schedule to meet the objectives of the project.
•	 Dedicated design and planning team from initial engagement
•	 Timberframe build solutions to include for fire mitigation
•	 Supply and erect of structural timber frame package
•	 On-site crane to erect the structure including large cassette panels
•	 External wall insulation, VCL and service zone framing package 	
	 supplied and fitted
•	 79 bedrooms in total
•	 STA Site Safe CAT C2 project
www.deesidetimberframe.com
14week
programme by
Deeside.
STUDENT ACCOMMODATION PROJECT CASE STUDY
Project Name
Brimms Construction Ltd
Building Type
Student Accommodation
Location
Coquet St, Newcastle
Architect
Ryder Architecture, Newcastle Upon Tyne
Client
Brimms Construction Ltd
Date Completed
2016
Case Study
Glassworks, Student
Accommodation, Newcastle
Deeside Timberframe Ltd
Broomhill Road
Spurryhillock Industrial Estate,
Stonehaven, Aberdeenshire AB39 2NH
Tel. 01569 767 123
Discover Deeside
AS AN AWARD-WINNING MANUFACTURER AND SUPPLIER FOUNDED IN 1985, OPERATING THROUGHOUT THE
UK, DEESIDE TIMBERFRAME DESIGNS, MANUFACTURES, DELIVERS AND INSTALLS FRAMING SYSTEMS FOR
COMMERCIAL DEVELOPERS, LOCAL AUTHORITIES, REGIONAL AND NATIONAL BUILDERS, SOCIAL HOUSING
AND THE PRIVATE SELF BUILD MARKET.
To discover more please contact
David Jamieson, National Sales Manager
Tel. 07501466575
Email. david.jamieson@deesidetimberframe.com
www.deesidetimberframe.com
STUDENT ACCOMMODATION PROJECT CASE STUDY
Deeside Timberframe Ltd
Unit 8A & 8B
Bandeath Industrial Estate,
Throsk, Stirling FK7 7NP
Tel. 01786 484 670

Weitere ähnliche Inhalte

Was ist angesagt?

F. King CV- Jan 2015
F. King CV- Jan 2015F. King CV- Jan 2015
F. King CV- Jan 2015
Frank King
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
John Pattison
 
STM WT 2015 two pages
STM WT 2015 two pagesSTM WT 2015 two pages
STM WT 2015 two pages
Ron Morton
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
khaikeat16
 
Fontainebleau Article
Fontainebleau ArticleFontainebleau Article
Fontainebleau Article
Robert Meller
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3
Carmelcrest
 
Jeff's cv - 2015 version
Jeff's  cv - 2015 versionJeff's  cv - 2015 version
Jeff's cv - 2015 version
Jeffrey Hunt
 

Was ist angesagt? (18)

1. Main CV pics
1. Main CV pics1. Main CV pics
1. Main CV pics
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
simon cv1 1
simon cv1 1simon cv1 1
simon cv1 1
 
resume 2014
resume 2014resume 2014
resume 2014
 
BM Construction
BM ConstructionBM Construction
BM Construction
 
March 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damagesMarch 2015 presentation to ASBC on slab heave and damages
March 2015 presentation to ASBC on slab heave and damages
 
Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
F. King CV- Jan 2015
F. King CV- Jan 2015F. King CV- Jan 2015
F. King CV- Jan 2015
 
Coates Hire - Case Study
Coates Hire - Case Study Coates Hire - Case Study
Coates Hire - Case Study
 
John Pattison CV 2016 for web
John Pattison CV 2016 for webJohn Pattison CV 2016 for web
John Pattison CV 2016 for web
 
2016 CV2.doc 2
2016 CV2.doc 22016 CV2.doc 2
2016 CV2.doc 2
 
STM WT 2015 two pages
STM WT 2015 two pagesSTM WT 2015 two pages
STM WT 2015 two pages
 
SITE REPORT (CT).pdf
SITE REPORT (CT).pdfSITE REPORT (CT).pdf
SITE REPORT (CT).pdf
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
SAMPLE
SAMPLESAMPLE
SAMPLE
 
Fontainebleau Article
Fontainebleau ArticleFontainebleau Article
Fontainebleau Article
 
Case Study Ronald Openshaw3
Case Study Ronald Openshaw3Case Study Ronald Openshaw3
Case Study Ronald Openshaw3
 
Jeff's cv - 2015 version
Jeff's  cv - 2015 versionJeff's  cv - 2015 version
Jeff's cv - 2015 version
 

Andere mochten auch

University of Toronto
University of TorontoUniversity of Toronto
University of Toronto
hasiukab
 

Andere mochten auch (10)

University of Toronto
University of TorontoUniversity of Toronto
University of Toronto
 
Onu new student housing application slide show
Onu new student housing application slide showOnu new student housing application slide show
Onu new student housing application slide show
 
Edificio tietgen dormitório trabalho aui
Edificio tietgen dormitório   trabalho auiEdificio tietgen dormitório   trabalho aui
Edificio tietgen dormitório trabalho aui
 
A Literature Review of Rupert Menzees College Student Accommodation, NSW Aust...
A Literature Review of Rupert Menzees College Student Accommodation, NSW Aust...A Literature Review of Rupert Menzees College Student Accommodation, NSW Aust...
A Literature Review of Rupert Menzees College Student Accommodation, NSW Aust...
 
Dormitory 2.0
Dormitory 2.0Dormitory 2.0
Dormitory 2.0
 
Dormitory
DormitoryDormitory
Dormitory
 
Peter zumthor
Peter zumthorPeter zumthor
Peter zumthor
 
Dormitory case studies
Dormitory case studiesDormitory case studies
Dormitory case studies
 
case study of chandigarh college of architecture
case study of chandigarh college of architecturecase study of chandigarh college of architecture
case study of chandigarh college of architecture
 
Obesity Presentation
Obesity PresentationObesity Presentation
Obesity Presentation
 

Ähnlich wie CaseStudy-Brimms

16386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.1516386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.15
Nicholas Ball
 
Project Sheet Pinehill Reservoir
Project Sheet Pinehill ReservoirProject Sheet Pinehill Reservoir
Project Sheet Pinehill Reservoir
Stuart Dring
 
STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD email
Lyndrea McGregor
 
Glaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 RGlaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 R
Chris Andersen
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4
Keith Callanan
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
john rhynold
 
MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2nd
michael matthews
 
BMSA Corporate Profile
BMSA Corporate ProfileBMSA Corporate Profile
BMSA Corporate Profile
Dave Barr
 
Genesis Manazil Group Presentation
Genesis Manazil Group PresentationGenesis Manazil Group Presentation
Genesis Manazil Group Presentation
Ahmed Shalaby
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
James Lee
 
GreatLakesRoofingCompanyPage8.25.16
GreatLakesRoofingCompanyPage8.25.16GreatLakesRoofingCompanyPage8.25.16
GreatLakesRoofingCompanyPage8.25.16
James Kosterman
 
STANDOUT_PROJECTS - NSW email
STANDOUT_PROJECTS - NSW emailSTANDOUT_PROJECTS - NSW email
STANDOUT_PROJECTS - NSW email
Lyndrea McGregor
 
Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Res
adamide
 

Ähnlich wie CaseStudy-Brimms (20)

16386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.1516386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.15
 
Castleoak - Modern Methods of Construction in action in the UK
Castleoak - Modern Methods of Construction in action in the UKCastleoak - Modern Methods of Construction in action in the UK
Castleoak - Modern Methods of Construction in action in the UK
 
Project Sheet Pinehill Reservoir
Project Sheet Pinehill ReservoirProject Sheet Pinehill Reservoir
Project Sheet Pinehill Reservoir
 
STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD email
 
Glaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 RGlaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 R
 
Capability Statement REV 4
Capability Statement REV 4Capability Statement REV 4
Capability Statement REV 4
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
 
Dowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show viewDowland contracting ltd company overview slide show view
Dowland contracting ltd company overview slide show view
 
MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2nd
 
BMSA Corporate Profile
BMSA Corporate ProfileBMSA Corporate Profile
BMSA Corporate Profile
 
Genesis Manazil Group Presentation
Genesis Manazil Group PresentationGenesis Manazil Group Presentation
Genesis Manazil Group Presentation
 
B30 Frame & Infill Balustrade - Brochure
B30 Frame & Infill Balustrade - BrochureB30 Frame & Infill Balustrade - Brochure
B30 Frame & Infill Balustrade - Brochure
 
B30 Brochure
B30 BrochureB30 Brochure
B30 Brochure
 
James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0James_Lee_Portfolio_5.0
James_Lee_Portfolio_5.0
 
Wilkie ccs master 090817
Wilkie ccs master 090817Wilkie ccs master 090817
Wilkie ccs master 090817
 
GreatLakesRoofingCompanyPage8.25.16
GreatLakesRoofingCompanyPage8.25.16GreatLakesRoofingCompanyPage8.25.16
GreatLakesRoofingCompanyPage8.25.16
 
STANDOUT_PROJECTS - NSW email
STANDOUT_PROJECTS - NSW emailSTANDOUT_PROJECTS - NSW email
STANDOUT_PROJECTS - NSW email
 
Westera Commercial Industrial Multi Res
Westera Commercial Industrial Multi ResWestera Commercial Industrial Multi Res
Westera Commercial Industrial Multi Res
 
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing DesignDon Talend Below-Grade Parking Boosts Low-Rise Housing Design
Don Talend Below-Grade Parking Boosts Low-Rise Housing Design
 

CaseStudy-Brimms

  • 1. www.deesidetimberframe.com Case Study Glassworks, Student Accommodation, Newcastle STUDENT ACCOMMODATION PROJECT CASE STUDY
  • 2. www.deesidetimberframe.com “Deeside Timberframe were pleased to work with Brimms Construction on this high profile project in Newcastle and will look forward to working with them on the next development.” DAVID JAMIESON NATIONAL SALES MANAGER DEESIDE TIMBERFRAME BRIMMS CONSTRUCTION AWARDED DEESIDE TIMBERFRAME TO DESIGN, SUPPLY AND ERECT THE TIMBER FRAME FOR THE STUDENT ACCOMMODATION PROJECT AT COQUET ST IN NEWCASTLE. • Onsite for 6 week period, followed by 8 week period for project completion • Wall and roof cassettes erected on site • CAT C2 build, under the STA’s Site Safety Policy due to site being surrounded by industrial buildings, offices, housing and other existing student accommodation To discover more please contact David Jamieson on 07501466575 or email david.jamieson@deesidetimberframe.com Unique Project Facts
  • 3. ONSITE STORY CRM Student Accommodation acquired the former Glassworks site in Newcastle for redevelopment and to provide much needed accommodation in this part of the city. Due to the nature and scale of the project, fire mitigation measures were required during construction. Deeside, as members of the STA, were awarded the project as we were best placed to advise our clients on this specification. It is a requirement that STA Site Safe Procedures are followed on any new building with a floor area of more than 600m2, and on site additional fire protection with the use of Fire Retardant sheathing boards, studs and floor decking as fire mitigation measures were adopted by Deeside Timberframe. SCALE OF DELIVERY Three student accommodation blocks were erected, with each block 5 storeys high. The development comprised of 165 rooms in total plus reception areas and management centre. The project was successfully completed within agreed timescales and budgets. WHAT WE DELIVERED From initial engagement with the client in January 2015, Deeside’s dedicated project management and design team worked alongside the architects, client and contractor to create a build solution and build schedule to meet the objectives of the project. • Dedicated design and planning team from initial engagement • Timberframe build solutions to include for fire mitigation • Supply and erect of structural timber frame package • On-site crane to erect the structure including large cassette panels • External wall insulation, VCL and service zone framing package supplied and fitted • 79 bedrooms in total • STA Site Safe CAT C2 project www.deesidetimberframe.com 14week programme by Deeside. STUDENT ACCOMMODATION PROJECT CASE STUDY
  • 4. Project Name Brimms Construction Ltd Building Type Student Accommodation Location Coquet St, Newcastle Architect Ryder Architecture, Newcastle Upon Tyne Client Brimms Construction Ltd Date Completed 2016 Case Study Glassworks, Student Accommodation, Newcastle Deeside Timberframe Ltd Broomhill Road Spurryhillock Industrial Estate, Stonehaven, Aberdeenshire AB39 2NH Tel. 01569 767 123 Discover Deeside AS AN AWARD-WINNING MANUFACTURER AND SUPPLIER FOUNDED IN 1985, OPERATING THROUGHOUT THE UK, DEESIDE TIMBERFRAME DESIGNS, MANUFACTURES, DELIVERS AND INSTALLS FRAMING SYSTEMS FOR COMMERCIAL DEVELOPERS, LOCAL AUTHORITIES, REGIONAL AND NATIONAL BUILDERS, SOCIAL HOUSING AND THE PRIVATE SELF BUILD MARKET. To discover more please contact David Jamieson, National Sales Manager Tel. 07501466575 Email. david.jamieson@deesidetimberframe.com www.deesidetimberframe.com STUDENT ACCOMMODATION PROJECT CASE STUDY Deeside Timberframe Ltd Unit 8A & 8B Bandeath Industrial Estate, Throsk, Stirling FK7 7NP Tel. 01786 484 670